ML20023B078

From kanterella
Jump to navigation Jump to search
Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures EPIP-10 Re Emergency Radiological Surveys Onsite & EPIP-25 Re Nearsite Emergency Operations Facility (Neof)
ML20023B078
Person / Time
Site: Oyster Creek
Issue date: 09/23/1982
From:
GENERAL PUBLIC UTILITIES CORP.
To:
Shared Package
ML20023B076 List:
References
PROC-820923, NUDOCS 8212210557
Download: ML20023B078 (39)


Text

'

=

C P? pry _ug No, i Ps e 1 Cf 10 B (p 1: A / [ W l t a u,e anev. cat.

Mmey Central 19781 (11/03/82) 11/13/82 Power & Light Company emision No.

1 Cate 9/23/82 Sucjec:: Emergency Radiological Surveys On-Site Autncn:sc Ey Director-StationOperations!

cccc .. /)

Accrevan&

./  ?&urrense42&ut:dd. f -

Oyster Creek Nuc1 Generating. Station J

LIST OF EFFECTIVE PACES DATE REVISION NUMBER 1 9/23/82 1 2 9/23/82 1 1 3 9/23/82 1

)

4 9/23/82 1 5 9/23/82 1 6 9/23/82 1 7 9/23/82 1 8 9/23/82 1 9 9/23/82 1 10 9/23/82 1 ATTACHMENTS Attachment 1 (2 pages) 9/23/82 1 Attachment 2 (2 pages) 9/23/82 1 Attachment 3 (1 page) 9/23/82 1 Attachment 4 (1 page) 9/23/82 1 b

  • f lj - (_*. f'; [ 5 "i." P :O ! l.. [--a l , , c ,, 12 2 . , . r,.,

g

  • g** { ,2 4* * , j 8212210557 021213 PDR ADOCK 05000219 i F PDR l

a

- ~ - . -

Sustest Proceewe Na

""-m  %> d to  %

Emergency Radiological Surveys On-Site Rension N& Qate 1 9/23/82 l

1.0 PURPOSE The purpose of this procedure is to provide guidance te On-Site radiation monit'o ring teams during declared ~ emergencies. The' On-Site Monitoring Teams are responsible for implementing this procedure.

2.0 ATTACHMENTS 2.1 Attachtpsnt #1 - On-Site Monitoring Points 2.2 Attachment #2 - On-Site Monitoring Checklist 2.3 Attachment #3 - Dose Rate Survey and Air Sample Log 2.4 Attachment #4 - Contamination and Biotic Media Survey Log 3.0 EMERGENCY ACTION LEVELS 3.1 This procedure is to be initiated upon any of the following conditions:

3.1.1 Alert (as determined by Procedure EPIP-3) 3.1.2 State Emergency (as determined by Procedure EPIP-4) 3.1.3 Ceneral Emergency (as determined by Procedure EPIP-5) 3.1.4 Upon direction of the Emergency Director.

4.0 EMERGENCY ACTIONS 4.1 If Operations Support Center is activated, On-Site Monitoring Team members will report to the Radiologicals Control Coordinator.

Otherwise, report to the Radiological Controls representative in the Control Room.

4.2 Obtain a copy of EPIP-10 from the Operations Support Center or Control Room. Utilize Attachment 2 to document procedural actions re ferencing the section listed for guidance. Record time and initials af ter completion of each step.

ee- w e ,p.-.m -

~

. . . .., . .S.. .-. . . , . . .

Faergency Radiological Surv:ys On-Sito IF  %

3 g 10 Aension No. 1 Cefe9/23/82

^

/ .

4.3 Proceed to Technical Support Center Emergency Locker to obtain dose rate meter, count rate meter and scaler for emergency vehicle.

4.4; Obtain emergency:. monitoring vehiele key at. the . pain . Gate Processing

~

Ce nter.

NOTE: If personnel dosimetry. is required, obtain TLD and self-reading dosimeter from kit and initiate dose card.

Rezero dosimeter at 3/4 full scale reading, updating dose ca rd. ,

4.5 Verify that emergency monitoring kit is locked. If monitoring kit is not locked, completely inventory the kit per Procedure 108.2, using the inventory checklist for emergency monitoring kit which is included in the kit. Note any deficiencies and transmit to RCC cr 5 Rad Con Representative in Control Room when radio check is performed. Operationally check radiation detection instruments.

4.5.1 Visually inspect instruments for physical damage.

4.5.2 If applicable, ver1fy battery condition by turning instrument switch to " battery" position. Replace batteries

. if nec'essary."

4.5.3 verify radiation response by placing detectors of count rate meter and dose rate meter per instructions on source template. Turn range, scale. to appropriate range of check l

' - reading marked on source template.

4.5.4 Take a 1-minute re'ading with scaler and verify that check reading falls within the range c.arked on the instrument.

6

. . . . . -- .. ~ S. ,. . . . . .- - . - . .

_ & Se

. _: . . .. . .i~ .m Proceewe No.

, susper

of pope cove _3 n PS# 4 m Emergency Radiological' Surveys On-Site Remsien No. Cate 1 a/23/82 l

l 4.5.5 If instrument source checks are. outside range, repeat twice. If two out of three checks fall within range,

~ ~' ' '~

"Ynstrument is satisfactory.

l 4.5.6 On At tachmeat 2, circle " SAT" or "UNSAT" for each l

respective instrument in Section 5. if "UNSAT* is circled, l

state the reason in the space provided.

4.6 Operationally check air sampler and power supply.

4.6.1 Start gasoline-driven generator per instructions labeled on generator housing. When " power" light illuminates, plug in air sampler to test operability.

4.6.2 If installed, check operability of DC/AC invert er by operating air sampler.

4.6.3 On Attachment 2, circle " SAT" or "UNSAT" in Section 6. If "UNSAT" is circled, state the reason in the space provided.

4.7 Upon completion of equipment checks, conduct a radio check with the RCC or Rad Con representative in the Control Room. Inform the RCC or Rad Con representative of emergency monitoring kit status, radiation detection instrument status and air sample power supply status.

Await further instructions from the RCC or Rad Con representative.

NorE: Ensure that dose rate meter is continuously operating and that exposure to the plume is ALARA.

4.8 hpon direction of the RCC or Rad Con representative, proceed to the I

specified on-site monitoring locations. Refer to Attachment i for r

directions.

(

- ....-. ~ . . . . . .

. . . . . . ... . . . . . . on- t e_. ._

~.t , Y ~ ~. 5.'. $5-.. - -

- 2= -

' Pmeseure Me.

Suareer:

EPIP-10 p,,. 5 g 10  %

Emergency Radiological Surveys On-Site Aemsior No. g cate9/23/82 f

4.9 Upon arrival at the on-site monitoring location, notify the RCC or Rad Con representative.. Perform radiological surveys .as directed by

- . ,- . . . . . .,..w. . . . - , ... . . . , .  ;. .,

the. RCC or Rad Con re presentative. Record Model No., Serial No., ,

1

\

Date Calibrated and Initials for Instruments at the bottom of . ,

1 Attachments 3 and 4.

4.9.1 To obtain dose rate, exic vehicle and take a reading at

  • waist level; sta rting at the highest scale of the instrument and working to lower scales. Record Monitoring Location Number f rom Attachment 1 or as designated by RCC or Rad Con Reprasentative, Time of Survey, dose rate and initials on Attachment 3. Transmit all data to the RCC or Rad Con representative.

i 4.9.2 Complete air samples . and counting as follows: Record data on Attachment 3.

4.9.2.1 Obtain AC Power for air sampler by use of the gasoline generator (or DC/AC inverter if installed) or' local AC receptacle.

