Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20210S769 | 12 August 1999 | Rev 10 to 6610-PLN-4200.02, TMI Emergency Dose Calculation Manual | Met Tower |
ML20206R653 | 13 May 1999 | Rev 39 to TMI Modified Amended Physical Security Plan | |
ML20204B529 | 12 March 1999 | Rev 9 to 6610-PLN-4200.02, TMI Emergency Dose Calculation Manual (Edcm) | |
ML20154D549 | 1 October 1998 | Cancellation Notification of Temporary Change Notice 1-98-0066 to Procedure 6610-PLN-4200.02 | |
ML20206C091 | 1 September 1998 | Rev 17 to Odcm | Shutdown Margin Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Power change |
ML20216E975 | 13 April 1998 | Emergency Dose Assessment Users Manual, for Insertion Into Rev 7 of Edcm | Met Tower |
ML20216E949 | 9 April 1998 | Rev 7,Temporary Change Notice 1-98-003 to 6610-PLN-4200.02, Edcm, Changing Pages 2 & 57 & Adding New Emergency Dose Assessment Users Manual | |
ML20202B206 | 30 January 1998 | Rev 7,Temporary Change Notice 1-98-0013 to 6610-PLN-4200.02, Edcm | |
ML20217M725 | 22 June 1997 | Rev 16 to Procedure 6610-PLN-4200.01, Odcm | Shutdown Margin Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report |
ML20138B464 | 6 May 1996 | Rev 14 to Procedure 6610-PLN-4200.01, Odcm | |
ML20092M194 | 21 September 1995 | TMI-1 Pump & Valve IST Program | Boric Acid Stroke time |
ML20084N354 | 24 March 1995 | Rev 11 to 6610-PLN-4200.01, Odcm | Shutdown Margin Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Power change |
ML20137B537 | 22 March 1995 | Rev 11 to 6610-PLN-4200.01, Odcm | Shutdown Margin Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Power change |
ML20081C128 | 8 March 1995 | Svc Water Sys Operational Performance Insp Self-Assessment Plan | Biofouling |
ML20073F941 | 26 September 1994 | Revised Plan for Long Range Planning Program for TMI Nuclear Station Unit 1 | |
ML20059M230 | 12 November 1993 | Rev 7 to 6610-PLN-4200.01, Odcm | |
ML20057B378 | 2 September 1993 | Rev 6 of Solid Waste Staging Facility Sys Description | |
ML20127A218 | 15 October 1992 | Rev 1 to 6615-PLN-4520.01, REMP - Plan | Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report |
ML20127A230 | 11 August 1992 | Rev 30 to Emergency Procedure 1202-32, Flood | Boric Acid |
ML20090D403 | 4 October 1991 | Rev 16 to Waste Solidification Process Control Program | Process Control Program |
ML20082M299 | 29 August 1991 | Rev 8 to Operating Procedure 1104-28I, Waste Solidification Process Control Program | Boric Acid Process Control Program |
ML20127A151 | 8 July 1991 | Rev 4 to 1000-PLN-4010.01, Gpu Nuclear Corp Radiation Protection Plan | High Radiation Area Locked High Radiation Area |
ML20082M295 | 27 June 1991 | Rev 14 to Operating Procedure 1104-28I, Waste Sodification Process Control Program | Boric Acid Process Control Program |
ML20198B974 | 17 June 1991 | Rev 2 to 6610-PLN-4200.02, TMI Emergency Dose Calculation Manual | |
ML20070L333 | 15 March 1991 | Rev 1 to 6610-PLN-4200.02, TMI Emergency Dose Calculation Manual | Met Tower |
ML20070U924 | 4 March 1991 | Rev 0 to 6610-PLN-4200.01, Odcm | Offsite Dose Calculation Manual |
ML20059H903 | 7 September 1990 | Rev 0 to 6610-PLN-4200.02, TMI Emergency Dose Calculation Manual | |
