MONTHYEARML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML22098A1172022-03-29029 March 2022 Engine Systems, Inc. Report No. 10CFR21-0134, Rev. 0 - 10CFR21 Reporting of Defects and Non-Compliance - (Emo Cylinder Head with Fireface Thickness Below Specification Cylinder Head P/N 40121485) ML21096A1142021-04-0606 April 2021 Ametek Solidstate Controls - Updated Interim Notifcation ML20049A0752020-02-11011 February 2020 C&D Technologies, Inc. -10 CFR Part 21 Evaluation Regarding Container Failure in KCR-07 Batteries ML19317D0932019-10-25025 October 2019 Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10 CFR21-0127, Rev. 0, Emd Fuel Injectors - Seized Plunger and Bushing ML19210D4342019-07-11011 July 2019 Curtiss-Wright SAS - 10 CFR Part 21 Reporting of Defects for Introl Positioner 890265-010 ML19190A0432019-06-28028 June 2019 Discusses Proprietary Information for Curtiss-Wright SAS - 10 CFR Part 21 Reporting of Defects for Introl Positioner 890265-010 - Cw SAS Initial Report No. 10CFR21-48 ML19029A1552018-12-27027 December 2018 10 CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10CFR21-0123, Rev. 1 ML18353A4282018-11-30030 November 2018 Engine Systems, Inc., 10CFR21-0123, Rev. 0, for a 10CFR21 Reportable Condition on Emd Fuel and Soakback Pumps ML17081A4532017-03-20020 March 2017 Part 21 - Plastic Jar Dedication Sampling ML14042A2002014-01-21021 January 2014 Part 21 Report Regarding Non-Conformance of an Electrical Tubular Water Heater ML13246A0872013-08-23023 August 2013 Nuclear Nonconformance Event Number 49302 - 10CFR21 Notification IR 05000391/20130032013-08-21021 August 2013 Construction Deficiency Report 50-391/2013-03 - Failure to Implement Plant Changes - Final Report ML13240A0062013-08-21021 August 2013 Construction Deficiency Report 50-391/2013-03 - Failure to Implement Plant Changes - Final Report ML13165A3422013-06-12012 June 2013 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML13094A1772013-03-18018 March 2013 Notice to the U.S. Nuclear Regulatory Commission of a Possible Deviation or Defect in Nuclear Qualified High Efficiency Particulate Air Filters Manufactured by Aaf ML12326A7142012-11-21021 November 2012 Fourth Interim Report Pursuant to 10 CFR 21 - Unexpected Degradation of Vital Batteries Lll and Lv ML12206A0552012-07-24024 July 2012 Second Interim Report Pursuant to 10 CFR 21 - Unexpected Degradation of Vital Batteries III and IV ML12094A3712012-04-0202 April 2012 Part 21 Report - Rosemount Pressure Transmitters with Nonzero Based Calibrations ML12097A3162012-03-0202 March 2012 Part 21 Report - Rosemont Pressure Tranmitters Out of Tolerance Condition ML12066A1182012-03-0202 March 2012 Part 21 Report - Rosemount Pressure Transmitters with Nonzero Based Calibrations ML12061A2682012-02-28028 February 2012 Part 21 Report - Potential Minimum Wall Violation on Seismic Plate Valve Bodies ML11220A3492011-08-0505 August 2011 Notification of Potential Part 21 Potential Defect in Qualtech Np Safety Related Motor Control Center Buckets ML11115A0392011-04-14014 April 2011 Notice of Deviation Pursuant to 10 CFR 21, NPKC-7-21A(N) Splice Kit with Possible Compromised Jacket Seal ML0907611882009-03-11011 March 2009 Part 21 Notification - Defective Hk and K-Line Circuit Breaker Tension Springs ML0520003332005-07-14014 July 2005 Part 21 Communication: Circuit Breaker Replacement Primary Bushings Not Tested to ANSI Standards ML0511602412005-04-14014 April 2005 Thermo Electron Svioc, SV18C and SV28C Series Recorders 2024-05-17
