Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML22307A0191 November 2022EN 56196 - NRC 10 CFR Part 21 Notification, Nutherm, Written Notification of Potential Defect Found in Nutherm/Sola Hevi-Duty Uninterruptible Power Supply (Ups), S4K2U1000-NM 191Reverse polarity
ML22301A17428 October 2022Global Nuclear Fuel Americas, LLC (GNF) - Part 21 60-Day Interim Report Notification: GNF3 Raised Water Rod (SC-22-04 Rt)Affidavit
GNF3
Water rod
ML21168A21717 June 2021GE Hitachi Nuclear Energy Americas, LLC - 10 CFR Part 21.21(d)-Reportable Condition: Fuel Support Side Entry Orifice Meta-Stable Flow for 2 Beam Locations in the BWR/6 ReactorsOperability Determination
Fuel cladding
M210077, GE Hitachi Nuclear Energy Americas, LLC - 10 CFR Part 21.21(d)-Reportable Condition: Fuel Support Side Entry Orifice Meta-Stable Flow for 2 Beam Locations in the BWR/6 Reactors17 June 2021GE Hitachi Nuclear Energy Americas, LLC - 10 CFR Part 21.21(d)-Reportable Condition: Fuel Support Side Entry Orifice Meta-Stable Flow for 2 Beam Locations in the BWR/6 ReactorsOperability Determination
Fuel cladding
M200087, GE-Hitachi Nuclear Energy Americas, LLC - 10 CFR Part 21.21(d)-Reportable Condition: Non-Conservative BWR/6 Side Entry Orifice (SEO) Loss Coefficients24 June 2020GE-Hitachi Nuclear Energy Americas, LLC - 10 CFR Part 21.21(d)-Reportable Condition: Non-Conservative BWR/6 Side Entry Orifice (SEO) Loss CoefficientsOperability Determination
Fuel cladding
ML20176A43224 June 2020GE-Hitachi Nuclear Energy Americas, LLC - 10 CFR Part 21.21(d)-Reportable Condition: Non-Conservative BWR/6 Side Entry Orifice (SEO) Loss CoefficientsOperability Determination
Fuel cladding
ML19317D09325 October 2019Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10 CFR21-0127, Rev. 0, Emd Fuel Injectors - Seized Plunger and Bushing
ML19199A0345 July 2019Lake Engineering Co., Third Interim Notification Per 10 CFR Part 21 Degraded Snubber SF1154 Hydraulic Fluid Batch No. ZJS1518
ML19190A0447 June 201910 CFR Part 21 Reporting of Defects for Introl Positioner 890265-010 - Cw SAS Initial Report No. 10CFR21-48Overspeed trip
Overspeed
ML19168A01231 May 2019Paragon Energy Solution LLC-10 CFR Part 21 Report of Defect GS2 Terry Turbine Introl Positioners
ML19071A1121 March 2019Lake Engineering Co., Corrected Potentially Degraded Snubber SF1154 Hydraulic Fluid Batch 11KLVS146 Final Report, Per 10 CFR Part 21
ML19002A20421 December 2018to Engine Systems, Inc., Part 21 Report Re Emd Fuel and Soakback Pumps - Potentially Undertorqued Cover Bolts
ML18354A7424 December 2018Engine Systems, Inc., Submittal of 1OCFR21 Reporting of Defects and Non-Compliance - Report No. 1OCFR21-0123, Rev. 0 - Emo Fuel and Soakback Pumps - Potentially Undertorqued Cover Bolts
ML18353A42830 November 2018Engine Systems, Inc., 10CFR21-0123, Rev. 0, for a 10CFR21 Reportable Condition on Emd Fuel and Soakback Pumps
ML18289A45510 October 2018Abb, Inc., 10 CFR Part 21 Notification of Deviation, Dry Type Transformer Serial#: 24-26458
ML18295A19924 September 2018Lake Engineering - Second Interim Notification Per 10 CFR Part 21: Degraded Snubber SF1154 Hydraulic Fluid Batch No. 11KLVS146
ML17194A82511 July 2017Part 21 Report Re Wedge Pin Failure in Anchor Darling Motor Operated Double Disc Gate Valves with Threaded Stem to Upper Wedge ConnectionsAnchor Darling
ML17081A45320 March 2017Part 21 - Plastic Jar Dedication Sampling
ML17026A41420 January 2017C&D Technologies, Inc. - Part 21 - Plastic Jar Dedication Sampling
ML16294A26418 October 2016Part 21 Report - Defective Current to Pressure Transducers
ML15288A1999 October 2015Part 21 Interim Report - Potential Defect on P/N 535-601 Moore Industries Milliamp Modules
