PNO-II-96-081, on 961112,Unit 2 Experienced Turbine Generator Trip from 100% Power.Investigation Into Cause of Turbine Generator Trip Revealed Ground Fault on Main Generator Stator Phase a Windings.Addl Followup Will Be Performed13 November 1996PNO-II-96-081:on 961112,Unit 2 Experienced Turbine Generator Trip from 100% Power.Investigation Into Cause of Turbine Generator Trip Revealed Ground Fault on Main Generator Stator Phase a Windings.Addl Followup Will Be Performed
PNO-II-93-062, on 931115,Unit 2 Tripped from 95% Reactor Power.Caused by Three Main Feedwater Regulating Valves Closed.Unit Has Been Taken to cold-shutdown to Investigate Cause of SG Level Oscillations16 November 1993PNO-II-93-062:on 931115,Unit 2 Tripped from 95% Reactor Power.Caused by Three Main Feedwater Regulating Valves Closed.Unit Has Been Taken to cold-shutdown to Investigate Cause of SG Level Oscillations
PNO-II-93-037, on 930820,unscheduled Shutdown in Excess of 72 H Occurred Due to Need to Repair Leak in Joint on SG B. RCS Temp Reduced Below 200 Degrees F.Licensee to Inspect Drain Valve Assemblies on Sg.State of VA Notified23 August 1993PNO-II-93-037:on 930820,unscheduled Shutdown in Excess of 72 H Occurred Due to Need to Repair Leak in Joint on SG B. RCS Temp Reduced Below 200 Degrees F.Licensee to Inspect Drain Valve Assemblies on Sg.State of VA Notified
PNO-II-92-020, on 920327,hot Particle Was Detected on Forehead of Health Physics Technician When Exiting Radiation Control Area.No Erythema Was Oberved & Employee Scheduled to Visit Company Physician as Precaution30 March 1992PNO-II-92-020:on 920327,hot Particle Was Detected on Forehead of Health Physics Technician When Exiting Radiation Control Area.No Erythema Was Oberved & Employee Scheduled to Visit Company Physician as Precaution
PNO-II-90-066, on 901023,util Made 1 H Rept Per 10CFR50.72 Re Entry Into Station Emergency Plan for Shutdown of Unit 2. Caused by Svc Water Flow,Less That Design Basis Required Flow.Licensee Currently Evaluating Situation23 October 1990PNO-II-90-066:on 901023,util Made 1 H Rept Per 10CFR50.72 Re Entry Into Station Emergency Plan for Shutdown of Unit 2. Caused by Svc Water Flow,Less That Design Basis Required Flow.Licensee Currently Evaluating Situation
PNO-II-89-066, licensees Prepared for Adverse Weather Conditions Due to Hurricane.Briefings Held W/Key Managers on Responsibilities to Check All Trailers,Secure Crane Hooks & Increase Emergency Food Supplies21 September 1989PNO-II-89-066:licensees Prepared for Adverse Weather Conditions Due to Hurricane.Briefings Held W/Key Managers on Responsibilities to Check All Trailers,Secure Crane Hooks & Increase Emergency Food Supplies
PNO-II-89-066A, updates Status of Hurricane Hugo for Nuclear Facilities in Southeast.Manning of Incident Response Ctr by Region II Continuing21 September 1989PNO-II-89-066A:updates Status of Hurricane Hugo for Nuclear Facilities in Southeast.Manning of Incident Response Ctr by Region II Continuing
ML20247N00711 September 1989PNS-I-89-015:revised Notification of Telephone Threat, Correcting Event Date from 890909 to 890911.Call, Originating from Limerick or Peach Bottom,Received at Corporate Ofc.On 890525,threat Received at Peach Bottom
PNO-V-89-047, on 890808,earthquake & Aftershock of 5.1 & 4.2 Magnitudes,Respectively,Occurred Approx 15 Miles Southwest of San Jose,Ca.Reactors Shutdown During Earthquake.Tour of GE Reactor Disclosed No Damage8 August 1989PNO-V-89-047:on 890808,earthquake & Aftershock of 5.1 & 4.2 Magnitudes,Respectively,Occurred Approx 15 Miles Southwest of San Jose,Ca.Reactors Shutdown During Earthquake.Tour of GE Reactor Disclosed No DamageEarthquake
