 Issue dateTitleTopic
ML20055G51418 July 1990Forwards Ltr Sent to Legislative Representatives Re Shoaling Problem at Forked RiverSafe Shutdown
ML20055F6405 July 1990Responds to Re Adequacy of Cooling Water Supply to Facility in Light of Severe Shoaling of Forked River.Nrc Does Not Have Necessary Regulatory Authority to Address Adverse Recreational & Economic Effects on Local ResidentsSafe Shutdown
ML20206C0637 November 1988Responds to Re Enrichment of Naturally Occurring Radionuclides in Proposed Alchemie Facilities.Company Advised That Facilities Subj to State of Tn Regulations
ML20205C35223 September 1988Final Response to FOIA Request for Documents Re Plant. Forwards App D Documents.App D Documents Also Available in PDR
ML20154M50522 September 1988Responds to Re Rev to Info on Applicability of 10CFR50 Applications for Enriching Stable Isotopes.Listed Observations Provided Based on Info in Ltr & 880914 Telcon
ML20236V7341 December 1987Partial Response to FOIA Request for Documents.Forwards Documents Listed in App C
ML20195G6882 November 1987Responds to to Chairman Zech Re Plant Restart W/O Effective Radiological Emergency Response Plan.Improvements Currently Underway,Based on 870806 FEMA Rept Listing Six Areas of Concern.Plant Will Not Start Until Issues Resolved
ML20236B84921 October 1987Forwards Nrc/State of Nc Environ Monitoring Appraisal on 871005-06.State Met All Obligations in 1986 Contract W/ Exceptions of H-3 Analyses in Surface Waters & I-131 Analyses in Milk,Both Required Lower Detection Limits
ML20235S6281 October 1987Responds to Supporting Request from Smud That Commission Hold Hearing in Sacramento,Ca Re Safety of B&W Nuclear Plants.Response to Concerns Will Be Addressed When Response to Ucs Petition Issued
ML20151W0209 September 1987Summarizes 870521 Meeting W/Massachsetts Officials Re Restart of Facility.Understands That Prior to Decision on Restart,Further Public Meetings Will Be HeldSystematic Assessment of Licensee Performance
ML20238B29924 August 1987Responds to Expressing Concern That Mgt & Safety Problems Recently Identified at Facility Could Endanger Constituents.Nrc Ready to Take Appropriate Action If Performance Degrades to Levels Endangering Public
ML20235X00020 July 1987Forwards Response to 861107 & 1231 Ltrs on 861023 Tech Spec Change Request 148 Re Reactor Coolant Radioiodine Monitoring.Util Request Requires Rev Prior to Final Action
ML20235G25116 June 1987Discusses Manner NRC Used to Select Sample of safety-related Concerns in Safeteam Files for Review,Per 870528 Request. Safety Concerns Properly Addressed.Applicable Insp Repts & Related Info EnclSafe Shutdown
High Radiation Area
Ultimate heat sink
Fire Barrier
Hydrostatic
Temporary Modification
Process Control Program
Systematic Assessment of Licensee Performance
Scaffolding
ML20213G50026 March 1987Submits Comments Re Legislation Proposing Placement of Nuclear Safety Inspector at Facility.Mou May Not Be Necessary Due to Precision & Detail of LegislationFitness for Duty
ML20237C92617 March 1987Responds to Questions Raised at 870116 Meeting in Bethesda,Md Re Emergency Response Data Sys (Erds).Daily Status Repts Cannot Be Provided Due to Limitations on NRC Computer Sys.Info on Status of SPDS for State Plants Encl
ML20237D23324 February 1987Responds to Questions Raised at 870116 Meeting in Bethesda,Md Re Emergency Response Data Sys.Implementation Status of SPDS for State Nuclear Power Plants Listed
