Issue date | Title | Topic | |
---|---|---|---|
ML20212B574 | 5 September 1999 | Rev 11 to 2000-ADM-4532.04, Oyster Creek Emergency Offsite Dose Calculation Manual | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report |
ML20101P156 | 31 March 1996 | Rev 9 to Oyster Creek Nuclear Generating Station Pump & Valve IST Program | Safe Shutdown High Radiation Area Stroke time |
ML20073F950 | 26 September 1994 | Revised Plan for Long Range Planning Program for Oyster Creek Nuclear Generating Station | |
ML20073F941 | 26 September 1994 | Revised Plan for Long Range Planning Program for TMI Nuclear Station Unit 1 | |
ML20072Q425 | 20 August 1994 | Rev 0 to Oyster Creek Nuclear Generating Station Sea Turtle Surveillance,Handling & Reporting Instructions for Operations Personnel | |
ML20070J797 | 31 July 1994 | Rev 8 to Oyster Creek Nuclear Generating Station Pump & Valve Inservice Testing Program | Safe Shutdown Stroke time |
ML20078A782 | 24 June 1994 | Purge & Vent Containment Isolation Valves Resilient Seal Maintenance/Surveillance Program & Technical Basis | |
ML20064G539 | 14 January 1994 | Rev 0 to Div I Mod Design Description MDD-OC-622-C Div I, Replacement of Recirculation Flow Monitoring Electronics | Half scram |
ML20046B527 | 29 July 1993 | Emergency Operating Procedures for Oyster Creek,Including Rev 1 to 2000-EMG-3200.01A,.01B,.04A,.04B,.08A,.08B,Rev 2 to 2000-EMG-3200.12,Rev 4 to 2000-EMG-3200.05,Rev 5 to 2000-EMG-3200.10,.11 & Rev 9 to 2000-EMG-3200.02 | Boric Acid Squib Hardened vent |
ML20045E693 | 28 June 1993 | Rev 52 to Procedure 2000-RAP-3024.01, NSSS Annunciator Response Procedure. | |
ML20056C315 | 7 May 1993 | Rev 1 to Vol IV of Gpun ISI & NDT Manual | VT-2 Scram Discharge Volume Dissimilar Metal Weld |
ML20085L414 | 31 October 1991 | Rev 7 to Pump & Valve Testing Program | Safe Shutdown High Radiation Area Stroke time |
ML20086B513 | 16 July 1991 | Rev 5 to Radiological Controls Policy & Procedure Manual 9300-ADM-4010.03, Oyster Creek Emergency Dose Calculation Manual | Met Tower |
ML20062G864 | 4 October 1990 | Rev 0 to Functional Requirements for Augmented Drywell Insp | |
ML20062B940 | 17 September 1990 | Rev 2 to TR-050, Gpun Response to Generic Ltr 88-01 & NUREG-0313,Rev 2 | Packing leak Weld Overlay Hydrostatic Pressure Boundary Leakage Through-Wall Leak |
ML20043C251 | 25 May 1990 | Rev 4 to Radiological Controls Policy & Procedure Manual 9300-ADM-4010.03, Emergency Dose Calculation Manual. | Met Tower |
ML20245K744 | 6 June 1989 | Rev 3 to 9300-ADM-4010.03, Oyster Creek Emergency Dose Calculation Manual | |
ML20246B622 | 25 March 1989 | Rev 2 to 9300-ADM-4010.03, Oyster Creek Emergency Dose Calculation Manual | |
ML20195K051 | 26 May 1988 | Oyster Creek,12R Outage,Igscc Insp/Stress Improvement Plans | |
ML20147F933 | 25 August 1987 | Rev 3 to Procedure 1000-ADM-1291.01, Procedure for Nuclear Safety & Environ Impact Review & Approval of Documents | Safe Shutdown Offsite Dose Calculation Manual Process Control Program Fire Protection Program Scaffolding |
ML20204B413 | 12 March 1987 | Rev 5 to Pump & Valve Inservice Testing Program | High Radiation Area Stroke time Scram Discharge Volume Excess Flow Check Valve |
ML20062G852 | 19 February 1987 | Rev 8 to Functional Requirements for Drywell Containment Vessel Thickness Exam | |
ML20205E789 | 7 August 1986 | Rev 0-03 to Corporate Procedure 1000-ADM-1291.01, Safety Review & Approval Procedure | Safe Shutdown Earthquake |
ML20214S662 | 9 April 1986 | Rev 0 to Emergency Preparedness Exercise Scenario 6. W/Four Oversize Maps | |
ML20205E705 | 9 March 1986 | Rev 2 to Oyster Creek Nuclear Generating Station Procedure 105.3, Maint of Oyster Creek Environ Qualified Equipment | Safe Shutdown |
ML20205E673 | 21 February 1986 | Rev 1-01 to Procedure 5000-ADM-7311.03, Project Reviews | |
