Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20217N42625 October 1999Forwards Amend 17 to License DPR-9 & Safety Evaluation. Amend Revises TS by Deleting SR D.3.c,which Required Weekly Observation of Nitrogen Cover Gas Pressure within Sodium Storage Tanks Located in Sodium Building
ML20217P16621 October 1999Forwards Insp Rept 50-341/99-17 on 990927-1005.No Violations Noted
ML20217M07719 October 1999Confirms Discussion Between GL Shear,M Mitchell,E Kosky, D Williams,B Rumins,D Harmon & W Rutenberg in Public Meeting on 990923.Purpose of Meeting Was to Discuss Current Status RP Program at Enrico Fermi 2
ML20217E56714 October 1999First Partial Response to FOIA Request for Documents.Records in App a Already Available in Pdr.App B Records Encl & Being Released in Entirety
ML20217F82313 October 1999Informs That on 990930,NRC Completed mid-cycle PPR of Catawba Nuclear Station.Based on Review,Nrc Did Not Identify Any New Areas That Warranted More than Core Insp Program Over Next Five Months.Historical Listing of Issues,EnclFire Barrier
ML20217F5937 October 1999Forwards Insp Rept 50-341/99-11 on 990724-0908.Two Violations Re Failure to Follow Procedures While Sampling Standby Liquid Control Tank & Wear Dosimetry Properly Being Treated as Noncited Violations
ML20217B8264 October 1999Forwards Summary of Decommissioning Insp Plan for Fy 2000. Plan Will Be Updated Annually & May Be Revised at Any Time Based Upon Future Insp Findings,Events & Resource Availability
ML20212J3011 October 1999Forwards Exemption from Certain Requirements of 10CFR54.17(c) Re Schedule for Submitting Application for Operating License Renewal.Se Also EnclAging Management
License Renewal
Exemption Request
ML20212J8121 October 1999Discusses Plant,Unit 2 Completion of Licensing Action for GL 98-01 & Suppl 1, Y2K Readiness of Computer Sys at Npps. Ack Efforts That Licensee Have Completed to Date in Preparing Plant for Y2K Transition
ML20217K2651 October 1999Forwards Retake Exams Repts 50-413/99-302 & 50-414/99-302 on 990921-23.Two of Three ROs & One SRO Who Received Administrative Section of Exam Passed Retake Exam, Representing 75 Percent Pass Rate
ML20212K88830 September 1999Refers to 990928 Meeting Conducted at Fermi Unit 2 to Discuss Initiatives in Risk Area & to Establish Dialog Between SRAs & PSA Staff
ML20212J83327 September 1999Responds to Licensee 990924 Request That NRC Exercise Discretion Not to Enforce Compliance with Actions Required in TS 3/4.6.1.8.Ltr Documents 990923 Telcon with Util in Which NRC Orally Issued NOEDEnforcement Discretion
ML20217A79124 September 1999Forwards Insp Repts 50-413/99-05 & 50-414/99-05 on 990718- 0828 at Catawba Facility.Nine NCVs Identified Involving Inadequate Corrective Actions Associated with Degraded Svc Water Supply Piping to Auxiliary Feedwater Sys
ML20212E64724 September 1999Discusses GL 98-01 Issued by NRC on 980511 & DPC Responses for Catawba NPP & 990615.Informs That NRC Reviewed Response for Catawba & Concluded That All Requested Info Provided.Considers GL 98-01 to Be Closed for Catawba
ML20216H35623 September 1999Informs That During 990914 Telcon,L Sanders & M Bielby Made Arrangements with NRC to Inspect Licensed Operator Requalification Program at Fermi Nuclear Station for Week of 991129 Which Coincides with Util Regularly Scheduled Exam
ML20216H45423 September 1999Informs That During 990914 Telcon L Sanders & M Bielby Made Arrangements for Administration of Licensing Exams at Fermi Nuclear Station for Week of Jan 31,2000.NRC Will Make Exam Validation Visit to Facility During Week of Jan 10,2000
ML20212F09421 September 1999Discusses Closeout of GL 97-06, Degradation of Steam Generator Internals for Cns,Units 1 & 2
