ML23100A107 | 10 April 2023 | Framatome Part 21 Report Re Erroneous Change of State for Circuit Breaker | |
ML23229A005 | 11 February 2022 | Ametek Solidstate Controls, Final 10CFR21 Report of a Potential Defect, Vishay Diodes. Reference Interim Report ML21092A129 Issued April 1, 2021 | |
ML21260A007 | 9 September 2021 | Ametek Solidstate Controls, Notification of Potential Defect - 10CFR Part 21 Report Re Omron Timer Relay | |
ML21092A129 | 1 April 2021 | Ametek Solidstate Controls - Notification of Potential Defect | |
ML20366A047 | 18 November 2020 | Curtiss-Wright 10 CFR Part 21 Notification for SF-1154 Hydraulic Fluid Batch 17BLVS293 | |
ML20049A075 | 11 February 2020 | C&D Technologies, Inc. -10 CFR Part 21 Evaluation Regarding Container Failure in KCR-07 Batteries | |
ML19347A426 | 10 December 2019 | General Atomics - Reportable Occurrence Under 10CFR21: Reported Failure in Analog High Range Radiation Monitor (RP-2C) | Post Accident Monitoring |
ML19317D093 | 25 October 2019 | Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10 CFR21-0127, Rev. 0, Emd Fuel Injectors - Seized Plunger and Bushing | |
ML19190A044 | 7 June 2019 | 10 CFR Part 21 Reporting of Defects for Introl Positioner 890265-010 - Cw SAS Initial Report No. 10CFR21-48 | Overspeed trip Overspeed |
ML19121A155 | 15 April 2019 | Curtiss-Wright Nuclear Division, Enertech - 10 CFR Part 21 Notification for SF-1154 Hydraulic Fluid | |
ML19002A204 | 21 December 2018 | to Engine Systems, Inc., Part 21 Report Re Emd Fuel and Soakback Pumps - Potentially Undertorqued Cover Bolts | |
ML18353A428 | 30 November 2018 | Engine Systems, Inc., 10CFR21-0123, Rev. 0, for a 10CFR21 Reportable Condition on Emd Fuel and Soakback Pumps | |
ML17354A026 | 27 November 2017 | Paragon Energy Solutions 10 CFR Part 21 Final Report of Potential Defect of Switch Assembly with OT-2 Homewood Products Corp Switch and Contact Block | |
ML17179A378 | 7 June 2017 | TE Connectivity - Part 21 Transfer of Information TE-023 | |
ML17114A070 | 13 April 2017 | Part 21 Notification - Identified Fisher 546S Electro-Pneumatic Transducers Standard Mounting Brackets Failed Seismic Testing Standards | |
ML17081A453 | 20 March 2017 | Part 21 - Plastic Jar Dedication Sampling | |
ML17026A414 | 20 January 2017 | C&D Technologies, Inc. - Part 21 - Plastic Jar Dedication Sampling | |
ML16342A978 | 2 December 2016 | ATC Nuclear - Part 21 - Pawl Fasteners Failed to Provide Sufficient Structural Support | Safe Shutdown Earthquake |
ML16321A451 | 21 October 2016 | Part 21 Reporting of Defects and Noncompliance | Commercial Grade |
ML16294A264 | 18 October 2016 | Part 21 Report - Defective Current to Pressure Transducers | |
ML16243A472 | 25 August 2016 | Part 21 Reporting of Defects and Noncompliance | Commercial Grade |
ML16139A834 | 10 May 2016 | Electroswitch - Transmittal of 10CFR Part 21 Reporting of Defects and Noncompliance Regarding Vendor Inspection of Electroswitch Corporation Docket No. 99900833 | Commercial Grade |
ML16098A447 | 21 March 2016 | Emerson Process Management, LLC - Part 21 Report Regarding Plug/Stem Assembly, Per Watts Bar | Commercial Grade |
ML16084A302 | 18 March 2016 | Emerson Process Management, LLC - Part 21 Report Regarding Groove Pin Dedication, Per Watts Bar | Commercial Grade |
ML15103A485 | 7 April 2015 | Itt Engineered Valves - 2nd Interim Report to the NRC of 10 CFR 21 Event 50285, Reported by Itt 07/18/14 Concerning M I Diaphragms, Customer Testing | |
ML15099A042 | 2 April 2015 | Notification of Part 21 Report - Potentially Defective Pressure & Temperature Switches | |
