MONTHYEARML22307A0192022-11-0101 November 2022 EN 56196 - NRC 10 CFR Part 21 Notification, Nutherm, Written Notification of Potential Defect Found in Nutherm/Sola Hevi-Duty Uninterruptible Power Supply (Ups), S4K2U1000-NM 191 ML22301A1742022-10-28028 October 2022 Global Nuclear Fuel Americas, LLC (GNF) - Part 21 60-Day Interim Report Notification: GNF3 Raised Water Rod (SC-22-04 Rt) ML21168A2172021-06-17017 June 2021 GE Hitachi Nuclear Energy Americas, LLC - 10 CFR Part 21.21(d)-Reportable Condition: Fuel Support Side Entry Orifice Meta-Stable Flow for 2 Beam Locations in the BWR/6 Reactors M210077, GE Hitachi Nuclear Energy Americas, LLC - 10 CFR Part 21.21(d)-Reportable Condition: Fuel Support Side Entry Orifice Meta-Stable Flow for 2 Beam Locations in the BWR/6 Reactors2021-06-17017 June 2021 GE Hitachi Nuclear Energy Americas, LLC - 10 CFR Part 21.21(d)-Reportable Condition: Fuel Support Side Entry Orifice Meta-Stable Flow for 2 Beam Locations in the BWR/6 Reactors M200087, GE-Hitachi Nuclear Energy Americas, LLC - 10 CFR Part 21.21(d)-Reportable Condition: Non-Conservative BWR/6 Side Entry Orifice (SEO) Loss Coefficients2020-06-24024 June 2020 GE-Hitachi Nuclear Energy Americas, LLC - 10 CFR Part 21.21(d)-Reportable Condition: Non-Conservative BWR/6 Side Entry Orifice (SEO) Loss Coefficients ML20176A4322020-06-24024 June 2020 GE-Hitachi Nuclear Energy Americas, LLC - 10 CFR Part 21.21(d)-Reportable Condition: Non-Conservative BWR/6 Side Entry Orifice (SEO) Loss Coefficients ML19317D0932019-10-25025 October 2019 Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10 CFR21-0127, Rev. 0, Emd Fuel Injectors - Seized Plunger and Bushing ML19199A0342019-07-0505 July 2019 Lake Engineering Co., Third Interim Notification Per 10 CFR Part 21 Degraded Snubber SF1154 Hydraulic Fluid Batch No. ZJS1518 ML19190A0442019-06-0707 June 2019 10 CFR Part 21 Reporting of Defects for Introl Positioner 890265-010 - Cw SAS Initial Report No. 10CFR21-48 ML19168A0122019-05-31031 May 2019 Paragon Energy Solution LLC-10 CFR Part 21 Report of Defect GS2 Terry Turbine Introl Positioners ML19071A1122019-03-0101 March 2019 Lake Engineering Co., Corrected Potentially Degraded Snubber SF1154 Hydraulic Fluid Batch 11KLVS146 Final Report, Per 10 CFR Part 21 ML19002A2042018-12-21021 December 2018 to Engine Systems, Inc., Part 21 Report Re Emd Fuel and Soakback Pumps - Potentially Undertorqued Cover Bolts ML18354A7422018-12-0404 December 2018 Engine Systems, Inc., Submittal of 1OCFR21 Reporting of Defects and Non-Compliance - Report No. 1OCFR21-0123, Rev. 0 - Emo Fuel and Soakback Pumps - Potentially Undertorqued Cover Bolts ML18353A4282018-11-30030 November 2018 Engine Systems, Inc., 10CFR21-0123, Rev. 0, for a 10CFR21 Reportable Condition on Emd Fuel and Soakback Pumps ML18289A4552018-10-10010 October 2018 Abb, Inc., 10 CFR Part 21 Notification of Deviation, Dry Type Transformer Serial#: 24-26458 ML18295A1992018-09-24024 September 2018 Lake Engineering - Second Interim Notification Per 10 CFR Part 21: Degraded Snubber SF1154 Hydraulic Fluid Batch No. 11KLVS146 ML17194A8252017-07-11011 July 2017 Part 21 Report Re Wedge Pin Failure in Anchor Darling Motor Operated Double Disc Gate Valves with Threaded Stem to Upper Wedge Connections ML17081A4532017-03-20020 March 2017 Part 21 - Plastic Jar Dedication Sampling ML17026A4142017-01-20020 January 2017 C&D Technologies, Inc. - Part 21 - Plastic Jar Dedication Sampling ML16294A2642016-10-18018 October 2016 Part 21 Report - Defective Current to Pressure Transducers ML15288A1992015-10-0909 October 2015 Part 21 Interim Report - Potential Defect on P/N 535-601 Moore Industries Milliamp Modules ML15187A0292015-06-29029 June 2015 Part 21 