Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20211G039 | 10 February 1999 | Revised ODCM, Including Revs to Revised ODCM Index,Odcm 01.01 Page 2 Paragraph 1,ODCM 02.01 Page 2 Section 1.0,ODCM 05.01 Page 2 Sections 1.0,2.0 & 3.0 & ODCM 13.05 Page 2 | Offsite Dose Calculation Manual |
ML20237E977 | 20 August 1998 | Rev 4 to EWI-09.04.01, Inservice Testing Program | High Radiation Area Stroke time Squib Scram Discharge Volume Power-Operated Valves Power Operated Valves |
ML20199H528 | 6 November 1997 | Software Requirement Specification (SRS) ERDS-SRS-1-3, Process Computer Sys - Emergency Response Data Sys (ERDS) - Data Point Library | Reactor Vessel Water Level Met Tower |
ML20137B508 | 12 March 1997 | Rev 2 to Inservice Insp Exam Plan | |
ML20115D862 | 28 June 1996 | Rev 3 to Engineering Work Instruction (Ewi) EWI-09.04.01, Inservice Testing Program | High Radiation Area Stroke time Squib Scram Discharge Volume Power-Operated Valves Power Operated Valves |
ML20100M482 | 29 August 1995 | Revised Sections to Odcm,Including Rev 1 to ODCM-03.01,Rev 1 to ODCM-12.05 & Rev 1 to ODCM-13.05.5 | Grab sample |
ML20083Q841 | 18 May 1995 | Rewrite of Rev 2 to Engineering Work Instruction (Ewi) EWI-09.04.01, Inservice Testing Program | High Radiation Area Stroke time Squib Scram Discharge Volume Power-Operated Valves Power Operated Valves |
ML20072P801 | 17 May 1994 | Rev 8 to Process Control Program, Installed Atcor Solidification Sys | Process Control Program |
ML20072P810 | 22 February 1994 | Offsite Dose Calculation Manual, Rev 0 | Offsite Dose Calculation Manual |
ML20127P232 | 19 January 1993 | Revised Software Requirement Specification (SRS) ERDS-SRS-2-B, Emergency Response Data Sys (ERDS) Data Point Library | |
ML20101Q313 | 21 April 1992 | Software Spec ERDS-SRS-1.00-1, ERDS Data Point Library | Met Tower |
ML20090C507 | 2 August 1991 | Rev 8 to Section 4.0 of PCP Manual, Dewatering of Resin & Other Filter Media | Hydrostatic Process Control Program |
ML20077C922 | 30 May 1991 | Rev 0 to TS Interpretation Manual, TS Interpretation 3.5.E.1 & 2-1 | |
ML113190502 | 23 February 1990 | Rev 7 to Monticello Nuclear Generating Plant Odcm. | Grab sample Offsite Dose Calculation Manual |
ML20245L366 | 26 July 1989 | Plant,Emergency Plan Exercise,Section Ii:Exercise Objectives & Guidelines | Squib Design basis earthquake Earthquake |
ML20237J792 | 31 July 1987 | Rev 8 to ASME Code Section XI Inservice Insp & Testing Program Manual,Second 10-Yr Insp Interval 810630- 920530 | Nondestructive Examination |
ML20207Q466 | 1 January 1987 | Rev 20 to Corporate Nuclear Emergency Plan Implementing Procedure, Table of Contents Record of Rev | |
ML20203L395 | 18 April 1986 | Rev 6 to ASME Code Section XI Inservice Insp & Testing Program,Second 10-Yr Insp Interval 810630-920530 | Nondestructive Examination VT-2 |
ML20095L233 | 29 February 1984 | Revised Radiation Environ Monitoring Plan | |
ML20079P576 | 21 December 1983 | Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures EPIP 1.1.11 Re Accident Assessment,Epip 1.2.1 Re Emergency Plan Training & EPIP 1.2.2 Re Exercises & Drills | Grace period |
ML20081A816 | 28 September 1983 | Public Version of Revised Emergency Plan Implementing Procedures A.2-101 Re Classification of emergencies,A.2-105 Re General Emergency & A.2-702 Re Response to Emergency at Prairie Island | Safe Shutdown Earthquake Fuel cladding |
ML20077G673 | 29 July 1983 | Program for Recirculation Piping Replacement at Monticello Nuclear Generating Plant | |
ML20077C193 | 20 May 1983 | Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures EPIP 1.1.1 Re Corporate Emergency Response Plan,Epip 1.1.2 Re Notifications & EPIP 1.1.3 Re Public Info.Rev 12 to Table of Contents Encl | Health Physics Network Grace period |
ML20072K659 | 22 February 1983 | Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures A.2-001 Re Emergency organization,A.2-101 Re Classification of Emergencies & A.2-108 Re Access Control During Emergencies | |
ML20072C849 | 17 February 1983 | Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures EPIP 1.1.10 Re Offsite Surveys,Epip 1.1.11 Re Accident Assessment & EPIP 1.1.14 Re Vendor & Consultant Svcs | |