[Table view] Category:Deficiency Report (per 10CFR50.55e and Part 21)
MONTHYEARML23100A1072023-04-10010 April 2023 Framatome Part 21 Report Re Erroneous Change of State for Circuit Breaker ML23229A0052022-02-11011 February 2022 Ametek Solidstate Controls, Final 10CFR21 Report of a Potential Defect, Vishay Diodes. Reference Interim Report ML21092A129 Issued April 1, 2021 ML21260A0072021-09-0909 September 2021 Ametek Solidstate Controls, Notification of Potential Defect - 10CFR Part 21 Report Re Omron Timer Relay ML21092A1292021-04-0101 April 2021 Ametek Solidstate Controls - Notification of Potential Defect ML20366A0472020-11-18018 November 2020 Curtiss-Wright 10 CFR Part 21 Notification for SF-1154 Hydraulic Fluid Batch 17BLVS293 ML20049A0752020-02-11011 February 2020 C&D Technologies, Inc. -10 CFR Part 21 Evaluation Regarding Container Failure in KCR-07 Batteries ML19347A4262019-12-10010 December 2019 General Atomics - Reportable Occurrence Under 10CFR21: Reported Failure in Analog High Range Radiation Monitor (RP-2C) ML19317D0932019-10-25025 October 2019 Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10 CFR21-0127, Rev. 0, Emd Fuel Injectors - Seized Plunger and Bushing ML19190A0442019-06-0707 June 2019 10 CFR Part 21 Reporting of Defects for Introl Positioner 890265-010 - Cw SAS Initial Report No. 10CFR21-48 ML19121A1552019-04-15015 April 2019 Curtiss-Wright Nuclear Division, Enertech - 10 CFR Part 21 Notification for SF-1154 Hydraulic Fluid ML19002A2042018-12-21021 December 2018 to Engine Systems, Inc., Part 21 Report Re Emd Fuel and Soakback Pumps - Potentially Undertorqued Cover Bolts ML18353A4282018-11-30030 November 2018 Engine Systems, Inc., 10CFR21-0123, Rev. 0, for a 10CFR21 Reportable Condition on Emd Fuel and Soakback Pumps ML17354A0262017-11-27027 November 2017 Paragon Energy Solutions 10 CFR Part 21 Final Report of Potential Defect of Switch Assembly with OT-2 Homewood Products Corp Switch and Contact Block ML17179A3782017-06-0707 June 2017 TE Connectivity - Part 21 Transfer of Information TE-023 ML17114A0702017-04-13013 April 2017 Part 21 Notification - Identified Fisher 546S Electro-Pneumatic Transducers Standard Mounting Brackets Failed Seismic Testing Standards ML17081A4532017-03-20020 March 2017 Part 21 - Plastic Jar Dedication Sampling ML17026A4142017-01-20020 January 2017 C&D Technologies, Inc. - Part 21 - Plastic Jar Dedication Sampling ML16342A9782016-12-0202 December 2016 ATC Nuclear - Part 21 - Pawl Fasteners Failed to Provide Sufficient Structural Support ML16321A4512016-10-21021 October 2016 Part 21 Reporting of Defects and Noncompliance ML16294A2642016-10-18018 October 2016 Part 21 Report - Defective Current to Pressure Transducers ML16243A4722016-08-25025 August 2016 Part 21 Reporting of Defects and Noncompliance ML16139A8342016-05-10010 May 2016 Electroswitch - Transmittal of 10CFR Part 21 Reporting of Defects and Noncompliance Regarding Vendor Inspection of Electroswitch Corporation Docket No. 99900833 ML16098A4472016-03-21021 March 2016 Emerson Process Management, LLC - Part 21 Report Regarding Plug/Stem Assembly, Per Watts Bar ML16084A3022016-03-18018 March 2016 Emerson Process Management, LLC - Part 21 Report Regarding Groove Pin Dedication, Per Watts Bar ML15103A4852015-04-0707 April 2015 Itt Engineered Valves - 2nd Interim Report to the NRC