Notification of Deviation Regarding COM-5 Protective Relay Defective Frame Assembly ML14337A0942014-11-24024 November 2014 Notification of Potential Part 21 - Lack of Proper Power Supply Indication ML14329A0632014-11-19019 November 2014 Notification of Potential Part 21 Re Lack of Proper Power Supply Indication ML14274A0522014-09-22022 September 2014 Final Report 10CFR Part 21 Evaluation Regarding Misaligned Separators in LCR-25 Standby Batteries, Revision 1 - Original Letter Did Not Include the List of Affected Utilities ML14210A0102014-07-23023 July 2014 Part 21 - Unseating of Valve Spring on Scram Solenoid Pilot Valve ML14204A7082014-07-23023 July 2014 Enclosure 2, Description of Closure Evaluation, Non-Proprietary Information - Class I (Public) ML14204A7072014-07-23023 July 2014 Completed Evaluation of Part 21 Potentially Reportable Condition Notification: Unseating of Valve Spring on SSPV ML14094A4452014-04-0101 April 2014 Notification of Part 21 Report on Defective Raw Material Used to Manufacture Valve Stems ML14069A4682014-03-0202 March 2014 Part 21 Report - Defective Raw Material Used to Manufacture Valve Stems ML14055A3522014-02-10010 February 2014 Part 21 Report - Instruction Leaflet for Subject Relays May Be Deficient ML13165A3422013-06-12012 June 2013 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML13073A1072013-03-12012 March 2013 Notification of Potential Part 21 Report - Defective Raw Material Used to Manufacture Valve Stems ML13064A0122013-02-25025 February 2013 Notification of Potential Part 21 Report Re Wedge Pin Failure of an Anchor/Darling Double-Disc Gate Valve ML13042A0962013-02-0808 February 2013 Completed Evaluation of Part 21 Potentially Reportable Condition Notification: Error in Main Steam Line High Flow Calculational Methodology ML13044A0752013-02-0808 February 2013 Part 21 - Completed Evaluation for Potential Error in Main Steam Line High Flow Calculational Methodology ML12352A1232012-12-13013 December 2012 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML12348A1362012-12-13013 December 2012 Part 21 60-Day Interim Report Notification: Adequacy of Design Change in Am Magne-Blast Circuit Breakers ML12347A3082012-12-12012 December 2012 Part 21 60-Day Interim Report Notification: Error in Main Steam Line High Flow Calculational Methodology ML12318A0412012-11-0808 November 2012 Part 21 Report - Commercial Grade Dedication Not Properly Applied to Butterfly Valves ML12283A2442012-10-0505 October 2012 Part 21 - Temperature Switch Potentially Shipped Without Set Screw ML12292A1972012-10-0505 October 2012 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10CFR21-0106, Rev. 0 ML12319A0122012-09-27027 September 2012 Error in Main Steam Line High Flow Calculational Methodology ML1219103332012-07-0707 July 2012 ATC Nuclear, Part 21 Notification Concerning Moore Process Controllers ML1219103372012-07-0202 July 2012 Update 10 CFR Part 21 Notification of Defective Moore 535 Controllers ML12158A4472012-06-0606 June 2012 Part 21 60-Day Interim Report Notification - Closufailure of CRD Collet Retainer Tube/Outer Tube Weld ML12163A1302012-06-0606 June 2012 Part 21 Report - Failure of CRD Collet Retainer Tube/Outer Tube Weld ML12061A2682012-02-28028 February 2012 Part 21 Report - Potential Minimum Wall Violation on Seismic Plate Valve Bodies ML12040A2832012-02-0707 February 2012 Notification of Potential Part 21 - Failure to Include Seismic Input in Reactor Control Blade Customer Guidance ML12038A0282012-02-0202 February 2012 Failure of CRD Collet Retainer Tube/Outer Tube Weld 2022-11-01
[Table view] |
Text
06/29/2015 U.S. Nuclear Regulatory Commission Operations Center Event Renort Part 21 (PAR) Event# 51190 Rep Org: ABB, INC. Notification Date I Time: 06/29/2015 17:16 (EDT)
