Issue date | Title | Topic | |
---|---|---|---|
ML20217E018 | 6 October 1999 | Provides Nj Dept of Environ Protection Comments on Oyster Creek Nuclear Generating Station TS Change Request 267 Re Clarifications to Several TS Sections | |
05000219/LER-1998-011, Forwards LER 98-011-02, Three Small Bore Pipe Lines Did Not Meet Design Bases for Siesmic & Thermal Allowables. Engineering Std Will Not Be Completed Until End of 4th Quarter of 1999 Due to Scheduling Conflicts | 30 September 1999 | Forwards LER 98-011-02, Three Small Bore Pipe Lines Did Not Meet Design Bases for Siesmic & Thermal Allowables. Engineering Std Will Not Be Completed Until End of 4th Quarter of 1999 Due to Scheduling Conflicts | |
ML20216J759 | 30 September 1999 | Informs NRC That Remediation Efforts for Software Sys Etude & Rem/Aacs/Cico Have Been Completed According to Schedule & Now Y2K Ready | |
ML20216K142 | 29 September 1999 | Provides NRC with Name of Single Point of Contact for Purpose of Accessing Y2K Early Warning Sys,As Requested by NRC Info Notice 99-025 | |
ML20217D166 | 27 September 1999 | Forwards Proprietary Completed NRC Forms 396 & 398,in Support of License Renewal Applications for Listed Individuals,Per 10CFR55.57.Encl Withheld | |
ML20212E197 | 16 September 1999 | Forwards Rev 11 of Gpu Nuclear Operational QAP, Reflecting Organizational Change in Which Functions & Responsibilities of Nuclear Safety & Technical Support Div Were Assigned to Other Divisions | |
ML20212B557 | 10 September 1999 | Forwards Rev 11 to Oyster Creek Emergency Dose Calculation Manual, IAW 10CFR50,App E,Section V | Offsite Dose Calculation Manual |
ML20211N294 | 3 September 1999 | Responds to NRC 990802 Telcon Request for Environ Impact Assessment of TS Change Request 251 Concerning Movement of Loads Up to 45 Tons with RB Crane During Power Operations | |
ML20211J677 | 30 August 1999 | Submits Response to NRC 990802 Telcon Request for Gpu to Provide Environ Impact Assessment for Tscr 251 | |
ML20211K239 | 23 August 1999 | Forwards fitness-for-duty Performance Data Repts for TMI, Oyster Creek & Corporate Headquarters Located in Parsippany, Nj | Fitness for Duty |
ML20211B901 | 18 August 1999 | Forwards Rev 0 to EPIP 1820-IMP-1720.01, Emergency Public Info Implementing Procedure | Reactor Vessel Water Level Fuel cladding |
ML20210D280 | 22 July 1999 | Submits Response to Administrative Ltr 99-02 Operating Reactor Licensing Action Estimates. Estimate of Licensing Actions Projected for Fy 2000 Encl.No Projection Provided for Fy 2001 | Enforcement Discretion Exemption Request |
ML20209H500 | 14 July 1999 | Forwards Revised TS Pages 3.1-15 & 3.1-17 Which Include Ref to Note (Aa) & Approved Wording of Note H of Table 3.1.1, Respectively | |
ML20210U441 | 12 July 1999 | Forwards Article from Asbury Park Press of 990708 Faxed to Legislative Officer by Mutual Constitute Fm Massari Indicating That Oyster Creek Nuclear Generating State Not Fully Y2K Compliant | |
ML20209G145 | 9 July 1999 | Forwards Rev 1 to 2000-PLN-1300.01, Oyster Creek Generating Station Emergency Plan. Attachment 1 Contains Brief Summary of Changes,Which Became Effective on 990702 | Safe Shutdown Health Physics Network Emergency Lighting Earthquake Fire Protection Program Inadvertent Siren Activation Siren |
ML20209E082 | 7 July 1999 | Forwards TS Change Request 269 for License DPR-16,changing Component Surveillance Frequencies to Indicate Frequency of Once Per Three Months | |
