 Issue dateTitleTopic
IR 05000293/19990058 October 1999Insp Rept 50-293/99-05 on 990726-0905.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant SupportHigh Radiation Area
Probabilistic Risk Assessment
Condition Adverse to Quality
Battery sizing
IR 05000293/199900427 August 1999Insp Rept 50-293/99-04 on 990610-0725.Non-cited Violations Noted.Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant SupportStroke time
Temporary Modification
ML20209G2339 July 1999Insp Rept 50-293/99-03 on 990419-0609.Violations Noted & Being Treated as non-cited Violations.Major Areas Inspected: Operations,Maint,Engineering & Plant Support.Response to Main Transformer Fire by Fire Brigade Members Was GoodFitness for Duty
High Radiation Area
Temporary Modification
Locked High Radiation Area
Condition Adverse to Quality
Job Performance Measure
Foreign Material Exclusion
Continuous fire watch
Scaffolding
IR 05000293/199900217 May 1999Insp Rept 50-293/99-02 on 990308-0418.Two Level 4 Violations Occurred & Being Treated as Ncv.Major Areas Inspected: Operations,Maint,Engineering & Plant SupportLocked High Radiation Area
Power change
IR 05000293/199900120 April 1999Insp Rept 50-293/99-01 on 990125-0307.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support.Also Included Routine Core Insp of Security Program During Period of 990301-05Grab sample
Fire Watch
Scaffolding
IR 05000293/199801022 December 1998Insp Rept 50-293/98-10 on 981020-1208.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Support,Including Implementation of Fire Protection ProgramSafe Shutdown
Fire Barrier
Hydrostatic
Probabilistic Risk Assessment
Emergency Lighting
Operability Determination
Fire Protection Program
Scaffolding
Power change
IR 05000293/19980081 December 1998Insp Rept 50-293/98-08 on 980907-1019.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant SupportHigh Radiation Area
Probabilistic Risk Assessment
Biofouling
Downpower
IR 05000293/199820324 November 1998Insp Rept 50-293/98-203 on 980928-1023.No Violations Noted. Major Areas Inspected:Capability of Selected Sys to Perform Safety Functions Required by Design Bases,Adherence of Sys to Design & Licensing Bases & Consistency of ConfigurationStroke time
Enforcement Discretion
Battery sizing
Grace period
IR 05000293/19980077 October 1998Insp Rept 50-293/98-07 on 980726-0906.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant SupportHigh Radiation Area
Temporary Modification
Foreign Material Exclusion
Operability Determination
Biofouling
Power change
Downpower
Flow Induced Vibration
IR 05000293/199800628 August 1998Insp Rept 50-293/98-06 on 980609-0725.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant SupportHot Short
Safe Shutdown
Fire Barrier
Temporary Modification
Process Control Program
Systematic Assessment of Licensee Performance
Biofouling
Fire Protection Program
IR 05000293/199800920 August 1998Insp Rept 50-293/98-09 on 980713-24.No Violations Noted. Major Areas Inspected:Engineering Activities in Areas Including Evaluations to Address Operability Concerns,C/A Process & Actions Associated W/Findings from Previous InspsCondition Adverse to Quality
Operability Determination
IR 05000293/19980059 July 1998Insp Rept 50-293/98-05 on 980421-0608.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support.Concerns W/Fire Proctection Area Were IdentifiedSafe Shutdown
Half scram
Fire Barrier
Temporary Modification
Scram Discharge Volume
Systematic Assessment of Licensee Performance
Operability Determination
Fire Protection Program
Fire Watch
ML20217P7803 April 1998Insp Rept 50-293/98-03 on 980302-05 & 11-12.Apparent Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Licensee Security Force Capability
IR 05000293/199800124 March 1998Insp Rept 50-293/98-01 on 980107-0224.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant SupportSafe Shutdown
Half scram
Offsite Dose Calculation Manual
Stroke time
Temporary Modification
Condition Adverse to Quality
Systematic Assessment of Licensee Performance
IR 05000293/19970136 February 1998Insp Rept 50-293/97-13 on 971111-980106.Violations Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant SupportUnanalyzed Condition
Reactor Vessel Water Level
Stroke time
Enforcement Discretion
Anchor Darling
Temporary Modification
Missed surveillance
Scram Discharge Volume
Systematic Assessment of Licensee Performance
Cold shutdown justification
Biofouling
Operability Assessment
Failure to Scram
IR 05000293/199701217 December 1997Insp Rept 50-293/97-12 on 971006-10 & 1119.Violations Noted. Major Areas Inspected:Eq Documents for EQ Equipment That Required Requalification Due to Containment Environ Changes Resulting from CS Flow Rate Reduction in 1988Post Accident Monitoring
Operability Determination
