Category:Deficiency Report (per 10CFR50.55e and Part 21)
MONTHYEARML20114E3172020-04-23023 April 2020 Final 10 CFR Part 21 Report for Masoneilan Model 8005N Transducer ML20042E2522020-01-31031 January 2020 EN 54485 Target Rock Redacted Update to Part 21 Report on Defect of Modification of Valve Component and Main Disc Lift Misadjustment ML20029D1612020-01-21021 January 2020 10 CFR Part 21 Report, Notification of a Defect Modification of a Valve Component and Main Disc Lift Misadjustment ML19323C9712019-11-15015 November 2019 Interim 10 CFR 21 Report for Masoneilan Model 8005N Transducer ML19261A1942019-09-0606 September 2019 Final Report (Log # 2019-22-00) (Event# EN 54215) - Non-Destructive Examination (Liquid Penetrant) Performance of Components by an Un-Qualified Employee ML18302A2282018-10-19019 October 2018 Itt Enidine - USNRC 10CFR Part 21 Notification ML17312A8422017-11-0808 November 2017 Transmittal of Final Part 21 Report for Westinghouse 1000 Horsepower Motor ML17188A4222017-06-26026 June 2017 Itt Enidine, Inc - Part 21 - Potential Transducer Component Defect ML17165A4072017-06-0909 June 2017 Part 21 Report - Defective Motor Operated Potentiometer ML17173A1392017-06-0909 June 2017 Engine Systems, Inc. - Transmittal of 10CFR21 Reporting of Defects and Non-Compliance - Report No. 10CFR21-0117, Rev. 0 ML17124A7342017-05-0404 May 2017 Final Part 21 Report for General Electric Hitachi Model AKR-2BE- 50 Breaker ML17101A3642017-04-0707 April 2017 Part 21 - Circuit Breaker Defect Discovered During Current Injection Testing ML16344A1182016-12-0909 December 2016 Interim 10 CFR 21 Report for General Electric Hitachi Model AKR-2BE-50 Breaker ML16294A2642016-10-18018 October 2016 Part 21 Report - Defective Current to Pressure Transducers ML16209A0502016-07-13013 July 2016 Part 21 - Furmanite Nuclear Grade Leak Seal Material FSC-N-1B ML15103A4852015-04-0707 April 2015 Itt Engineered Valves - 2nd Interim Report to the NRC of 10 CFR 21 Event 50285, Reported by Itt 07/18/14 Concerning M I Diaphragms, Customer Testing ML14337A0942014-11-24024 November 2014 Notification of Potential Part 21 - Lack of Proper Power Supply Indication ML14329A0632014-11-19019 November 2014 Notification of Potential Part 21 Re Lack of Proper Power Supply Indication ML14261A1502014-09-17017 September 2014 Interim Report to the NRC of 10 CFR 21 Event 50285, Reported by Itt 07/18/14 Concerning M1 Diaphragms, Customer Testing ML14129A4362014-05-0808 May 2014 Interim Report -10CFR 21 Evaluation Regarding Potential Deficiencies in ASME Code Required Valve and Component Testing ML14094A4452014-04-0101 April 2014 Notification of Part 21 Report on Defective Raw Material Used to Manufacture Valve Stems ML13324A4902013-11-13013 November 2013 Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance - Report No. 10CFR21-0110, Rev. 0, CR7 Diode Wiring Reversed: AVR Panel P/N D72-12200-100-PVNGS ML13339A7682013-11-13013 November 2013 Letter from Tom Homer Notification of Part 21 Report on a CR7 Diode Wiring Reversed on the Automatic Voltage Regular (AVR) Panels for Palo Verde IR 07200122/20001002013-11-13013 November 2013 Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance - Report No. 10CFR21-0110, Rev. 0, CR7 Diode Wiring Reversed: AVR Panel P/N D72-12200-100-PVNGS ML13261A1512013-09-10010 September 2013 Part 21 Report - Improper Dedication of Actuator Parts ML13238A2532013-08-21021 August 2013 Notification of Potential Part 21 Report - Foxboro Power Supply Potential Failures Due to Defective the Wraps and Holders ML13165A3422013-06-12012 June 2013 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML13122A1272013-04-30030 April 2013 Notification of Potential Part 21 Re Brackets Used Proximity Switches Installed Upside Down ML13101A1232013-04-0909 April 2013 Part 21 - Defect Due to Change in Manufacturing Process Causing Relay Failure in Safety Related Systems ML13100A3572013-04-0808 April 2013 Westinghouse, Updated Notification of a Defect Pursuant to Requirements 10CFR21 ML13093A1532013-04-0202 