Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML23338A152 | 7 December 2023 | Public Meeting Slides for North Anna and Surry Emergency Plan Augmentation Times License Amendment Request | |
ML23275A242 | 5 October 2023 | Pre-Submittal Meeting Slides | Minimum staff |
ML23254A056 | 13 September 2023 | Presentation Material for 9/13/23 Pre-Submittal Meeting License Amendment Request to Support Cycle Reloads Using Framatome Gaia Fuel | |
ML23177A114 | 26 June 2023 | Annual Assessment Meeting Reactor Oversight Process 2023 | |
ML23087A297 | 17 April 2023 | Annual Assessment Meeting Presentation | |
ML23103A348 | 14 April 2023 | Annual Assessment Meeting Presentation for North Anna and Surry | Reserve Station Service Transformer |
ML23073A004 | 14 March 2023 | Annual Assessment Meeting for Millstone Power Station - NRC Presentation Slides | COVID-19 |
ML23066A247 | 7 March 2023 | Presubmittal Meeting Slides for March 7, 2023, Public Meeting | |
ML22277A841 | 18 October 2022 | Presentation Material for 10/18/22 Pre-Submittal Meeting Licensing Requests to Implement Framatome Gaia Fuel | |
ML22251A235 | 14 September 2022 | Presentation Slides for September 14, 2022, Observation Public Meeting | |
ML22243A032 | 7 September 2022 | Presentation Material for 9/7/22 Pre-Submittal Meeting Supplement to the Spent Fuel Pool Criticality Safety Analysis | |
ML22236A060 | 29 August 2022 | Presentation Material for 8/29/22 Pre-Submittal Meeting Reactor Pressure Vessel Head Peening Follow-Up Exam Deferral | Boric Acid Pressure Boundary Leakage Dissimilar Metal Weld |
ML22215A287 | 9 August 2022 | Presentation Material for 8/9/22 Pre-Submittal Meeting Containment Recirc Spray System Flow Test Alternative Request | |
ML22130A128 | 10 May 2022 | Annual Assessment Meeting for Seabrook Station - NRC Presentation Slides | Coronavirus |
ML22130A009 | 28 April 2022 | Duke Presentation for April 28, 2022 Public Meeting - Bolting Integrity | Aging Management License Renewal Subsequent License Renewal Biofouling Thermography |
ML22130A010 | 28 April 2022 | Duke Presentation for April 28, 2022 Public Meeting - Containment Liner | Subsequent License Renewal |
ML22109A212 | 20 April 2022 | Duke Energy Pre-Submittal Public April 20, 2022, Meeting Presentation | Incorporated by reference Surveillance Frequency Control Program Operational leakage |
ML22097A226 | 13 April 2022 | Presubmittal Presentation April 13, 2022 One-time TS Change of AOT for Unit 2 AFW Piping Replacement | FLEX |
ML22091A090 | 1 April 2022 | Combined 2021 Assessment Meeting Slides | Operator Manual Action Spent Fuel Pool Instrumentation Coronavirus Pressure Boundary Leakage Fire Protection Program |
ML22082A148 | 23 March 2022 | Annual Assessment Meeting for Millstone Power Station - Webinar Presentation (NRC) | Coronavirus Power change |
ML22075A201 | 7 March 2022 | Duke 03/07/2022 Presentation - Bolting Integrity | VT-2 Subsequent License Renewal Thermography |
ML22067A199 | 3 March 2022 | Annual Assessment Meeting Presentation | Coronavirus |
ML22055B113 | 2 March 2022 | Technical Support Center (TSC) Relocation Proposed License Amendment Request - NRC Pre-Submittal Meeting, March 2, 2022 | |
ML22067A184 | 1 March 2022 | Enc 2 -NRC Regulatory Conference Presentation | High Radiation Area Locked High Radiation Area Significance Determination Process Substantial potential for overexposure |
ML22067A185 | 1 March 2022 | Enc 3 - Energy Northwest Presentation | Locked High Radiation Area Significance Determination Process Foreign Material Exclusion Substantial potential for overexposure |
ML22146A347 | 23 February 2022 | Slides - Pre-Submittal Meeting for February 23 with Nextera Energy Seabrook, LLC Regarding Planned Submittal of License Amendment Request to Update Pressure-Temperature Limits Curves Period of Applicability | |