PNO-IV-89-045, on 890703,earthquake Near Tremonton,Ut Occurred.Earthquake Safety Interlocks Did Not Trip & No Damage Occurred5 July 1989PNO-IV-89-045:on 890703,earthquake Near Tremonton,Ut Occurred.Earthquake Safety Interlocks Did Not Trip & No Damage OccurredEarthquake
PNO-V-89-022, on 880403,earthquake of Magnitude of 4.5 on Richter Scale Occurred 10 Miles Northeast of San Jose,Ca. Automatic Seismic Protection Did Not Trigger Shutdown. Reactors Manually Shutdown.No Radioactive Release Occurred3 April 1989PNO-V-89-022:on 880403,earthquake of Magnitude of 4.5 on Richter Scale Occurred 10 Miles Northeast of San Jose,Ca. Automatic Seismic Protection Did Not Trigger Shutdown. Reactors Manually Shutdown.No Radioactive Release OccurredEarthquake
PNO-II-89-026, 80,000 1b Reactor Coolant Pump Motor Enroute to Cheswick,Pa Collapsed One Side of Low Boy Trailer Resulting in Small Brush Fire.Surveys at Site Confirmed No Contamination.Commonwealth of VA Health Dept Notified27 March 1989PNO-II-89-026:80,000 1b Reactor Coolant Pump Motor Enroute to Cheswick,Pa Collapsed One Side of Low Boy Trailer Resulting in Small Brush Fire.Surveys at Site Confirmed No Contamination.Commonwealth of VA Health Dept Notified
PNO-IV-89-020, Region IV Notified of Recent Reactor Trip at Palo Verde Unit 3 That Was Complicated by Inability to Open Steam Generator Atmospheric Dump Valves Mfg by Control Components,Inc.No Sticking Problems Noted at Other Plants23 March 1989PNO-IV-89-020:Region IV Notified of Recent Reactor Trip at Palo Verde Unit 3 That Was Complicated by Inability to Open Steam Generator Atmospheric Dump Valves Mfg by Control Components,Inc.No Sticking Problems Noted at Other Plants
PNO-II-89-015A, on 890225,primary to Secondary Steam Generator Tube Leak at Plant.Caused by Mechanical Failure. Eddy Current & Boroscopic Insps of Affected Tube Will Be Conducted Following Removal of Plug10 March 1989PNO-II-89-015A:on 890225,primary to Secondary Steam Generator Tube Leak at Plant.Caused by Mechanical Failure. Eddy Current & Boroscopic Insps of Affected Tube Will Be Conducted Following Removal of Plug
PNO-II-89-015, on 890125,Unit 1 Tripped Due to Ruptured Air Line to Main Feedwater Regulating Valve.Subsequent to Trip, Radiation Monitor Indications & Increased Charging Flow Revealed primary-to-secondary Leak from C Steam Generator27 February 1989PNO-II-89-015:on 890125,Unit 1 Tripped Due to Ruptured Air Line to Main Feedwater Regulating Valve.Subsequent to Trip, Radiation Monitor Indications & Increased Charging Flow Revealed primary-to-secondary Leak from C Steam Generator
PNO-I-88-116, on 881108,voters Voted Down state-wide Referendum to Shutdown Plants in State of Ma If Nuclear Waste Produced in Process9 November 1988PNO-I-88-116:on 881108,voters Voted Down state-wide Referendum to Shutdown Plants in State of Ma If Nuclear Waste Produced in Process
PNO-V-88-044, on 880627,earthquake Occurred 5 Miles East of Santa Cruz,Ca.Seismic Instrumentation Not Triggered at Vallecitos,Aerotest Operations or at Univ of California at Berkeley27 June 1988PNO-V-88-044:on 880627,earthquake Occurred 5 Miles East of Santa Cruz,Ca.Seismic Instrumentation Not Triggered at Vallecitos,Aerotest Operations or at Univ of California at BerkeleyEarthquake