- 4.9.2.2 Place a particulate filter (rough side out) and a l silver zeolite cartridge in the sampic holder of the air sampler. Place the air sampler outside I

the vehicle. Plug the AC cord of the air sampler into the 110 volt outlet of the power supply.

Note time and turn sampler to ~0N". Run sample for ten minutes. Turn air sampler and generator "0FF". Record time on Attachment 3.

( NOTE: Total Flow (ce) = 60 L x 10 min. x 1000cc = 6.0E+05 min L

. , . . ~ . . . .

. u. . . . , . . . . . . . . .

i l.f L. - . . - . . .n .. . . . . . .

I Suevose Proenewe Ne.

Emergency Radiological' Surveys On-Site- EPIP-10 Pege 6 g 10 %

"'""*"" 1 Cate9/23/82 4.9.2.3 Remove particulate filter from air sample holder with tweezers and place in , sample envelope.

' Record monitiiring location land dat'e 'and# t'imf.of- '

~ ~

, sample on sample envelope. Retain for submittal .

to RCC for analysis.

NCTfF.: If count rate meter indicates that background a radiation is greater than 300 cpm, notify the RCC

. or Rad Con representative and proceed to an area less than 300 cpm to count the air sauple.

4.9.2.4 To count the air sample,' place an unused silver zeolite ca rtridge in the sample holder.~ Place the detector on the sample holder.

4.9.2.5 Place function switch of scaler to "10-minute" position and initiate counting cycle. Divide scaler dispisy by 10 to obtain background counts per minute, (BCPM). Record on Attachment 3.

Remove unused silver zeolite cartridge.

4.9.2.6 Place air sample silver zeolite cartridge in sample holder with upstream (side facing out of air sampler sample holder) beneath the detector.

Count sample on scaler for ten minutes. Divide final scaler display by 10 to obtain gross counts

) s per minute. Record on Attachment 3.

\

s

.- f-

..g.........1,.,,...,... -y,.. ..,.y.,.v.,.. ..

-. ~m ev

.+

. , .- D .: . . a. .

~

. . . .a . . . -. - . . . . . , ..-. a.- . . . -

% evest:

Pressews %

Emergency Radiological' Surveys On-Site EPIP-10  % 7 g 10 g Aension h g Cote 9/23/82 f .

4.9.2.7 Remove silver zeolite ca rtridge from sample holder and , place in sample envelope. Record monito ring location, date and- time of sample.-

,,. . 1 ....

Retain for ' submittal'to' the RCC for an'alysis.

4.9.2.8 Calculate net counts per minute by subtracting background counts per minute from gross counts per minute (GCPM - BCPM = NCPM). Record on Attachment 3.

4.9.2.9 Obtain the scaler efficiency in percent from the label on the instrument. Record on Attachment 3.

4.9.2.10 Transmit monitoring location, time, net counts per minute (NCPM) and percent scaler efficiency 9

\ to the RCC or Rad Con representative.

4.9.3 Perform a contamination survey as directed by the RCC or Rad Con representative. Record on Attachment 4. Obtain smear discs and sam1 2 e envelopes from the monitoring kit and label with date, time and monitoring location. Wipe

- the smear disc over a smooth surfaced 4"x4" (100cm )

area. Determine the background counts per minute (BCPM) with the count rate meter.' If BCPM are greater than 300 cps, notify the RCC and proceed to an area less than 300 cpm to count the smear. Obtain gross counts per minute (GCPM) by counting' the smear on the count rate meter.

Subtract BCPM from GCPM to obtain net counts per minute (NCIH). (GCPM - BCPM - NCPM). Calculate disintegration 100cm2

\,

3,'**, , * * . * * *

~.......-m,.. ~.s-...e,*. s . , .r - . . . *.~...w.,em=+

.. 7 , . ..

w e

. . . " . . e.. u. .. . .

.. _ . . . . ~..

Preseawe Ne.

Sne,est: EPIP-10  % 8 g 10 p.g.,

Baergency Radiological' Surveys On-Site

'" " 1 Cafe 9/23/82 l f~ l per minute /100cm by moltiplying NCPM by an efficiency

= dpm/100cm ). Record factor of ten (NCPM/100cm x 10

. .c .

GCPM,"BCPM- NCPM/100cm *.and DPM/100 cm .on! Attachment 4.

' 4 -

... . .. 4 s. . ,.

2 -

~

Trans,it to RCC m monitoring loc'ation, time and dpm/100cm .

or Rad Con representative. Retain smear in sample envelope for later analysis as directed by the RCC or Rad Con

  • representative. .

4.9.4 Perform. soil samples as directed by the RCC or Rad Con representative. Record on Attachment ,4.

Obtain a plastic sample container and trowel from the monitoring kit. Choose a sample area free from leaves, grass or vegetation. Using the trowel, scrape up and place

( in .the container the top 2" of soil until container is full. Perform a contact radiation survey with the dose rate meter.

I.abel the container with time, date, dose rate and monitoring location. Record all data on Attachment 4.

- Transmit dose rate of soil sample to RCC. Retain sample for later analysis as directed by the RCC.

A.9.5 Obtain' water samples as directed by the RCC or Rsd Con representative.

l i acrew-top water sample bottle from Obtain plastic monitoring kit. ' Remove top, submerge bottle in water (taking care not to disturb sediment) and fill bottle from the surface of the water. Recap bottle. Perform a contact i

~ ~ - ~ - -

_;. ..-. m 7.. w - .,

.a

g...,.-,-,...s-.(.

.'..;. . . V.  :,. . .

':s . w . .... __.;,.,,,,,.

Proeseure ige, Suevesc Emergency Radiological' Surveys On-Site EPIP-10 g 9 ,10

~

Reusson Ne. 1 Cate9/23/82 radiation survey with the dose rate meter. Label bottle Record

, .w i..th d.i. me, date, dose rate and monitoring location.

~4'. .

  • Transmit . dose /. rate of water .

~ -

' ' ' all 'da'ta ~ onN 'tachment t

' ' ~~

'~ '

's' ample bo RCC or Rad Co'n rep'resen'tative. "Rdtain samp1'e~ for .

by the RCC or Rad Con later analysis as directed representative.

, 4.9.6 Obtain vegetation samples as directed by the RCC or Rad Con I representative. Obtain clippers and mediu.a plastic bags from the monitoring kit. Choose green (living) vegetation for sampling. Clip off vegetation and place in sample bag, taking care not to include soil, large branches or roots.

Take as large a sample as can fit in the bag. Tape the bag ,

i l'

s' closed. Perform a contact radiation survey with . the dose rate meter. Label with time, date, dose race and monitoring  !

location. Record all data on Attachment 4. Transmit dose l rate of vegetation sample to RCC. Retain sample for later analysis as directed by the RCC or Rad Con representative.

~

NOTE: . Use tkte radio to communicate with the RCC i, . Rad Con representative. If the radio is inoperative, call the RCC by telephone at the OCS -

4975/4770 or the Rad Con representative at the Control room at. 4666/4667.

4.10 Minimize personnel exposure by moving out of areas of axposure when Report performing calculations or 'avaiting further instructions.

personnel exposure to RCC or Rad Con representative and record all '

personnel exposures from dosimeter reading on Daily Exposure and k Access Cards and return them to dosimetry after completion of surveys.

.....,.-,-..,.:..--m.,_.,

y

.,4,,,.

~ ~ '

. 1 ' .. *. ; ; :. . ..

1... . a .. .

Suevest Presseure No.

- Emergency Radiological Surveys On-Site EPIP-10  % 10 g 10 .