ML20212M20020 September 1999Confirms 990913 Telcon Between M Purser & R Carroll Re Management Meeting to Be Conducted on 991026 in Atlanta,Ga to Discuss Operator Licensing Issues
ML20212A41314 September 1999Informs That TR DPC-NE-2009P Submitted in 990817 Affidavit, Marked Proprietary,Will Be Withheld from Public Disclosure, Pursuant to 10CFR2.709(b) & Section 103(b) of Atomic Energy Act of 1954,as AmendedAffidavit
ML20212M19313 September 1999Refers to 990909 Meeting Conducted at Region II Office Re Presentation of Licensee self-assessment of Catawba Nuclear Station Performance.List of Attendees & Licensee Presentation Handout Encl
ML20212A37510 September 1999Informs That Postponing Implementation of New Conditions Improved by RG 1.147,rev 12,acceptable Since Evaluation on Relief Based on Implementation Code Case for Duration of Insp IntervalThrough-Wall Leakage
ML20217A9429 September 1999Informs That NRC Plan to Conduct Addl Resident Insps Beyond Core Insp Program Over Next 6 Months to Assess Improvements in Areas of Procedural Compliance & Quality of Work. Historical Listing of Plant Issues Encl
ML20211M81925 August 1999Confirms 990825 Telcon Between G Gilbert & R Carroll Re Mgt Meeting to Be Held on 990909 in Atlanta,Ga,To Allow Licensee to Present self-assessment of Catawba Nuclear Station Performance
ML20211A96420 August 1999Forwards SE Authorizing Licensee 990118 Request for Approval of Proposed Relief from Volumetric Exam Requirements of ASME B&PV Code,Section XI for Plant,Units 2
IR 05000341/199901319 August 1999Discusses Insp Rept 50-341/99-13 & OI Rept 3-98-039 Conducted Into Potential Misconduct of Operator Formerly Employed by De.Nrc Determined That Violation of NRC Regulations Occurred.Synopsis of IO Rept EnclEnforcement Discretion
Fire Protection Program
ML20211C05217 August 1999Forwards Tables for Sections 3.6 & 3.7 of Draft Safety Evaluation of Proposed Conversion of Current TS to Improved Standard TS
ML20210V03213 August 1999Forwards Insp Repts 50-413/99-04 & 50-414/99-04 on 990606- 0717.Six Violations of NRC Requirements Identified & Being Treated as non-cited Violations,Consistent with App C of Enforcement Policy
IR 05000341/199900110 August 1999Forwards Insp Rept 50-341/99-01 on 990619-0723 & Nov. Violation of Concern Because Operators Did Not Understand License Requirements & Placed Plant in Configuration Where EDG 11 Was Removed from ServiceZebra Mussel
IR 05000341/19990126 August 1999Forwards Insp Rept 50-341/99-12 on 990712-0716.No Violations Noted.Insp Focused on Implementation of Plant Chemistry & Radiological Environ Monitoring Programs & Operation of post-accident Sampling Sys
ML20211C4766 August 1999Forwards Draft Safety Evaluation Re Proposed Conversion of Current TS to Improved Standard TSSafe Shutdown
Shutdown Margin
Safety Limit Minimum Critical Power Ratio
Ultimate heat sink
Grab sample
Offsite Dose Calculation Manual
Probabilistic Risk Assessment
Scram Discharge Volume
Annual Radiological Environmental Operating Report
Excess Flow Check Valve
Unidentified leakage
Subsequent actuation
ML20210Q3755 August 1999Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Authorized Representative of Facility Must Submit Ltr as Listed,Thirty Days Before Exam Date,In Order to Register Individuals for ExamGeneric Fundamentals Examination
IR 05000413/19980132 August 1999Discusses Integrated Insp Repts 50-413/98-13,50-414/98-13, 50-413/98-16,50-414/98-16 & NRC Special Repts 50/413/99-11 & 50-414/99-11 Conducted Between Aug 1998 & May 1999.Six Violations Occurred,Based on OI Investigation & InspCondition Adverse to Quality
ML20210J21223 July 1999Discusses NRC OI Investigation Rept 3-98-039 Completed on 990524 & Forwards Notice of Violation
IR 05000413/199901022 July 1999Discusses Insp Rept 50-413/99-10 & 50-414/99-10 on 990314- 0424 & Forwards Notice of Violation Re Failure to Comply with TS 3.7.13,when Misalignment of Two Electrical Breakers Rendered SSS Inoperable from 981216-29
