 Issue dateTitleTopic
ML18107A3441 June 1999Interim Part 21 Rept Re Premature Over Voltage Protection Actuation in Circuit Specific Application in Dc Power Supply.Testing & Evaluation Activities Will Be Completed on 990716
ML18106B09325 February 1999Part 21 Rept Re Possible Defect in Swagelok Pipe Fitting Tee,Part Number SS-6-T.Caused by Crack Due to Improper Location of Heated Bar.Only One Part Out of 7396 Pieces in Forging Lot Was Found to Be Cracked.Affected Util,Notified
ML18106B0551 February 1999Part 21 Rept Re Possible Matl Defect in Swagelok Pipe Fitting Tee,Part Number SS-6-T.Defect Is Crack in Center of Forging.Analysis of Part Is Continuing & Further Details Will Be Provided IAW Ncr Timetables.Drawing of Part,Encl
ML18106B04429 January 1999Part 21 Rept Re Possible Defect in Swagelok Pipe Fitting Tee Part Number SS-6-T.Caused by Crack in Center of Forging. Continuing Analysis of Part & Will Provide Details in Acoordance with NRC Timetables
ML17354B0979 September 1998Part 21 Rept Re Possible Machining Defect in Certain One Inch Stainless Steel Swagelok Front Ferrules,Part Number SS-1613-1.Caused by Tubing Slipping Out of Fitting at Three Times Working Pressure of Tubing.Notified Affected Utils
ML17264A93810 July 1997Deficiency Rept Re Potential Safety Hazard Associated w/FM-Alco 251 Engin,High Pressure Fuel tube-catalog: 4401031-2 in Which Dual Failure Mode Exists.Caused by Incorrect Forming Process
ML18102A3706 September 1996Part 21 Rept Re Installation of NUS Model OCA 801 Signal Isolator Modules & Model Mth 801 Signal Summator Modules. Replacement Modules Including Spares for Plant,Unit 2 Have Been Inspected by Vendor & RepairedDesign basis earthquake
ML18102A33821 August 1996Part 21 Rept Re Chipping of Latching Mechanism Props Installed in GE 4 Kv magne-blast Circuit Breakers,Type AM-4.16-350-2H.Two Affected Breakers Have Been Returned to Vendor
ML18102A5598 August 1996Part 21 Rept Re Defect in NUS Model OCA801 Signal Isolator Modules.Replacement Modules Installed in Reactor Control & Protection SysDesign basis earthquake
ML18101A8774 August 1995Interim Part 21 Rept Re Potentially Reportable Deficiency in Edward Valve Model 838YT Check Valves Due to Disk Exhibiting Excessive Leakage.Disk from Original Valve Cleaned, Inspected & Installed in Replacement Valve
ML18101A8611 August 1995Interim Part 21 Rept Re Velan Valve Corp Check Valve Failure to Close.Insp of Internals Showed Moderate Wear in Gap Between Valve Disc & Hanger Arm.New Disc Installed & Valve Tested Satisfactorily
ML18038A8977 September 1994Part 21 Rept Re Defect in Latching Mechanism of Potter & Brumfield Relay on C&D High Voltage Shut Down Alarm Assembly Printed Circuit Boards.Pull Test on Relay Reset Button Incorporated Into Receiving Insp Procedures
ML18100B23927 July 1994Part 21 Rept Re Signal Summators PM-505B & 506B Found to Saturate High When Summators Lose Power & Reenergized. Summators Powered from Independent Vital Instrument Buses & Inverters.Design Changes Implemented
ML18100B22725 July 1994Part 21 Rept Re Cracking in Valve Stem & Plug Connection Pinning Collar Area on PORVs 1PR1 & 1PR2.Caused Attributed to Either IGSCC or Hydrogen Assisted Cracking.Porv Internals Replaced W/Internals Mfg from SS 316 Matl W/Plug Stellited
ML18100B21014 July 1994Deficiency Rept Re PORV Plug & Stem Material Defects. Initially Reported 940714.PORV Internals Were Replaced W/Plug Stellited
ML18100B19130 June 1994Initial Part 21 Rept Re Deficiency in Signal Summators PM-505B & PM-506B Supplied by Westinghouse.Design Changes Implemented & Operators Made Aware of Affects of Power Supply Transient on Summator Operability
ML18100A76813 December 1993Interim Part 21 Rept Re Discovery That Ge/Alco EDGs High Pressure Injection Tube Studs Did Not Meet Correct Matl non- Std & Not Correct Geometry.All Nonconforming Studs Identified & Replaced