PNO-V-88-038, on 880612,earthquake Occurred on Calaveras Fault within 50 Miles of Identified Facilities.All Reactors Shutdown at Time of Earthquake.No Seismic Trips Observed. Insp Revealed No Signs of Damage at Facilities13 June 1988PNO-V-88-038:on 880612,earthquake Occurred on Calaveras Fault within 50 Miles of Identified Facilities.All Reactors Shutdown at Time of Earthquake.No Seismic Trips Observed. Insp Revealed No Signs of Damage at FacilitiesEarthquake
PNO-IV-88-040, on 880509,System Energy Resources,Inc to Manage & Operate All Middle South Nuclear Plants.Arkansas Power & Light & Louisiana Power & Light Will Apply for Appropriate License Amends9 May 1988PNO-IV-88-040:on 880509,System Energy Resources,Inc to Manage & Operate All Middle South Nuclear Plants.Arkansas Power & Light & Louisiana Power & Light Will Apply for Appropriate License Amends
PNO-II-88-022, on 880405,low Levels of Radioactive Matl Detected in Demineralizer Beds for Plant Makeup Water.Caused by Concentrating Effect of Radionuclides.Licensee Currently Storing Spent Demineralizer Beds Onsite Until NRC Approval6 April 1988PNO-II-88-022:on 880405,low Levels of Radioactive Matl Detected in Demineralizer Beds for Plant Makeup Water.Caused by Concentrating Effect of Radionuclides.Licensee Currently Storing Spent Demineralizer Beds Onsite Until NRC Approval
PNO-I-88-020, on 880216,CA Mcneill Named Executive Director - Nuclear W/Responsibility of Directing Nuclear Operations, Including Nuclear Dept Reorganization & Restart Efforts of Peach Bottom16 February 1988PNO-I-88-020:on 880216,CA Mcneill Named Executive Director - Nuclear W/Responsibility of Directing Nuclear Operations, Including Nuclear Dept Reorganization & Restart Efforts of Peach Bottom
PNO-II-88-011, on 880206,slight Positive Pressure Created in Primary Drain Tank Due to Large Vol of Water & Overhead Gas Compressor Inoperable,Causing Gaseous Leak in Auxiliary Bldg.Cause Not Stated8 February 1988PNO-II-88-011:on 880206,slight Positive Pressure Created in Primary Drain Tank Due to Large Vol of Water & Overhead Gas Compressor Inoperable,Causing Gaseous Leak in Auxiliary Bldg.Cause Not Stated
PNO-I-88-017, on 880202,util to Announce Change to Corporate Mgt,Per Highly Critical INPO Ltr.Jh Austin Will Retire as of 880301 & Jl Everett Will Assume Duties of President Until Replacement Named2 February 1988PNO-I-88-017:on 880202,util to Announce Change to Corporate Mgt,Per Highly Critical INPO Ltr.Jh Austin Will Retire as of 880301 & Jl Everett Will Assume Duties of President Until Replacement Named
PNO-II-88-004, on 880113,licensee Identified Resin Intrusion from Powdex Demineralizer Sys Into Secondary Side of Steam Generator.Resin Causes Formation of Sulphates,Believed to Be Prime Cause of Steam Generator Tube Failures14 January 1988PNO-II-88-004:on 880113,licensee Identified Resin Intrusion from Powdex Demineralizer Sys Into Secondary Side of Steam Generator.Resin Causes Formation of Sulphates,Believed to Be Prime Cause of Steam Generator Tube Failures
PNO-I-88-001, on 880104,realignment of Nuclear Mgt Updated. Action Provides for Corporate Officer at Each Plant to Elevate Level of Plant in Corporate Mgt Structure4 January 1988PNO-I-88-001:on 880104,realignment of Nuclear Mgt Updated. Action Provides for Corporate Officer at Each Plant to Elevate Level of Plant in Corporate Mgt Structure
PNO-II-87-079, on 871128,North Anna Unit 1 Was Taken Off Line Due to Excessive Seal Leakage on B Reactor Coolant Pump. Outage Planned for 10 Days to Replace Seal Package & Inspect Lower Radial Bearing on Pump.Commonwealth of VA Informed1 December 1987PNO-II-87-079:on 871128,North Anna Unit 1 Was Taken Off Line Due to Excessive Seal Leakage on B Reactor Coolant Pump. Outage Planned for 10 Days to Replace Seal Package & Inspect Lower Radial Bearing on Pump.Commonwealth of VA Informed