ML20215G20720 February 1987Responds to Expressing Concerns Re 870104 Newsday Article on Plant Emergency Plan.Given Unwillingness of State & Local Govts to Participate in Development of Plan,Approved Util Offsite Emergency Plan Only Such Plan AvailableChernobyl
ML20211C5256 February 1987Discusses NRC Analysis of Licensing Schedules for Facility, Per Util 870202 Request for NRC Statement to State of Ca. NRC Sept 1981 - Feb 1982 Monthly Repts to Congress Re Licensing Projections for Pending OL Applications Encl
ML20214U1623 December 1986Responds to FOIA Request to DOJ for Records Re DOJ Investigation of Util Role in Siting,Licensing & Constructing Diablo Canyon.Forwards App a & B Documents. Documents Also Available in PDR
IA-86-699, Responds to FOIA Request to DOJ for Records Re DOJ Investigation of Util Role in Siting,Licensing & Constructing Diablo Canyon.Forwards App a & B Documents. Documents Also Available in PDR3 December 1986Responds to FOIA Request to DOJ for Records Re DOJ Investigation of Util Role in Siting,Licensing & Constructing Diablo Canyon.Forwards App a & B Documents. Documents Also Available in PDR
ML20215K75721 October 1986Discusses Licensee 860808 Discovery of Incorrectly Installed Pressure Sensing Line & NRC Actions to Ensure That Similar Errors Do Not Exist,In Response to .Insp Rept Detailing NRC Followup EnclTemporary Modification
ML20206U8151 October 1986Ack Receipt of in Response to NRC 851203 Acceptance Appraisal & Concerns.Responses Acceptable. Implementation of Corrective Actions Will Be Reviewed During Future Performance Appraisal
ML20203N32417 September 1986Responds to Re Mitchell Allegations Re as-built Drawings at Byron Station.Allegations Will Be Vigorously Pursued.Recommendation to Pursue Investigation at Byron 2 & Braidwood 1 & 2 PrematureSafe Shutdown Earthquake
Design basis earthquake
ML20214M2604 September 1986Responds to 860725 Request for Assistance in Matters Re Plant & Siting of Hazardous Waste Disposal or Storage Facilities.Nrc Has No Position on Presence of Waste Sites Near Reactor Sites.Related Info Encl
ML20206S1704 September 1986Responds to 860725 Request for Assistance in Matters Re Plant & Siting of Hazardous Waste Disposal or Storage Facilities.Nrc Has No Position on Presence of Waste Sites Near Reactor Sites.Related Info Encl
ML20209E3902 September 1986Responds to 860815 Request That Perry Not Be Licensed for Full Power & Davis-Besse Not Be Permitted to Achieve Full Power Operation Until State of Oh Review of Emergency Evaluation Plans CompletedEarthquake
Chernobyl
ML20215B2852 September 1986Requests Addl Info Clarifying State of Oh Position Re Participation in Perry Evacuation Plan Prior to 860905 Meeting to Consider Issuance of Full Power LicenseEarthquake
Chernobyl
ML20203J00715 April 1986Addresses Questions & Concerns on Mod 4 to Agreement NRC-31-83-671 Re Interim Preoperational Environ Surveillance Programs at Facilities,Per Jf Thiel & Subsequent Telcons.Funding Levels Detailed
ML20197F82915 April 1986Forwards Population Density Map for Emergency Planning Zone. Map Developed by ORNL by Projecting from 1982 Census Data & Must Be Taken as Estimate.W/O Encl
ML20197F03815 April 1986Forwards Population Density Map for Emergency Planning Zone. Map Developed by ORNL by Projecting from 1982 Census Data & Must Be Taken as Estimate.W/O Encl
ML20155F1238 April 1986Responds to 860218 Request for Addl Info Re Potential Water Hammer Event in Isolation Condenser Sys.Reactor Water Level Should Not Exceed 185 Inches Above Top of Active Fuel Due to Potential Damage from Water Hammer EventWeld Overlay