Supplier: ABB, INC. Event Date I Time: 06/29/2015 (EDT)
Last Modification: 06/29/2015 Region: 1 Docket #:
City: CORAL SPRINGS Agreement State: Yes County: License #:
State: FL NRC Notified by: DENNIS BATOVSKY Notifications: ANTHONY DIMITRIADIS RIDO HQ Ops Officer: STEVE SANDIN KATHLEEN O'DONOHUE R2DO Emergency Class: NON EMERGENCY LAURA KOZAK R3DO 10 CFR Section: NEIL OKEEFE R4DO 21.21(d)(3)(i) DEFECTS AND NONCOMPLIANCE PART 21/50.55 REACTORS EMAIL PART 21 NOTIFICATION OF DEVIATION REGARDING COM-5 PROTECTIVE RELAY DEFECTIVE FRAME ASSEMBLY The following information was provided by ABB via fax:
"This letter provides notification of a deviation for Class IE COM-5 (Long Time Overcurrent Relays) styles 1326D81A01, 1326D81A02, and 326D81A09.
"On April 30, 2015 ABB received a customer complaint regarding a COM-5 relay received with a bracket (ABB Part Number #3518A17H01) detached from the relay frame assembly (ABB Part Number #1456C92G01).
"ABB's investigation determined that the bracket, which is spot-welded to the frame, can be detached from the frame using a relatively small amount of force. If the weld fails, the Indicating Contactor Switch (ICS) unit held by the bracket could inadvertently close, causing a false trip. The affected frame assemblies were manufactured by ABB on 9/25/2014 (Lot-#: 45001414115) by an operator who incorrectly followed the inspection procedure required to verify the integrity of the resistance spot welds.
"ABB records show a total of 11 suspect relays were provided to two customers as detailed in attachment I
[BELOW].
"ABB does not have the capability to perform the evaluation to determine if a defect exists, thus we are notifying the purchasers or affected licensees of this determination so that they may evaluate the deviation, pursuant to 10 CFR. 21 .21(b).
"ABB recommends that the affected licensees evaluate their specific application and determine whether the
06/29/2015 U.S. Nuclear Regulatory Commission Operations Center Event Report Page 2 deviation described in this notice affects their design basis. If it is determined that it does, the licensees should contact ABB to determine appropriate corrective action. ABB is conducting the following actions:
- ABB has improved existing inspection processes used to verify resistance spot welds.
- ABB has performed an extent of condition evaluation and determined that this issue is limited to this process.
"If you have any questions regarding this notice, please contact ABB Technical Support at +1-954-752-6700 or+ 1-800-222-1946 Very truly yours, Dennis Batovsky Managing Director "ATTACHMENT 1 "Customer List for 1326D81A01, 1326D81A02 and 1326D81A09 COM-5 Relays "Exelon Business Services Corporation, Chicago, IL - Clinton Nuclear Station "ORDER / CUSTOMER P0 / DATE / STYLE / SERIAL NO. / QTY "ENW0716 / 00531032 Rev 001 / 9-26-2014 / 1326D81A01 / 12910-12912 / 3 "ENW0742 / 00541813 Rev 002 / 3-3-2015 / 1326D81A01 / 12938, 12939 /2 "Westinghouse Electric Corporation, New Stanton, PA "ORDER / CUSTOMER P0 / DATE / STYLE / SERIAL NO. / QTY "VEP10980O/4500653421 Rev 1 / 12-8-2014 / 1326D81A02 / 12928, 12929 /2 "VEP10976 / 4500653398 Rev 1 / 12-8-2014/1326D81A02 / 12925-1 2927 / 3 "VEP11168 /4500657304 rev 1 / 1-20-2015 / 1326D81A09 / 12919 /1"
954 05:27:02 p~m. 06-29-2015 1 /4
,K A S} D Pii!liP June 29, 2015 US Nuclear Regulatory Commission Washington, DC 20555-00 1
Subject:
10 C.F.R. Part 21 Notification of Deviation regarding COM-5 Protective Relay -
Defective Frame Assembly
Dear Sir or Madam:
This letter provides notification of a deviation for Class 1E COM-5 (Long Time Overcurrent
- Relays) styles 1326D81A01, 1326DS1A02, and 1326D81A09.