April 2013 Part 21 Report - Foxboro Power Supply Potential Failures Due to Defective Tie Wraps and Holders ML13079A3202013-03-18018 March 2013 Notification of Potential Part 21 Interim Report Re Possible Deviation or Defect in Nuclear Qualified High Efficiency Particulate Air Filters ML12352A1232012-12-13013 December 2012 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML12348A1362012-12-13013 December 2012 Part 21 60-Day Interim Report Notification: Adequacy of Design Change in Am Magne-Blast Circuit Breakers ML12346A3002012-12-0707 December 2012 Part 21 Report - Brackets Used Proximity Switches Installed Upside Down ML12319A4732012-11-0909 November 2012 Interim Part 21 Report for Flowserve Four Inch Regulating Value ML12318A0412012-11-0808 November 2012 Part 21 Report - Commercial Grade Dedication Not Properly Applied to Butterfly Valves ML12243A1872012-08-23023 August 2012 Notification of Potential Part 21 - Stress Corrosion Cracking Causing Relay Failure in Safety Related Systems ML12094A3712012-04-0202 April 2012 Part 21 Report - Rosemount Pressure Transmitters with Nonzero Based Calibrations ML12097A3162012-03-0202 March 2012 Part 21 Report - Rosemont Pressure Tranmitters Out of Tolerance Condition ML12066A1182012-03-0202 March 2012 Part 21 Report - Rosemount Pressure Transmitters with Nonzero Based Calibrations ML12058A1412012-02-23023 February 2012 Part 21 Report - Rosemount Nuclear Instruments, Inc., Pressure Transmitter with Nonzero Based Calibrations ML11363A1882011-12-0202 December 2011 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10CFR21-0098, Rev. 3, Amot Thermostatic Valve Element P/N: 9760X ML11336A3692011-12-0101 December 2011 Notification of Potential Part 21 Interim Report on Thermostatic Valve Failure on Palo Verde EDG ML11193A0072011-07-0909 July 2011 Part 21 Notification of Valve Failed Leak Test Due to a Disc/Shaft Assembly Machining Issue ML11103A0162011-04-0505 April 2011 Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance, Report No. 10CFR21-0098, Rev. 1 ML1109701512011-04-0101 April 2011 Interim Report on Thermostatic Valve Failure on Palo Verde EDG ML1109506582011-03-23023 March 2011 Submittal of Defect Discovered on Asea Brown Boveri Abb K600S 480 Vac Class 1E Breaker - Bell Alarm Switch Bracket Misalignment ML1105908862011-02-24024 February 2011 Notification of Potential Part 21 Report - Misaligned Bell Alarm Switch Brackets on 480 Vac Class 1E Circuit Breakers ML1030601022010-10-29029 October 2010 Notification of Potential Part 21 Transfer of Information Concerning Control Components Inc. (CCI) Drag Valves 2020-04-23
[Table view] Category:Letter
MONTHYEARML24295A0362024-10-23023 October 2024 Regulatory Audit Plan in Support of Relief Request No. 71; Resubmittal of Relief Request-30 ML24296B2152024-10-22022 October 2024 Transmittal of Valve Relief Request (VRR) - 03: Alternative Request Allowing Removal of the Lower Acceptance Criteria Threshold from Solenoid-Operated Valves ML24296B2142024-10-22022 October 2024 Transmittal of Valve Relief Request (VRR) - 02: Alternative Request Allowing Normally Closed Valves with a Safety Function to Close to Be Exercise Tested Once Per Refueling Cycle IR 05000528/20244022024-10-22022 October 2024 Security Baseline Inspection Report 05000528/2024402 and 05000529/2024402 and 05000530/2024402 ML24292A2192024-10-18018 October 2024 Core Operating Limits Report Revision 34, 26 and 33 ML24296B2172024-10-18018 October 2024 Submittal of Unit 1 Core Operating Limits Report, Revision 34, Unit 2 Core Operating Limits Report, Revision 26, and Unit 3 Core Operating Limits Report, Revision 3 ML24292A0322024-10-17017 October 2024 Th Refueling Outage Steam Generator Tube Inspection Report ML24285A2562024-10-11011 October 2024 License Renewal - Alloy 600 Management Program Plan Response to Request for Additional Information IR 07200044/20244012024-10-0808 October 2024 Independent Spent Fuel Storage Installation Security Inspection Report 07200044/2024401 ML24269A1542024-09-27027 September 