Issue date | Title | Topic | |
---|---|---|---|
IR 05000382/2023010 | 31 January 2024 | Comprehensive Engineering Team Inspection Report 05000382/2023010 | Stroke time Arc flash Significance Determination Process Foreign Material Exclusion Power Uprate |
ML24012A142 | 31 January 2024 | Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0051 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) | Time of Discovery Contraband Condition Adverse to Quality Safeguards Contingency Plan Exemption Request |
IR 05000416/2023004 | 25 January 2024 | Integrated Inspection Report 5000416/2023004 | |
ML23326A039 | 24 January 2024 | Issuance of Amendment No. 281 Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b | |
IR 05000382/2023003 | 23 January 2024 | Acknowledgment of Reply to a Notice of Violation NRC Inspection Report 05000382/2023003 | |
ML24018A022 | 18 January 2024 | Core Operating Limits Report (COLR) Cycle 24, Revision 2 | |
IR 05000458/2023040 | 18 January 2024 | 95001 Supplemental Inspection Supplemental Report 05000458/2023040 and Follow-Up Assessment Letter | |
ML24017A158 | 17 January 2024 | Submittal of Emergency Plan Revision 50 | |
IR 05000416/2024301 | 16 January 2024 | NRC Initial Operator Licensing Examination Approval 05000416/2024301 | |
ML24012A196 | 12 January 2024 | Response to 2nd Round Request for Additional Information Concerning Relief Request Number EN-RR-22-001 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and | |
RBG-48271, Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b and Application to Adopt 10 CFR 50.69, Risk | 12 January 2024 | Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b and Application to Adopt 10 CFR 50.69, Risk | |
ML24011A174 | 11 January 2024 | Security Baseline Inspection Report (Cover Letter) | Affidavit |
IR 05000313/2023420 | 10 January 2024 | Security Baseline Inspection Report 05000313/2023420 and 05000368/2023420 | |
IR 05000313/2023402 | 2 January 2024 | Security Baseline Inspection Report 05000313/2023402 and 05000368/2023402 | |
ML23340A229 | 28 December 2023 | Withdrawal of an Amendment Request to Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability (EPID L-2022-LLA-0169)-LTR | |
ML23349A167 | 21 December 2023 | Request for Withholding Information from Public Disclosure | Affidavit |
ML23354A002 | 21 December 2023 | Request for Withholding Information from Public Disclosure | Exclusive Use Affidavit |
ML23348A371 | 14 December 2023 | Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report (05000416/2024011) and Request for Information | Safe Shutdown Commercial Grade Dedication Hydrostatic Probabilistic Risk Assessment Temporary Modification Aging Management Job Performance Measure Fire Protection Program |
ML23348A357 | 14 December 2023 | Application to Revise Technical Specifications to Use Online Monitoring Methodology Slides and Affidavit for Pre-Submittal Meeting | Surveillance Frequency Control Program Affidavit |
ML23340A222 | 13 December 2023 | Project Manager Assignment | |
ML23340A159 | 13 December 2023 | Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment | |
ML23352A029 | 13 December 2023 | Entergy - 2024 Nuclear Energy Liability Evidence of Financial Protection | |
IR 05000313/2023405 | 12 December 2023 | Security Baseline Inspection Report 05000313/2023405 and 05000368/2023405 | Affidavit |
IR 05000458/2023010 | 12 December 2023 | Biennial Problem Identification and Resolution Inspection Report 05000458/2023010 | Boric Acid Past operability Condition Adverse to Quality Significance Determination Process Operability Determination Through-Wall Leak Through Wall Leak |
ML23341A083 | 11 December 2023 | Material Control and Accounting Program Inspection Report 05000313/368/2023404- Cover Letter | Affidavit |
ML23305A092 | 7 December 2023 | Summary of Regulatory Audit Regarding License Amendment Request to Revise Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b | Tornado Missile Internal Flooding Probabilistic Risk Assessment Emergency Lighting FLEX TORMIS Battery sizing |
RBG-48267, Reply to a Notice of Violation, NRC Inspection Report 05000458/2023003 | 7 December 2023 | Reply to a Notice of Violation, NRC Inspection Report 05000458/2023003 | Ultimate heat sink |
ML23333A136 | 29 November 2023 | Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | |
ML23275A207 | 28 November 2023 | Issuance of Amendment No. 280 Removal of Technical Specification Condition Allowing Two Reactor Coolant Pump Operation | Anticipated operational occurrence Surveillance Frequency Control Program Safeguards Contingency Plan Nonconservative Technical Specifications Fuel cladding |
IR 05000313/2023003 | 21 November 2023 | Revised - ANO Revised Integrated Inspection Report 05000313/2023003 and 05000368/2023003 and Independent Spent Fuel Storage Installation Inspection Report 07200013/ 2023001 | Boric Acid Stroke time Enforcement Discretion Functionality Assessment FLEX Significance Determination Process Job Performance Measure Operability Determination Spent Fuel Pool Instrumentation Fire Protection Program Downpower |
ML23325A142 | 21 November 2023 | Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | |
ML23325A141 | 21 November 2023 | Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | |
ML23325A144 | 21 November 2023 | Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | |
ML23325A143 | 21 November 2023 | Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | |
ML23312A183 | 14 November 2023 | Integrated Inspection Report 05000382/2023003 and Notice of Violation | Offsite Dose Calculation Manual Enforcement Discretion Temporary Modification Functionality Assessment Significance Determination Process Annual Radioactive Effluent Release Report Process Control Program Operability Determination Earthquake Fire Protection Program Overexposure Overspeed trip |
IR 05000416/2023403 | 13 November 2023 | Security Baseline Inspection Report 05000416/2023403 Cover Letter | Affidavit |
ML23313A096 | 13 November 2023 | Integrated Inspection Report 05000313/2023003 and 05000368/2023003 and Independent Spent Fuel Storage Installation Inspection Report 07200013/2023001 | Boric Acid Stroke time Enforcement Discretion Functionality Assessment FLEX Operability Determination Fire Protection Program Downpower |
ML23243B045 | 13 November 2023 | Request for Withholding Information from Public Disclosure | Exclusive Use Affidavit |
ML23310A032 | 13 November 2023 | Integrated Inspection Report 05000458/2023003 | Time of Discovery Reactor Vessel Water Level Ultimate heat sink Mission time Internal Flooding Enforcement Discretion Probabilistic Risk Assessment Temporary Modification Functionality Assessment Incorporated by reference Significance Determination Process Process Control Program Operability Determination Time Critical Operator Action Maintenance Rule Program Fire Protection Program Substantial potential for an overexposure Downpower Overexposure |
IR 05000458/2023003 | 13 November 2023 | Integrated Inspection Report 05000458/2023003 | Time of Discovery Reactor Vessel Water Level Ultimate heat sink Mission time Internal Flooding Enforcement Discretion Probabilistic Risk Assessment Temporary Modification Functionality Assessment Incorporated by reference Condition Adverse to Quality Significance Determination Process Process Control Program Operability Determination Time Critical Operator Action Maintenance Rule Program Fire Protection Program Substantial potential for an overexposure Downpower Overexposure |
ML23311A432 | 9 November 2023 | Notification of NRC Supplemental Inspection (95001) and Request for Information | |
ML23311A208 | 9 November 2023 | Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV | |
IR 05000416/2023003 | 8 November 2023 | Integrated Inspection Report 05000416/2023003 | Reactor Vessel Water Level Grab sample Offsite Dose Calculation Manual Stroke time Enforcement Discretion Met Tower Functionality Assessment Significance Determination Process Job Performance Measure Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Operability Determination Fire Protection Program |
RBG-48264, Core Operating Limits Report (COLR) - Cycle 23, Revision 1 | 6 November 2023 | Core Operating Limits Report (COLR) - Cycle 23, Revision 1 | |
RBG-48260, Notification of Readiness for Supplemental Inspection | 12 October 2023 | Notification of Readiness for Supplemental Inspection | |
IR 05000313/2023011 | 10 October 2023 | Commercial Grade Dedication Inspection Report 05000313/2023011 and 05000368/2023011 | Commercial Grade Dedication |
ML23278A240 | 6 October 2023 | Regulatory Audit Plan in Support of License Amendment Requests to Revise TSs to Adopt Risk-Informed Completion Times and Implement the Provisions of 10 CFR 50.69 | Internal Flooding Probabilistic Risk Assessment FLEX |