Similar Documents at Surry |
---|
Category:Meeting Agenda
MONTHYEARPMNS20241176, Pre-submittal Meeting with Dominion Energy Regarding a Planned License Amendment Request for North Anna Power Station and Surry Power Station to Revise Selected Alternate Source Term Dose Consequence Analyses2024-09-23023 September 2024 Pre-submittal Meeting with Dominion Energy Regarding a Planned License Amendment Request for North Anna Power Station and Surry Power Station to Revise Selected Alternate Source Term Dose Consequence Analyses PMNS20240863, Pre-submittal Meeting with Virginia Electric and Power Company (VEPCO) to Discuss Its Proposed License Amendment for Surry Power Station, Units 1 and 22024-06-27027 June 2024 Pre-submittal Meeting with Virginia Electric and Power Company (VEPCO) to Discuss Its Proposed License Amendment for Surry Power Station, Units 1 and 2 PMNS20240758, Notice of Meeting with Dominion Energy Inc. to Discuss Guidance in NUREG-0800 Standard Review Plan (SRP)2024-06-12012 June 2024 Notice of Meeting with Dominion Energy Inc. to Discuss Guidance in NUREG-0800 Standard Review Plan (SRP) PMNS20240556, Annual Assessment Meeting Surry Power Station Annual Assessment Meeting2024-04-18018 April 2024 Annual Assessment Meeting Surry Power Station Annual Assessment Meeting PMNS20231323, Meeting with Virginia Electric and Power Company Regarding License Amendment Request to Revise Emergency Plan Staff Augmentation Times for North Anna Power Station Units 1 and 2 and Surry Power Station Units 1 and 22023-11-27027 November 2023 Meeting with Virginia Electric and Power Company Regarding License Amendment Request to Revise Emergency Plan Staff Augmentation Times for North Anna Power Station Units 1 and 2 and Surry Power Station Units 1 and 2 PMNS20230615, Meeting with Virginia Electric and Power Company Regarding License Amendment Request to Revise Emergency Plan Staff Augmentation Times for North Anna Power Station Units 1 and 2 and Surry Power Station Units 1 and 22023-05-11011 May 2023 Meeting with Virginia Electric and Power Company Regarding License Amendment Request to Revise Emergency Plan Staff Augmentation Times for North Anna Power Station Units 1 and 2 and Surry Power Station Units 1 and 2 PMNS20230430, Assessment Meetingsurry Power Station Annual Assessment Meeting2023-04-13013 April 2023 Assessment Meetingsurry Power Station Annual Assessment Meeting ML22097A2262022-04-13013 April 2022 Presubmittal Presentation April 13, 2022 One-time TS Change of AOT for Unit 2 AFW Piping Replacement PMNS20220318, Public Meeting with the Dominion Energy to Discuss a Planned Emergency Preparedness Submittal for the North Anna Power Station and the Surry Power Station2022-04-0707 April 2022 Public Meeting with the Dominion Energy to Discuss a Planned Emergency Preparedness Submittal for the North Anna Power Station and the Surry Power Station PMNS20220349, Assessment Meetingsurry Power Station Annual Assessment Meeting2022-04-0404 April 2022 Assessment Meetingsurry Power Station Annual Assessment Meeting PMNS20220301, Pre-submittal Meeting with Virginia Electric and Power Company (VEPCO) to Discuss Its Proposed License Amendment for Surry Power Station, Units 1 and 22022-03-29029 March 2022 Pre-submittal Meeting with Virginia Electric and Power Company (VEPCO) to Discuss Its Proposed License Amendment for Surry Power Station, Units 1 and 2 PMNS20220113, Pre-submittal Meeting with Virginia Electric Power Company (VEPCO) to Discuss Future License Amendment for Surry Power Station, Units 1 and 22022-02-11011 February 2022 Pre-submittal Meeting with Virginia Electric Power Company (VEPCO) to Discuss Future License Amendment for Surry Power Station, Units 1 and 2 PMNS20210540, Pre-Submittal Meeting - Proposed License Amendment Request (LAR) to Revise the New and Spent Fuel Pool Criticality Analyses for