PNO-II-87-078, on 871126,licensee Removed Unit 1 from Svc to Repair Leaking Manway Cover on Secondary Side of C Steam Generator.Unit Cooled Down & Manway Gasket Replaced. Commonwealth of Virginia Informed30 November 1987PNO-II-87-078:on 871126,licensee Removed Unit 1 from Svc to Repair Leaking Manway Cover on Secondary Side of C Steam Generator.Unit Cooled Down & Manway Gasket Replaced. Commonwealth of Virginia Informed
PNO-V-87-076, on 871123-24,two Moderate Earthquakes Centered Near Westmoreland,Ca Occurred,Triggering Seismic Alarms at San Onofre.Unusal Event Declared.Plant Sys & Components Not Adversely Affected.Effects on Other Locations Noted24 November 1987PNO-V-87-076:on 871123-24,two Moderate Earthquakes Centered Near Westmoreland,Ca Occurred,Triggering Seismic Alarms at San Onofre.Unusal Event Declared.Plant Sys & Components Not Adversely Affected.Effects on Other Locations NotedEarthquake
PNO-III-87-138, on 871103,reactor Shutdown After Two MSIV Failed to Close.Valves Recycled Resulting in Acceptable Time Responses.Augumented Insp Team Dispatched to Plant Site to Review Possible Causes of MSIV Closure Problems3 November 1987PNO-III-87-138:on 871103,reactor Shutdown After Two MSIV Failed to Close.Valves Recycled Resulting in Acceptable Time Responses.Augumented Insp Team Dispatched to Plant Site to Review Possible Causes of MSIV Closure Problems
PNO-II-87-069, on 871012,Turkey Point Units 3 & 4 Declared NOUE Based on Potential for Hurricane Force Winds & Technical Support Ctr Activated for Mgt of Storm Preparation & Operations.St Lucie Also Made Severe Weather Preparations13 October 1987PNO-II-87-069:on 871012,Turkey Point Units 3 & 4 Declared NOUE Based on Potential for Hurricane Force Winds & Technical Support Ctr Activated for Mgt of Storm Preparation & Operations.St Lucie Also Made Severe Weather Preparations
PNO-II-87-070, on 871013,NRC Authorized Startup & Operation Limited to 50% Power for Facility,Down Since 870715 Following Steam Generator Tube Rupture.No Evidence of Steam Generator Tube Leakage Noted13 October 1987PNO-II-87-070:on 871013,NRC Authorized Startup & Operation Limited to 50% Power for Facility,Down Since 870715 Following Steam Generator Tube Rupture.No Evidence of Steam Generator Tube Leakage Noted
PNO-I-87-093, on 871009,util Announced Listed Changes to Corporate Nuclear Mgt to Provide for Corporate Officer at Each Plant & to Elevate Plant Level.Changes Will Be Effective on 871101.Nuclear Review Board Reconstituted9 October 1987PNO-I-87-093:on 871009,util Announced Listed Changes to Corporate Nuclear Mgt to Provide for Corporate Officer at Each Plant & to Elevate Plant Level.Changes Will Be Effective on 871101.Nuclear Review Board Reconstituted
PNO-II-87-061, on 870920,automatic Trip from 100% Power Occurred.Caused by Phase to Ground Fault in B Phase at Electrical Connection on B Reactor Coolant Pump.Safety Injection Signal Reset21 September 1987PNO-II-87-061:on 870920,automatic Trip from 100% Power Occurred.Caused by Phase to Ground Fault in B Phase at Electrical Connection on B Reactor Coolant Pump.Safety Injection Signal Reset
PNO-II-87-060, on 870719,hot Particle Recovered from Skin of Left Shoulder Blade of Contract Health Physics Technician & Determined to Be 1.6 Uci of C-60.Investigation Continuing. Technician Restricted from Radiation Control Zone20 August 1987PNO-II-87-060:on 870719,hot Particle Recovered from Skin of Left Shoulder Blade of Contract Health Physics Technician & Determined to Be 1.6 Uci of C-60.Investigation Continuing. Technician Restricted from Radiation Control Zone