ML20199J84727 March 1986Forwards Population Density Maps for Facilities Emergency Planning Zones.Maps Developed by ORNL from 1980 Census Data & Must Be Taken as Estimate.W/O Encl
ML20199J89527 March 1986Forwards Population Density Maps for Facilities Emergency Planning Zones.Maps Developed by ORNL from 1980 Census Data & Must Be Taken as Estimate.W/O Encl
ML20199J89727 March 1986Forwards Population Density Maps for Facilities Emergency Planning Zones.Maps Developed by ORNL from 1980 Census Data & Must Be Taken as Estimate.W/O Encl
ML20199J90227 March 1986Forwards Population Density Maps for Facilities Emergency Planning Zones.Maps Developed by ORNL from 1980 Census Data & Must Be Taken as Estimate.W/O Encl
ML20142A11121 February 1986Forwards Appraisal of State of Nc Program for Performing Environ Monitoring Activities at Listed Plants,Including Assessment of Facilities,Equipment,Program Staffing & Personnel Qualification.Program Meets NRC Requirements
ML20153H07912 February 1986Responds to Re Util Proposal to Accelerate Power Ascension Program.Util Proposed Five Methods of Compression & Discussed Implementation of Mods During 850801 Meeting. Acceleration Feasible Approach to Testing Mod
ML20137Q34721 November 1985Advises That NRC & R Hubbard Concerns Re Idvp Will Be Addressed in Upcoming Sser Under Chapter 17.5 Independent Design Verification
ML20133P80030 October 1985Forwards Hb Tucker & H Thompson Draft Ltrs & Environ Assessment Re Duke Power Co Request for Approval of Procedure for Disposal of Radioactively Contaminated Wood, for Review.W/O Encl
ML20137E95320 August 1985Responds to & 850809 Telcon Re Environ Surveillance Program Under Cooperative Agreement NRC-31-83-671.Program Satisfactory,Based on Accumulated Baseline Environ Data Collected During Jan 1984 - Aug 1985
ML20213F38130 July 1985Responds to 850711 & 15 Requests for Suspension of Low Power Testing Program at Facility & Review of Training of Personnel & Condition of Equipment to Determine If Plant Safe to Test at Low Power.Plant Safely Operated by Util
ML20133M1303 July 1985Further Response to FOIA Request for Documents Re Drafting of IE Bulletins 79-14 & 80-11.Forwards App B Documents. Documents Also Available in Pdr.App C Documents Already in PDREarthquake
ML20128Q52918 June 1985Responds to FOIA Request for Documents Re Drafting of IE Bulletins 79-14 & 80-11.Forwards App a Documents.App a Documents Also Available in PDR
ML20205A4264 April 1985Responds to Re Shipment of Spent Nuclear Rods from West Valley,Ny to Oyster Creek Nuclear Station.Route Will Be Resurveyed to Ensure Against Any Serious Safeguarding Dangers Over Route I-287
ML20206H0955 February 1985Forwards Insp Rept 50-482/84-18 in Response to Five Nonspecific Allegations Forwarded in .W/O Rept
ML20128Q7457 December 1984Discusses Util Program for Early Completion of Const & rate-setting Procedures.Danger in Speeding Up Const Noted
IA-84-354, Discusses Util Program for Early Completion of Const & rate-setting Procedures.Danger in Speeding Up Const Noted7 December 1984Discusses Util Program for Early Completion of Const & rate-setting Procedures.Danger in Speeding Up Const Noted
ML20134M92013 July 1984Forwards Certification of Pollution Control Facilities,Per Util 840529 & 0703 Submittals.Portions of Certification Abate or Control Atmospheric Pollutants or Contaminants
ML20133M99623 October 1979Ack Receipt of Requesting NRC Present Testimony on Me Puc Investigation of Facility.W Russell Will Meet W/Me Puc,Complainants & Util on 791025 in Augusta,Me to Discuss Issues Outlined
ML20237J67722 April 1975Forwards RW Caudle to GL Madsen & GL Madsen to Pg Brittain