Surry Power Station, Units 1 and 22021-05-11011 May 2021 Pre-Submittal Meeting - Proposed License Amendment Request (LAR) to Revise the New and Spent Fuel Pool Criticality Analyses for Surry Power Station, Units 1 and 2 PMNS20210612, Pre-Submittal Meeting - Proposed License Amendment (LAR) Request to Revise the Licensing Basis for the Turbine Building and the Fuel Building Trolley Support Structures Relative to Tornado Effects for Surry Power Station, Units 1 and 22021-05-10010 May 2021 Pre-Submittal Meeting - Proposed License Amendment (LAR) Request to Revise the Licensing Basis for the Turbine Building and the Fuel Building Trolley Support Structures Relative to Tornado Effects for Surry Power Station, Units 1 and 2 PMNS20210382, the U.S. Nuclear Regulatory Commission (NRC) Will Hold a Webinar to Discuss the Nrc'S Assessment of Safety Performance at the V. C. Summer, North Anna and Surry Power Stations for 20202021-04-12012 April 2021 the U.S. Nuclear Regulatory Commission (NRC) Will Hold a Webinar to Discuss the Nrc'S Assessment of Safety Performance at the V. C. Summer, North Anna and Surry Power Stations for 2020 PMNS20201174, Notice of Pre-Submittal Meeting with Virginia Electric and Power Company (Vepc)2020-10-0101 October 2020 Notice of Pre-Submittal Meeting with Virginia Electric and Power Company (Vepc) PMNS20201170, Notice of Pre-Submittal Meeting with Virginia Electric and Power Company (Vepc)2020-09-30030 September 2020 Notice of Pre-Submittal Meeting with Virginia Electric and Power Company (Vepc) ML18121A0342018-03-29029 March 2018 Possible Topics for the April 17, 2018 Public Meeting with Dominion on Its Surry SLRA ML14076A1112014-03-17017 March 2014 Notice of Public Meeting to Provide an Open Forum to Discuss the Annual Assessment of Surry Power, Units 1 and 2 ML14066A1252014-03-0707 March 2014 March 18, 2014, Notice of Category 3 Public Meeting/Open House Regarding Surry, Units 1 & 2, Annual Assessment ML14065A4942014-03-0606 March 2014 Notice of Category 3 Public Meeting/Open House with Virginia Electric and Power Company to Discuss Surry Power Station Units 1 and 2 Annual Assessment ML14065A5302014-03-0606 March 2014 Notice of Category 3 Public Meeting/Open House with Virginia Electric and Power Company to Discuss Surry Power Station Units 1 and 2 Annual Assessment ML11256A2912010-08-12012 August 2010 Email from R. Guzman, NRR/DORL/LPL1-1 to R. Chang, Res/Dsa/Spb, Soarca Weekly Team Meeting ML0931002542009-11-0909 November 2009 Notice of Conference Call with Virginia Electric and Power Company to Discuss Issues Relating to Surry Power Station ML0730400332007-11-0101 November 2007 Public Meeting Slides for Meeting with Dominion Nuclear ML0726900152007-09-26026 September 2007 Notice of Forthcoming Meeting with Dominion Nuclear to Discuss Proposed Chemical Testing Methods Related to GSI-191, Assessment of Debris Accumulation on PWR Sump Performance, as Proposed by Its Vendor ML0632605122006-11-22022 November 2006 Forthcoming Meeting with Virginia Electric and Power Company. Regarding Main Control Room and Emergency Switchgear Room for Surry Nuclear Station Units 1 and 2 ML0626203902006-09-19019 September 2006 Notice of Meeting with Virginia Electric Power Company (VEPCO) to Discuss Organizational Changes at VEPCO, Etc ML0525606282005-09-13013 September 2005 Notice of Category 1 Meeting W/ VEPCO Surry and ISFSI Related Criticality Analysis Between Part 50 and 72 ML0513100022005-05-10010 May 2005 Notice of Meeting Regarding the plant-specific Implementation of VIPRE-D Topical Report for Dominion, VEPCO, (Surry, North Anna & Millstone) ML0420301852004-07-21021 July 2004 Notice of Meeting with Virginia Electric & Power Company (VEPCO) to Discuss Vepco'S Proposed plant-specific Topical Report That Implements VIPRE-D Code ML0411806032004-04-21021 April 2004 Meeting Summary with Virginia