Remsion No. 1 Cete9/23/82

- 4 __

4.11 Lintain all completed Attachments, 2, 3 and 4 and inventory checkli, sts f or. pe. rmanent records, as directed

... . . . , by the RCC or Rad Con

' c. . .-

-( ; ,

. g s gf i g g e t yg,,, .

5.0. . FINAL CONDITIONS .

5.1 on-site monitoring is no longer required when releases of radioactive material to' the environment have terminated and the Emergency Director has advised the RCC to recall the survey team (s).

5.2 Upon direction of the RCC, return the vehicle to the hin Cate Processing Center. Check vehicle fuel level, generator fuel ' level and perform a complete inventory of the Emergency Monitoring Kit per Procedure 108.2. Record fuel levels on Attachment 2, Section 11.

5.3 Submit vehicle key, Inventory Checklists and Attachments 2, 3, and 4 t

to RCC for his review.

5.4 Return TLD to Dosimetry.

l x  !

l b 1

  • -e. -=-.-==e.,...g . -s .r. m, , ap .

9 ., +,_,s ,g ., .

.,9 ..,...g...., ., .

.3- .'. ,, . 4 . .

..  ;. . .  :: : . v u. . . . . .. .. . . . - . . .

y 6

1 1 . m .

- ~ > .

w- -

y e n

m -

_ _a -

w

.1 , . .

>a 'I' -

.=

> 1

~~

-f C\ g s %,%9 .. _

^. g ,No 'd l l.g

[-

n ~

o t

~

,_ . b ,_

~

l ,

a

,/

1 , "

(1-uT . .

A

  • ota f f

. o

. . g .I 1

Il J. e., ,s .1 - ,4, i ,

(

'l E l,. .

/ .k ., l ,

,3-OJ -

y 7(r

) ij j r

....ln . . ..

x  : .  ; m

~'

'x j

. . s r A, ,,, //-Y /

j _

-ih ,s L

v

.g s- I .i . a t

(

Tw

/ W r Y cd f'

'. (3(

. 13Yfi I" N EE'.5 N : g d N g !/ E' ' ~ ]'l x- ,

  • *'- / \ $ i 8arm e g* * /

4 H!

M' , H.

c w 1J m l070M < vii f[IN @

n d

.i

/

t

/

I

-3

=": L / f\\ Nli -

-J I ',

g' +-

  1. g '*'
e. p [ r-j . \.

KN- / .

== =_. = 4 '/ w e ,

/

u.

4 :W-

.s., t

.t, g.,q  !

sc ,s l ne - e e mdg ase= ,M

\

- g up,0 ,

/

e-l is a m't E5E=g= -

E s

l

) .,E (p=='K

'l M:g_ ' s- M -

~,.'-

x/

">,,. c. . .T,',,,, -

9 i_- 6 \ n PA  %

7 fN *] N -

O-l y '. g - f ,,

I.

\ -

- s, ~

1

// 2 e

  • ik

.\ /,..

a..

~ -- -- - 1,,

e

\(a j.

i

\ ,; .,

I *

, ai  !

-l hql

,l C'( I

)

, c' i

  • y'! , 'a  %'i 3

/ x i

/

1 m .

x ,

x

/ \ y</..s .

t >c ,

b j.g.

p 3

1 Affachatnt 1

- . . . . ~ . .. , : ........ ,...... _,. . _ . . . . _

-.,.,,.y

.x

. 7 . -. .

l

l T** .'. . .;~ . .. - . . Li' L * . . ...

~ . . . .

7..

4 N

EPIP-10 Ngo 2 ef 2 Ngos Emergency Radiological. Surveys On-Site Rension h cote 1 9/23/82

' /

(

ATIACIDfENT 1 ON-SITE EMERGENCY MONITORING POINTS

1. trortheast' cdr'ner'~of 'the fence 'near the northwese cor' n er of the Materir.ls

- * .:. e *' ! ' Warehouse'W . ~ * */

.s

. . - + . ' ~ ' * ~. H f . ' ' . s ' . ~

  • u. .t d ;* <

.n ': .. . c' s n.

2. The southwest corner of the Materials Warehouse.
3. The southeast corner of the Materials Warehouse.
4. The intersection of the fence and railway sou.1 if the Materials Warehouse.
5. Corner of the fence southeast of the off Gas Building.
6. The fence at the northeast corner of the Parking Area souti2wes t of the Smoke Stack. .
7. The southwest corner of the Main Gate Guard House.
8. The northeast corner of the Diesel Generator Building.

(. 9. At the corner of the fence by the Condenser Outfall to the Discharge Canal.

10. At the fence by the light tower west of the Maintenance Building and southwest of the Torus Tank.
11. At the corner of the fence east of the North Gate Guard House.
12. Midway along the fence north of the trailers and between the North Gate and the Materials Warehouse.

l t

\ -...

.,on. a , .

-...... _. =- .- . . _ .

...,-.A. . , , . - . . . , . .

.,y7.,,..,y.,.....g,...,.......,--..... . ..

. . - . . ;t . . ,.:. . ., . . . .~ . ..w . . . . . . .. ...

i. -

~* 2 suavest: Preseewe me, Baerg:ncy Radiological Surviye On-Sito EPIP-10 Pege 1 w 2 peges

.o

) -

Renmen No. Qete i}

3 9/23/82 ---

ATTACHMEriT 2 ON-SITE MONITORING CHECKI.I*T DATE / /

ACTION 5teference . Time / Initials

. a., .. , .

.f .; .

. . . .li .)btain'ecpy .cf..EPIP 10, Initiate. . 3; . #. ,  :

..;,.t- ,- -

At tachment 2. 4.2 /

2. Obtain key to vehicle and instrumentation 4.3-4 /
3. Verify that monitoring kit is locked (sealed) 4.5 /
4. If applicable, don TLD and self-reading dosimeter 4.5 /
5. Inventory monitoring kit (if applicable) 4.5 /
6. Operationally check survey" instruments 4.5 /

6.1 Scaler SAT UNSAT _

4.5 6.2 Count Rate Meter SAT UNSAT 4.5 6.3 Dose. Rate Meter SAT UNSAT 4.5

7. Operationally check air sampler and power supply SAT UNSAT 4.6 /
8. Perform radio check and equipment status ~

transmission to RCC or Rad Con Represcutative 4.7 /

9. Ensure that dose rate meter is contin-uously operating 4.7 /
10. Proceed to on-site monitoring locations and perform radiological surveys as directed by RCC or Rad Con Representative 4.8 10.1 Obtain dose rate suivey for all loca-tions specified by the RCC or Rad Con representative and record on Attachment 3 4.9.1 10.2 obtain air sample and analyze with scaler for all locations specified by the RCC or Rad Con representative. Retain particu-late filter and silver zeolite cartridge and record data on Attachment 3 4.9.2 i ~.
1. . . - . . . . _ _ _

.. .. w. .... ,,. .p.;

. . . , . . - - - a. . .

... .: L . .. . . . . . . . . - .- . ~ . . . , -.

. . . . . . .. .- . a --

w. . . . .

.- l

. . l l

Emergency Radiological' Surveys On-Site E1O  %

2 g 2 i

Mewssen m 1 Dete9/23/82 ATTACHMENT 2 l

ON-SITE MONITORING CHECKLIST DATE / /

(Continued)

. 'D . ' . : .: . s ; '. " ,a

..  ; . :. .' ..;.- :s . , . , .!:. :; .. . s . : .< .. .. x '. '.. .....;.. .

. Time / Initials ACTION * . Re fe ren~ee 10.3 Obtain smear survey for all locations i

specified by the RCC or Rad Con rap- l resentative and record on Attachment 4. 4.9.3 /

Retnin smears.