of 10 CFR 21 Event 50285, Reported by Itt 07/18/14 Concerning M I Diaphragms, Customer Testing ML15099A0422015-04-0202 April 2015 Notification of Part 21 Report - Potentially Defective Pressure & Temperature Switches ML15099A0432015-04-0202 April 2015 Amendment to Event Number 50299, 10 CFR Part 21 Notification, Potentially Defective Pressure & Temperature Switches ML15049A4582015-02-0606 February 2015 Thermo Gamma-Metrics, LLC - Part 21 Report Regarding Shutdown Margin Monitor Environmental Qualification Noncompliance ML15014A0612015-01-0808 January 2015 Notification of Potential Part 21 Re Failure of Sbm Type Switches ML14337A0942014-11-24024 November 2014 Notification of Potential Part 21 - Lack of Proper Power Supply Indication ML14329A0632014-11-19019 November 2014 Notification of Potential Part 21 Re Lack of Proper Power Supply Indication ML14274A0522014-09-22022 September 2014 Final Report 10CFR Part 21 Evaluation Regarding Misaligned Separators in LCR-25 Standby Batteries, Revision 1 - Original Letter Did Not Include the List of Affected Utilities ML14261A1502014-09-17017 September 2014 Interim Report to the NRC of 10 CFR 21 Event 50285, Reported by Itt 07/18/14 Concerning M1 Diaphragms, Customer Testing ML14213A0992014-07-24024 July 2014 Notification of Part 21 Report - Potentially Defective Pressure & Temperature Switches IR 05000391/20140012014-06-23023 June 2014 Construction Deficiency Report 50-391/2014-01 - Potential Opening of Littelfuse Part Number FLAS005.T Fuses - Final Report ML14174A0422014-06-23023 June 2014 Construction Deficiency Report 50-391/2014-01 - Potential Opening of Littelfuse Part Number FLAS005.T Fuses - Final Report ML14160A7832014-06-0303 June 2014 Part 21 Report Regarding Watts Bar, Unit 2, Potentially Defective Fuses Installed ML14364A1682014-06-0202 June 2014 Flowserve Corp., Vermont, Formal Evaluation of Deviations Reported - Notification of Defect - Watts Bar II ML14034A1882014-01-23023 January 2014 Part 21 Report Regarding Nonconformance of an Electrical Tubular Water Heater ML14042A2002014-01-21021 January 2014 Part 21 Report Regarding Non-Conformance of an Electrical Tubular Water Heater ML13256A1392013-09-13013 September 2013 Notification of Potential Part 21 Report Re Watts Bar Nuclear Plant, Unit 1 - Dresser Masoneilan Valve Stem/Plug Assemblies Found Out-of-Tolerance ML13234A1162013-08-16016 August 2013 Notification of Potential Part 21 Report - Auxiliary Feedwater Level Control Value Stem/Plug Assembly Out of Tolerance ML13204A3812013-07-18018 July 2013 Construction Deficiency Report 50-391/2013-01 - Commercial Grade Dedication Program - Final Report IR 05000391/20130012013-07-18018 July 2013 Construction Deficiency Report 50-391/2013-01 - Commercial Grade Dedication Program - Final Report IR 05000391/20130022013-06-27027 June 2013 Construction Deficiency Report 50-391/2013-02 - Instrument Sense Line Slope Issue - Final Report ML13182A4602013-06-27027 June 2013 Construction Deficiency Report 50-391/2013-02 - Instrument Sense Line Slope Issue - Final Report ML13165A3422013-06-12012 June 2013 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML13161A3422013-06-0505 June 2013 ATC Nuclear, Interim Part 21 Report Involving Review of Seismic Testing Methodology ML13129A1762013-05-0606 May 2013 Construction Deficiency Report 50-391/2013-01 - Commercial Grade Dedication Program - Second Interim Report ML13091A3882013-03-28028 March 2013 Interim Part 21 Report Involving Review of Seismic Testing Methodology 2023-04-10