IR 05000293/199701111 December 1997Insp Rept 50-293/97-11 on 970914-1110.Violations Noted:Major Areas Inspected:Operations,Maint,Engineering & Plant SupportHot Short
Reactor Vessel Water Level
Non-Destructive Examination
Enforcement Discretion
Temporary Modification
Systematic Assessment of Licensee Performance
Exemption Request
Grace period
Power change
IR 05000293/199701026 November 1997Insp Rept 50-293/97-10 on 971104-07.No Violations Noted. Major Areas Inspected:Emergency Response Organization, Simulated Events,Mitigation Actions Emergency Declarations & off-site Agencies
IR 05000293/199700824 October 1997Insp Rept 50-293/97-08 on 970805-0913.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant SupportHigh Radiation Area
Locked High Radiation Area
Fire Protection Program
Downpower
ML20198L92321 October 1997Insp Rept 50-293/97-05 on 970514-0828.Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:EngineeringUnanalyzed Condition
Ultimate heat sink
Mission time
Past operability
Met Tower
Temporary Modification
Condition Adverse to Quality
Through-Wall Leak
IR 05000293/199700715 September 1997Insp Rept 50-293/97-07 on 970625-0816.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant SupportTemporary Modification
Condition Adverse to Quality
Downpower
IR 05000293/199708012 September 1997Insp Rept 50-293/97-80 on 970721-0801.Violations Noted.Major Areas Inspected:Effectiveness of Processes for Identifying Resolving & Preventing Issues That Degrade Quality of Plant Operations & SafetyFitness for Duty
Packing leak
Condition Adverse to Quality
Operability Determination
ML20216G8184 September 1997Insp Rept 50-293/97-09 on 970827-28.No Violations Noted. Major Areas Inspected:Licensee Access Authorization ProgramFitness for Duty
IR 05000293/19970047 August 1997Insp Rept 50-293/97-04 on 970505-23.No Violations Noted. Major Areas Inspected:Effectiveness of Licensees Efforts in Maintaining Design Basis of safety-related SysHigh Radiation Area
Ultimate heat sink
Stroke time
Operability Determination
ML20149K04322 July 1997Insp Rept 50-293/97-03 on 970429-0624.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support
ML20141K78622 May 1997Insp Rept 50-293/97-02 on 970303-0428.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant SupportSafe Shutdown
Reactor Vessel Water Level
Fire Barrier
Stroke time
Hydrostatic
Temporary Modification
VT-2
Locked High Radiation Area
Main transformer failure
Foreign Material Exclusion
Scaffolding
Downpower
ML20137E56718 March 1997Insp Rept 50-293/97-01 on 970112-0302.Violations Noted.Major Areas Inspected:Operations,Engineering & Plant SupportTime of Discovery
Reactor Vessel Water Level
High Radiation Area
Temporary Modification
Condition Adverse to Quality
Missed surveillance
Systematic Assessment of Licensee Performance
Fuel cladding
Fire Watch
Scaffolding
Backfit
Downpower
ML20134K5957 February 1997Insp Rept 50-293/96-10 on 961123-970111.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant SupportPacking leak
Enforcement Discretion
Coatings
Temporary Modification
Condition Adverse to Quality
Test box
Abnormal operational transient
IR 05000293/199600818 December 1996Insp Rept 50-293/96-08 on 960924-1122.Violation Noted.Major Areas Inspected:Engineering,Maint,Plant Support,Radioactive Effluent Controls Program,Radiological Environmental Monitoring & Meteorological Monitoring.Meeting Slides EnclShutdown Margin
Reactor Vessel Water Level
Packing leak
Half scram
Offsite Dose Calculation Manual
Finite Element Analysis
Foreign Material Exclusion
Operability Determination
Through-Wall Leak
Scaffolding
Downpower
IR 05000293/199600630 October 1996Insp Rept 50-293/96-06 on 960729-0923.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant SupportTime of Discovery
High winds
Reactor Vessel Water Level
Half scram
Temporary Modification
Condition Adverse to Quality
Test box
Systematic Assessment of Licensee Performance
Operability Determination
Fuel cladding
Liquid penetrant
Through-Wall Leak
ML20129A04411 October 1996Insp Rept 50-293/96-09 on 960916-20.Violations Noted. Major Areas Inspected:Miscellaneous Security & Safeguard Issues,Access Authorization Program & Administration Organization & Background Investigation Elements
ML20129D83620 September 1996Insp Rept 50-293/96-07 on 960708-12,0722-26 & 0828-0903. Non Cited Violation Noted.Major Areas Inspected:C/As After Licensee Had Identified Potentially Inoperable Primary Containment as Documented in LER 96-04
IR 05000293/199302010 January 1994Insp Rept 50-293/93-20 on Stated Date.No Violations Noted. Major Areas Inspected:Operations,Maintenance & Surveillance, Engineering & Plant SupportReactor Vessel Water Level
High Radiation Area
Probabilistic Risk Assessment
Fire Protection Program