ML18096B2421 February 1993Part 21 Rept Re Possible Matl Defect in Stainless Steel Swagelock Tube Fittings.Initially Reported on 921218.List of Part Numbers,Heat Codes & Addl Affected Customers Encl
ML20126J59631 December 1992Part 21 Rept Re Potential Loss of RHR Cooling During Nozzle Dam Removal.Nozzle Dams May Create Trapped Air Column Behind Cold Leg Nozzle Dam.Mod to Nozzle Dams Currently Underway. Ltrs to Affected Utils EnclHydrostatic
ML20118B43911 September 1992Part 21 Rept Re Degradation in Abb Type 27N Undervoltage Relays Used in Electrical Switchgear.Recommends That Users Review Applications Requiring Exposures Greater than 1E03 Rads TID W/Time Delay Function Option
ML18095A4032 August 1990Part 21 Rept Re MSIV Design Deficiency at Plant.Design Spec Provided by Westinghouse Did Not Specify Requirement to Provide Seal in Capability & Util Design Process Failed to Recognize Deficiency
ML18095A23224 May 1990Part 21 Rept Re Discrepancies Identified in ECCS Flow Orifice K Factors Supplied by Westinghouse.Initially Reported on 900518.Util Fabricated New Orifice Plates to Original SpecsUnanalyzed Condition
ML18095A22522 May 1990Part 21 Rept Re Insufficient Welds on Pedestal Support Alignment Lug & Slide Shoe for 11,12,21 & 22 Charging/Safety Injection Pumps.Initially Reported on 900516.Windows Cut in Support Pedestals to Gain Access to Affected Areas
ML18094B44627 April 1990Part 21 Rept Re shaft-to-pinion Key Failures in Limitorque Actuators.Initially Reported on 900424.Caused by Reduction of cross-sectional Area & Ultimate Propagation of Cracks. Util Intends to Replace Keys in Actuators W/Keys of Steel
ML18094A44216 May 1989Part 21 Rept Re Defect in Solid State Protection Sys. During Mods in Solid State Protection Sys Cabinets,Noted That Two Wires Became Dislodged from Circuit Board.Visual Insp & Complete Pull Test Performed
ML18093A8286 May 1988Part 21 & Deficiency Rept Re Asea Brown Boveri,Power Distribution,Inc Low Voltage K-Line Circuit Breakers. Efforts Underway to Define Quantity & Type of Component Parts That May Need to Be Replaced
ML20153G0116 May 1988Part 21 Rept Re Potential Defect in Bussman Buss KTK-R Fuse Blocks W/Part Numbers 2078,2079 & 2080.Purchasing Records Reviewed to Identify If Any Parts Were Actually Used or Shipped to Customers.Results Listed
ML18093A47223 October 1987Part 21 Rept Re Calibr Gas Leakage Problem in Exo-Sensors, Inc Containment Hydrogen Analyzer Sys.Caused by Design Deficiency Associated W/Calibr Gas Subassembly.Monitoring Program to Be Maintained for Period After Sys Mods
ML20215G24416 June 1987Part 21 Rept Re Failure of Load Sequencing Equipment Supplied in Aug 1977 During Scheduled Testing.Caused by Open Electrical Connection on One Crimp Lug.Since 1978,insulated Lugs Used on All Equipment
FVY-86-105, Part 21 Rept Re Design Defect Relating to Limitorque Motor Operators Mfg Prior to 1975.Mfg Contacted & Retrofit Kits Installed on safety-related & nonsafety-related Operators. Addl Info Encl10 November 1986Part 21 Rept Re Design Defect Relating to Limitorque Motor Operators Mfg Prior to 1975.Mfg Contacted & Retrofit Kits Installed on safety-related & nonsafety-related Operators. Addl Info Encl
ML20215G53510 October 1986Part 21 Rept Re Vendor Tests of air-operated Diaphragm Valves Revealing Natural Frequencies Less than Required Values of 33 Hz.Initially Reported on 841227.No Adverse Effects Noted During TestingStroke time
ML20215G68010 October 1986Part 21 Rept Re Vendor Tests of air-operated Diaphragm Valves Revealing Natural Frequencies Less than Required Values of 33 Hz.Initially Reported on 841227.No Adverse Effects Noted During TestingStroke time
ML20206S08430 June 1986Part 21 Rept Re Possible Cut Wires in Wire Harness of Bbc Brown Boveri K600/K800 Circuit Breakers.Initially Reported on 860509.Safety Implications Listed.Gear Guard Designed to Prevent Cut Wires