Electric and Power Company to Discuss Risk Significance of Concerns Associated with NRC Response to Potential Fire in Emergency Switchgear ML0325500192003-09-12012 September 2003 Notice of Meeting with Dominion Regarding Proposed Consolidation of the Quality Assurance Programs for Surry, Units 1 and 2, North Anna, Units 1 and 2, Millstone, Units 2 and 3, Nuclear Plants ML0305902342003-02-28028 February 2003 Forthcoming Meeting with Virginia Electric Power Co. to Discuss Control Room Habitability Testing ML0205303982002-01-0808 January 2002 Attachment to the 01/08/2002 Mtg with NEI, Southern Nuclear Operating Company (Snc), Florida Power and Light Company (Fpl), Virginia Electric and Power Company (Vepco), Duke Energy Corporation (Duke), and Exelon Generation Company (Exelon) 2024-09-23
[Table view] Category:Meeting Briefing Package/Handouts
MONTHYEARML24283A1442024-10-16016 October 2024 Main Steam Line Break Accident Analysis LAR Pre-Application Meeting ML24183A2082024-07-11011 July 2024 Presubmittal Presentation: TS 3.7, 3.14 Change for Extended AOT During Outage and SW Piping Maintenance, Cfrp SW Application - Slides ML24108A0712024-04-30030 April 2024 Combined - 2023 Annual Assessment Public Meeting Slides ML23338A1522023-12-0707 December 2023 Public Meeting Slides for North Anna and Surry Emergency Plan Augmentation Times License Amendment Request ML23103A3482023-04-14014 April 2023 Annual Assessment Meeting Presentation for North Anna and Surry ML22097A2262022-04-13013 April 2022 Presubmittal Presentation April 13, 2022 One-time TS Change of AOT for Unit 2 AFW Piping Replacement ML22055B1132022-03-0202 March 2022 Technical Support Center (TSC) Relocation Proposed License Amendment Request - NRC Pre-Submittal Meeting, March 2, 2022 ML21134A1632021-05-20020 May 2021 Resolution of Tornado Wind Nonconformances Proposed License Amendment Request NRC Pre-Submittal Meeting - May 20, 2021 ML21127A1362021-05-13013 May 2021 May 13, 2021 NRC Pre-Submittal Meeting - Surry Power Station New Fuel Storage and Spent Fuel Pool Criticality Analysis Proposed License Amendment Request ML21034A5972021-02-10010 February 2021 External Presentation Am Atkinson_Nrc ISG-06 Meeting Dominion Digital IC Project 02102021 ML20307A1772020-11-0404 November 2020 NRC Presentation North Anna Power Station, Units 1 and 2 Subsequent License Renewal Review ML20309A5912020-10-14014 October 2020 Pre-Submittal Meeting for License Amendment Requests to Implement Batch Framatome 15 X 15 AGORA-5A-I (Agora) Fuel at Surry Power Station Units 1 and 2 (SPS) - Slides ML20098B7292020-04-0707 April 2020 Sur 2019 Annual Assessment Meeting Presentation ML20098B6022020-04-0707 April 2020 Annual Assessment Meeting Presentation ML19311C5292019-11-0707 November 2019 Dsies Slides for Nov. 7, 2019 Public Meeting ML19007A2162019-01-0808 January 2019 Subsequent License Renewal Environmental Scoping Meeting, Surry Power Station, Unit Nos. 1 and 2, January 8, 2018 ML18320A2502018-11-20020 November 2018 50.90 License Amendment Request - Dominion Fleet EAL Scheme Changes, November 20, 2018 Public Meeting ML18141A3072018-05-21021 May 2018 18 - SLR Status ML18032A5842018-02-0707 February 2018 SLR Pre-Application 02/07/2018 Meeting - Dominion Energy Slides ML17320A2012017-11-15015 November 2017 Modeling FLEX in Surry Power Station Internal Events and Flooding PRA ML16320A5232016-09-0707 September 2016 Pre-Submittal Meeting with Surry Power Station Regarding Carbon Fiber Reinforced Polymer Alternative Request ML16124A7592016-05-0303 May 2016 April 12, 2016 Summary of Public Meeting - Surry, Units 1 and 2 ML14176A0922014-06-25025 June 2014 6/25/2014, Dominion Public Meeting Presentation for Surry GMRS Profile ML14101A1132014-04-11011 April 2014 Summary of Meeting with Public to Discuss Annual Assessment of Surry Power Station with the Public for the Period