10.4 Obtain biotic m'edia - samples for 4.9.4-6 all locations specified by the RCC or Rad Con representative and record on Attachment 4. -

11. Upon direction of the RCC, return to Main .

Cate Processing Center, checking vehicle fuel level, generator fuel level and per-form a complete inventory of the emergency monitoring kit.

Vehicle Fuel Level 5.2 Generator Fuel Level Inventory completed /

12. Submit vehicle, Key, Inventory Checklists and Attachments 2, 3 and 4 to RCC. 5.3 /
13. Return TLD to Dosimetry 5.4 /

Reviewed by RCC / /

Signature Time Date l

1 1

t I

I

-' + .,.. . . ,. _ _.r._. y .; q . - . - -

3 3 - , y -. y .. ..

- c.~...... y.. ..

  • ' S

=- .

Q  ; ;;;y,,,

. . '1.: ,,

.u. . .. . .

5. /. . e.

l

'j '

..= EPIP-10 Rev. I 9/23/82 i Page 1 of 1 ..

ATTACllMENT 3

. c. . '.

.i i .g

,;3 DOSE RATE SURVEY AND AIR SAMPLE LOG

k. fi ,'

3 ', '.;:

.* DATE: / / -

'.,-)I SURVEY TEAM MEMBERS 1. 2. . . .a .

'i 'f t.'

t .?

. .'i .

i

.y DOSE RATE DATA AIC SAMPLE DATA

' [

  • \*: .

I f.{ Gaumna e-  :

4Q Honitoring Dase Rate Beta Dose Crosa Background He t '., Scaler i.s

'I,3 Location Time (MR/HR) Rate MR/HR Initiala Time CPM CPM __ CPM ,i Efficiency (%) Ioltiala A 1. I...

r-  ;.

1 .

~

j 2. jj ;u

.)o.5

' 3.  ;- i t 'O ..

? 4. >.

e

- ,I . 5.

[ i

?.

6. '.,~
1. - .

.l

I

8. i' .-

9,

  • . .<- s
10. '

j;?

r j II* I,.

12, 'c.  :*

1

13. g
14. -

I. '

L r, *

15. *

. r >

n 1 INSTRUPENT MODEL SERIAL NO. CALIBRATION DATE ' INITIALS

1. Dose Rate Meter 7
2. Air Sampler "
3. Scaler - ' '

!  ; 4. Count Rate Meter i,'

i .

1

. .i ..t^ - .

,. e

1. . .

. - 8

., ,3 ,

,j . . .. .s b' .: -

, . EPIP-10 Rev. 1 9/23/82 f..

, 8. Page 1 of 1 , .-

.' , ATTACHMENT 4 -

~,~. ' . ' I' CONTAMINATION AND BIOTIC MEDI A SURVEY LOC DATE: / / - r 3:

l 'N SURVEY TEAM MEMBERS 1. 2. s' f.

i  : .'. '

1. SHEAR SURVEY .".

, k-; ..

. Monitoring Cross BEC Net DPH lbnit. Cross BKC Net DPH

+ )$

. , .l Location Time CPM CPM CPN/100 t'M7 100 CH2 Init. Incation Time CPM CPM CPM /100CH2 100CH2 Init. k[--

. 'I i ') 1. 11. '

4

'1 2. 12. ..

fa 3. 13. '

i* ,,

4. 14. .
5. 15. 1, .

< 6. 16. .i '

7. 17.

..l i* 8. 18. * .f

9. 19. - j- -
i 10. 20. i.

4

2. BIOTIC MEDI A SURVEY - SOIL, WATER VECETATION -

h t

i ,.

'.' Monitoring Type of Dose Rate Monitoring Type of ' Dose Rate  ?

Location Sample Time mR/h r Initials Location Sample Time mR/h r Initials 4

1. 11. f
2. 12.
3. 13.

.i 4. 14. .

5.
6. 16. ~.
7. 17.  !
8. 18. .-

r

9. 19. ~
10. 20. ',

INSTRUMENT MODEL SERIAL NO. CALIBRATION DATE NITIALS

l. Count Rate Meter .
2. Air Sampler ,

),

i ).- .

1

Precocure No.  ;

Page 1 Cf 6

_ . MW V:4 AI[MJ l m P-25 Cate issued Effecuve Cate i Jersey Central 02/24/81 cu /u /s23 n/21/s2 Power & Light Company semien No.

1 c.te 09/23/82 i

" "Nea'r' site Emergency Operations Autncnzsc a Director-Station Operations Facility (NEOF)

Acctcvau cnc.;tranca

' [r $ /?l// f b() Y -

Proj c. . .: .

. . - ..~..4..,.3 < . .

l

/.: - .

s. .. ,9 n.me ,

t,...V $r,, , 1.

_ , .ie4-e sestion

/

lg .

DATE REVISION NLMBER  ;

LIST OF EFFECTIVE PAGES 09/23/82 1 1

09/23/82 1 2 -

09/23/82 1 3 '

4 09/23/82 1 ~

09/23/82 1 5

6 09/23/82 1 ,

I ATTACIDENTS 09/23/82 1 l Form 25-1 (1 page) 09/23/82 1 Form 25-2 (2 pages)

Form 25-3 (1 page) 09/23/82 1 09/23/82 1 Form 25-4 (1 page) l 09/23/82 1 Form 25-5 (1 page)

Form 25-6 (1 page) 09/23/82 1 )

09/23/82 1 j Attachment 1 (1 page) 09/23/82 1  ;

Attachment 2 (3 pages) i l

1 hy V 4 ,- . -

This Documen; V. '.: . ::: u - i Up To Caio 6.e =

a . -g.

. o ..

.  : -- -~ "~

m. . - u. ,

_ _ _ _ ._ : w: .z.. . _ _ . .

smageen presseure NE

.Nearsite Emergency Operations EPIP-25 2 g 6 Facility (NEOP)

Revision Mt 1 Cate09/23/82

. I 1.0 PURPOSE This precedure describes the activation and initial operation of the  ;

\

. . w '.f 1. : ,: .. . ., , . . s. . : .g. :

s '.a.p::py . H.- . .. , . , .. .s ... :. . : .3 _ ;i ..v, . . . .:y :. , .,

.. . 2. . ,: ; _

Nearsite Emergency. Operations Facility.

2.0 REFERENCES

2.1 EPIP-3, Alert .

2.2 EPI?-4, Site Emergency.

. 2.3 EPIP-5, General Emergency.

2.4 EPIP-28, Farsite Emergency Operations Facility.

3.0 RESPONSIBILITIES .

3.1 The Emergency Director is responsible to evaluate conditions and determine 'the need for Full Mobilization.

< ' murity Coordinator is responsible to ensure accessibility and

/ of tbe NEOF. Access is to be limited to the south side entrance of Building #12 to ensure one point of entry for frisking and dosimetry issue.

3.3 The Emergency Support Director, through his staff and the Emergency Advisor, is responsible for carrying out the requirements of this procedure and to act as' a single point of contact to disseminate media information releases and status updates to outside agencies

~

upon concurrence of the Emergency Director.

3.4 The Group Imader-Administrative Support is responsible to ensure a working shift schedule to support activation and operation of the l

facility.  ;

l 3.5 The Group Leader-RadCon Support is responsible to establish l l

habitability; monitor the Continuous Air Monitor and Area Radiation l

(' Monitor and to initiate dosimetry issue, if necessary.

i i

4

. . . .. . ..- . . - . . . . .-. m , ., -- + . - .

. - ~~..**~..

?