ML20209H311 | 31 October 1985 | Emergency Operating Procedure Writer'S Guide | |
ML20138J382 | 22 October 1985 | Rev 2 to Standing Order 38, Reactor Low Level Alarm Response W/Yarways Out of Svc | Reactor Vessel Water Level |
ML20138J138 | 3 October 1985 | Rev 16 to Procedure 116, Surveillance Test Program. W/ Cross-Ref of Surveillance Procedures & Tech Specs | Fire Barrier Missed surveillance Scram Discharge Volume |
ML20205E679 | 13 September 1985 | Rev 1-01 to Technical Functions Div Procedure 5000-ADM-7313.01, Mod & Sys Design Descriptions | Safe Shutdown Fire Protection Program |
ML20205E655 | 14 June 1985 | Rev 0-01 to Technical Functions Div Procedure 5000-ADM-7317.01, Equipment Environ Qualification | Safe Shutdown Anticipated operational occurrence |
ML20205E726 | 31 May 1985 | Rev 0-00 to Corporate Procedure 1000-POL-7317.01, Environ Qualification of Equipment | Safe Shutdown Fire Protection Program |
ML20205E795 | 1 February 1985 | Safety Review Training Program Description. Related Info Encl | |
ML20095C683 | 25 July 1984 | Rev 1 to Procedure 125, Engineering Calculations & Technical Evaluations | |
ML20090J329 | 10 May 1984 | Annual Exercise Scenario,840510 | |
ML20082G622 | 1 October 1983 | Offsite Dose Calculation Manual | Offsite Dose Calculation Manual |
ML20077L642 | 29 July 1983 | Procedure Generation Package for Emergency Operating Procedures | Scram Discharge Volume |
ML20076K354 | 30 June 1983 | Program Plan for Control Room Human Factors Review at Oyster Creek Nuclear Generating Station | Excess Flow Check Valve |
ML20085J078 | 20 May 1983 | Public Version of Revised Emergency Plan Implementing Procedures EPIP-1 Re Classification of Emergency Conditions, EPIP-4 Re Site Emergency & EPIP-5 Re General Emergency | Safe Shutdown Earthquake Fuel cladding |
ML20071Q383 | 5 May 1983 | Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures EPIP-5 Re General Emergency, EPIP-1 Re Classification of Emergency Conditions & EPIP-3 Re Alert | |
ML20028D726 | 22 December 1982 | Public Version of Revised Emergency Plan Implementing Procedures EPIP-07 Re Personnel injury,EPIP-09 Re Offsite Dose Projections & EPIP-22 Re Search & Rescue Operations | |
ML20065A152 | 2 November 1982 | Public Version of Rev 1 to Emergency Plan Implementing Procedures EPIP-26 Re Activation of Technical Support Ctr & EPIP-27 Re Activation of Operations Support Ctr | |
ML20023B078 | 23 September 1982 | Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures EPIP-10 Re Emergency Radiological Surveys Onsite & EPIP-25 Re Nearsite Emergency Operations Facility (Neof) | |
ML20069F203 | 17 August 1982 | Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures EPIP-1 Re Classification of Emergency conditions,EPIP-2 Re Unusual Event & EPIP-3 Re Alert | Safe Shutdown Earthquake Fuel cladding |
ML20063G126 | 1 July 1982 | to Tech Spec for Water Quality | Grab sample |
ML20050D369 | 12 March 1982 | Public Version of Emergency Plan Implementing Procedures, Including Procedures EPIP-01 Re Classification of Emergency conditions,EPIP-02 Re Unusual Event & EPIP-03 Re Alert | Safe Shutdown Met Tower Earthquake Fuel cladding |
ML20039A722 | 24 November 1981 | Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures EPIP-1 Re Classification of Emergency conditions,EPIP-2 Re Unusual Event & EPIP-3 Re Alert | Earthquake Fuel cladding |
ML20064N273 | 24 September 1981 | Inservice Insp-Plan B | |
ML20009C271 | 7 July 1981 | Process Control Program for In-Container Solidification of Concentrated Liquid Waste & Filter Sludge. | Safe Shutdown Process Control Program Earthquake |
ML20080Q617 | 21 May 1981 | Rev 0 to Stress Analysis for Demonstration of Operability of Purge & Vent Valves During Dbas | Hydrostatic |