of January 1, 2013 - December 31, 2013 ML13151A1022013-05-31031 May 2013 Summary of Public Meeting with Virginia Electric and Power Company, to Discuss Annual Assessment of Surry Power Stationfor the Period of January 1, 2012 December 31, 2012 ML12115A0732012-04-19019 April 2012 RCS Standpipe White Violation Slides ML1110304302011-04-13013 April 2011 Public Meeting/Open House - Handouts ML11228A2312009-08-13013 August 2009 State-of-the-Art Reactor Consequence Analyses (Soarca); Semi-Annual Briefing for Commission Tas ML0912702462009-05-0404 May 2009 NPS Hostile Action Drill - Protective Action Decision Considerations ML0911000832009-04-17017 April 2009 Summary of Meeting with Public/Open House to Discuss NRC Reactor Oversight Process and the Annual Assessment of the Surry Power ML11228A2302009-04-14014 April 2009 State-of-the-Art Reactor Consequence Analyses; Semi-Annual Briefing for Commission Technical Assistants ML11228A2292008-12-17017 December 2008 Soarca Seismic Issue; Briefing for the Commissioners' Technical Assistants ML11228A2282008-09-10010 September 2008 State-of-the-Art Reactor Consequence Analyses (Soarca); Semi-Annual Briefing for Commission Technical Assistants ML11228A2272008-06-0202 June 2008 State-of-the-Art Reactor Consequence Analyses; Briefing for Commission Technical Assistants ML0730400332007-11-0101 November 2007 Public Meeting Slides for Meeting with Dominion Nuclear ML0613902012006-05-17017 May 2006 Att. 6, FAQ 60.3 ML0529005282005-09-27027 September 2005 Meeting Summary, Use of Nuhoms Fuel Storage System Under General License at Surry - 10CFR50.68 Implications ML0525604472005-08-17017 August 2005 B&W Owners Group Reactor Vessel Working Group Summary of the Plans of the B&Wog Reactor Vessel Integrity Program ML0521403292005-03-0909 March 2005 RIC 2005 Presentation - A3 - Donald G. Harrison - 50.69 ML0331604212003-11-21021 November 2003 Meeting Handouts for 9/24/03 Public Meeting Re. Discussion of Planned Consolidation of Quality Assurance Programs ML0327206212003-09-24024 September 2003 Examiner - Vendor Matrix with Phone Number ML0327206112003-09-22022 September 2003 Exam Process ML0309805972003-04-0303 April 2003 Annual Assessment Meeting for Surry Power Station. NRC Presentation Slides ML0224702742002-08-29029 August 2002 NRC Staff'S Handout for 08/08/2002 Meeting with Dominion VEPCO (Enclosure 1), Dominion Vepco'S Graphs on Total Number of Flow Accelerated Corrosion Events (Enclosure 2) ML0231102312002-08-21021 August 2002 Attachment 2 - 11/06/02 Memo to C.L. Miller Frm. M.J. Ross-Lee Summary of the August 21, 2002, Meeting Between the Nuclear Regulatory Commission Staff and Dominion Virginia Power ML0215103002002-05-29029 May 2002 May 29, 2002, Slides from Public Meeting: Preliminary Results of Environmental Review, Surry Units 1 and 2 ML0213404582002-05-16016 May 2002 Training Managers Conference Handouts ML0205303982002-01-0808 January 2002 Attachment to the 01/08/2002 Mtg with NEI, Southern Nuclear Operating Company (Snc), Florida Power and Light Company (Fpl), Virginia Electric and Power Company (Vepco), Duke Energy Corporation (Duke), and Exelon Generation Company (Exelon) 2024-07-11
[Table view] Category:Slides and Viewgraphs
MONTHYEARML24283A1442024-10-16016 October 2024 Main Steam Line Break Accident Analysis LAR Pre-Application Meeting ML24183A2082024-07-11011 July 2024 Presubmittal Presentation: TS 3.7, 3.14 Change for Extended AOT During Outage and SW Piping Maintenance, Cfrp SW Application - Slides ML24108A0712024-04-30030 April 2024 Combined - 2023 Annual Assessment Public Meeting Slides ML23338A1522023-12-0707 December 2023 Public Meeting Slides for North Anna and Surry Emergency Plan Augmentation Times License Amendment Request ML23103A3482023-04-14014 April 2023 Annual Assessment Meeting Presentation for North Anna and Surry ML22097A2262022-04-13013 