ML20071D905 | 2 February 1983 | Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures A.2-406 Re Offsite Dose Projection & A.2-422 Re Stack Iodine/Particulate Sampling & Analysis | Grab sample Met Tower |
ML20028F700 | 20 January 1983 | Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures EPIP 1.1.5 Re Startup Operation of Emergency Offsite Facility & EPIP 1.1.6 Re Emergency Organization Shift Turnover | |
ML20028F701 | 6 January 1983 | Public Version of Revised Emergency Response Plan Implementing Procedures,Including Procedures A.2-420 Re Containment Atmosphere Radiochemical Analysis & A.2-404 Re Airborne Iodine Sampling & Analysis | |
ML20028D436 | 22 December 1982 | Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures A.2-001 Re Emergency organization,A.2-107 Re Activation of Operational Support Ctr & A.2-402 Re Contamination Control | |
ML20064E942 | 7 December 1982 | Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures EPIP 1.1.2 Re Notifications & EPIP 1.1.4 Re Emergency Organization Records & Forms | |
ML20027D267 | 8 October 1982 | Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures EPIP 1.1.1 Re Corporate Emergency Response Organization,Epip 1.1.2 Re Notifications & EPIP 1.1.3 Re Public Info | |
ML20064M109 | 11 August 1982 | Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures EPIP 1.1.2 Re Notifications & EPIP 1.1.5 Re Startup & Operation of Emergency Operations Facility | Health Physics Network |
ML20063N470 | 5 August 1982 | Public Version of Revised Emergency Response Plan Implementing Procedures,Including Procedures A.2-001 Re Emergency organization,A.2-302 Re Assembly Point Activation & A.2-303 Re Search & Rescue | Safe Shutdown Health Physics Network High Radiation Area Grab sample Met Tower |
ML20063H789 | 1 July 1982 | Public Version of Revision 3 to Emergency Plan Implementing Procedure A.2-101, Classification of Emergencies. Revised List of Current Pages Encl | Safe Shutdown Design basis earthquake Earthquake Fuel cladding |
ML20052G925 | 12 May 1982 | to Inservice Insp & Testing Program. | |
ML20040B259 | 18 January 1982 | Inservice Insp & Testing Program,Second Ten-Yr Insp Interval,810630-910629. | |
ML20039G690 | 7 December 1981 | Public Version of Revision 1 to Emergency Plan Implementing Procedure A.2-001, Emergency Organization. | Safe Shutdown |
ML20040A780 | 3 December 1981 | Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures 1.1.2 Re Notifications, 1.1.4 Re Emergency Organization & Records & 1.1.5 Re Startup & Operation of Emergency Offsite Facility | |
ML20040A869 | 19 November 1981 | Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures A.2-102 Re Notification of Unusual event,A.2-103 Re Alert & A.2-104 Re Site Area Emergency | |
ML19350D100 | 27 March 1981 | ASME Code Section XI Inservice Insp & Testing Program,Second 10-yr Insp interval,810630-910629 | Stroke time Hydrostatic Nondestructive Examination VT-2 Power Operated Valves Dissimilar Metal Weld |
ML112990692 | 27 March 1981 | to ASME Code Section XI Inservice Insp & Testing Program & Info Required for NRC Review of Requests for Relief from ASME Code Section XI Requirements | |
ML19207B871 | 30 August 1979 | Rept NSP-37-005,Revision 1, IE Bulletin 79-14, Safety-Related Piping Sys Insp Plan,Monticello Nuclear Generating Plant. | Earthquake |
ML19225D003 | 27 July 1979 | of ASME Code Section XI Inservice Insp & Testing Program & Info Required for NRC Review of Requests for Relief from ASME Code Section XI Requirements. | |
ML20090L678 | 10 January 1975 | Rev 4 to Special Process Std NUT-NC-3, Procedure for Automatic Recording of Ultrasonic Test Data | Nondestructive Examination |
ML20090L670 | 10 January 1975 | Rev 4 to Special Process Std NUT-NC-1E, Nuclear Ultrasonic Weld Exam Calibr Procedure | |
ML20090L662 | 1 January 1975 | Rev 4 to Special Process Std NUT-NC-1A, Nuclear Ultrasonic Testing Procedure Ultrasonic Insp of Welds,In 1/4 to 2-1/2 Thickness Range | |
ML20128D213 | 11 April 1974 | Operator Requalification Program Prairie Island & Monticello Nuclear Generating Plants | Shutdown Margin Power change |