ML20209B750 | 1 July 1999 | Responds to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants.Generic Ltr 98-01 Requested Response on Status of Facility Y2K Readiness by 990701.Licensee Y2K Readiness Disclosure for Ocngs,Encl | |
ML20196G136 | 23 June 1999 | Provides Status of Corrective Actions Proposed in in Response to Insp Rept 50-219/98-80 & Revised Schedule for Completion of Actions Which Are Not Yet Complete | |
ML20196E642 | 22 June 1999 | Forwards Revised Pages of TS Change Request 261,dtd 990618. Replacement Requested Due to Several Dates Being Omitted on Certain Pages | |
ML20195D055 | 3 June 1999 | Forwards TS Change Request 226 to License DPR-16,permitting Operation with Three Recirculation Loops.Certificate of Svc & Tss,Encl | |
ML20195C551 | 25 May 1999 | Forwards Book of Controlled Drawings Currently Ref But Not Contained in Plant Ufsar.Drawings Were Current at Time of Submittal | Scram Discharge Volume |
ML20206N771 | 11 May 1999 | Forwards Rev 0 to Oyster Creek Emergency Plan, IAW 10CFR50.47(b) & 10CFR50.54(q).Changes Became Effective on 990413 | Safe Shutdown Health Physics Network High Radiation Area Emergency Lighting Earthquake Fire Protection Program Inadvertent Siren Activation Siren |
ML20206H944 | 28 April 1999 | Forwards Application for Amend to License DPR-16,requesting Approval to Handle Loads Up to & Including 45 Tons Using Reactor Bldg Crane During Power Operations,Per NRC Bulletin 96-002 | |
ML20206B699 | 26 April 1999 | Forwards Copy of Rev 11 to UFSAR & Rev 10 to Oyster Creek Fire Hazards Analysis Rept. Without Fire Hazard Analysis | |
ML20206D380 | 26 April 1999 | Forwards Rev 11 to UFSAR, & Rev 10 to Fire Hazards Analysis Rept, for Oyster Creek Nuclear Generating Station, Per 10CFR50.712(e) | |
ML20206C826 | 22 April 1999 | Submits Financial Info IAW Requirements of 10CFR50.71(b) & 10CFR140.21 | Incorporated by reference |
ML20206A993 | 22 April 1999 | Forwards Number of Personnel & Person Rems by Work & Job Function Rept for Period Jan-Dec 1998. Included in Rept Is Listing of Number of Station,Util & Contractor Personnel as Well as Diskette Reporting 1998 Occupational Radiation | |
ML20205P841 | 15 April 1999 | Forwards TS Change Request 267 to License DPR-16,modifying Items in Sections 2 & 3 of Ts,Expanding Two Definitions in Section 1 & Modifying Bases Statements in Sections 2,3 & 4. Certificate of Svc Encl | |
ML20205P940 | 12 April 1999 | Informs NRC That Gpu Nuclear Is Modifying Oyster Creek FSAR to Reflect Temp Gradient of 60 F & to Correct Historical Record | |
05000219/LER-1998-015, Forwards LER 98-015-01,as Original Submittal on 981028 Inadvertently Indicated That Suppl Would Be Submitted.Suppl Should Not Have Been Required as Only Change Is on Cover Page | 5 April 1999 | Forwards LER 98-015-01,as Original Submittal on 981028 Inadvertently Indicated That Suppl Would Be Submitted.Suppl Should Not Have Been Required as Only Change Is on Cover Page | |
ML20205H108 | 31 March 1999 | Forwards Current Funding Status for Decommissioning Funds Established for OCNPP,TMI-1,TMI-2 & SNEC | |
ML20205F061 | 25 March 1999 | Submits Info on Sources & Levels of Property Insurance Coverage Maintained & Currently in Effect for Oyster Creek Nuclear Generating Station,Iaw 10CFR50.54(w)(3) | |
ML20205E117 | 24 March 1999 | Forwards Rev 39 to Oyster Creek Security Plan & Summary of Changes,Iaw 10CFR50.54(p).Rev Withheld | |