April 2022 Presubmittal Presentation April 13, 2022 One-time TS Change of AOT for Unit 2 AFW Piping Replacement ML22091A0902022-04-0101 April 2022 Combined 2021 Assessment Meeting Slides ML22055B1132022-03-0202 March 2022 Technical Support Center (TSC) Relocation Proposed License Amendment Request - NRC Pre-Submittal Meeting, March 2, 2022 ML21134A1632021-05-20020 May 2021 Resolution of Tornado Wind Nonconformances Proposed License Amendment Request NRC Pre-Submittal Meeting - May 20, 2021 ML21127A1362021-05-13013 May 2021 May 13, 2021 NRC Pre-Submittal Meeting - Surry Power Station New Fuel Storage and Spent Fuel Pool Criticality Analysis Proposed License Amendment Request ML21034A5972021-02-10010 February 2021 External Presentation Am Atkinson_Nrc ISG-06 Meeting Dominion Digital IC Project 02102021 ML20307A1772020-11-0404 November 2020 NRC Presentation North Anna Power Station, Units 1 and 2 Subsequent License Renewal Review ML20309A5912020-10-14014 October 2020 Pre-Submittal Meeting for License Amendment Requests to Implement Batch Framatome 15 X 15 AGORA-5A-I (Agora) Fuel at Surry Power Station Units 1 and 2 (SPS) - Slides ML20098B6022020-04-0707 April 2020 Annual Assessment Meeting Presentation ML20098B7292020-04-0707 April 2020 Sur 2019 Annual Assessment Meeting Presentation ML19311C5292019-11-0707 November 2019 Dsies Slides for Nov. 7, 2019 Public Meeting ML19296D7862019-11-0606 November 2019 Dseis Slides for November 7, 2019 Public Meeting ML19248C7352019-09-0909 September 2019 CFR 50.69 License Amendment Request Pre-Submittal Meeting with NRC - September 9, 2019 ML19007A2162019-01-0808 January 2019 Subsequent License Renewal Environmental Scoping Meeting, Surry Power Station, Unit Nos. 1 and 2, January 8, 2018 ML18141A3072018-05-21021 May 2018 18 - SLR Status ML18102A5692018-04-17017 April 2018 Dominion'S Presentation on Surry'S SLRA Safety Meeting-Final (for April 17, 2018) ML18086A7742018-02-21021 February 2018 LOR Program Biennial Inspection 71111.11B Exam Overlap Issues ML18032A5842018-02-0707 February 2018 SLR Pre-Application 02/07/2018 Meeting - Dominion Energy Slides ML17320A2012017-11-15015 November 2017 Modeling FLEX in Surry Power Station Internal Events and Flooding PRA ML16124A7592016-05-0303 May 2016 April 12, 2016 Summary of Public Meeting - Surry, Units 1 and 2 ML14176A0922014-06-25025 June 2014 6/25/2014, Dominion Public Meeting Presentation for Surry GMRS Profile ML13151A1022013-05-31031 May 2013 Summary of Public Meeting with Virginia Electric and Power Company, to Discuss Annual Assessment of Surry Power Stationfor the Period of January 1, 2012 December 31, 2012 ML12129A2532012-05-0808 May 2012 EOC Poster Boards 2011 ML12115A0732012-04-19019 April 2012 RCS Standpipe White Violation Slides ML1110304092011-04-13013 April 2011 Annual Assessment Meeting Summary Slides ML1011005472010-04-20020 April 2010 NRC Strategic Plan Posters ML11228A2312009-08-13013 August 2009 State-of-the-Art Reactor Consequence Analyses (Soarca); Semi-Annual Briefing for Commission Tas ML0912702462009-05-0404 May 2009 NPS Hostile Action Drill - Protective Action Decision Considerations ML11228A2302009-04-14014 April 2009 State-of-the-Art Reactor Consequence Analyses; Semi-Annual Briefing for Commission Technical Assistants ML11228A2292008-12-17017 December 2008 Soarca Seismic Issue; Briefing for the Commissioners' Technical Assistants ML12024A3792008-11-0505 November 2008 Soarca Comparison to NUREG-1150, Res/Dra ML11228A2282008-09-10010 September 2008 State-of-the-Art Reactor Consequence Analyses (Soarca); Semi-Annual Briefing for Commission Technical Assistants ML0822614842008-08-13013 August 2008 Keys to Surry Power Station'S NRC Exam ML11228A2272008-06-0202 June 2008 State-of-the-Art Reactor Consequence Analyses; Briefing for Commission Technical Assistants ML0811301672008-04-15015 April 