On April 30, 2015 ABB received a customer complaint regarding a COM-5 relay received with a bracket (ABB Part Number #3518A17H01) detached from the relay frame assembly (ABB Part Number #1456C92G0 1).
rFi ir
<~With Top of COM 5 Frame Bracket Shown at LEFT I I ABB's investigation determined that the bracket, which is spot-welded to the frame, can be detached from the frame using a relatively small amount of force. If the weld fails, the Indicating Contactor Switch (ICS) unit held by the bracket could' inadvertently close, causing a f'alse trip. The affected frame assemblies were manufactured by ABEB on 9/25/2014 (Lot#: 45001414115) by an operator who incorrectly followed the inspection procedure required to. verify the integrity of the resistance spot welds.
II AB3B records show a total of 11 suspect relays were provided to two customers as detailed in attachment 1.
ABB does not have the capability to perform the evaluation to determine if a defect exists, thus we are notifying the purchasers or affected licensees of this determination so that they may evaluate the deviation, pursuant to 10 C.F.R. 21.21(b).
- Protective Relays and Switches* 4300 Coral Ridge Drive*.
Tel. (954) 752-6700 www. abb.us,/substationautornatio n
' " Coral Springs FL 33065 .Fax (954) 345-5329
954 05:27:29 p.m. 06-29-2015 2/4 ABB recommends that the affected licensees evaluate their specific application and determine S whether the deviation described in this notice affects :their design basis. If it is determined that it does, the licensees should contact ABB to determine appropriate corrective action.
AI3B is conducting the following actions:
- AB3B has improved existing inspection processes used to verify resistance spot welds.
,
- ABB has performed an extent of condition evaluation and determined that this issue is
~limited to this process.
If you have any questions regarding this notice, please contact ABB Technical Support at +1-954-752-6700 or +1-800-222-1946 Very truly yours, Managing Director Protecti~je Relays aridSwitches 4300 Corut Ridge Drive.
- Tel. (954) 752.-6700 www. abb.us/substationautrimatlan
- "' '" Coral Springs EL33055. Fax (954) 345-5329-
954 95405:27:42 p~m, 06-29-2015 4 3/4 PALlPlP l
Attachment 2.
Customer List for 1326D81A01, 1326D81A02 and. 326D81A09 COM-5 eas Exelon Business Services Corporation, Chicago, IL Clinton Nuclear Station ORDER CUSTOMER P0 DATE STYLE SERIAL NO. QV(
,ENW0J716 00531032 Rev 001 9/26/2014 1326081A01 12910-12912 3 ENW0742 00541813 Rev 002 3/3/2015 1326D81A01 12938, 12939 2 Westinghouse Electric Corporation, New Stanton, PA ORDER CUSTOMER PO DATE STYLE SERIAL NO. QTY VEP10980 4500653421 Rev i 12/8/2014 1326D81A02 12928, 12929 2 VEP10976 4500653398 Rev i 12/8/2014 1326D81A02 12925-12927 3 VEP11168 4500657304 rev I 1/20/2015 1326D81A09 12919 1
' ' :: .Pratective Relays and Switches 4300 Coral Ridi Re Drive *Tel. (954) 752-5700 www. abb.us/substatlanautomatiari
- - Coral Springs FL133065 Fax (954) 345-5329
- 05:28:06 p.m. 06-29-2015 4/4