. . ..a . . . . . . . .c.... ... . . . . .. _

. . . _ . . 1

.'., l Proceeure Ne, Suavest 6

,., Nearsite Emergency Operations EPIP-25  % 3 g  %

. Facility (NEOF)

Aonmen No. 1 Cote 09/23/82 4.0 PREREQUISITES 4.1. ... NEOF activation may b,e,. i.ni.t.iated by any of the following:

., v ..:.. ..v . ... . ~

'^

g,y ,7 u n..gy,"gg;m

. , . , . .w ..; y e . . ,n:

, tw ,

. . . e < v. . o i

4.1.2 Site Emergency; .

4.1.3 General Emergency; 4.1.4 By direction c t' a Emergency Director.

4.2 Continuous Air Monitor and area Radiation Monitor are operating and operational checks are performed to establish habitability.

4.3 The folloving precautions will be observed:

4.3.1 Use preper respiratory protective devices as directed by Radiological Controls; 4.3.2

  • Use proper dosimetry as directed by Radiological Controls; 4.3.3 Maintain radiation / airborne radioactivity level surveillance during emergency operations; 4.3.4 All personnel will use proper self-frisking techniques upon arrival at the NEOF prior to entry and exit.

5.0 REQUIREMENTS 5.1 The NEOF is loca"ted at the Forked River Site in Building #12 (Attachments 1 & 2).

5.2 Upon the instruction to activate the NEOF as directed by the l

Emergency Director, the Security Coordinator will ensure:

5.2.1 Call-out of the Full Mobilization Organization is completed in an ord'erly and timely manner; 5.2.2 An SPO is dispatched to the NEOF to define a single point of entry and ensure the security and accessibility of the 4

( facility.

~,

Ci

- ~ . - - - ~ ~ . . .

n-..- -. gmy,e - ~,, ; -

.,~.---~ .< , - ~ - - - - . . - -

~

^

t 9

.. :x. . x . ' .;

r'

' ~

L ~' ,

__ _ .2._ -

hF Proeseure Me. 4 EPIP-25 6 Nearsite Emergency Operations g g Facility (NEOF-)

Rowmen Me. 1 Dete09/23/32 5.3 Re Emergency Support Director, assisted by his staff, will ensure that the following duties are assumed:

'

  • I

. N0fF,:. ; IFunctional:M '.ip's .may .begin..td take' actio'n.'as' scon.'as .5 . . .

~" * *

'adeqtiataly staf' fed' anY appdse'd of Ehe current situation. .

5.3.1 Emergency Support Pirector and Staff (Form 25-1 completed).

5s3.2 Group Leader-Administrative Support (Form 25-2 complaced).

5.3.3 NE0h Communications Coordinator (Form 25-3 completed).

5.3.4 Technical Support Representative (Form 25-4 completed).

NOTE: In the event of Technical Support Center evacuation to the NE0F, the Technical Support Coordinator will continue to provide technical advisement to the Emergency Director and supplement the efforts of the Tech Functions Rapresentative.

5.3.5 Group k.eader-Chemistry Support.

5.3.6 Group Imader-RadCon Support (Form 25-5 completed) .

5.3.7 Group Leader-Maintenance Support.

5.3.8 Group Imader-Security Support (Form 25-6 completed).

~

5.4 When the desired positions are adequately manned and functional, the Emergency Support Director or his designae should inform the l 1

Emergency Director that the NEOF is activated.

5.5 Ihe NEOF supports the Emergency Director in the, Emergency Command

<,e nte r.

5.6 In the event that evacuation'is deemed necessary by the Emergency Support Director due to degraded habitability of the NEOF, the i

following responsibilities are assigned:

I 3 s

}

*1**'~:***:>

.r,.,

-e.,-.Y*.**'.***-

..~s -%***.'.".~*.*'.~~~'**

  • ..'.'~~"'~'?.**""'"

. ~..'a*.= '

. . _ . . ..-- -_ . . . . . . . _a --

,.:.) ,

.! Suarest Proceeure No.

Nearsite Emergency Operations EPIP-25 Poge 5 W6  %

  • I Aension No. I care 09/23/82 5.6.1 The Emergency Support Director shall annnunce to the J Emergency Director, NEOF and FEOF' personnel the decision

..- . . ../ cf. . . . /.. 3 9. ,.,13..f:. . . g. , . . .

. . : . . . p , ... , . . . . .,

, .e ,2 . m, . . . . , . ..

to evacuate the NEOF :.and to relocate to 'the Farsite-Emergency Operations Facility (FEOF) (reference EPIP-28, .

Farsite Emergency Operations Facility). He will transfer his responsibilities to the Emergency Director until the

. FEOF is fi2117 functional.

5.6.2 Group Leader-Ad::tinistrative Support shall ensure that transportation for evacuation is arranged.

5.6.3 Group Leader-RadCon Support shall ensure that dosimetry

!- assigned to NEOF personnel is collected and evacuated to the FEOF to' be processed.

5.6.4 Technical Functions Representatives will ensure that pertinent prints and technical manuals are collected and evacuated to the FEOF for reference.

5.6.5 NEOF Communications Coordinator shall ensure that necessary documentation and procedures are collected and

. evacuated to the FEOF for reference.

5.6.6 NEOF Communications Coordinator shall ensure that all status reports to outside agencies are completed as directed by the Emergency Support Director phor to evacuation.

5.6.7 NEOF Communications' Coordinator shall ensure that all  ;

emergency telephone handsets are properly cradled and l headsets are turned off. .

i u ,. . - . . . . . - , ....--:.-.. .,, , ._ - .; .-

y... .r. -. - . ,. r. -

.: n-- '. .' :. '

. . ....- . . GT"i i. ~ t 'L- ...- .-

Proceews Me, h eisst:

Ne:r::ito Emerg:ncy Op;rctiena EPIP-25 Psge 6 of 6 pages

. Facility (NEOF) "*"*""*' 1 Cats 09/23/82 6.0 RECOVERY When the Emergency Director secures from the emergency and allows the

.e - s ; .. . ......a .:..... ... ..a. ,:. ...; . . . . , '

.[,, ,

NEOF,,to,. secure., the Group Imader-Administratiye Support will' ensu;.re'the'

'following s'tep's are taken (Form 25-2)':

6.1 All documentation is gathered up and turned over to the Emergency Preparedness Department.

. 6.1.1 All completed communicator's message sheets; 6.1.2 All completed procedure checklists; 6.1.3 All facsimile machine-transmitted documentation.

6.2 Inventory all emergency kits and lockers.

6.2.1 Record what supplies are needed to meet inventory requirements; i

8 6.2.2 Record what equipment malfunctioned.

6.3 'Re turn center to standby condition.

6.3.1 Restow tables'and chairs, as required; 6.3.2 Wipe all status board.s clean; 6.3.3 Refile all prints and proceduras as required.

6.4 Report discrepancies to Emergency Prepa:edness Department.

l 6.4.1 Deliver documents from Section 6.1.

6.4.2 Report missing supplies ani equipment discovered in l performing Section 6.2.

6.4.3 Report missing points and procedures discovered in performing Section 6.3.

I

6.5 Report NEOF secured to the Emergency Support Director.

e

.o-

. . . . . , . . , . , . . . , , . - . . . . , . . -..r...,.. -,:..-.-

~~

....L. . ...

",T ~, .. ..

e.. ~ . . - . ~ . . ~.. . . , - .a u-: '

4

.: susper: Procoows No.

0 Ne:r::ito Faerr.ncy Op;rcticna EPIP-25 %1 of 1 p ,;,,

been No. 1 Oste 09/23/82 FORM 25-1

.. ;; e. . . . . . .,....:. . . . . . . .. ..- . , . . .. .