2008 Annual Assessment Meeting Slides - Reactor Oversight Program - Cy 2007 ML0730400332007-11-0101 November 2007 Public Meeting Slides for Meeting with Dominion Nuclear ML0634704322006-12-0606 December 2006 December 6, 2006, Surry Public Meeting Regarding Chilled Water Piping ML0611100852006-04-19019 April 2006 NRC Cy 2005 Annual Assessment Meeting, Surry Power Station ML0529005282005-09-27027 September 2005 Meeting Summary, Use of Nuhoms Fuel Storage System Under General License at Surry - 10CFR50.68 Implications ML0525604472005-08-17017 August 2005 B&W Owners Group Reactor Vessel Working Group Summary of the Plans of the B&Wog Reactor Vessel Integrity Program ML0509704632005-03-30030 March 2005 Presentation Slides for Surry 03/30/2005 NRC Cy 2004 Regulatory Performance Meeting ML0510302122005-03-30030 March 2005 NRC Cy 2004 Annual Assessment Meeting, Surry Plant, 03/30/2005 ML0521403292005-03-0909 March 2005 RIC 2005 Presentation - A3 - Donald G. Harrison - 50.69 ML0421800892004-08-0404 August 2004 VIPRE-D Topical Report DOM-NAF-2 Meeting with NRC ML0410401122004-04-0808 April 2004 Annual Assessment Meeting with NRC Re Reactor Oversight Program - Cy 2004 2024-07-11
[Table view] |
Text
Pre-Submittal Meeting with NRC Surry License Amendment Request (LAR)
Addition of 10-Day Allowed Outage Time for Auxiliary Feedwater Cross-Connect Capability to Perform Maintenance with Three Inoperable AFW Pumps April 13, 2022 1
Agenda
- Introduction/Opening Remarks
- License Amendment Request Overview - Additional 10-Day AOT for AFW Cross-connect Capability w/three inoperable AFW pumps
- Need for 10-Day AFW Cross-connect AOT
- Technical Specifications (TS) Requirements
- Proposed TS Change
- Risk Assessment
- Compensatory measures required during 10-Day AOT
AFW System Design Overview 3
License Amendment Request Submittal Overview
- Need for 10-Day AOT for AFW Cross-connect Capability
- All three unit-specific AFW pumps are required to be operable to supply the opposite units AFW system via a cross-connect if required (e.g., a total loss of AFW on the opposite unit due to a fire or main steam line break in the Main Steam Valve House)
- A 72- hour TS AOT is permitted for opposite unit AFW cross-connect capability
- Unit 2 AFW full flow recirculation piping has two identified leaks that have been temporarily repaired in accordance with ASME Code Case N-513, Rev. 3
- The piping must be permanently repaired during the Surry Unit 2 2023 spring Refueling Outage (RFO)
- The Unit 2 AFW full flow recirculation piping is common to all three AFW pumps; consequently, the pipe replacement work will result in the inoperability of all three Unit 2 AFW pumps, which results in the inoperability of the opposite unit AFW cross-connect supply to Unit 1
- The repair schedule to repair/replace the affected AFW pipe indicates it will take 8 days, which far exceeds the 72-hour AOT for opposite unit cross-connect capability 4 April 7, 2022
AFW System Pipe Replacement 5
License Amendment Request Submittal Overview
- Need for 10-Day AOT for AFW Cross-connect Capability
- Therefore, an additional, 10-day AOT is required to support the replacement of the Unit 2 common AFW full flow recirculation piping, as well as any similar maintenance that would result in the inoperability of all three AFW pumps and opposite unit cross-connect capability they support (e.g., Emergency Condensate Storage Tank maintenance, repair/replacement of the corresponding Unit 1 AFW piping) 6
License Amendment Request Submittal Overview (continued)
TS Requirements TS 3.6.C.4.a requires the operability of the opposite units AFW system as follows:
Two of the three auxiliary feedwater pumps and the associated redundant flowpaths on the opposite unit (automatic initiation instrumentation need not be OPERABLE) capable of being used with the opening of the cross-connect.
