Issue date | Title | Topic | |
---|---|---|---|
ML20114E317 | 23 April 2020 | Final 10 CFR Part 21 Report for Masoneilan Model 8005N Transducer | Mission time |
ML20042E252 | 31 January 2020 | EN 54485 Target Rock Redacted Update to Part 21 Report on Defect of Modification of Valve Component and Main Disc Lift Misadjustment | |
ML20029D161 | 21 January 2020 | 10 CFR Part 21 Report, Notification of a Defect Modification of a Valve Component and Main Disc Lift Misadjustment | |
ML19323C971 | 15 November 2019 | Interim 10 CFR 21 Report for Masoneilan Model 8005N Transducer | |
ML19261A194 | 6 September 2019 | Final Report (Log # 2019-22-00) (Event# EN 54215) - Non-Destructive Examination (Liquid Penetrant) Performance of Components by an Un-Qualified Employee | Nondestructive Examination Liquid penetrant |
ML18302A228 | 19 October 2018 | Itt Enidine - USNRC 10CFR Part 21 Notification | |
ML17312A842 | 8 November 2017 | Transmittal of Final Part 21 Report for Westinghouse 1000 Horsepower Motor | |
ML17188A422 | 26 June 2017 | Itt Enidine, Inc - Part 21 - Potential Transducer Component Defect | |
ML17165A407 | 9 June 2017 | Part 21 Report - Defective Motor Operated Potentiometer | |
ML17173A139 | 9 June 2017 | Engine Systems, Inc. - Transmittal of 10CFR21 Reporting of Defects and Non-Compliance - Report No. 10CFR21-0117, Rev. 0 | |
ML17124A734 | 4 May 2017 | Final Part 21 Report for General Electric Hitachi Model AKR-2BE- 50 Breaker | |
ML17101A364 | 7 April 2017 | Part 21 - Circuit Breaker Defect Discovered During Current Injection Testing | Unanalyzed Condition Fitness for Duty |
ML16344A118 | 9 December 2016 | Interim 10 CFR 21 Report for General Electric Hitachi Model AKR-2BE-50 Breaker | |
ML16294A264 | 18 October 2016 | Part 21 Report - Defective Current to Pressure Transducers | |
ML16209A050 | 13 July 2016 | Part 21 - Furmanite Nuclear Grade Leak Seal Material FSC-N-1B | |
ML15103A485 | 7 April 2015 | Itt Engineered Valves - 2nd Interim Report to the NRC of 10 CFR 21 Event 50285, Reported by Itt 07/18/14 Concerning M I Diaphragms, Customer Testing | |
ML14337A094 | 24 November 2014 | Notification of Potential Part 21 - Lack of Proper Power Supply Indication | |
ML14329A063 | 19 November 2014 | Notification of Potential Part 21 Re Lack of Proper Power Supply Indication | |
ML14261A150 | 17 September 2014 | Interim Report to the NRC of 10 CFR 21 Event 50285, Reported by Itt 07/18/14 Concerning M1 Diaphragms, Customer Testing | |
ML14129A436 | 8 May 2014 | Interim Report -10CFR 21 Evaluation Regarding Potential Deficiencies in ASME Code Required Valve and Component Testing | |
ML14094A445 | 1 April 2014 | Notification of Part 21 Report on Defective Raw Material Used to Manufacture Valve Stems | |
ML13324A490 | 13 November 2013 | Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance - Report No. 10CFR21-0110, Rev. 0, CR7 Diode Wiring Reversed: AVR Panel P/N D72-12200-100-PVNGS | |
ML13339A768 | 13 November 2013 | Letter from Tom Homer Notification of Part 21 Report on a CR7 Diode Wiring Reversed on the Automatic Voltage Regular (AVR) Panels for Palo Verde | |
IR 07200122/2000100 | 13 November 2013 | Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance - Report No. 10CFR21-0110, Rev. 0, CR7 Diode Wiring Reversed: AVR Panel P/N D72-12200-100-PVNGS | |
ML13261A151 | 10 September 2013 | Part 21 Report - Improper Dedication of Actuator Parts | |
