NORTHERN STATES POWER COMPANY MONTICELLO NUCLEAR GENERATING PLANT DOCKET NO. 50-263 LICENSE NOS. DPR-22 ASME CODE SECTION XI INSERVICE INSPECTION AND TESTING PROGRAM AND INFORMATION REQUIRED FOR NRC REVIEW OF REQUESTS FOR RELIEF FROM ASME CODE SECTION XI REQUIREMENTS SUBMITTED:

March 15, 1978 REVISED:

Revision 1 August 28, 1978 Revision 2 January 5, 1979 Revision 3 February 26, 1979 Revision 4 July 27, 1979 Revision 5 March 5, 1980 Revision 6 July 16, 1980 Revision 7 March 27, 1981 8104 1'30 3 12

RECORD OF REVISIONS Page No Cover ii iv 1-1 1-2 thru 1-3 1-4 1-5 1-6 1-7 thru 1-8 1-9 thru 1-11 1-12 thru 1-28

'1-28A 1-29 1-30 1-31 1-32 1-33 1-34 1-35 1-36 1-37 thru 1-39 1-40 1-41 1-42 1-43 1-44 1-45 1-45A 1-46 1-47 1-47A 1-48 1-49 1-50 2-1 3-1 3-2 3-3 3-4 thru 3-7 Revision No 6

Original 6

5 Original 1

3 1

6 3

Original 6

6 5

5 5

3 5

3 1

3 Original 6

3 Original 1

Original 1

1 3

6 3

6 1

Original 2

4 1

7 2

Page No.

3-8 3-9 3-10 3-11 3-12 3-13 3-14 3-15 thru 3-19 3-20 thru 3-2z 4-1 4-2 thru 4-4 4-5 4-6 thru 4-7 4-8 4-9 4-10 thru 4-1 4-12 4-13 4-14 4-15 4-16 4-17 thru 4-2 4-23 thru 4-2 4-28 4-29 thru 4-3 4-32 4-33 4-34 4-35 thru 4-3 4-37 4-38 4-39 4-40 4-41 thru 4-4 4-44 thru 4-4 4-46 thru 4-4 4-48 5-1 thru 5-31 6-1 6-2 6-3 thru 6-7 6-8 6-9 thru 6-10 6-11 6-12 thru 6-1 6-15 6-16 thru 6-2 6-21 Revision No 4

Original 4

2 4

2 Original 2

3 1

Original 2

Original 3

2 Original 1

Original 1

Original 2

1 Original 1

Original 2

Original 2

Original 2

1 3

1 2

3 5

7 Original 3

1 Original 2

Original 2

Original 4

Original 3

1 2

7 1

6 3

5 7

4 0

Revision 7 3/27/81 iii

0 D. Valve Testing *

'I FSAR Valve Valve Applicable ASME Valve Test Request System Number No.

Description Code Class Category Frequency Test For Relief Ma in Steam AO 2-80A 80-A Main Steam Isolation 1

A Q

ull Stroke-Time 28 Ma in Steam AO 2-80B 80-B Main Steamn Isolation 1

A Q

'ull Stroke-Time 28 Main Starnm Main Ste'mi AO 2-80C 80-C Main Steamn Isolation 1

A Q

Full Stroke-Time 284 L

-t 4

-+--

4 4

-~

L L

-~

AO 2-SOD 80-D Main Steam Isolation 1

A Q

Full Stroke-Time 28 Main Steam AO 2-86A 86-A Main Steam Isolation 1

A Q

Full Stroke-Time 28 Ma in Steam AO 2-86B 86-B Main Steam Isolation 1

A Q

Full Stroke-Time 28 Main Steam AO 2-86C 86-C Main Steam Isolation 1

A Q

Full Stroke-Time 28 i Main Steam AO 2-86D 86-D Main Steam Isolation 1

A Q

Full Stroke-Time 28 Ma in Steam M0-2373 74 Steamline Drain Isolation 1

A Q

Full Stroke-Time 28 Ma in Steam MO-2374 77 Steamline Drain Isolation 1

A Q

Full Stroke-Time 28 Main Steam RV-2-71A RV-71-A Main Steam Safety Relief 1

C IWV-3510 Setpoint Main Steam RV-2-71B RV-71-B Main Steam Safety Relief 1

C IWV-3510 Setpoint Main Steam RV-2-71C RV-71-C Main Steam Safety Relief 1

C IWV-3510 Setpoint Ma in Steam RV-2-71D RV-71-D Main Steam Safety Relief 1

C IWV-3510 Setpoint Ma in Steam RV-2-71E None Main Steam Safety Relief 1

C IWV-3510 Setpoint Ma in Steam RV-2-71F None Main Steam Safety Relief 1

C IWV-3510 Setpoint Main Steam RV-2-71G None Main Steam Safety Relief 1

C IWV-3S10 Setpoint Main Steam RV-2-71HI None

-Main Steam Safety Relief 1

C IWVJ-3510 Setpoint

  • Request for Relief 43 applies to all Category A valves.

I Lj

40

43.

REQUEST FOR RELIEF Component Function Applicable ASME Valve Code Class Category All Category A Valves 1,2,3 A

Code Requirement These valves will not be leak-tested at the frequency required by lWV-3420(b).

Basis Paragraph IWV-3420 of Section XI, 1974 Edition with Addenda through and including Summer, 1975, requires that category A valves be leak-tested at the same frequency as scheduled refueling outages but not less than once every two years.

This does not allow leak-testing to be done during maintenance-only outages.

Alternate Testing These valves will be leak-tested in-accordance with Paragraph IWV-3420 of Section XI, 1977 Edition with Addenda through and including Summer, 1978.

Schedule for Implementation March 27, 1981 04 H 0

__4