ML20217G52420 July 1999Forwards Exam Repts 50-413/99-301 & 50-414/99-301 on 990524- 27,0603,07-10 & 16.Of Fourteen SRO & RO Applicants Who Received Written Exams & Operating Tests,Eight Applicants Passed & Six Failed Exam
ML20209F65712 July 1999Forwards Insp Rept 50-341/99-09 on 990516-0618.No Violations Noted.Weak Procedural Guidance,Communications Issues & Configuration Control Weaknessess Were Evident
NUREG-1431, Forwards SER Agreeing with Util General Interpretation of TS LCO 3.0.6,but Finds No Technical Basis or Guidance That Snubbers Could Be Treated as Exception to General Interpretation9 July 1999Forwards SER Agreeing with Util General Interpretation of TS LCO 3.0.6,but Finds No Technical Basis or Guidance That Snubbers Could Be Treated as Exception to General Interpretation
ML20196L0378 July 1999Approves Requested Schedule Change of Current two-year Requalification Examinations to non-outage dates.Two-year Cycle Will Start on 991001 & Will End on 020930
ML20196J9006 July 1999Informs That 990520 Submittal of Rept DPC-NE-3004-PA,Rev 1, Mass & Energy Release & Containment Response Methodology, Marked Proprietary Will Be Withheld Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954Affidavit
ML20196J5512 July 1999Discusses GL 92-01,Rev 1,Supp 1, Rv Integrity, Issued by NRC on 950519 & DE Responses & 980729 for Fermi 2.Informs That Staff Revised Info in Rvid & Released Info as Rvid Version 2 as Result of Review of Responses
IR 05000413/19990031 July 1999Discusses Insp Repts 50-413/99-03 & 50-414/99-03 Completed on 990605 & Transmitted by Ltr .Results of Delibrations for Violation Re Discovery of Potentially More Limiting Single Failure Affecting SGTS Analysis ProvidedEnforcement Discretion
Operator Manual Action
ML20209E2701 July 1999Forwards Insp Repts 50-413/99-03 & 50-414/99-03 on 990425- 0605.Six Violations of NRC Requirements Occurred & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy
ML20209E99930 June 1999Forwards Insp Rept 50-016/99-01 on 990614-17.No Violations Noted.Potential Weakness in Airborne Effluent Concentration Assessment Identified
ML20209B24729 June 1999Informs That NRR Revised Schedule for Conversion of Fermi 2 TS to Improved Std Ts.Planned Amend Date Has Been Moved to 990930 & Date for Draft Amend Has Been Moved to 990806
ML20209E39328 June 1999Informs of 990618 Meeting Conducted at Facility to Present Results of Most Recent Periodic Plant Performance Review for Plant.List of Attendees Encl
ML20196G88624 June 1999Discusses GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structrual Integrity 950816 & 960729 Responses.Rvid,Version 2 Released as Result of Review.Rvid Should Be Reviewed & Comments Should Be Received by 990901 If Not Acceptable for Plant
ML20196G65417 June 1999Confirms 990614 Telephone Conversation Re Rescheduling of Two Predecisional Enforcement Conferences Originally Scheduled for 990623.SSS Conference Rescheduled for 990712 & Ice Condenser Conference Rescheduled for 990720
ML20196A57814 June 1999Discusses Notice of Enforcement Discretion for Duke Energy Corp Re Catawba Nuclear Station Unit 1 TSs 3.5.2 & 3.7.12Enforcement Discretion
Large early release frequency
ML20195E9173 June 1999Confirms Conversation with Bradshaw on 990526 Re Rescheduling 990607 Predecisional Enforcement Conference to Discuss Apparent Violation in Insp Repts 50-413/99-10 & 50-414/99-10.Conference Will Be on 990623 in Atlanta,Ga
ML20195F4142 June 1999Forwards Insp Repts 50-413/99-11 & 50-414/99-11 on 990422-23 & 0503.Apparent Violation Identified & Being Considered for Escalated Enforcement Action.Violation Involved Failure to Maintain Unit 1 Ice Condenser Lower Inlet Door Operable