ML15187A02929 June 2015Part 21 Notification of Deviation Regarding COM-5 Protective Relay Defective Frame Assembly
ML14337A09424 November 2014Notification of Potential Part 21 - Lack of Proper Power Supply Indication
ML14329A06319 November 2014Notification of Potential Part 21 Re Lack of Proper Power Supply Indication
ML14274A05222 September 2014Final Report 10CFR Part 21 Evaluation Regarding Misaligned Separators in LCR-25 Standby Batteries, Revision 1 - Original Letter Did Not Include the List of Affected Utilities
ML14210A01023 July 2014Part 21 - Unseating of Valve Spring on Scram Solenoid Pilot ValveSafe Shutdown
Shutdown Margin
Scram Discharge Volume
Failure to Scram
Affidavit
ML14204A70823 July 2014Enclosure 2, Description of Closure Evaluation, Non-Proprietary Information - Class I (Public)Safe Shutdown
Shutdown Margin
Scram Discharge Volume
Failure to Scram
ML14204A70723 July 2014Completed Evaluation of Part 21 Potentially Reportable Condition Notification: Unseating of Valve Spring on SSPVAffidavit
ML14094A4451 April 2014Notification of Part 21 Report on Defective Raw Material Used to Manufacture Valve Stems
ML14069A4682 March 2014Part 21 Report - Defective Raw Material Used to Manufacture Valve Stems
ML14055A35210 February 2014Part 21 Report - Instruction Leaflet for Subject Relays May Be Deficient
ML13165A34212 June 201360-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers
ML13073A10712 March 2013Notification of Potential Part 21 Report - Defective Raw Material Used to Manufacture Valve Stems
ML13064A01225 February 2013Notification of Potential Part 21 Report Re Wedge Pin Failure of an Anchor/Darling Double-Disc Gate ValveAnchor Darling
ML13042A0968 February 2013Completed Evaluation of Part 21 Potentially Reportable Condition Notification: Error in Main Steam Line High Flow Calculational MethodologyPower Uprate
ML13044A0758 February 2013Part 21 - Completed Evaluation for Potential Error in Main Steam Line High Flow Calculational MethodologyPower Uprate
ML12352A12313 December 201260-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers
ML12348A13613 December 2012Part 21 60-Day Interim Report Notification: Adequacy of Design Change in Am Magne-Blast Circuit Breakers
ML12347A30812 December 2012Part 21 60-Day Interim Report Notification: Error in Main Steam Line High Flow Calculational Methodology
ML12318A0418 November 2012Part 21 Report - Commercial Grade Dedication Not Properly Applied to Butterfly ValvesCommercial Grade Dedication
Condition Adverse to Quality
ML12283A2445 October 2012Part 21 - Temperature Switch Potentially Shipped Without Set Screw
ML12292A1975 October 2012Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10CFR21-0106, Rev. 0
ML12319A01227 September 2012Error in Main Steam Line High Flow Calculational Methodology
ML1219103337 July 2012ATC Nuclear, Part 21 Notification Concerning Moore Process Controllers
ML1219103372 July 2012Update 10 CFR Part 21 Notification of Defective Moore 535 Controllers
ML12158A4476 June 2012Part 21 60-Day Interim Report Notification - Closufailure of CRD Collet Retainer Tube/Outer Tube Weld
ML12163A1306 June 2012Part 21 Report - Failure of CRD Collet Retainer Tube/Outer Tube Weld
ML12061A26828 February 2012Part 21 Report - Potential Minimum Wall Violation on Seismic Plate Valve Bodies
ML12040A2837 February 2012Notification of Potential Part 21 - Failure to Include Seismic Input in Reactor Control Blade Customer GuidanceSafe Shutdown Earthquake
Operating Basis Earthquake
Channel-control blade interference
ML12038A0282 February 2012Failure of CRD Collet Retainer Tube/Outer Tube Weld