2024 Summary of Presubmittal Meeting with Arizona Public Service Company to Discuss Proposed Life-of-Plant Alternatives for a Pressurizer Thermowell Nozzle Repair at Palo Verde Nuclear Generating Station, Unit 1 ML24262A0972024-09-23023 September 2024 Notification of Post-Approval Site Inspection for License Renewal and Request for Information Inspection (05000529/2024011) ML24241A2782024-08-28028 August 2024 License Amendment Request to Revise the Technical Specifications 3.5.1 and 3.5.2 Safety Injection Tank Pressure Bands, and to Use GOTHIC Code ML24241A2542024-08-28028 August 2024 Inservice Inspection Request for Information ML24240A2682024-08-27027 August 2024 Transmittal of Technical Specification Bases Revision 79 IR 05000528/20240052024-08-22022 August 2024 Updated Inspection Plan for Palo Verde Nuclear Generating Station - Units 1, 2, and 3 (Report 05000528/2024005, 05000529/2024005, 05000530/2024005) 05000530/LER-2024-001-01, Inoperable Boron Dilution Alarm System(Bdas) with Technical Specification Violation2024-08-21021 August 2024 Inoperable Boron Dilution Alarm System(Bdas) with Technical Specification Violation ML24208A0612024-08-20020 August 2024 Issuance of Amendment Nos. 224, 224, and 224 Regarding Revision to Technical Specifications 3.5.1, 3.5.2 and 3.6.5 IR 05000528/20244042024-08-0808 August 2024 Cybersecurity Inspection Report 05000528/2024404, 05000529/2024404 and 05000530/2024404 ML24213A3232024-07-31031 July 2024 Transmittal of Relief Request (RR) No. 71: Re-Submittal of RR-30 ML24213A3292024-07-31031 July 2024 Transmittal of Relief Request (RR) No. 72: Re-Submittal of RR-39 IR 05000528/20240022024-07-29029 July 2024 Integrated Inspection Report 05000528/2024002 and 05000529/2024002 and 05000530/2024002 ML24173A3302024-07-24024 July 2024 Pressurizer Surge Line Inspection Program ML24159A4702024-07-17017 July 2024 Issuance of Amendment Nos. 223, 223, and 223 Revision to Technical Specifications 3.5.1 and 3.5.2 Using Risk Informed Process for Evaluations ML24198A0662024-07-16016 July 2024 Program Review - Simulator Testing Methodology ML24193A3442024-07-11011 July 2024 Fourth 10-Year Interval, Second Period Owner’S Activity Report Number 3R24 ML24129A0522024-07-0303 July 2024 Review of the Spring 2023 Steam Generator Tube Inspection Report IR 05000528/20240042024-06-25025 June 2024 Notification of Inspection (NRC Inspection Report 05000528/2024004, 05000529/2024004, 05000530/2024004) ML24177A3212024-06-25025 June 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Transportable Storage Canisters Identification Numbers AMZDFX180, AMZDFX181, AMZDFX182 Vertical Concrete Cask Identification Nu ML24177A3222024-06-25025 June 2024 Invalid Specified System Actuation of Train B Emergency Diesel Generator 05000530/LER-2024-002, Invalid Specified System Actuation of Train B Emergency Diesel Generator2024-06-25025 June 2024 Invalid Specified System Actuation of Train B Emergency Diesel Generator ML24170A9962024-06-18018 June 2024 Response to Second Request for Additional Information to Revise Technical Specifications (TS) 3.5.1, Safety Injection Tanks (Sits) – Operating, TS 3.5.2, Safety Injection Tanks (Sits) – Shutdown a ML24129A2062024-06-14014 June 2024 Issuance of Amendment Nos. 222, 222, and 222 Revision to Technical Specifications to Adopt TSTF-266-A 05000530/LER-2024-001, Inoperable Boron Dilution Alarm System(Bdas) with Technical Specification Violation2024-06-0505 June 2024 Inoperable Boron Dilution Alarm System(Bdas) with Technical Specification Violation ML24159A0262024-06-0303 June 2024 Annual Report of Guarantee of Payment of Deferred Premium 05000529/LER-2024-001, Valid Specified System Actuations of Unit 2 Train B Emergency Diesel Generator and Train B Auxiliary Feedwater2024-05-23023 May 2024 Valid Specified System Actuations of Unit 2 Train B Emergency Diesel Generator and Train B Auxiliary Feedwater ML24135A2482024-05-14014 May 2024 Response to Second Request for Additional Information to Proposed Method to Manage Environmentally