Notification of Potential Part 21 Interim Report Re Possible Deviation or Defect in Nuclear Qualified High Efficiency Particulate Air FiltersML13079A320 |
Person / Time |
---|
Site: |
Beaver Valley, Peach Bottom, Browns Ferry, Oconee, Mcguire, Nine Mile Point, Palo Verde, Catawba, Watts Bar, Prairie Island, Surry, Duane Arnold, Robinson, South Texas, McGuire |
---|
Issue date: |
03/18/2013 |
---|
From: |
Watkins M AAF International |
---|
To: |
Document Control Desk, Office of Nuclear Reactor Regulation |
---|
References |
---|
Download: ML13079A320 (3) |
|
Similar Documents at Beaver Valley, Peach Bottom, Browns Ferry, Oconee, Mcguire, Nine Mile Point, Palo Verde, Catawba, Watts Bar, Prairie Island, Surry, Duane Arnold, Robinson, South Texas, McGuire |
---|
Category:Deficiency Report (per 10CFR50.55e and Part 21)
MONTHYEARML24302A2402024-10-28028 October 2024 CFR 21 Report 1-BY-BC-1-LV Battery Charger ML24281A0662024-10-0404 October 2024 EN 57363 - MPR Associates, Inc. Report in Accordance with 10 CFR Part 21 on Incomplete Dedication of Contactors Supplied as Basic Components DCL-24-083, CFR Part 21 Notification: Commercially Dedicated Snubber Valve Not Properly Heat Treated2024-09-0909 September 2024 CFR Part 21 Notification: Commercially Dedicated Snubber Valve Not Properly Heat Treated ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification DCL-24-056, Part 21 Interim Report Re Emergency Diesel Generator Fuel Snubber Valve Assembly2024-05-28028 May 2024 Part 21 Interim Report Re Emergency Diesel Generator Fuel Snubber Valve Assembly ML24127A0892024-05-0202 May 2024 57079-EN57079-1 - Redline Strikethrough e-mail Re Part 21 Interim Notification of Potential Defect with Schneider Electric Medium Voltage Vr Type Circuit Breaker ML24108A0792024-04-16016 April 2024 EN 57079 Paragon Energy Solutions Email Forwarding Part 21 Interim Report Re Potential Defect with Schneider Electric Medium Voltage Vr Type Circuit Breaker Part Number V5D4133Y000 ML24107A6972024-04-12012 April 2024 Engine Systems, Inc Part 21 Report Re EMD Cylinder Liner Water Leak ML24103A2022024-04-0909 April 2024 EN 57068 - Transco Products Inc Part 21 Initial Notification of Unverified Critical Characteristics of Darmatt KM-1 Flat Board ML24057A3382024-02-25025 February 2024 EN 56993 - Fairbanks Morse ML24088A1102024-02-25025 February 2024 Fairbanks Morse (Fm) Part 21 Notification Report Number 23-01 Re Asco Stainless Steel Solenoid Valves ML24088A1142024-02-25025 February 2024 Fairbanks Morse (Fm) Part 21 Report 23-02 Re Synchro-Start Mini-Gen Signal Generator ML24057A3372024-02-25025 February 2024 56992-EN 56992 - Fairbanks Morse Defense ML24018A0112024-01-18018 January 2024 CFR 21 Report Emergency Diesel Generator Fuel Oil Piping ML24018A0142024-01-17017 January 2024 Engine Systems, Inc., Report No. 10CFR21-0137, Rev. 1, 56913-EN 56913 ML24010A2132024-01-10010 January 2024 CFR 21.21 Final Report Regarding Siemens Medium Voltage Circuit Breakers ML24018A0952024-01-0404 January 2024 Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance Report No. 10CFR21-0137, Rev. 0 ML24008A0692024-01-0404 January 2024 Part 21 Report No. 10CFR21-0137, Rev. 0 for Reportable Notification for an Emo Cylinder Liner with Bore Deficiency, P/N 9318833 (Component of Power Assembly P/N 40124897), S/N 20M0938 ML24002A7112023-12-28028 December 2023 Interim Part 21 Report of a Deviation or Failure to Comply - Lube Oil Scavenging and Fuel Oil Engine Driven Pump NL-23-0901, 30-Day 10 CFR 21 Notification - Framatome Supplied Siemens Medium Voltage (Mv) Circuit Breakers2023-12-15015 December 2023 30-Day 10 CFR 21 Notification - Framatome Supplied