ML15099A043 | 2 April 2015 | Amendment to Event Number 50299, 10 CFR Part 21 Notification, Potentially Defective Pressure & Temperature Switches | |
ML15049A458 | 6 February 2015 | Thermo Gamma-Metrics, LLC - Part 21 Report Regarding Shutdown Margin Monitor Environmental Qualification Noncompliance | Shutdown Margin |
ML15014A061 | 8 January 2015 | Notification of Potential Part 21 Re Failure of Sbm Type Switches | Commercial Grade |
ML14337A094 | 24 November 2014 | Notification of Potential Part 21 - Lack of Proper Power Supply Indication | |
ML14329A063 | 19 November 2014 | Notification of Potential Part 21 Re Lack of Proper Power Supply Indication | |
ML14274A052 | 22 September 2014 | Final Report 10CFR Part 21 Evaluation Regarding Misaligned Separators in LCR-25 Standby Batteries, Revision 1 - Original Letter Did Not Include the List of Affected Utilities | |
ML14261A150 | 17 September 2014 | Interim Report to the NRC of 10 CFR 21 Event 50285, Reported by Itt 07/18/14 Concerning M1 Diaphragms, Customer Testing | |
ML14213A099 | 24 July 2014 | Notification of Part 21 Report - Potentially Defective Pressure & Temperature Switches | |
IR 05000391/2014001 | 23 June 2014 | Construction Deficiency Report 50-391/2014-01 - Potential Opening of Littelfuse Part Number FLAS005.T Fuses - Final Report | Commercial Grade |
ML14174A042 | 23 June 2014 | Construction Deficiency Report 50-391/2014-01 - Potential Opening of Littelfuse Part Number FLAS005.T Fuses - Final Report | Commercial Grade |
ML14160A783 | 3 June 2014 | Part 21 Report Regarding Watts Bar, Unit 2, Potentially Defective Fuses Installed | Unanalyzed Condition Fitness for Duty Commercial Grade |
ML14364A168 | 2 June 2014 | Flowserve Corp., Vermont, Formal Evaluation of Deviations Reported - Notification of Defect - Watts Bar II | |
ML14034A188 | 23 January 2014 | Part 21 Report Regarding Nonconformance of an Electrical Tubular Water Heater | |
ML14042A200 | 21 January 2014 | Part 21 Report Regarding Non-Conformance of an Electrical Tubular Water Heater | |
ML13256A139 | 13 September 2013 | Notification of Potential Part 21 Report Re Watts Bar Nuclear Plant, Unit 1 - Dresser Masoneilan Valve Stem/Plug Assemblies Found Out-of-Tolerance | Stroke time |
ML13234A116 | 16 August 2013 | Notification of Potential Part 21 Report - Auxiliary Feedwater Level Control Value Stem/Plug Assembly Out of Tolerance | Stroke time |
ML13204A381 | 18 July 2013 | Construction Deficiency Report 50-391/2013-01 - Commercial Grade Dedication Program - Final Report | Commercial Grade Dedication Commercial Grade |
IR 05000391/2013001 | 18 July 2013 | Construction Deficiency Report 50-391/2013-01 - Commercial Grade Dedication Program - Final Report | Commercial Grade Dedication Commercial Grade |
IR 05000391/2013002 | 27 June 2013 | Construction Deficiency Report 50-391/2013-02 - Instrument Sense Line Slope Issue - Final Report | |
ML13182A460 | 27 June 2013 | Construction Deficiency Report 50-391/2013-02 - Instrument Sense Line Slope Issue - Final Report | |
ML13165A342 | 12 June 2013 | 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers | |
ML13161A342 | 5 June 2013 | ATC Nuclear, Interim Part 21 Report Involving Review of Seismic Testing Methodology | Time of Discovery Safe Shutdown Earthquake |
ML13129A176 | 6 May 2013 | Construction Deficiency Report 50-391/2013-01 - Commercial Grade Dedication Program - Second Interim Report | Commercial Grade Dedication Commercial Grade |
ML13091A388 | 28 March 2013 | Interim Part 21 Report Involving Review of Seismic Testing Methodology | Time of Discovery Safe Shutdown Earthquake |