PNO-II-87-053A, on 870730,State of Ny,Dept of Environ Conservation & Dept of Radiation Health Completed Survey of Miscellaneous Boxes & Equipment W/Markings from VEPCO Found in Abandoned Bldg in Springwater,Ny.No Problems Noted30 July 1987PNO-II-87-053A:on 870730,State of Ny,Dept of Environ Conservation & Dept of Radiation Health Completed Survey of Miscellaneous Boxes & Equipment W/Markings from VEPCO Found in Abandoned Bldg in Springwater,Ny.No Problems Noted
PNO-II-87-053, on 870728,licensee Notified That Fireman Discovered Miscellaneous Boxes & Equipment in Abandoned Bldg Outside Springwater,Ny.Matl Might Be Clean Surplus Matl Disposed of After Cancellation of North Anna 329 July 1987PNO-II-87-053:on 870728,licensee Notified That Fireman Discovered Miscellaneous Boxes & Equipment in Abandoned Bldg Outside Springwater,Ny.Matl Might Be Clean Surplus Matl Disposed of After Cancellation of North Anna 3
PNO-III-87-101, on 870726,licensee Received Bomb Threat from Caller Angry Because Place of Residence Lost Power During Storm.Security Personnel Notified & Search Procedures Implemented.No Bomb Discovered27 July 1987PNO-III-87-101:on 870726,licensee Received Bomb Threat from Caller Angry Because Place of Residence Lost Power During Storm.Security Personnel Notified & Search Procedures Implemented.No Bomb Discovered
PNO-II-87-049, on 870716,augmented Insp Team Formed After Licensee Calculated Possible Leak Rate of 600 Gpm.Util Will Visually Inspect Steam Generator for More Precise Reading on Occurrence & Reconstructing Circumstances of Event17 July 1987PNO-II-87-049:on 870716,augmented Insp Team Formed After Licensee Calculated Possible Leak Rate of 600 Gpm.Util Will Visually Inspect Steam Generator for More Precise Reading on Occurrence & Reconstructing Circumstances of EventSafe Shutdown
PNO-II-87-048, on 870715,cold Shutdown Reached & Util Downgraded from Alert Status to Recovery Mode.Nrc Inspectors Will Remain Onsite to Follow Up on Licensee Actions & Assess Sequence of Events.Pno Updates PNO-II-87-04715 July 1987PNO-II-87-048:on 870715,cold Shutdown Reached & Util Downgraded from Alert Status to Recovery Mode.Nrc Inspectors Will Remain Onsite to Follow Up on Licensee Actions & Assess Sequence of Events.Pno Updates PNO-II-87-047
PNO-II-87-047, on 870715,unit Experienced Steam Generator Tube Leak.Util Reported Estimated Release of Radioactive Matl to Atmosphere Less than 1.3% of Tech Spec Release Limit.Release Path Isolated15 July 1987PNO-II-87-047:on 870715,unit Experienced Steam Generator Tube Leak.Util Reported Estimated Release of Radioactive Matl to Atmosphere Less than 1.3% of Tech Spec Release Limit.Release Path Isolated
PNO-II-87-043, on 870702,util Shutdown Facility for Longer than 48 Hs to Repair Manual Isolation Valve.Util Plans to Bring Plant to Hot Shutdown & Repair Valve.Svc Will Resume in Several Days2 July 1987PNO-II-87-043:on 870702,util Shutdown Facility for Longer than 48 Hs to Repair Manual Isolation Valve.Util Plans to Bring Plant to Hot Shutdown & Repair Valve.Svc Will Resume in Several Days
PNO-II-87-040, on 870623,unit Manually Shut Down Following Estimated 40 Gpm Leak in Rcs.Caused by Packing on Reactor Coolant Loop Stop Valve.Licensee Preparing Unit to Go to Mode 5 to Effect Repairs23 June 1987PNO-II-87-040:on 870623,unit Manually Shut Down Following Estimated 40 Gpm Leak in Rcs.Caused by Packing on Reactor Coolant Loop Stop Valve.Licensee Preparing Unit to Go to Mode 5 to Effect Repairs