Siemens Medium Voltage (Mv) Circuit Breakers ML23348A3942023-12-14014 December 2023 Interim Part 21 Report of a Potential Deviation or Failure to Comply Associated with Starter Contactors for the High Pressure Coolant Injection Suppression Pool Inboard Suction Valve ML24004A2092023-12-12012 December 2023 Flowline, Inc. - Interim Part 21 Report Notification Regarding Supply of 1 Sch. 80 (0.179 Wall) SB466 Uns C71500 Buttweld Long Radius 90 Degree Elbow; Manufacturer: Flowline; Heat No: 27668; 27 Pieces - Heat Code ML23352A2382023-12-0808 December 2023 56882-EN 56882 - Tioga Pipe, Inc Interim Part 21 Report Re Supply of 1 Inch Sch. 80 SB466 Uns C71500 Buttweld Long Radius 90 Degree Elbow ML23335A0722023-12-0101 December 2023 Interim Report of a Deviation or Failure to Comply Associated with a Relay in the Unit 2 Reactor Core Isolation Cooling Condensate Pump ML23320A2542023-11-16016 November 2023 Interim Part 21 Report of a Deviation or Failure to Comply Associated with Check Valve 0-CKV-023-0565 for D1 Residual Heat Removal Service Water Pump ML23282A0022023-10-0606 October 2023 Interim Part 21 Report of a Deviation or Failure to Comply Associated with Check Valve 0-CKV-023-0565 for D1 Residual Heat Removal Service Water Pump ML23279A0612023-10-0505 October 2023 Paragon Energy Solutions LLC, Part 21 Final Report Re Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23254A0242023-09-0606 September 2023 Paragon Energy Solutions LLC, Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) NLS2023049, 10 CFR Part 21 Report Regarding HGA Relays2023-09-0606 September 2023 10 CFR Part 21 Report Regarding HGA Relays ML23241A0022023-08-25025 August 2023 Paragon Final Part 21 Report on Defect with Eaton/Cutler Hammer Size 4 and 5 Freedom Series Contactors Modified by Paragon with Special Coils And/Or with RTV to Improve the Securing of Shading Coils RBG-48245, Part 21 Notification of a Failure to Comply Identified During Preinstallation Testing on a Motor Driven Relay2023-08-24024 August 2023 Part 21 Notification of a Failure to Comply Identified During Preinstallation Testing on a Motor Driven Relay ML23221A3702023-08-0303 August 2023 Paragon Energy Solutions, 10CFR Part 21 Initial Notification: P21-08032023-IN, Rev. 0 ML23207A0762023-07-14014 July 2023 EN 56557 - Update to Part 21 Report Re Potential Defect with Trane External Auto/Stop Emergency Stop Relay Card Pn: XI2650728-06 ML23192A0622023-06-30030 June 2023 Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance, Report No. 10CFR21-0136, Rev. 0 ML23187A4722023-06-30030 June 2023 56603-EN 56603 - Engine Systems, Inc., Report No. 10CFR21-0136, Rev. 0 Re Voltage Regulator Chassis ML23212A9502023-05-24024 May 2023 Engine Systems, Inc., Part 21 Report Re Woodward EGB-35P Governor/Actuator with Foreign Material ML23117A0432023-04-20020 April 2023 Framatome, Inc., Part 21 Notification of Existence of a Defect ML23100A1072023-04-10010 April 2023 Framatome Part 21 Report Re Erroneous Change of State for Circuit Breaker ML23094A1252023-03-31031 March 2023 Talen Part 21 Final Notification P21-03032023-FN R0 Re Defect Identified in Automatic Transfer Switch ML23094A1242023-03-31031 March 2023 EN 56387 Update - Paragon Energy Solutions Final Notification of Defect of Automatic Transfer Switch ML23087A1292023-03-23023 March 2023 Trillium Valves USA - Part 21 Written Notification - Event Number: 56420 ML23082A1122023-03-17017 March 2023 10 CFR Part 21 Report – Inconsistent Crimping of Motor Leads to Ring Terminal Connectors and Failure to Comply. Trillium Valves USA Part 21 Evaluation I211003 ML23066A2212023-03-0707 March 2023 Velan, Inc. - Revised Part 21 