ML20140J42631 March 1986Part 21 Rept Re Nuclear Valves Shipped to Pse&G.Internal Parts Lapped Which Could Reduce or Eliminate Nickel Plating Resulting in Seat Leakage & Shifting Problems
ML20210G99213 August 1985Part 21 Rept Re Failure of Isolated Worm Shaft Gear When Certain Critical Speeds Combined W/Repetitive Transfer of Actuator Clutch Mechanism from Manual (Handwheel) to Motor Drive Mode.Two Possible Solutions Noted
ML20116E84823 April 1985Part 21 Rept Forwarding Rev 1 to Insp Procedure for Investigating Emergency Diesel Generators for Fractured Welds on Air Deflectors.Rev Will Be Forwarded to Each Facility
ML20092D97115 June 1984Part 21 Rept Re Thermal Nonrepeatability & Other Calibr Errors in Barton Lot 1 Transmitters.Initially Reported on 840615.Transmitter Defects Identified & Expected Error Deviations Calculated.Utils Notified
ML20082F36217 November 1983Part 21 Rept Responding to IE Bulletin 83-06, Nonconforming Matls Supplied by Tube-Line Corp. List of Matls & Sys in Which Installed EnclNondestructive Examination
ML18082A14215 February 1980Final Deficiency Rept:Check Valve 2DR-7 Failed to Meet Applicable Seismic Class I Loading.Caused by Design Defect. Addl Support Will Be Completed by 800228
ML18081B04821 December 1979Final Deficiency Rept Re Undetectable Failure in Engineered Safety Features Actuation Sys.Testing Procedures Revised to Include Testing of Permissive Circuitry P4 on Periodic Basis.Unit Will Be Tested Prior to Operation
ML18081B0603 December 1979Initial Deficiency Rept Re Potential Dropped Rod Events Leading to Calculated DNB Ratios Lower than Reported to NRC for Certain Westinghouse Plants.Util Is Investigating Condition for Applicability to Facility
ML18081A3755 October 1979Significant Deficiency Rept Re Containment Purge & pressure- Vacuum Relief Valves.Actuator Torque Values Were Insufficient to Move Valves from Open to Closed Positions W/ Design Differential Pressure of 60 Psi.Design Reviewed
ML18081A3785 October 1979Significant Deficiency Rept 79-06 Re Steam Generator Water Level Instrumentation.Pipe Breaks in Containment Could Lead to Elevated Temp Readings Which Could Result in Delayed Protection Sys Actuation.Setpoints to Be Changed
ML18081A7554 October 1979Interim Deficiency Rept Re Max Flow of RHR Pump During post- LOCA Mode.Caused by Low Sys Resistance to Pump Runout Conditions.Sys Resistance Increased by Placement of Resized Orifices
ML18079A95228 October 1978Deficiency Rept:On 780928,during Routine Design Review, Undersizing of Refueling Water Storage Tank Was Discovered. Tank Storage Capacity Has Been Increased.Design Drawings for Tank Piping & Foundation Will Be Modified
ML20086C0041 July 1976Interim Deficiency Rept Re Fan Coil Unit Motor 15 Failure to Meet Test Requirements.Initially Reported on 760611.Fan Coil Unit Motor from Unit 1 Installed in Place of Motor 15.Faulty Motor Returned to Westinghouse for Repair
ML20086C02017 June 1976Interim Deficiency Rept Re Polar Gantry Crane Gear Misalignment.Initially Reported on 760611.Caused by Misalignment of Hoist Drum Gear & Pinion.Drum Assembly Realigned & Secured & Dressing Gears Initiated
ML20086C03010 June 1976Final Deficiency Rept Re Pressurizer Snubber Malfunction. Initially Reported on 760402.Caused by Heavy Corrosion Buildup.Nine Units Replaced W/Pacific Scientific Units & 54 Units Replaced W/Combination of Redesigned Units
ML20086C0422 June 1976Interim Deficiency Rept Re Automatic Transfer of 4-kV Outside Feed.Initially Reported on 760512.Caused by Design Error.Circuitry for Automatic Bus Transfer Redesigned to Eliminate Possibility of Transfer
ML20086C07428 May 1976Suppl to Deficiency Rept Re Steam Generator Head Cladding Indications.Initially Reported on 760408.Cause Still Under Investigation.Ultrasonic Exam ConductedNondestructive Examination