ML20207K247 | 25 February 1999 | Forwards Fitness for Duty Performance Data Repts for TMI, Oyster Creek & Corporate Headquarters Located in Parsippany, Ny | Fitness for Duty |
ML20206S254 | 20 January 1999 | Confirms Resolution of Thermo-Lag Fire Barriers in Fire Zones OB-FZ-6A & OB-FZ-6B (480 Switchgear Rooms) IAW Previous Commitments Contained in Gpuns Ltrs to NRC & 971001 | Fire Barrier |
ML20199J263 | 18 January 1999 | Requests That Listed Changes Be Made to Correspondence Distribution List for Oyster Creek Generating Station | |
ML20199D027 | 11 January 1999 | Requests Listed Addl Info in Order to Effectively Review TS Change Request 264 Re Ownership of Property within Exclusion Area | |
ML20199A652 | 7 January 1999 | Notifies That Reactor Operators G Scienski,License SOP-11319 & D Mcmillan,License SOP-3919-4 Have Terminated Licenses at Oyster Creek Nuclear Generating Station, Effective 990101 | |
ML20198T106 | 6 January 1999 | Forwards Rev 15 to Gpu Nuclear Corporate Emergency Plan for TMI & Oyster Creek Nuclear Station. with Summary of Changes Which Reflect Use of EALs Approved in NRC Ltr to Gpun on 980908 & Other Changes Not Related to Use of New EALs | Safe Shutdown Health Physics Network Shutdown Margin Operating Basis Earthquake Emergency Lighting Earthquake Fire Protection Program Inadvertent Siren Activation Siren Exclusive Use |
ML20198K033 | 23 December 1998 | Forwards Change Request 268 for Amend to License DPR-16. Amend Would Change TS to Specify Surveillance Frequency of Once Per Three Months | |
ML20198H018 | 22 December 1998 | Forwards Attachment Addressing New Info & Modifying 980505 Submittal Re Request for Change to Licensing Bases for ECCS Overpressure,In Response to NRC Bulletin 96-03, Potential Plugging of ECCS by Debris in Bwrs | |
ML20198H852 | 16 December 1998 | Dockets Completion of Physical Inventory Performed in July 1997,as Addl Info to Nuclear Matl Balance Rept Submitted on 980416 | |
ML20196H446 | 2 December 1998 | Provides Final Response to NRC GL 96-01, Testing of Safety-Related Logic Circuits | |
ML20196B447 | 23 November 1998 | Provides Required Response 2 to NRC Bulletin 96-003, Potential Plugging of ECC Suction Strainers in Bwrs. During Recently Completed 17R Refueling Outage,New Strainers Were Installed | |
ML20195J845 | 12 November 1998 | Forwards Rev 11 to 1000-PLN-7200.01, Gpu Nuclear Operational QA Plan, as Change Previously Made Without Appropriate Notification to NRC | |
ML20195C720 | 11 November 1998 | Forwards 120-day Required Response to GL 98-04, Potential for Degradation of ECCS & CSS After LOCA Because of Construction & Protective Coating Deficiencies & Foreign Matl in Containment, | Commercial Grade Dedication Coatings |
ML20195E122 | 10 November 1998 | Notifies NRC of First Time Usage of Code Case N-504 & Inclusion Into OCNGS ISI Program,As Accepted by RG 1.147, Inservice Insp Code Case Acceptability | |
ML20155J685 | 5 November 1998 | Forwards TS Change Request 266,to Modify Safety Limits & Surveillances of LPRM & APRM Sys & Related Bases to Ensure APRM Channels Respond within Necessary Range & Accuracy & Verify Channel Operability | |
ML20155H564 | 2 November 1998 | Informs That Bne Has No Comments on Proposed Change 259 to Ts,Correcting Required Water Level in Condensate Storage Tank So That Design Basis Is Correctly Implemented | |
ML20155G374 | 29 October 1998 | Forwards Response to NRC 980619 RAI Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions |