Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML22207A03122 July 2022NRC-2022-000092 - Resp 1 - Final, Agency Records Subject to the Request Are Enclosed
LR-N22-0016, Radiological Survey of Site Property to Be Used for Offshore Wind Port Facility24 February 2022Radiological Survey of Site Property to Be Used for Offshore Wind Port Facility
RS-20-140, Proposed Changes to Decommissioning Trust Agreements30 October 2020Proposed Changes to Decommissioning Trust AgreementsExemption Request
ML19101A40510 April 2019Annual Assessment Meeting Attendee List
ML18156A01430 May 201830-2018 Annual Assessment Meeting Attendee List
ML17097A2107 April 2017List of Attendees for Annual Assessment Meeting for Salem, Hope Creek
ML16096A04130 March 2016Attendance List for Salem_Hope Creek Aam March 30, 2016
ML16049A45818 February 2016FOIA/PA-2016-0261 - Resp 1 - Final, Salem 2011 Annual Environmental Operating ReportNJPDES
ML13364A28330 December 2013Announcement of 2014 Generic Fundamentals Examination Administration Dates-Letter Dated Dec 30, 2013Generic Fundamentals Examination
ML13059A29726 February 2013SL-011725, Rev. 0, Salem, Mitigation Strategies for Beyond Design Basis External Events, EA-12-049 Overall Integrated Plan Response.
ML13052A79421 February 2013Complete Set of NRC Questions_2-21-13Grab sample
ML12334A45121 November 2012SL-2012-10795, Rev. 0, Sgs Flood Walkdown Report, 10 CFR 50.54(f) Section 2.3 (Flood) Response.Unanalyzed Condition
Fire Barrier
Internal Flooding
Hydrostatic
Operator Manual Action
Fukushima Dai-Ichi
Earthquake
Scaffolding
ML12366A2978 November 2012Bypass Testing InformationGrab sample
ML12290A1444 October 2012EN-AA-602-0006, Revision 0, Cultural and Historic Resources
ML12138A00615 May 2012Aam Attendance Sheet, May 15, 2012
ML12129A38927 April 2012Attachment 1 to LR-N12-0124, Generic Letter 2004-02, Updated Supplemental Response for Salem Regarding Generic Letter 2004-02Boric Acid
Ultimate heat sink
Mission time
Coatings
LR-N12-0124, Salem Generating Station, Units 1 and 2 - Attachment 1 to LR-N12-0124, Generic Letter 2004-02, Updated Supplemental Response for Salem Regarding Generic Letter 2004-0227 April 2012Salem Generating Station, Units 1 and 2 - Attachment 1 to LR-N12-0124, Generic Letter 2004-02, Updated Supplemental Response for Salem Regarding Generic Letter 2004-02Boric Acid
Ultimate heat sink
Mission time
Coatings
ML12129A39027 April 2012Attachments 1 Through Attachment 8, Response to Generic Letter 2004-02High Radiation Area
Mission time
Grab sample
Hydrostatic
Coatings
Operating Basis Earthquake
Temporary Modification
Design basis earthquake
Foreign Material Exclusion
Exemption Request
Earthquake
Fuel cladding
Scaffolding
ML12056A05212 March 2012Enclosure 6 - List of Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status
ML11136010310 May 20112011 Salem/Hope Creek Annual Assessment Meeting Attendance List
ML10300033822 October 2010Document: Salem NRC Punchlist
ML10300033722 October 2010Document: Configuration Change #80101381 Rev 1Safe Shutdown
Probabilistic Risk Assessment
Coatings
Cyber Security
Tornado Generated Missile
Foreign Material Exclusion
Moisture barrier
Through-Wall Leak
Fire Protection Program
ML10300033922 October 2010Document: Operability Evaluation, Opeval, Rev 0 Salem Unit 2Safe Shutdown
Coatings
Finite Element Analysis
ML10300034022 October 2010Document: Operability Evaluation, Opeval, Rev 0, Salem Unit 2, DraftSafe Shutdown
Tornado Missile
Hydrostatic
Coatings
Finite Element Analysis
ML10300034122 October 2010Document: Operability Evaluation, Opeval, Rev 0, Salem Unit 2, with Handwritten NotesSafe Shutdown
Hydrostatic
Coatings
Finite Element Analysis
Tornado Generated Missile
ML10300034222 October 2010Document: Operability Evaluation, Opeval, Rev 0, Salem Unit 2 with Handwritten NotesSafe Shutdown
Tornado Missile
Coatings
Finite Element Analysis
ML10300040622 October 2010Document: SAP685996Past operability
ML10300040722 October 2010Large Bore Pipe Detail Index List Psbp No. 132419, Aux Feedwater
ML10300040922 October 2010Document: Label Request Form, Label 12AF155 S1 Aix
ML10300040522 October 2010Document: Operability Evaluation, Opeval, Rev 0, Salem Unit 2 with Handwritten NotesSafe Shutdown
Tornado Missile
Coatings
Finite Element Analysis
ML10300040221 September 2010Document PSEG Notification 20462034 Basis AFW Discharge Line Design Pressure
ML10301049618 August 2010Document: 1R20 AF Buried Pipe Insp Results, Notification #20457262, Salem 1- Auxiliary FeedwaterPast operability
Coatings
Finite Element Analysis
Downpower
ML10301049718 August 2010Document: Operation Key Info, Buried Pipe Program Inspection Reports for 12 and 14 Aux Feedwater LinesPast operability
Coatings
Finite Element Analysis
ML10160027517 June 2010List of Attendees for NRC Public Management No. Nm 10-019; Salem Nuclear Generating Station Discussion of Independent Spent Fuel Storage on 05/27/10
ML10300020424 May 2010Document: Design Analysis Minor Revision, Subject: Qualification of Safety-Related Buried Commodities for Tornado Missile and Seismic EvaluationTornado Generated Missile
ML1030004035 May 2010Document: PSEG Notification 2041785Dissimilar Metal Weld
ML10295023929 April 2010Branch 3 Daily StatusFinite Element Analysis
ML10344044824 April 2010Document: Salem Unit 1 12/14 AF Piping Reroute, #80101382 Rev 2Tornado Missile
Fire Protection Program
ML10298046523 April 2010RM Documentation No. SA-SURV-2010-001, Rev. 1, Risk Assessment of Missed Surveillance - Auxiliary Feedwater Discharge Line Underground Piping Pressure Testing.Missed surveillance
ML10344045123 April 2010Document: Ansys Input Files and Calculation Package DraftsSafe Shutdown
Tornado Missile
Hydrostatic
Coatings
Finite Element Analysis
ML10300020322 April 2010Document: Stress and Support Summary
ML10298048922 April 2010Operability Evaluation with Tracked ChangesSafe Shutdown
Tornado Missile
Coatings
Finite Element Analysis
ML10298026121 April 2010Notification 000020459689, Submitted by Edley GilesVT-2
ML10300020120 April 2010Document: Ultrasonic Thickness Examination Record, Order #60084266, Procedure #OU-AA-335-004
ML10295054112 April 2010Branch 3 Daily StatusFinite Element Analysis
ML1029503947 April 2010Branch 3 Daily Status
ML10193046025 March 2010List of Historical Leaks and Spills at Us Commercial Nuclear Power Plants
ML0913201105 May 2009Aam Sign-in Sheets, 05/05/2009
ML0812207451 May 2008Sign-In Sheet, April 30, 2008
ML0806704197 March 2008CDBI FindingsReactor Vessel Water Level
Stroke time
Past operability
Battery sizing