. ..,3...,.. _

-1.0 Nearsite Faergency Operations Facility / ' . .

Emergency Support Director's Checklist .

No te: The E3D Staff /ESD Advisor should complete this checklist.

Time / Initials

/ 1.1 Facility accessible, security established and frisking station established. ,

/ 1.2 Facility functionally staffed per shif ting report of Group Leader-Administrative Sup~2rt.

'/ 1.3 Emergency Director informed that the NEOF is activated.

< / 1.4 Facility deactivation upon recovery or evacuation.

(

Name Time Date ESD Staff /ESD Advisor -

e.

.g

-J -- m - . . . ,..

.c  ; .

e.. . .r.;,,.; . .-

c . , m . .._ .,

^ - - .,

ym . g .- _

..' , , ,*.'.?'.*.4 . . . , ..

s '

a * . *

'T*

' ' ~~ ~

" :~ '

. . ' j- . , .!. . _,

U ;;.'-- .':' - _,' f ,',- i j."'~

. C. " , _ , , _ ,, ,

p, Precoeure Ne.

Ne2rsito Emerg:ncy Op;rcticus EPIP-25 page 1 of 2 pages Facility (NEOF-)

Aonson Me. 1 Octe 09/23/82 FORM 25-2

.' . ; . f. ., ..,..,.., , . , , . ., ,

.4 <

l'.0 ' Croup Imader'-Administrative Suppert Chec'klis't,' ,

Time / Initials . .

/

1.1 Establish work area for Mainistrative Support group

, and coordinate the efforts of the Security Support Group and Materials Management Coordinator (i.e. ,

procurement of transportation, equipment).

/ 1.2 Assist NEOF Coordinators and Group Leaders in developing shift schedules, maintaining status boards, coordinating with offsite supporti and obtaining needed re trence material.

~/ 1.3 Develop a shift schedulo for your organization.

/ 1.4 Collect, coordinate and maintain shif t staffing schedules prepared by the following Group Leaders and notify the Emergency Support Director /ESD Advisor when the facility is functionally staf fed.

/ 1.4.1 NEOF Communications Coordinator

/ 1.4.2 Technical Support Representative

/ 1.4.3 Group taader-Chemistry Support

/ 1.4.4 Group Leader-RadCon Support

/

l.4.5 Group Imader-Maintenance Support

/ 1.4.6 Group Leader-Security Support

/ 1.4.7 Environmental Assessment Coordinator .

Farsite Emergency Operations Facility

/ 1.4.8 f

Coordinator s

t i

C

    • I. - .* - ,- y ry,. . , ~ -r- - .-- -- .:.c -: n .

- . , :- ~ -- ' '

~ ~m-- =

. j ',.. ..* ' .:

.. ; a L. ~ . . .

~., .

-- .w. . _ . . . . ,

- , , , , - - - , - - ----v-m-

. . .. .~ ...::

~...........

- . .a. . . .

. .a.

. -.. ~. - ,

a-W. Proceeure m EPIP-25

, Ne:rcito Faarg:ncy Op:rsticas Pege 2 of 2 peges Facility (NEOF)

Ra'sim % i Cate09/23/82

. i FORM 25-2 f.

"2.0 'Grdtip Leader-Admidiitrative Su'pport Recovery Checklist-Time / Initials

/ 2.1 Documentation collected

/ 2.2 ' Faergency ki~t s and lockers restowed

/ 2.3 NEOF returned to standby condition

/ 2.4 Documents, records and reports delivered to Emergency Preparedness Department -

Name Time Date Group Leader-Administrative Support e

O e

i i

.)

  • i

~$ .

.......,...,..,--e,.

m ..

. - - - - - - - , , yw - , . - - - - , - - - - , , _ , - , y., , , - - , w-

'. . .: -. : r;: : .' " #'. -I -- ? Y *' $';?; 'p : :_'i. T _ _. * * ..:.

$uopse: Prosecure No.

Nearcito Emergency Op:re,tienh EPIP-25  % 1 of 1 pages Facility (NEOF) Rommon Me. 1 Cate09/23/82

. FORM 25-3 lv > .-

. ..s. e . ,.;,. , .. .7 ,

1.0 NE0F' Comunications' Coordinator Checklist Identify personnal to fill the following positions:

Time / Initials 1.1

/ _

1.1.1 Notification / Verification communicator (s)

/ _,

1.1.2 Radiological /BRP line comunicator

/ 1.1.3 Log keepers, as needed

/ 1.2 Ensure sufficient communicators are available as the -

ESD directs.

/ 1.3 Develop shift schedule for your organization and f provide a copy to the Group Leader-Administrative I

Suppo rt .

/ 1.4 Notify the Group Leader-Administrative Support that the duties of the NEOF Comunications Coordinator have been assumed. Forward t.his completed checklist to the Group Leader-Administrative Support.

Name Time Date NEOF Comunications Coordinator -

i I

1 k

e m f

-~-

.--v.<..=....-.

~, . .

. L. .

.n:s .- ,-. n. c.=.

.. a- c. . c s-

..y~ , .

. . ..:.. '.. ..u.. . .,

{ .

suopsse: Pressows No.

Nearsite Emergency Operations EPIP-25 Pega 1 of 1 pages Facility (NEOF)

Aewmea Ne- 1 Cete 09/23/82 FORM 25-4

.,. .::. , . . .. . . . . . . . .s - - . . . . . . . . .,>: . .

.1.0 ' technical Support Representative C' ec h klis't

~

Dat e/ Initials

/ 1.1 Establish Technical Support work area and position

, personnel to perform as:

/ 1.1.1- Operations line communicator

/ _

. 1:1.2 Plant Status Update line communicator

/ 1.1.3 Plant Status Board keeper

/ 1.1.4 Tech Functions line communicator

/ 1.2 Establish conr.sunications with Parsippany Technical Functions and Technical Support Center on Technical Functions line.

/ 1.3 Ohtain prints, technical manuals, reference material, etc. and set up in work area as needed.

/ 1.4 Develop shif t schedule for your organization and provide a copy to the Group Leader-Administrative Suppo rt .

/ 1.5 Notify the Group Leader-Administrative Support that

~

the duties of the Technical Support Representative have been assumed. Forward this completed form to the Group Leader-Administrative Support.

Name Time Date l Technical Support Representative

\

1 9

l

" * ~ ' ' '

~

__~~~?" i".j ; _ ,r -- : D Qi[T'K} , . , } , *. T ~ ~ ~ '

~

3meteen Proeseure Me. l Ne:rsito Em3rg:ncy Op rrtic20 EPIP-25 p,,, i ,, 1 Facility (NEOP)

Monsion Me. 1 Cote 09/23/82 FORM 25-5 1

l

~

l

.1.0, Group Imad'er-RadCon Support Checklist Time / Initials .

/ 1.1 Establish RadCon Support work area, monitor habitability and position personnel to perform dosimetry issue.

/ 1.2 Establish contact with Radiologic'al As sessme7t Coordinator and determine the manpower and RadCon equipment needed to support the emergency effort. ,

/ 1.3 Establish contact with other facilities, etc. , to obtain additional assistance, as required.

Coordinate all outside requests through the ESD Staff.

/ 1.4 Dewslop a shif t schedule for your organization and provide a copy to the Group Leader-Admf nistrative Support. ,

~

/ 1.5 Notify the Group Leader-Administrative Support tilat the duties of the Group Leader-RadCon Support have been assumed. Forward this completed checklist to the Group Leader-Administr'ative Support.

Name Time Date Group Imader-RadCon Support

?