Notification Re Butterfly Valves Found to Have a Number of Fasteners Loose ML23065A2002023-03-0303 March 2023 EN 56252 Update - Flow Serve - Final Notification of Potential Part 21 on Peerless 56 Frame DC Motors ML23065A1962023-03-0202 March 2023 EN 56387 Paragon - Part 21 Report Re Defect Identified in Automatic Transfer Switch Pn: NLI-ATS480A400X1 ML23060A0412023-03-0101 March 2023 Part 21 Interim Report of a Deviation or Failure to Comply Associated with a Limitorque Actuator ML23038A0192023-02-0606 February 2023 Curtiss-Wright Part 21 Notification for Qualtech Np Supplied Eaton TMR5 Timing Relays ML23030A6642023-01-27027 January 2023 Flowserve, Part 21 Second Interim Notification Report Re Peerless 56 Frame DC Motors ML23025A2532023-01-25025 January 2023 Part 21 Final Report Regarding Siemens Medium Voltage Circuit Breakers ML23024A0292023-01-24024 January 2023 Part 21 Interim Report of a Deviation or Failure to Comply Associated with a Limitorque Actuator 2024-09-09 The following query condition could not be considered due to this wiki's restrictions on query size or depth: <code> [[:Beaver Valley]] OR [[:Peach Bottom]] OR [[:Browns Ferry]] OR [[:Oconee]] OR [[:Mcguire]] OR [[:Nine Mile Point]] OR [[:Palo Verde]] OR [[:Catawba]] OR [[:Watts Bar]] OR [[:Prairie Island]] OR [[:Surry]] OR [[:Duane Arnold]] OR [[:Robinson]] OR [[:South Texas]] OR [[:McGuire]] </code>.
[Table view]The following query condition could not be considered due to this wiki's restrictions on query size or depth: <code> [[:Beaver Valley]] OR [[:Peach Bottom]] OR [[:Browns Ferry]] OR [[:Oconee]] OR [[:Mcguire]] OR [[:Nine Mile Point]] OR [[:Palo Verde]] OR [[:Catawba]] OR [[:Watts Bar]] OR [[:Prairie Island]] OR [[:Surry]] OR [[:Duane Arnold]] OR [[:Robinson]] OR [[:South Texas]] OR [[:McGuire]] </code>. |
Text
SUITE 2200 LOUISVILLE KY 40223-5000 P.O. BOX 35690 LOUISVILLE.KY 40232-5690 800.869.6907 výw.aafilntI.om March 18, 2013 VIA OVERNIGHT MAIL U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555-0001 Re: Part 21 Interim Report Notification
Dear Sirs:
By this letter, AAF International ("AAF") provides notice to the U.S. Nuclear Regulatory Commission ("NRC") of a possible deviation or defect in nuclear qualified High Efficiency Particulate Air ("HEPA") filters manufactured by AAF. Although late, this interim notification is submitted pursuant to the requirements of 10 CFR Part 21.
On December 5, 2012, AAF received a report from an end user of its HEPA filters, which indicated that two (2) nuclear qualified HEPA filters failed a Resistance to Pressure test conducted by or on behalf of the end user. The cause of the test failure is not known as of the date of this interim report, but AAF is in the process of investigating the matter and performing a root cause analysis. In order to complete the root cause analysis, it is necessary for AAF to build several filters for testing. The process of building new filters and testing will likely require approximately thirty (30) days due to the time necessary to procure raw materials from AAF's suppliers. However, AAF anticipates that its investigation will be completed no later than April 15, 2013.
Attached hereto, AAF provides a list of customers who may be impacted by the potential defect in these nuclear qualified HEPA filters. AAF will update this list upon completion of its investigation into this matter. AAF will also follow up with a full report to the NRC upon the completion of its investigation. In the meantime, if you have any questions or require any additional information, you may contact the undersigned at (502) 637-0275, or via email at mwatkins*,aafintl .com.