If TS 3.6.C.4.a cannot be met due to the unavailability of the opposite units cross-connect capability, the affected unit must enter TS 3.6.I, which states, in part, I. The requirements of Specification 3.6.C.4 above concerning the opposite units auxiliary feedwater pumps; the associated redundant flowpaths, including piping, headers, valves, and control board indication; the cross-connect piping from the opposite unit; and the protected condensate storage tank may be modified to allow the following components to be inoperable, provided immediate attention is directed to making repairs. Automatic initiation instrumentation associated with the opposite units auxiliary feedwater pumps need not be OPERABLE.
- 1. One of the opposite units flowpaths or two of the opposite units auxiliary feedwater pumps may be inoperable for a period not to exceed 14 days.
- 2. Both of the opposite units flowpaths; the opposite units protected condensate storage tank; the cross-connect piping from the opposite unit; or three of the opposite units auxiliary feedwater pumps may be inoperable for a period not to exceed 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.
If the above requirements are not met, be in HOT SHUTDOWN within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and be less than 350°F and 450 psig within the following 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
7
License Amendment Request Submittal Overview (continued)
Proposed TS Change TS 3.6.I.2 is being revised as follows (change indicated in bold text):
Both of the opposite units flowpaths; the opposite units protected condensate storage tank; the cross-connect piping from the opposite unit; or three of the opposite units auxiliary feedwater pumps may be inoperable for a period not to exceed 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. For the specific purpose of performing maintenance related to the operability of all three of the opposite unit's auxiliary feedwater pumps, these components may be inoperable for a period not to exceed 10 days.
8
License Amendment Request Submittal Overview (continued)
Risk Assessment Results A risk assessment has been performed for a 10-day AOT for the opposite units cross-connect capability due to maintenance that renders all three AFW pumps inoperable. The risk assessment concluded the following:
- The risk associated with a 10-day AOT is acceptably small for both CDF and LERF with considerable margin remaining.
- Both the AFW cross-tie MOVs and check valves are modeled in the internal events PRA, so the risk estimates are precise.
- FLEX strategies are credited in this risk assessment. FLEX is not in the dominant internal events sequences, but it is important for the estimation of fire risk.
9
License Amendment Request Submittal Overview (continued)
Compensatory Measures While in the 10-Day AOT
- Weather conditions will be monitored and the pipe replacement will not be scheduled if severe weather conditions are anticipated
- The opposite units steam-driven AFW pump will be controlled as Protected Equipment while in the 10-day AOT
- TRM compensatory actions to address 10 CFR 50.65 (a)(4) fire risk related to the AFW cross tie unavailability, which include periodic walkdowns in relevant fire areas, will be taken
- The AFW BDB/FLEX pump will be pre-staged to provide AFW defense-in-depth comparable to the AFW cross-tie during the 10-day AOT 10
Schedule Action Target Date Facility Safety Review April 28, 2022 Committee Approval of LAR Submit LAR to NRC May 5, 2022 NRC Approval Requested April 15, 2023 Implement License Prior to Unit 2 Amendments Spring 2023 RFO 11
Conclusions
- Repair/replacement of the Unit 2 common AFW full flow recirculation piping requires eight days to complete
- Tagging out the Unit 2 common AFW full flow recirculation piping renders all three Unit 2 AFW pumps inoperable, which requires the opposite unit (i.e., Unit 1) to enter a 72-hour AOT TS clock due to the inoperability of both AFW cross-connect trains
- The addition of a 10-day AOT for the inoperability of the opposite unit AFW cross-connect trains due to three inoperable AFW pumps allows sufficient time to complete the repair/replacement of the Unit 2 common AFW full flow recirculation piping, as well as the future repair of the corresponding Unit 1 AFW piping as required, without requiring a dual unit outage
- The risk assessment performed for the 10-day AOT concluded the risk associated with making the proposed TS change is acceptably low for CDF and LERF
- Compensatory measures will be put in place whenever the 10-day AOT is entered 12
Surry Units 1 and 2 LAR to Add 10-Day AOT for Opposite Unit Cross-Connect Capability Discussion 13