ML13238A253 | 21 August 2013 | Notification of Potential Part 21 Report - Foxboro Power Supply Potential Failures Due to Defective the Wraps and Holders | |
ML13165A342 | 12 June 2013 | 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers | |
ML13122A127 | 30 April 2013 | Notification of Potential Part 21 Re Brackets Used Proximity Switches Installed Upside Down | |
ML13101A123 | 9 April 2013 | Part 21 - Defect Due to Change in Manufacturing Process Causing Relay Failure in Safety Related Systems | Commercial Grade Dedication |
ML13100A357 | 8 April 2013 | Westinghouse, Updated Notification of a Defect Pursuant to Requirements 10CFR21 | Commercial Grade Dedication |
ML13093A153 | 2 April 2013 | Part 21 Report - Foxboro Power Supply Potential Failures Due to Defective Tie Wraps and Holders | |
ML13079A320 | 18 March 2013 | Notification of Potential Part 21 Interim Report Re Possible Deviation or Defect in Nuclear Qualified High Efficiency Particulate Air Filters | |
ML12352A123 | 13 December 2012 | 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers | |
ML12348A136 | 13 December 2012 | Part 21 60-Day Interim Report Notification: Adequacy of Design Change in Am Magne-Blast Circuit Breakers | |
ML12346A300 | 7 December 2012 | Part 21 Report - Brackets Used Proximity Switches Installed Upside Down | |
ML12319A473 | 9 November 2012 | Interim Part 21 Report for Flowserve Four Inch Regulating Value | |
ML12318A041 | 8 November 2012 | Part 21 Report - Commercial Grade Dedication Not Properly Applied to Butterfly Valves | Commercial Grade Dedication Condition Adverse to Quality |
ML12243A187 | 23 August 2012 | Notification of Potential Part 21 - Stress Corrosion Cracking Causing Relay Failure in Safety Related Systems | Commercial Grade Dedication |
ML12094A371 | 2 April 2012 | Part 21 Report - Rosemount Pressure Transmitters with Nonzero Based Calibrations | |
ML12097A316 | 2 March 2012 | Part 21 Report - Rosemont Pressure Tranmitters Out of Tolerance Condition | |
ML12066A118 | 2 March 2012 | Part 21 Report - Rosemount Pressure Transmitters with Nonzero Based Calibrations | |
ML12058A141 | 23 February 2012 | Part 21 Report - Rosemount Nuclear Instruments, Inc., Pressure Transmitter with Nonzero Based Calibrations | |
ML11363A188 | 2 December 2011 | 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10CFR21-0098, Rev. 3, Amot Thermostatic Valve Element P/N: 9760X | Commercial Grade Dedication |
ML11336A369 | 1 December 2011 | Notification of Potential Part 21 Interim Report on Thermostatic Valve Failure on Palo Verde EDG | Commercial Grade Dedication |
ML11193A007 | 9 July 2011 | Part 21 Notification of Valve Failed Leak Test Due to a Disc/Shaft Assembly Machining Issue | |
ML11103A016 | 5 April 2011 | Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance, Report No. 10CFR21-0098, Rev. 1 | |
ML110970151 | 1 April 2011 | Interim Report on Thermostatic Valve Failure on Palo Verde EDG | |
ML110950658 | 23 March 2011 | Submittal of Defect Discovered on Asea Brown Boveri Abb K600S 480 Vac Class 1E Breaker - Bell Alarm Switch Bracket Misalignment | |
ML110590886 | 24 February 2011 | Notification of Potential Part 21 Report - Misaligned Bell Alarm Switch Brackets on 480 Vac Class 1E Circuit Breakers | |
ML103060102 | 29 October 2010 | Notification of Potential Part 21 Transfer of Information Concerning Control Components Inc. (CCI) Drag Valves | Boric Acid |