Sincerely, /
Marilyn J. atkins Director, Quality Assurance Enclosure www.aafintl.com
AAF International Attachment to Interim Report 18 March 2013 Sold To Customer Name & Ship to Customer Name &
No Address Address ARIZONA PUBLIC SERVICE CO / PO APS PALO VERDE / 5801 SOUTH Box 53999 / PHOENIX AZ 85072- WINTERSBURG ROAD / TONOPAH 1 3950 AZ 85354 PGN H. B. ROBINSON PLANT)
PROGRESS ENERGY CAROLINA INC 3581 WEST ENTRANCE ROAD ]
2 / PO Box 870 / RALEIGH NC 27602 HARTSVILLE SC 2955C STP NUCLEAR OPERATING STP NUCLEAR OPERATING COMPANY / 12090 FM 521 (8 MI COMPANY / PO Box 270 / WEST OF WADSWORTH) /
3 WADSWORTH TX 77483 WADSWORTH LOS ALAMOS NATIONAL AIR TECHNIQUES INTERNATIONAL)
LABORATORY / PO Box 1663 / LOS 1708 WHITEHEAD ROAD) 4 ALAMOS NM 87545 BALTIMORE'MD 21207 NEBRASKA PUBLIC POWER NEBRASKA PUBLIC POWER DIST / DISTRICT / 72676 648A AVENUE) 5 BOX 1740 / COLUMBUS NE 68602 BROWNVILLE NE 68321 NUCLEAR BUSINESS UNIT /
PSEG NUCLEAR LLC / PO Box 1868 ALLOWAY CREEK NECK ROAD /
6 / NEWARK NJ 07101 HANCOCKS BRIDGE NJ 08038 SEXTON& PEAKE INC,/ 9687 DOMINION VIRGINIA POWER/
GERWIG LANE/ COLUMBIA MD 5570 HOG ISLAND ROAD / SURRN 7 .21046 VA23883 TATE ENGINEERING SYSTEMS INC/ EXELON NUCLEAR / 314E 1560 CATONCENTER DRIVE / SANATOGA ROAD / POTTSTOWN 8 " I.....,BALTIMORE MD 21227 PA 19464 TATE EjNGINEERIN(d. SYSTEMS INC / EXELON NUCLEAR - LASALLE 1560CATONWCENTER DRIVE / STATION / 2601 NORTH 21SI 9 BALTIMORE MD.21227 ROAD / MARSEILLES IL61341 TENNESSEE VALLEY AUTHORITY / WATTS BAR NUCLEAR PLANT j PO Box 15500 / KNOXVILLE TN 1270 HIGHWAY 68 - UNIT 1) 10 37901-5500 SPRING CITY TN 37381 TENNESSEE VALLEY AUTHORITY / TVA/BROWNS FERRY NUCLR PO Box 15500 / KNOXVILLE TN PLANT / 10833 SHAW ROAD /
11 37901-5500 ATHENS AL 35611 LAWRENCE LIVERMORE NATL AIRTECHNIQUES INTERNATIONAL)
LABS / PO Box 5001 / LIVERMORE 170.WHITEHEA* ROAD) 12 CA 94551 BALTIMORE M D 2i)O7 ENERGY NORTHWEST /76 NORTH ENERGY NORTHWEST / PO Box POWER PLANT LOOP / RICHLAND 13 968 / RICHLAND WA 99352 WA 99354 EDGEWOOD CHEMICAL US ARMY ABERDEEN ACQUISITION BIOLOGICAL CTN/ 5.165;WEBSTEF C / BUILDING 4118 SUSQUEHANNA ROADr.,bDG 0 E/ABERDEEN 14 BLVD /APG MD 21005-5 :,.PROVING AIR TECHNIQUES INTERNATIONAL]
UT BATTELLE LLC / PO Box 2308 / f1708WH/TEHEAD ROAD /
15 OAK RIDGE TN 37831-6436[. BALTIMQRE MD.21207 DUANE ARNOLD NUCLEAR PLAN7 SCIENTIFIC SALES INC/ PO Box WHS / 3277 DAEC ROAD / PALO IA 16 : 406 1/ OAK RIDGE TN 37831 52324
