Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML23100A10710 April 2023Framatome Part 21 Report Re Erroneous Change of State for Circuit Breaker
ML23229A00511 February 2022Ametek Solidstate Controls, Final 10CFR21 Report of a Potential Defect, Vishay Diodes. Reference Interim Report ML21092A129 Issued April 1, 2021
ML21260A0079 September 2021Ametek Solidstate Controls, Notification of Potential Defect - 10CFR Part 21 Report Re Omron Timer Relay
ML21092A1291 April 2021Ametek Solidstate Controls - Notification of Potential Defect
ML20366A04718 November 2020Curtiss-Wright 10 CFR Part 21 Notification for SF-1154 Hydraulic Fluid Batch 17BLVS293
ML20049A07511 February 2020C&D Technologies, Inc. -10 CFR Part 21 Evaluation Regarding Container Failure in KCR-07 Batteries
ML19347A42610 December 2019General Atomics - Reportable Occurrence Under 10CFR21: Reported Failure in Analog High Range Radiation Monitor (RP-2C)Post Accident Monitoring
ML19317D09325 October 2019Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10 CFR21-0127, Rev. 0, Emd Fuel Injectors - Seized Plunger and Bushing
ML19190A0447 June 201910 CFR Part 21 Reporting of Defects for Introl Positioner 890265-010 - Cw SAS Initial Report No. 10CFR21-48Overspeed trip
Overspeed
ML19121A15515 April 2019Curtiss-Wright Nuclear Division, Enertech - 10 CFR Part 21 Notification for SF-1154 Hydraulic Fluid
ML19002A20421 December 2018to Engine Systems, Inc., Part 21 Report Re Emd Fuel and Soakback Pumps - Potentially Undertorqued Cover Bolts
ML18353A42830 November 2018Engine Systems, Inc., 10CFR21-0123, Rev. 0, for a 10CFR21 Reportable Condition on Emd Fuel and Soakback Pumps
ML17354A02627 November 2017Paragon Energy Solutions 10 CFR Part 21 Final Report of Potential Defect of Switch Assembly with OT-2 Homewood Products Corp Switch and Contact Block
ML17179A3787 June 2017TE Connectivity - Part 21 Transfer of Information TE-023
ML17114A07013 April 2017Part 21 Notification - Identified Fisher 546S Electro-Pneumatic Transducers Standard Mounting Brackets Failed Seismic Testing Standards
ML17081A45320 March 2017Part 21 - Plastic Jar Dedication Sampling
ML17026A41420 January 2017C&D Technologies, Inc. - Part 21 - Plastic Jar Dedication Sampling
ML16342A9782 December 2016ATC Nuclear - Part 21 - Pawl Fasteners Failed to Provide Sufficient Structural SupportSafe Shutdown Earthquake
ML16321A45121 October 2016Part 21 Reporting of Defects and NoncomplianceCommercial Grade
ML16294A26418 October 2016Part 21 Report - Defective Current to Pressure Transducers
ML16243A47225 August 2016Part 21 Reporting of Defects and NoncomplianceCommercial Grade
ML16139A83410 May 2016Electroswitch - Transmittal of 10CFR Part 21 Reporting of Defects and Noncompliance Regarding Vendor Inspection of Electroswitch Corporation Docket No. 99900833Commercial Grade
ML16098A44721 March 2016Emerson Process Management, LLC - Part 21 Report Regarding Plug/Stem Assembly, Per Watts BarCommercial Grade
ML16084A30218 March 2016Emerson Process Management, LLC - Part 21 Report Regarding Groove Pin Dedication, Per Watts BarCommercial Grade
ML15103A4857 April 2015Itt Engineered Valves - 2nd Interim Report to the NRC of 10 CFR 21 Event 50285, Reported by Itt 07/18/14 Concerning M I Diaphragms, Customer Testing
ML15099A0422 April 2015Notification of Part 21 Report - Potentially Defective Pressure & Temperature Switches
ML15099A0432 April 2015Amendment to Event Number 50299, 10 CFR Part 21 Notification, Potentially Defective Pressure & Temperature Switches
ML15049A4586 February 2015Thermo Gamma-Metrics, LLC - Part 21 Report Regarding Shutdown Margin Monitor Environmental Qualification NoncomplianceShutdown Margin
ML15014A0618 January 2015Notification of Potential Part 21 Re Failure of Sbm Type SwitchesCommercial Grade
ML14337A09424 November 2014Notification of Potential Part 21 - Lack of Proper Power Supply Indication
ML14329A06319 November 2014Notification of Potential Part 21 Re Lack of Proper Power Supply Indication
ML14274A05222 September 2014Final Report 10CFR Part 21 Evaluation Regarding Misaligned Separators in LCR-25 Standby Batteries, Revision 1 - Original Letter Did Not Include the List of Affected Utilities
ML14261A15017 September 2014Interim Report to the NRC of 10 CFR 21 Event 50285, Reported by Itt 07/18/14 Concerning M1 Diaphragms, Customer Testing
ML14213A09924 July 2014Notification of Part 21 Report - Potentially Defective Pressure & Temperature Switches
IR 05000391/201400123 June 2014Construction Deficiency Report 50-391/2014-01 - Potential Opening of Littelfuse Part Number FLAS005.T Fuses - Final ReportCommercial Grade
ML14174A04223 June 2014Construction Deficiency Report 50-391/2014-01 - Potential Opening of Littelfuse Part Number FLAS005.T Fuses - Final ReportCommercial Grade
ML14160A7833 June 2014Part 21 Report Regarding Watts Bar, Unit 2, Potentially Defective Fuses InstalledUnanalyzed Condition
Fitness for Duty
Commercial Grade
ML14364A1682 June 2014Flowserve Corp., Vermont, Formal Evaluation of Deviations Reported - Notification of Defect - Watts Bar II
ML14034A18823 January 2014Part 21 Report Regarding Nonconformance of an Electrical Tubular Water Heater
ML14042A20021 January 2014Part 21 Report Regarding Non-Conformance of an Electrical Tubular Water Heater
ML13256A13913 September 2013Notification of Potential Part 21 Report Re Watts Bar Nuclear Plant, Unit 1 - Dresser Masoneilan Valve Stem/Plug Assemblies Found Out-of-ToleranceStroke time
ML13234A11616 August 2013Notification of Potential Part 21 Report - Auxiliary Feedwater Level Control Value Stem/Plug Assembly Out of ToleranceStroke time
ML13204A38118 July 2013Construction Deficiency Report 50-391/2013-01 - Commercial Grade Dedication Program - Final ReportCommercial Grade Dedication
Commercial Grade
IR 05000391/201300118 July 2013Construction Deficiency Report 50-391/2013-01 - Commercial Grade Dedication Program - Final ReportCommercial Grade Dedication
Commercial Grade
IR 05000391/201300227 June 2013Construction Deficiency Report 50-391/2013-02 - Instrument Sense Line Slope Issue - Final Report
ML13182A46027 June 2013Construction Deficiency Report 50-391/2013-02 - Instrument Sense Line Slope Issue - Final Report
ML13165A34212 June 201360-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers
ML13161A3425 June 2013ATC Nuclear, Interim Part 21 Report Involving Review of Seismic Testing MethodologyTime of Discovery
Safe Shutdown Earthquake
ML13129A1766 May 2013Construction Deficiency Report 50-391/2013-01 - Commercial Grade Dedication Program - Second Interim ReportCommercial Grade Dedication
Commercial Grade
ML13091A38828 March 2013Interim Part 21 Report Involving Review of Seismic Testing MethodologyTime of Discovery
Safe Shutdown Earthquake