ML20059C793 | 23 August 1990 | Rev 5 to Sys Description 3184-007, Solid Waste Staging Facility | |
ML20006C057 | 18 January 1990 | Public Version of Rev 33 to Crisis Mgt Implementing Procedure CMIP-1, Recovery Manager & Immediate Staff & Rev 24 to CMIP-2, News Group Plan. | |
ML15264A157 | 2 January 1990 | Revised Crisis Mgt Implementing Procedures,Including Rev 32 to CMIP-1,Rev 29 to CMIP-4,Rev 33 to CMIP-5,Rev 38 to CMIP-6,Rev 37 to CMIP-7,Rev 32 to CMIP-9,Rev 1 to CMIP-14 & Rev 30 to CMIP-21 | Health Physics Network |
ML16152A895 | 2 January 1990 | Rev 33 to Public Version of Crisis Mgt Plan for Nuclear Stations. | |
ML20012A375 | 1 January 1990 | Rev 25 to, Offsite Dose Calculation Manual,Cawtaba Nuclear Station. | Offsite Dose Calculation Manual |
ML20012A377 | 1 January 1990 | Rev 26 to, Offsite Dose Calculation Manual McGuire Nuclear Station. | Boric Acid Offsite Dose Calculation Manual |
ML20012A379 | 1 January 1990 | Rev 27 to, Offsite Dose Calculation Manual,Oconee Nuclear Station. | Offsite Dose Calculation Manual |
ML20012A380 | 1 January 1990 | Rev 28 to, Offsite Dose Calculation Manual,Oconee,Mcguire & Catawba Nuclear Stations. | Offsite Dose Calculation Manual |
ML20012A369 | 5 December 1989 | Rev 8 to, Process Control Program,Mcguire Nuclear Station. | Process Control Program |
ML20011D244 | 1 December 1989 | Crisis Mgt Implementing Procedures. | |
ML19351A437 | 30 November 1989 | Rev 9 to 9110.PLN-4200.02, Emergency Dose Calculation Manual. | Power change |
ML20012A372 | 27 November 1989 | Rev 4 to, Process Control Program,Cawtaba Nuclear Station. | Boric Acid Process Control Program |
ML20012A373 | 15 November 1989 | Rev 4 to, Process Control Program Oconee Nuclear Station. | Process Control Program |
ML19325F193 | 1 November 1989 | Public Version of Rev 32 to, Crisis Mgt Plan for Nuclear Stations. | Safe Shutdown |
ML19332C845 | 1 November 1989 | Public Version of Revised Crisis Mgt Implementing Procedures,Including Rev 31 to CMIP-1,Rev 28 to CMIP-4,Rev 32 to CMIP-5,Rev 37 to CMIP-6,Rev 36 to CMIP-7,Rev 25 to CMIP-8,Rev 31 to CMIP-9 & Rev 19 to CMIP-13 | Health Physics Network |
ML20248D407 | 27 September 1989 | Rev 8 to 9100-PLN-4200.02, TMI Emergency Dose Calculation Manual | Grab sample Met Tower Power change |
ML20247H337 | 15 September 1989 | Revised Corporate Organization for Nuclear Incidents (Coni) Procedure Manual Including Rev 15 to CONI-1.01, Preparation,Issuance & Control Procedures, Rev 30 to CONI-1.02, Coni & Rev 19 to CONI-1.03, Alerting .. | Boric Acid Earthquake Fatality |
ML20245L765 | 7 August 1989 | Rev 0 to Offsite Dose Calculation Manual | Offsite Dose Calculation Manual |
ML20245K121 | 2 August 1989 | Rev 4 to SD 3184-007, Div Sys Description for Solid Waste Staging Facility | |
ML20247M792 | 31 July 1989 | Rev 6 to PWR Operations Guideline Number 12 Simulator Testing Program. Simulator Transient Test Review Data Encl | Boric Acid Stroke time |
ML20247M915 | 27 July 1989 | Procedure Generation Package | |
ML20244C296 | 30 June 1989 | Rev 1 to Sys Description SD 3510-013, Div Sys Description for Reactor Bldg Sump Recirculation Sys | |
ML20247N042 | 19 June 1989 | Rev 5 to SS-1, Braidwood Simulator Steady State Performance Test |