[Table view] |
Text
H C,0 4 1 1 4 01/21/2014 U.S. NuclearRegulator, Commission OperationsCenter Event Report Pagge I Part 21 (PAR) Event# 49751 Rep Org: CCI THERMAL TECHNOLOGIES INC. Notification Date / Time: 01/21/2014 12:37 (EST)
Supplier: CCI THERMAL TECHNOLOGIES INC. Event Date / Time: 01/16/2014 (EST)
Last Modification: 01/21/2014 Region: Docket #:
City: OAKVILLE Agreement State: No County: License #:
State:
NRC Notified by: ALEJANDRO MALDONAD Notifications: RANDY MUSSER R2DO HQ Ops Officer: VINCE KLCO PART 21 GROUP EMAIL Emergency Class: NON EMERGENCY 10 CFR Section:
21.21 (d)(3)(i) DEFECTS AND NONCOMPLIANCE PART 21 - NONCONFORMANCE OF AN ELECTRICAL TUBULAR WATER HEATER The following information was received via facsimile:
Subject:
Non-Conformance on [CCI Thermal Technologies] Purchase Order 244232-1-MRA-MEEW-00001 Element "We notify you that we have initiated a notification process today to:
"Bechtel Project Quality Manager EQB1A/Watts Bar Nuclear Plant Hwy 68 Spring City, TN 37381 "Regarding finding on January 16, 2014 related to non-conforming items shipped under purchase order 244232 MRA-MEEW-00001 Element.
"Manufactured by:
"CCI Thermal Technologies Inc.
2721 Plymouth Dr.
Oakville, [Ontario]
[Canada], L6H5R5 "Non-conforming items are under investigations with further pending review of action with the issuance party on
H0 0 41 1 4 01/21/2014 U.S. Nuclear Regulatory Commission OperationsCenter Event Report Pame 2 Part 21 (PAR) Event # 49751 the purchase order indicated."
The nonconformance is related to a borated water storage tank electrical heater that was shipped in 2011 for use on Watts Bar Unit 2.
FAX 9058294430 CCI THERMAL Q0I/01/0 10 4o114
.01/21/2014 TUE 12237 CCI Th,nermif- ý"al l Technologies INC., info@pccilheraI P 1uarn Heating and Filtration Solutions www.ccithermal .com January 17, 2014 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Ann: NRC's Document Control Desk,
Subject:
Non-Conformance on Purchase order 244232-1],-MRA-MEEW-00001. Element We notify you that we have initiated a notification process today to:
Bechtel Project Quality Manager EQB1A/Watts Bar Nuclear Plant Hwy 68 Spring City, TN 37381 Regarding finding on January 16-201,4 related to non-conforming items shipped under purchase order 244232-1-MRA-MEEW-00001. Element.
Manufactured by:
CCI Thermal Technologies inc 2721 Plymouth Dr.
Oakvllle, ON L685R5 Non-conforming items are under Investigations with further pending review of action with the issuance party on the purchase order indicated.
Regards, Alejandro Ma onado, P.Eng.
Chief Technology Officer (Pli)905-829-4422 Email: amaldonado@ccitherrnalcom CCI Thermal Technologies, Inc.
Edmonton (1.0oad Ofico) Oakvlile r0l1la Gino:,n shi:irc 1--low'.1on 591H3 Roper Road 2721 PlymoUih Drive I Huntor Valley Rood 1420 Wesl Main Strool 15550 Vickoty Dtive 8152 SovthPark Lanu Edmonton, Albrta Oakvlllo, Onlario 0llia, Ontario CrFonsbULWq, Indiana SwIliu 100. Houston, "lbxaa I...ittleton, Coliado Canada 168 381* Canada L-615R5 Canada L3V 6H2 U.SA. 4/240 U.S.A. 71032 U.S.A. 80120 T 780.466.3178 T 905,829,4422 T 705,325,3473 T 012,663.4141 T 281,506.2310 T 303,979.q7:39 F 7nnO.46eJ,5,)4 F 905.829,4430 F 705.325,2106 F 912.663,.4202 F 281.505.23,16 F 303.979.7350 1.800,061 .8529 1,00.410.3131 1.877.325.3473 1.800.473.2402 1,855,219.2101 1,851.244.3120