IR 05000293/199308021 December 1993Insp Rept 50-293/93-80 on 931018-23.No Violations Noted. Major Areas Inspected:Station Blackout Coping Sys,Onsite Ac Supplies & Reliability Program,Plant Mods & QA & Maint Practices for Station Blackout EquipmentSafe Shutdown
High winds
Emergency Lighting
IR 05000293/199301923 November 1993Insp Rept 50-293/93-19 on 930928-1101.No Violations Noted. Major Areas Inspected:Plant Operations,Maint & Surveillance, Engineering,Plant Support,W/Regard to Security & NRC Info Notice 93-079
ML20058D47719 November 1993Insp Rept 50-293/93-16 on 930830-1015.Violations Noted.Major Areas Inspected:Audits & Surveillances,Training & Qualifications,Radiological Problem Repts & Associated C/A
IR 05000293/199301515 October 1993Insp Rept 50-293/93-15 on 930817-0927.No Violations Noted. Major Areas Inspected:Plant Operations,Radiological Controls Maint & Surveillance,Emergency Preparedness,Security,Safety Assessment & Quality VerificationHigh winds
Reactor Vessel Water Level
High Radiation Area
Temporary Modification
Squib
Fire Watch
IR 05000293/199301724 September 1993Insp Rept 50-293/93-17 on 930830-0903.No Violations Noted. Major Areas Inspected:Mgt Controls,Qa Audits & ODCM
IR 05000293/19930148 September 1993Insp Rept 50-293/93-14 on 930713-0816.No Violations Noted. Major Areas Inspected:Plant Operations,Maintenance & Surveillance,Engineering & Plant SupportReactor Vessel Water Level
High Radiation Area
Half scram
Hydrostatic
Nondestructive Examination
Excess Flow Check Valve
Liquid penetrant
Pressure Boundary Leakage
Pressure boundary leak
Dissimilar Metal Weld
Unidentified leakage
IR 05000293/19930114 August 1993Insp Rept 50-293/93-11 on 930606-11.No Violations Noted. Major Areas Inspected:Licensee Corrective Actions of Previously Identified Electrical Distribution Sys Functional Insp Findings & ObservationsOperability Assessment
IR 05000293/19930013 February 1993Insp Rept 50-293/93-01 on 930111-14.Weaknesses Noted.Major Areas Inspected:Eop Review,Rev,Approval Process,Qa Involvement in EOP Program & Operator Training in EOPs
IR 05000293/19920812 February 1993Probabilistic Risk Assessment Based Insp Rept 50-293/92-81 on 921130-1218.Violation Noted.Major Areas Inspected:Review of Emergency Diesel Generators & Hpcis.App a EnclSafe Shutdown
Loop seal
Probabilistic Risk Assessment
Temporary Modification
Emergency Lighting
Job Performance Measure
Operability Determination
IR 05000293/199202828 January 1993Insp Rept 50-293/92-28 on 921124-1231.Violations Noted. Major Areas Inspected:Plant Operations,Radiological Controls,Maint & Surveillance,Emergency Preparedness, Security,Safety Assessment & Quality VerificationHigh winds
Reactor Vessel Water Level
Packing leak
High Radiation Area
Stroke time
Probabilistic Risk Assessment
Operability Determination
IR 05000293/199202621 January 1993Insp Rept 50-293/92-26 on 921207-11.No Violations or Deviations Noted.Major Areas Inspected:Ep Program Changes, Emergency Response Facilities,Equipment,Instrumentation, Supplies & Organization & Mgt Control
IR 05000293/199202329 December 1992Safety Insp Rept 50-293/92-23 on 921020-1123.No Violations Noted.Major Areas Inspected:Plant Operations,Radiological Controls,Maint & Surveillance,Emergency Preparedness, Security & Safety Assessment & Quality VerificationReactor Vessel Water Level
High Radiation Area
Ultimate heat sink
Hydrostatic
Locked High Radiation Area
Operability Determination
Code Reconciliation
Liquid penetrant
Fire Protection Program
Scaffolding
Siren
IR 05000293/199202423 November 1992Insp Rept 50-293/92-24 on Stated Date.No Safety Concerns or Violations Noted.Major Areas Inspected:Audits & Surveillances,Collective Personnel Exposure Status,Outage Radiological Controls & Implementation of Exposure ProgramsHigh Radiation Area
IR 05000293/19900207 November 1990Safety Insp Rept 50-293/90-20 on 900816-1008.Violation Noted.Major Areas Inspected:Plant Operations,Security, Maint & Surveillance,Engineering & Technical Support, Radiological Controls,Emergency Preparedness & SafetyReactor Vessel Water Level
Packing leak
High Radiation Area
Stroke time
Temporary Modification
IR 05000293/199002111 October 1990Insp Rept 50-293/90-21 on 900905-07.Major Areas Inspected: 900902-03 Event Involving Number of Component Malfunctions & Operational Complications Following Shutdown.Operating Procedures Lacked Adequate Guidance for Operators
IR 05000293/199000920 August 1990Insp Rept 50-293/90-09 on 900806-10.No Violations or Deviations Noted.Major Areas Inspected:Control of Design, Design Changes,Mods,Engineering & Technical Support Organization,Staffing,Communications,Qa & TrainingTemporary Modification
IR 05000293/199001630 July 1990Partially Withheld Physical Security Insp Rept 50-293/90-16 on 900625-29 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Mgt Support & Program Plans,Protected & Vital Area Physical Barriers & Detection & Assessment Aids