ML20095C683

From kanterella
Jump to navigation Jump to search
Rev 1 to Procedure 125, Engineering Calculations & Technical Evaluations
ML20095C683
Person / Time
Site: Oyster Creek
Issue date: 07/25/1984
From:
GENERAL PUBLIC UTILITIES CORP.
To:
Shared Package
ML20095C663 List:
References
125, NUDOCS 8408230101
Download: ML20095C683 (7)


Text

. . . _ _ . .

l ENCLOSURE 1 MUClear OYSTER CREEK NUCLEAR GENERATING STATION PROCEDURE 125 Title Revision No.

Conduct Of Plant Engineering .

. FORM 125-1 ENGINEERING CALCULATIONS AND TECHNICAL EVALUATIONS Prepared By: PETA NO.

DATE Calculation (s) Required: YES NO Technical Evaluation (s) Required: YES NO .

Reference Documentation Sunnary Form 125-2 Required: YES NO 3

Description:

A I

3- Independent Review Required: YES NO l

f

~

R'eviewed and Accepted By:

1 3

l < Comments:

\

l 8408230101 840810 POR ADOCK 05000219 G PDR E3-1

Nuclear -

OYSTER CREEK NUCLEAR GENERATING STATION PROCEDURE 125

    • Rews n No.

Conduct Of Plant Engineering ,

1 FORM 125-2 I REFERENCE DOCUMENTATION

SUMMARY

l .

A. Task Closeout Documentation Applicable Initial

1. Response provided to task originator  ;
2. Completed " Modification Control Package"  ; -

(Procedure 124) j

3. Completed task flie with QAF-14 Form for filing in D.C.C.

9

4. Other:

e 8.

Actions Performed for Task Completion

1. Procedures revised (attach list) l-a-  !

l

2. Drawing changes initiated .

l

3. Vendor manuals reviewed / update initiated l 4. 125-1 Forms completed for  !

calculations and evaluations - l S. Training Department nottfled i

6. Required Reading issued (# )

Plant walkdown/ verification (attach list I

! 7.

of areas and justification) l

8. Warehouse checked for components with deficiency  ;
9. Iristrument Shop checked for 5 components with deficiency
10. Electrical Shop checked for l

i 5 components wtth deficiency

11. %chanical Shop checked for components with deficiency ll j
12. Spare Parts Group notified g

of deficient component 2

AOOO105011 82 E4-1

Number Nuclear OYSTER CREEK NUCLEAR GENERATING STATION PROCEDURE 125 Title Revision No.

-- Conduct Of Plant Engineering - ,.

1 l

FORM 125-2 (Cont'd)

REFERENCE DOCUMENTATION

SUMMARY

l Applica.ble Initial

13. Purchasing notified of deficient ',

component

14. Technical Functions notified of deficient component -
15. Warehouse notified of deficient component c
16. QA notified of deficient component
17. Deficient component log updated  :

- 18. Inout provided to NOMIS _

19. Input prov;ded to Nuclear Network
20. Input provided to NPROS
21. Electrical Load Study Updated
22. Others: _

C. Data Bases Utilized in Task Completion

1. Plant Procedures
2. Corporate Procedures
3. Technical Functions Procedures
4. M&C Procedures 3 5. QA Procedures

=

6. SU&T Procedures 5 7. Plant Drawings

! 8. Vendor Manuals I

k A000105011 82 i -

E4-2

I OYSTER CREEK NUCLEAR GENERATING (UCl Gar STATION PROCEDURE 125

" Revisi n Na g- Conduct Of Plant Engineering -

1 FORM 125-2 (Cont'd)

REFERENCE DOCUMENTATION

SUMMARY

Applicable Initial

9. CARIRS .

9.1 Procedure Data Base  ;

9.2 Drawing Data Base  !

9.3 , Library Data Base l

10. Spare Parts Inventory Printout -
11. Instrument Cards ,
12. Instrument List
13. Valve List l
14. Equipment History Cards i
15. PM Checksheets
16. Procurement Requisitions  :

1

17. Purchase Orders l
18. Specifications j
19. Receipt Inspections (Receipt Deficiency  !

Notice) '

20. Procurement Quality Assurance .

Documents . l

21. Material Non-conformance Reports  ;
22. Quality Deficiency Reports j l
23. SQCL List l  :
24. QA Plan

=

2 25. NDE Documentation El j' 26. Technical Data Reports 1

( i=

Ao008050Il 82 E4-3

\

I U l

l l

Nuci CYSTER CREEK NUCLEAR GENERATING r STATION PROCEDURE 125 Revision No.

  • Conduct Of Plant Engineering 1 l FORM 125-2 (Cont'd)

REFERENCE DOCUMENTATION

SUMMARY

Appitcable Initial

27. FDSAR/FSAR -

l

28. Technical Specifications l
29. Reportable Occurrences l-
30. Licensee Event Reports
31. I&E Inspection and Audit Reports ,-
32. Regulatory Guides .
33. Nuregs
34. Code of Federal Regulations l

' 35. 10 CFR 21 Reports l l

36. Codes and Standards i
37. EPRI Reports l
38. Environmental Qualification Reports l
39. Outage Reports .
40. Annual and Semtannual Operation Reports i
41. Preoperational SU&T Results

, 42. Modification SU&T Results .

I

. 43. PORC Minutes 5 44. GORB Minutes

45. Engineering Tasks E

'46. Technical Functions Mork Requests

{

ll 47. Licensing Action Items l  ! 48. M&C Short Forms A00010501l.82 E4-4

Numbw

$UCl$$f l OYSTER CREEK NUCLEAR GENERATING l STATION PROCEDURE 125 Title Revision No.

Conduct Of Plant Engineering -

1 FORM 125-2 (Cont'd)

REFERENCE DOCUMENTATION

SUMMARY

Applicable Initial

49. M&C Work Requests -
50. Station Operating Logs and Charts
51. 0.C.D.C.C. Flie Index -
52. Plant Personnel (attach list of names and titles) .
53. Plant Walkdowns/ Verifications (attach list of areas) -

5'4. NOMIS _

' ~

55. Nuclear Network
56. NPRDS
57. GE SILs, TILs and SAIs
58. Other vendor service letters
59. Others: -

1 Plant Engineering Task # l Completed By:

Approved By:

l h l s

m 5

I .

t

t i

k l

( i 2 -

, AOOO105011-82 l E4-5 I

Enclosure 2 .'

REVIEW AND APPROYAL AUTHORITY

~ ^

, - a +

' ' t

. ii.

Correspondence establishing Correspondence connitting Correspondence providing . Correspondence providing major policy or making a resources and scheduling. technical infonnation technical information that -

significant new conesitment. compatible with current generated for this reply. was previously. published

i. , ongoing GPUN plans. '

including written confinea-

! ' i

~ tion of required immediate ,

e-

. notification to NRC.

b. '

7 ,. 3-l

_ p 3 1 Preparer 1. Preparer- 1. Preparer ;_ l. Preparer 7~.

s-4

./

g

~? g
2. Preparer's Management 2. Preparer's Management- '2.' Preparer's Management 2. Preparer's Management

, w l 3. Cognizant Division 3. Cognizant Division 3. Appropriate Department 3. Licensing Management

Directors which are Mananagers which are Director / Manager affected by conaitment affected by commitment 4
4. Licensing Management 4. Licensing Management 4. Licensing Management 4. OC Plant Operations Director
5. Vice President GPUN 5. OC Plant Operations 5. OC Plant Operations S. VP and Director  ;

Director Director Oyster Creek '

~

l j 6. VP and Director 6. VP and Director

Oyster Creek Oyster Creek l,

4

- _