ML22301A167 | 5 February 2022 | Presentation 5 - Oconee Trip and Notification of Unusual Event on February 5, 2022 | Coatings |
ML22063A114 | 17 January 2022 | Duke Presentation for Public Meeting on February 17, 2022 | License Renewal Subsequent License Renewal Thermal fatigue |
ML21322A326 | 29 November 2021 | Duke Energy November 29, 2021 Pre-Submittal Public Meeting Slides for EOF Relocation Licensing Amendment Request | |
ML21292A141 | 19 October 2021 | Meeting Slides | Internal Flooding Probabilistic Risk Assessment FLEX |
ML21235A045 | 25 August 2021 | August 25, 2021, Oconee Nuclear Station, Units 1, 2, and 3 Subsequent License Renewal Application Public Environmental Scoping Meeting Presentation | License Renewal Subsequent License Renewal Environmental Justice |
ML21168A145 | 22 June 2021 | Annual Assessment Meeting Slides | Fitness for Duty COVID-19 |
ML21134A163 | 20 May 2021 | Resolution of Tornado Wind Nonconformances Proposed License Amendment Request NRC Pre-Submittal Meeting - May 20, 2021 | Finite Element Analysis Earthquake |
ML21127A136 | 13 May 2021 | May 13, 2021 NRC Pre-Submittal Meeting - Surry Power Station New Fuel Storage and Spent Fuel Pool Criticality Analysis Proposed License Amendment Request | |
ML21102A063 | 14 April 2021 | ONS Slides for Pre-Application Meeting to Discuss Proposed Relief Request Related to Code Case N-853 | Weld Overlay Stress corrosion cracking |
ML21089A173 | 30 March 2021 | EOC Slides Final | Coronavirus |
ML21081A181 | 22 March 2021 | Pre-Submittal Meeting Slides | Aging Management |
ML21081A124 | 22 March 2021 | EOC Slides Final | Coronavirus |
ML21076A332 | 18 March 2021 | 3/18/21 - Annual Assessment Meeting for Millstone Power Station - Presentation Slides | Earthquake Coronavirus Power change |
ML21034A597 | 10 February 2021 | External Presentation Am Atkinson_Nrc ISG-06 Meeting Dominion Digital IC Project 02102021 | Cyber Security |
ML21034A556 | 26 January 2021 | SLRA - Duke Presubmittal Meeting Slides | Aging Management License Renewal Subsequent License Renewal |
ML21034A555 | 26 January 2021 | SLRA - NRC Presubmittal Meeting Slides | License Renewal Subsequent License Renewal |
ML20307A177 | 4 November 2020 | NRC Presentation North Anna Power Station, Units 1 and 2 Subsequent License Renewal Review | License Renewal Subsequent License Renewal Environmental Justice |
ML20300A087 | 27 October 2020 | Subsequent License Renewal Application NRC Environmental Pre-Application Meeting - Duke Energy Presentation | Probabilistic Risk Assessment Large early release frequency License Renewal Subsequent License Renewal |
ML20300A090 | 27 October 2020 | Subsequent License Renewal Environmental Pre-Application Meeting - NRC Presentation | License Renewal Subsequent License Renewal |
ML20309A591 | 14 October 2020 | Pre-Submittal Meeting for License Amendment Requests to Implement Batch Framatome 15 X 15 AGORA-5A-I (Agora) Fuel at Surry Power Station Units 1 and 2 (SPS) - Slides | |
ML20226A411 | 19 August 2020 | Presentation Material for 8/19/20 Pre-Submittal Meeting Biennial Emergency Preparedness Exercise Date Change Exemption Request | Exemption Request Pandemic Coronavirus |
ML20176A276 | 29 June 2020 | Presentation Material for 6/29/20 Pre-Submittal Meeting Proposed License Amendment Request for Measurement Uncertainty Recapture Power Uprate | |
ML20161A081 | 3 June 2020 | Annual Assessment Meeting June 3, 2020 Slides | Fitness for Duty COVID-19 |
ML20143A077 | 26 May 2020 | Presentation Material for 5/26/20 Pre-Submittal Meeting Steam Generator Examination Frequency Alternative Request |