Assisted Fatigue for the Pressurizer Surge Line ML24164A2582024-05-0909 May 2024 10-PV-2024-04 Post-Exam Comments ML24128A2702024-05-0707 May 2024 Docket Nos. Stn 50-528/529/530 - Response to NRC Regulatory Issue Summary (RIS) 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24129A1482024-05-0707 May 2024 And Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Casks with Applied Changes IR 05000528/20240012024-05-0202 May 2024 Independent Spent Fuel Storage Installation, Integrated Inspection Report 05000528/2024001, 05000529/2024001, 05000530/2024001, 07200044/2024001, and Exercise of Enforcement Discretion ML24119A0022024-04-26026 April 2024 2023 Annual Environmental Operating Report ML24116A2082024-04-24024 April 2024 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report 2023 IR 05000528/20244012024-04-22022 April 2024 Security Baseline Inspection Report 05000528/2024401 and 05000529/2024401 and 05000530/2024401 (Cover Letter) ML24109A0712024-04-22022 April 2024 NRC Initial Operator Licensing Examination Approval 05000528/2024301, 05000529/2024301, and 05000530/2024301 ML24112A0012024-04-19019 April 2024 Core Operating Limits Report, Revision 32 ML24108A1982024-04-16016 April 2024 Independent Spent Fuel Storage Installation - Registration of Dry Spent Fuel Storage Casks with Applied Changes Authorized by an Amended Certificate of Compliance ML24103A2482024-04-12012 April 2024 Emergency Core Cooling System Performance Evaluation Models, 10 CFR 50.46(a)(3)(ii) Annual Report for 2023 ML24131A0972024-04-10010 April 2024 Annual Radiological Environmental Operating Report 2023 ML24096A2202024-04-0505 April 2024 Transmittal of Technical Specification Bases Revision 78 ML24032A1542024-04-0303 April 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) 2024-09-27
[Table view] |
Inspection Report - - 2000100 |
---|
|
|
Text
ESI ENGINE SYSTEMS, INC.175 Freight Road Rocky Mount, NC 27804 Telephone:
252/977-2720 Fax: 252/446-1134 November 13, 2013 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 Subject: 10CFR21 Reporting of Defects and Non-Compliance-Engine Systems, Inc. Report No. 10CFR21-0110, Rev. 0 CR7 Diode Wiring Reversed:
AVR Panel P/N D72-12200-100-PVNGS
Dear Sir:
The enclosed report addresses a reportable notification on a CR7 diode wiring reversed on the automatic voltage regulator (AVR) panels for APS-Palo Verde, P/N D72-12200-100-PVNGS.
A copy of the report has been mailed to our affected nuclear customer.Please sign below, acknowledging receipt of this report, and return a copy to the attention of Document Control at the address above (or, fax to number 252/446-1134)
within 10 working days after receipt.Yours very truly, ENGINE SYSTEMS, INC.Susan Woolard Document Control Please let us know if ANY of your mailing information changes -name of recipient, name of company/facility, address, etc. Mark the changes on this acknowledgment form and send to us by mail or FAX to the number above.RECEIVED: 93 DATE: Z_Quality Performance With Pride ENGINE SYSTEMS, INC.175 Freight Road, Rocky Mount, NC 27804 Telephone:
252/977-2720 Fax: 252/446-1134 Report No.Rev. 0: 10CFR21-0110 11/12/13 10CFR21 REPORTING OF DEFECTS AND NON-COMPLIANCE COMPONENT:
SYSTEM: CONCLUSION:
CR7 diode wiring reversed AVR panels for APS-Palo Verde P/N: D72-12200-100-PVNGS Emergency Diesel Generator (APS-Palo Verde)Reportable in Accordance With 1OCFR21 Prepared By:.Reviewed By:.7 Engineering Manager Quality Assurance Manager Date: _______/__
Date: //-/2-/,'Quality Performance With Pride 4 Report No. 1OCFR21 -0110 Record of Revisions Page: 1 of 1 REV DATE PAGE DESCRIPTION 0 11/12/13 Initial issue.
Report No. 10CFR21-0110 Revision:
0 Date: 11/12/13 Page: 1 of 4 Component:
Diode CR7 wiring reversed:
AVR panel P/N D72-12200-100-PVNGS Summary: Engine Systems Inc. (ESI) began a 10CFR21 evaluation on 10/25/2013 after receiving notification from APS-Palo Verde Nuclear Generating Station that diode CR7 on their automatic voltage regulator (AVR) panels had the wiring connections reversed.