I l

l o

1

.. .,,. - - .,, . s, --.- = = ~ - 1

. . _ . . .....r,.e...,. , .

. .;...r.>. . . . . . .

  • *  ?* i

... . . , . . . - . . . . . . ...c.. _ . . . . . . . . . ,.. .

hM

--g ---e. --.-.,e---, , , , , , ,

--r- -

., _. , . .; ; s, p; .- ~ ;; ,. -

, hovesr, Precaewe Na Nearsite Emorg:ncy Op;rcticco EPIP-25 p,,, 1 ,, 1 p,q,,

Monsson No. 1 Cote 09/23/82 o-FORM 25-6 4

1.0 ' Group Leader-Security ' Support Checklist -

Time / Initials .

/ 1.1 Establish Security Support work area and position

. personnel to perform the following functions:

/ 1.1.1 Security badge issue

/ 1.1.2 NEOF armed guard

/ 1.2 Establish contact with the Security Coordinator and determine support required for the emergency efforts.

'/ 1.3 Establish contact with other facilities, agencies,

' etc. , to obtain additional assistance, as required.

Coordinate all outside requests through the ESD staff.

/ 1.4 Develop a shif t schedule for your organization and provide a copy to the Group Leader-Administrative Support.

/ 1.5 Notify the Group Leader-Administrative Support that the duties of the ' Group Leader-Security Support have been assumed. Forward this completed checklist to the Group IAader-Administrative Support.

~

Name Time Date Group Imader-Security Support l

l l l l

l

.  ! l

!1 e . , ,, e - ; .~p .n --.. . .; , ,. . -- --

- e..;. .. - . - - - - -

si' .: . . . .. ._ _

..m a~ --

l . -

.!~ -

.i.,

' y ~-.

Energy Spectrum -

.t. -] ,

i 3

3 r s

.h b 2,1. . .

(% s T

/

/

so

'd 4

.,1 n

h  ?

uQ FORKED RIVER

/\

j ..Ci E SITE L OYSTER CREEK NUCLEAR ,

p; i GENERATING STATION /$ w.'

  • 1 d

,e..h0%

i i _

. g

-(,

? *

  • f s'3 NEARSITE EMERGENCY OPERATIONS FACILITY LOCATION
s. . ?.g i . , Directions:

- lt j From Oyster Creek Nuclear Generating Station -

j ,i ' , Proceed north on Route 9 j '.iq Turn left at first road, after canal bridge .

I  !, . Continue past JCP&L " Energy Spectrum" and i j

-H Forked River Site Security .

r Park in West Parking Lot of Forked River Site I l Enter Gate 524. .

} l l

'd H

i D O ed

, d3 to 4

.i O % e4 ,

f

/( pU l

P.,3 F :

H  ?

ii H.

l e

N 4 ,

l .

l j -

l

a r--- c--a,- w---- - - - _ - _ - _ - _ _ _ _ _ _ _ _ _ _

. w . a 4 . . =, 4. . . T - - . . . w -. . . - i.e . . . .w . .. seSQ . . . .o . - o o .c:5..- -

  • EPIP-25 Rev. 1 09/23/82 l Ptg3 1 of.3 ATTACHMENT 2

. 1

~

NEOF

, . .. ~ i g'

@@ O el @

MEDIA AFFAIRS e h @ b i I

EMERGENCY l SUPPORT b -"

- . DIRECTORS .. -

OFFICE- '

g g .

@@ E@@ @ @

.~

i .