- 1. List shows Sold To and Ship 10 cu .t- - r Mrnfwfh~ rlr
- 2. Non-nuclear agencies are shaded. 1
AAF International Attachment to Interim Report 18 March 2013 Sold To Customer Name & Ship to Customer Name &
No Address Address COMMERCIAL FILTER SALES / 2715 PUGET SOUND NAVAL SHIPYARD /
SIXTH AVENUE SOUTH / SEATTLE 1400 FARRAGUT AVENUE /
17 WA 98134 BREMERTON WA 98314 DOMINION VIRGINIA POWER / SURRY POWER STATION / 5570 500 COXENDALE ROAD / CHESTER HOG ISLAND ROAD / SURRY VA 18 VA 23836 23883 EXELON BUSINESS SERVICES CO / EXELON NUCLEAR GENERATION PO Box 805388 / CHICAGO IL CO LLC / 2601 NORTH 21ST ROAD /
19 60680-5388 MARSEILLES IL 61341 EXELON BUSINESS SERVICES CO / PEACH BOTTOM ATOMIC POWER PO Box 805388 / CHICAGO IL STATION / 1848 LAY ROAD / DELTA 20 60680-5388 PA 17314 EXELON BUSINESS SERVICES CO / EXELON GENERATION COMPANY /
PO Box 805388 / CHICAGO IL 22710 206TH AVENUE NORTH!
21 60680-5388 CORDOVA IL 61242 EXELON BUSINESS SERVICES CO / EXELON NUCLEAR / 3146 PO Box 805388 / CHICAGO IL SANATOGA ROAD / POTTSTOWN 22 60680-5388 PA 19464 FILTMORE TECHNOLOGIES / 7618 RECEIVING OFFICER / 1968 LAKE POINTE DRIVE / CRESTWOOD GILBERT STREET / NORFOLK VA 23 KY 40014 23511 DUKE ENERGY CAROLINAS, LLC / OCONEE NUCLEAR STATION / 155 PO Box 37925 / CHARLOTTE NC EAST PICKENS HWY, HWY 183 /
24 28237 SENECA SC 29672 DUKE ENERGY CAROLINAS, LLC / CATAWBA NUCLEAR STATION /
PO Box 37925 / CHARLOTTE NC 4800 CONCORD ROAD / YORK SC 25 28237 29745 DUKE ENERGY CAROLINAS, LLC / MCGUIRE NUCLEAR STATION I PO Box 37925 / CHARLOTTE NC 13225 HAGERS FERRY RD HWY 73/
26 28237 HUNTERSVILLE NC 28078 PRAIRIE ISLAND NUCLEAR PLANT /
NORTHERN STATES POWER MN / 1717 WAKONADE DRIVE EAST /
27 PO Box 46504/ DENVER CO 80202 WELCH MN 55089 INDIANA MICHIGAN POWER AMERICAN ELECTRIC POWER /
COMPANY / PO Box 24400 / 9970 RED ARROW HIGHWAY/
28 CANTON OH 44702-4410 BRIDGMAN MI 49106 NINE MILE POINT NUCLEAR NINE MILE POINT NUCLEAR STATION LLC / PO Box 63 / STATION LLC / 348 LAKE ROAD /
29 LYCOMING NY 13093 OSWEGO NY 13126 FIRSTENERGY NUCLEAR BEAVER VALLEY MAIN OPERATING CO / 76 SOUTH MAIN WAREHOUSE / ROUTE 168 /
30 STREET / AKRON OH 44308 SHIPPINGPORT PA 15077 US DEPARTMENT OF ENERGY / AIR TECHNIQUES INTERNATIONAL /
9800 SOUTH CASS AVENUE / 1708 WHITEHEAD ROAD!
31 ARGONNE IL 60439 BALTIMORE MD 21207
- 1. List shows Sold To and Ship To customers for individual orders.
- 2. Non-nuclear agencies are shaded. 2