During installation of the AVR panels, generator output voltage buildup was observed to be longer than expected during fast start testing.The slow voltage buildup was determined to be caused by a lack of generator field flashing.Troubleshooting revealed that the field flash diode CR7 wiring was reversed.The evaluation was concluded on 11/11/2013 and it was determined that this issue is a reportable defect as defined by 10CFR21. The incorrect wiring of diode CR7 prevents field flashing of the generator.
Lack of generator field flashing can result in failure of generator voltage buildup, or excessive voltage buildup time, during starting of the emergency diesel generator (EDG). This condition could therefore have impacted operability of the EDG and prevented it from performing its safety related function.Discussion:
The AVR panel, part number D72-12200-100-PVNGS, is part of the overall static excitation system for the Palo Verde EDGs. Diode CR7 is wired in series with the field flash resistor and a normally open contact from the field flash contactor (FFC) to the generator field (F+) connection.
This circuit is only active during startup of the EDG as the generator field is flashed (via an external 125 VDC supply) to initiate generator voltage buildup. CR7 conducts in the forward direction during field flashing to excite the generator field and it prevents reverse current flow when the exciter output begins to increase as the generator comes up to nominal voltage. An electrical schematic of the field flash circuitry is shown below in Figure 1.Figure 1 -Generator Field Flash Schematic
- Report No. 1OCFR21 -0110 Revision:
0 Date: 11/12/13 Page: 2 of 4 APS-Palo Verde determined during installation testing of the AVR panel that the CR7 diode was installed incorrectly; specifically, the wiring to the anode and cathode was reversed.
The CR7 diode assembly consists of a standard power diode (where the mounting stud is the cathode and the terminal end is the anode) mounted on a heat sink. With the diode mounted to the heat sink via the diode stud, the heat sink becomes the diode cathode. A screw installed in the heat sink provides a mounting stud for the CR7 cathode wiring connection(s).
The diode anode is wired to another stud at the other end of the heat sink; this stud is electrically isolated from the heat sink and is utilized for the CR7 anode wiring connection(s).
Location of CR7 on the AVR panel is shown below in Figure 2.Figure 2 -AVR Panel Component Layout Report No. 10CFR21-0110 Revision:
0 Date: 11/12/13 Page: 3 of 4 Root cause evaluation:
The AVR panel layout drawing (8000654-01)
conflicts with the AVR panel electrical schematic and wiring diagram. The layout drawing has CR7 oriented such that the anode connection is on the top and the cathode connection is on the bottom; both the electrical schematic (8000654-02)
and the wiring diagram (8000654-11)
show the CR7 anode wiring as the "bottom" and the cathode wiring as the "top". With the layout showing the anode at the top, the CR7 wiring was installed reversed.Functional test procedure 8000654-FTP-1 for the AVR panel verified operation of the field flash contactor FF but did not include checks to verify proper installation of diode CR7. The pre-operational tests of ESI field test procedure 8001720-TP should have discovered the reversed CR7 connections because it required verification of field flash voltage at AVR terminals TS3(F+) and TS3(F-); apparently these steps were not performed or were not performed correctly during the installation process.Evaluation of previous shipments:
Drawings for AVR panels supplied previously by ESI have been reviewed and the CR7 diode wiring has been verified to be correct. The CR7 reversed wiring condition only applies to the AVR panels (P/N D72-12200-100-PVNGS)
shipped to Palo Verde.Affected Customers:
APS-Palo Verde is the only affected customer.
This reversed CR7 wiring condition only applies to the five (5) AVR panels (P/N D72-12200-100-PVNGS)
shipped to Palo Verde on ESI sales order 8001720 (4 panels shipped in May 2013 and 1 panel shipped in June 2013).
Report No.Revision: Date: Page: 10CFR21 -0110 0 11/12/13 4 of 4 Corrective Action: Diode assembly CR7 shall be removed from the AVR subpanel, rotated 180 degrees and re-installed using the same mounting holes and mounting hardware.
The existing panel wiring to CR7 shall then be connected in the same physical location, thereby connecting wire F+ to the cathode and wire F7 to the anode as shown in the photographs below. This shall be performed on all five (5) AVR panels shipped to APS-Palo Verde (reference ESI sales order 8001720).CR7 Diode Assembly -Not Correct (as-shipped)
CR7 Diode Assembly -Correct (rotated 180*)To prevent recurrence of this issue, the following is being implemented:
o AVR panel layout drawing 8000654-01 has been revised to rotate diode CR7 180 degrees.This will change the anode connection from the top to the bottom orientation.
o The AVR panel factory test procedure 8000654-FTP-1 has been revised to include steps to verify proper connection of diode CR7 within the field flash circuitry.