@ S H

NRC OFFICE /

7-CONFERENCE k

ROOM _. g GC 3 FI RE Ext T~

s HAu.wY rm To 5.%%g, pr 4 -

gI c Ins t m

9 EMERGENCY PREPAREDNESS 1

. .A 0

g a y l -

mem A le 9

~~~

t....... . .. . . . . . .. .

- * * ~ * ~

! ,.. . 5. , ;c . . .*.-,----.p-

. , , ., ,,f.

...' L.. '.: . . . .

C . . i-T.V. ' ' .-=~&--

' - ~

, e,q.- * * ,. - - , . , - , -r-, -- ----,.s- - - - . w-. --- -

7

...,~.,y.......

_. 7.. ..

7 , ,,

  • Suagesr-. Proceewe me, Near:ito Emarg ;ncy Op;rcticn3 EPIP 25 2 3 g g

- -' 7acility (NEOF)

Monsson No. 1 Oste 09/23/82 f~ . l

~

ATTACHMENT 2 EO(IIPMENT/ STATUS BOARDS / MAPS s

A. Emergency Positions Status Board l B. Staffing Board I C. Emergency Locker D. Emergency Monitoring Kit E. EPIP/ Procedure Library F. Fire' Bose G. Fire Extinguisher H. Topographical Area Map I. AMS J. AILM K. 3-M Copier L. Offsite Monitoring Points Map

. . M. Breathing Air Tank N. Environmental Assessment Status Board j

0. Onsite Monitoring Survey Points l

P. Radiological Assessment Status Board l

I Q. Blank Status Board /2-5-10 mi. EPZ Status Board

( ,

R. Telefax Machine S. Blank Status Boa,rd T. Containment Status Board U. Rx Schematics and Diagrams V. Fire Extinguisher X. 24-Hour Clock 1

i l

k 3

s' l

i

.'s

.h i

l

\

s,-... -

.n__; , ,,

' 5.. . ?. k 1 s

, '

  • 4"
    • T - .:.

.L*:; _

.e..~ e .ew =

e- e.

_ , , ;;; L _ , , ,_ _ _, ,,, . , _ _ _ _

T_-------

, [

\

w g,c- P*cescus Nc. l Nearsite Emergency Operations EPIP-25 peq3 3 ef 3  ::

Fac111cy (NEOF)

Rensica N c. 1 Octe09/23/82 j

ATTACFMENT 2

- . . .- NEOF TELEPEONES -

~

1. Energency Director Line (DLV 11)
2. Operations Line (DLV #2)
3. Radiological Line (DLV #3)
4. Tech.nical Functions Line (DLV 14) g
5. Environmental Assessment Line (DLV #5)
6. News Line (DLV #6)
7. Plant Status Update Line (DLV #7)
8. Station Security and Accountability (DLV #8)
9. 20-Button Set - Ener. Dir. Selective DLV Circuit
10. State of New Jersey Emergency Director Hotline -
11. Emergency Direcrar Rotline
12. Dimension Line ~
13. Ocean County Verification Line
14. Ocean County Notification Line
15. New Jersey State Police Verification Line
16. New Jersey State Policy Notification Line
  • 17. Bureau of Radiation Protection Alternate / Police '

Alternate Verification Line -

  • 18. Outside Line .
19. Bureau of Radiation a cotection Information Line
  • 20. Outside Line for Telefax -
  • 21. Direct Dial Of fsite - __
  • 22. DLV 2 (Operations)/DLV 4 (Tech'nical Functions) -

. s Selective Monitor Phone)

23. Nuclear Regulatory Coemission Health Physics Ne twork' Line 2 4 ., Nuclea'r Regulatory Commission Hotline
25. Dimension Line .
  • 26. Direct Dial Offsite
  • 27. Direct Dial Offsite -
  • 28. Direct Dial Offsite -
  • 29. Direct Dial Offsite -
  • Direct Dial S

h5 l

1

~

Prococure No.

B (ei V:4 e ry 91 c2 1 o n _, n lPage 3 Cf 5 l Cate issued Effectve Cate Jersey Central 09/23/s2 u1/04/s2) un4/s2 l Power & Light Company sevisien No. care 0 09/23/82 "D

l ~ Post Accident In-Plant Radiation Autncnzsc Sy Me asurement Director-S:ation Operations f

'""'$ Y'"E" ms V/ W N

  • ~

I Oyster, Creek Nuclea nerating Station U

LIST OF EFFECTIVE PAGES DATE REVISION NUMBER 1 09/23/82 0 2 09/23/82 0 3 09/23/82 0 4 09/23/82 0 5 09/23/82 0 .

ATTACHMENT For:n EPIP-30-1 (1 page) 09/23/82 0

,.g g *1 .

f,l Q .1 '

T},isDo.:.. -

t .ma M # * '

1 1

N..

me

= 8

..e g -en e OM

. ....c... .. . _ . .' . . , . . . . _ . . .

Snapse: Proceewe No. l

- Post Accid;nt In-Plcat EPIP-30 %2,g5 g

. Radiation Measurement Rension No- 0 Date09/23/82 I 1.0 PURPOSE This procedure defines the methods and techniques necessary for .

j

. performance of in plant. radiation mesurements after 'an emergency has f

. . I occurred. )

l The Emergency Director (ED) shall be responsible for initiating this I procedure; the Radiological Assessment Coordinator (RAC) shall be

, responsible for providing advisement; and the Radiation Controls Coordinator (RCC) shall be responsible for imple=enting this procedure.

2.0 ATTACP.ME NTS Fo rm EP IP-3 0-l.

3.0 EMERGENCY ACTION LEVELS This procedure shall be activated upon the declaration of any of the following:

3.1 EPIP-3, Alert.

3.2 EPIP-4, Site Emergency. -

3.3 EPIP-5, General Emergency. .

4.0 EMERGENCY ACTIONS

~

4.1 The Emergency Director,' Radiological Assessment Coordinator or Radiation Controls Coordinator shall direct personnel to locations where radiation measurements are required.

4.2 Ihe following equipment is available at the Operations Support Center (OSC): i i

4.2.1 Calibrated air sampler with particulate and silver zeolite f cartridges for air sample collection.

4.? 2 A high range portable dose rate meter.

-. . . - . . ~ ... . . . - . . . - --

i.

. . ..s_. .1-. z- -

Suspear: .

Proceewe Na Posti Accident In-Plant EPIP-30 Psge3 of 5 m,q ,e Radiation Measurement -

Monsion NS 0 cate09/23/82 4.2.3 Scott Air Pak II with full bottle.

, 4. 2 4..

High . Rad Key or. Af fected Area Key.s needed for access.

',4 .2. 5 .

Sufficient

  • protective clothing. .

'4.2.6' Nigh range dosimster and TLD badge. .

4.2.7 Portable radio.

4.3 Quarterly dose should be evaluated for personnel selected for entry.

4.4 Do not exceed 10 CFR 20 personnel exposure limits without written permission from the ED as documented on Form EPIP-30-1. The following emergency radiation exposure levels shall be used: ,

i Whole Body Activity Cam:na Dose Thyroid Dose Lifesaving - Voluntary l .

/

Basis only I 75 Rem l No Limit

' Vo luntary Protective or -

Corrective Actions Basis only 25 Rem 125 Rem ,

NOTE: Minimum of two personnel will be required for entry into radiation areas under accident conditions. One person will be.a qualified radiation controls technician.

4.5 Prior to leaving the OSC, ensure that the dose rate instrument batteries are charged and the instrument is operational. Obtain a portable radio from Security or OSC equipment locker and perform .

radio check with the ACC.  !

4.6 Put on protective clothing as directed by the RAC and implemented by l

the RCC.

4.7 Place air sample filtera in the air sampler. l

(

,.~.. .. . x. _w. . .._..:.._--

Suageef*, Proceewe No,

. Post Accident In-Plant EPIP-30 peon 4 ef 5 ma ps

, Radiation Measurement Renmou No. 0 Oste 09/23/82 f

4.8 Verify dosimetry is in coverall pocket and high-range self reading dosimet'er is zeroad. ' Keys necessary for access to af fected area shall be made available to ' entry personnel.

~

4.' 9 Be fore entry *, 'the RAC. ash' ll make the' initia1 eval'uation of the ARM conditions and relay the essential cose information to the RCC.

NUIE: If the ARMS are of f-scale, further evaluation of the

. affected building shall be performed by the RAC prior to entry. .

NUIE: Dose rates through the Reactor Building wall on the 51' elevation are needed to evaluate the entry. 7 A briefing shall be conducted under the direction of the OSC and RCC of the purpose and details of the entry.

(

\. 4.10 Turn the dose rate instrument on to the highest scale and enter the survey area. Make notification of entry time to RCC or timekeeper outside of af fected building.

4.11 Monitor the dose rate meter at all times.

4.12 Be aware of the radiation levels in the area and evaluate stay time,

. . l to be evaluated by frequent observation of self-reading dosimeter not to exceed 10 CFR 20 personnel exposure linics or emergency l radiation levels assigned by the ED.

4.13 If the following radiation levels (maximum general area dose rates)  !'

are presenc in the affected area, leave the area and notify RCC of exit and transmit radiation l'evals for further evaluation by the RAC and ED:

N~ . '

l

-~ '~ *

-- c -

l 1

l . - - ,

~

. . . . =g- . _. . . . . . - . . . . .. .. .. . . . , I _ ~ . ;.. _ . . ...

.e

'~~ '

Laper Proceewe Me, Post Accid::nt In-Plcnt EPIP-30 %5 g5  %.

Radiation Measurement f

t Protective or Life Saving

, . 10 CER 20 Corrective. Actions Actions whole Body 3 Rem *- 25 Rem 75 Rem Dose .- -

Go/No-Go 12 Rem /hr* 100. Rem /h r . 300 . Ram / h r Whole Body Dose .

  • Assuming personnel has no previous exposure in the current calendar quart er.

NOIE: The ' Rem /hr radiation levels are based upon Scott Air Pak II encries of 15 minutes stay time with maximum general

- ares dosos.

4.14 Switch to the next lowest scale until the meter is on scale.

4.'15 Start your air sample as directed by the RCC and record the sample l start time. Observe AMS III or ARM status in af fected area, if

/ applicable.

i, i

4.16 Obtain smear survey as directed by the RCC.

4.17 Stop air sampler and leave area. Notify RCC (or timekeeper) of exit. Record air sample results, smear itsults (if applicable),

dose rate data, .and trcnsmit to the RCC. RCC shall transmit radiological inf'ormatioh to RAC.

i 4.18 Air samples shall be retained and handled as directed by the RCC. t 4.19 Remove protective clothing outside of the affected area and secure i further access to the area with proper posting. Retain protective clothing and equipment used in entry for possible analysis as ,

directed. Return as directed' by the RCC to the OSC..

?

9

. . . . . . . . - _ . . - - .....--.-.-.a

. - . . ..~ ....

. . ~ . . . . -

,. . ; . :. . . . .. . . . . . .__._.. . . . . .:_.._s.- . . _

s

. p W Proceewe Na EPIP-30 page I g I Post Accid:nt In-Picat Radiation Measdrement **""*"N' O Cate09/23/82 f -

l I

FORM EPIP-30-1

,* ' Time:

~

Date: .

EMERGENCY DOSE AUTHORIZATION Name Social Security Number 1.

L

2. ,

3.

4. <

5.

k. 6.

'l 7.

Dosage Authorized: Whnle Body ,

Thy:51d .

i For ( Action):

  • I l

l Reviewed By:

Radiological Assessment Coordinator Approved By: I Emergency Director e i

i I?

=

  • I
  • ~ * * * ~ ' - * *

,,.....y, f

i-

" --- --m, _ _ - * , . _ . - ,