PNO-III-87-081, on 870610,earthquake Measuring 5.0 on Richter Scale Occurred Near Lawrenceville,Il.Unusual Events Declared by Six Power Stations But No Damage Observed.Ground Motion Felt at Five Other Plants11 June 1987PNO-III-87-081:on 870610,earthquake Measuring 5.0 on Richter Scale Occurred Near Lawrenceville,Il.Unusual Events Declared by Six Power Stations But No Damage Observed.Ground Motion Felt at Five Other PlantsEarthquake
PNO-II-87-037, on 870607,licensee Entered 24 H Limiting Condition for Operation When Outside Recirculation Spray Pump B Failed Periodic Surveillance Test Due to High Vibration & Low Discharge Pressure.Unit Shut Down9 June 1987PNO-II-87-037:on 870607,licensee Entered 24 H Limiting Condition for Operation When Outside Recirculation Spray Pump B Failed Periodic Surveillance Test Due to High Vibration & Low Discharge Pressure.Unit Shut Down
PNO-II-87-032, updates PNO-II-87-029.Util Determined That Partial Closure of Isolation Valve Which Brought About Reactor Scram on 870516 Caused by Shearing of Valve Stem Above Backseat.Metallurgist Evaluating Break21 May 1987PNO-II-87-032:updates PNO-II-87-029.Util Determined That Partial Closure of Isolation Valve Which Brought About Reactor Scram on 870516 Caused by Shearing of Valve Stem Above Backseat.Metallurgist Evaluating Break
PNO-II-87-029, on 870516,unit Tripped on Low Reactor Coolant Flow Rate in Loop A.Caused by Partial Closure of Hot Loop Isolation Valve.Outage of 12 Days Planned to Correct Problem.Resident Inspector Will Provide Followup18 May 1987PNO-II-87-029:on 870516,unit Tripped on Low Reactor Coolant Flow Rate in Loop A.Caused by Partial Closure of Hot Loop Isolation Valve.Outage of 12 Days Planned to Correct Problem.Resident Inspector Will Provide Followup
PNO-II-87-011A, on 870213,leak Discovered in Svc Water Line Below Floor of Unit 2 Turbine Bldg.Util Will Replace Defective Portion of Unit 2 Side of Svc Water Piping.Unit 1 Side of Same Sys Tested & Acceptable18 February 1987PNO-II-87-011A:on 870213,leak Discovered in Svc Water Line Below Floor of Unit 2 Turbine Bldg.Util Will Replace Defective Portion of Unit 2 Side of Svc Water Piping.Unit 1 Side of Same Sys Tested & Acceptable
PNO-II-87-011, heatup of Unit 1 Beginning in Preparation for Return to Svc.Restart of Unit 2 Scheduled 2 to 3 Wks Later.Licensee Informed of Region II Acceptance of Restart Plan in 870210 Augmented Insp Team Rept12 February 1987PNO-II-87-011:heatup of Unit 1 Beginning in Preparation for Return to Svc.Restart of Unit 2 Scheduled 2 to 3 Wks Later.Licensee Informed of Region II Acceptance of Restart Plan in 870210 Augmented Insp Team Rept
PNO-III-87-009, on 870114,Safe Energy Commission of Michigan (Sec) Announced Results of Investigation Into Licensee Safeteam Program.Rept Contends Safeteam Program Failure.Sec Plans to File 2.206 Petition W/Nrc14 January 1987PNO-III-87-009:on 870114,Safe Energy Commission of Michigan (Sec) Announced Results of Investigation Into Licensee Safeteam Program.Rept Contends Safeteam Program Failure.Sec Plans to File 2.206 Petition W/Nrc
PNO-III-87-004, rept Submitted on 870107 to State of Oh Governor Rf Celeste Re Emergency Planning at Facilities Recommended That Plants Be Limited to 5% Power Until Emergency Planning Deficiencies Corrected7 January 1987PNO-III-87-004:rept Submitted on 870107 to State of Oh Governor Rf Celeste Re Emergency Planning at Facilities Recommended That Plants Be Limited to 5% Power Until Emergency Planning Deficiencies Corrected