Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML22207A031 | 22 July 2022 | NRC-2022-000092 - Resp 1 - Final, Agency Records Subject to the Request Are Enclosed | |
LR-N22-0016, Radiological Survey of Site Property to Be Used for Offshore Wind Port Facility | 24 February 2022 | Radiological Survey of Site Property to Be Used for Offshore Wind Port Facility | |
RS-20-140, Proposed Changes to Decommissioning Trust Agreements | 30 October 2020 | Proposed Changes to Decommissioning Trust Agreements | Exemption Request |
ML19101A405 | 10 April 2019 | Annual Assessment Meeting Attendee List | |
ML18156A014 | 30 May 2018 | 30-2018 Annual Assessment Meeting Attendee List | |
ML17097A210 | 7 April 2017 | List of Attendees for Annual Assessment Meeting for Salem, Hope Creek | |
ML16096A041 | 30 March 2016 | Attendance List for Salem_Hope Creek Aam March 30, 2016 | |
ML16049A458 | 18 February 2016 | FOIA/PA-2016-0261 - Resp 1 - Final, Salem 2011 Annual Environmental Operating Report | NJPDES |
ML13364A283 | 30 December 2013 | Announcement of 2014 Generic Fundamentals Examination Administration Dates-Letter Dated Dec 30, 2013 | Generic Fundamentals Examination |
ML13059A297 | 26 February 2013 | SL-011725, Rev. 0, Salem, Mitigation Strategies for Beyond Design Basis External Events, EA-12-049 Overall Integrated Plan Response. | |
ML13052A794 | 21 February 2013 | Complete Set of NRC Questions_2-21-13 | Grab sample |
ML12334A451 | 21 November 2012 | SL-2012-10795, Rev. 0, Sgs Flood Walkdown Report, 10 CFR 50.54(f) Section 2.3 (Flood) Response. | Unanalyzed Condition Fire Barrier Internal Flooding Hydrostatic Operator Manual Action Fukushima Dai-Ichi Earthquake Scaffolding |
ML12366A297 | 8 November 2012 | Bypass Testing Information | Grab sample |
ML12290A144 | 4 October 2012 | EN-AA-602-0006, Revision 0, Cultural and Historic Resources | |
ML12138A006 | 15 May 2012 | Aam Attendance Sheet, May 15, 2012 | |
ML12129A389 | 27 April 2012 | Attachment 1 to LR-N12-0124, Generic Letter 2004-02, Updated Supplemental Response for Salem Regarding Generic Letter 2004-02 | Boric Acid Ultimate heat sink Mission time Coatings |
LR-N12-0124, Salem Generating Station, Units 1 and 2 - Attachment 1 to LR-N12-0124, Generic Letter 2004-02, Updated Supplemental Response for Salem Regarding Generic Letter 2004-02 | 27 April 2012 | Salem Generating Station, Units 1 and 2 - Attachment 1 to LR-N12-0124, Generic Letter 2004-02, Updated Supplemental Response for Salem Regarding Generic Letter 2004-02 | Boric Acid Ultimate heat sink Mission time Coatings |
ML12129A390 | 27 April 2012 | Attachments 1 Through Attachment 8, Response to Generic Letter 2004-02 | High Radiation Area Mission time Grab sample Hydrostatic Coatings Operating Basis Earthquake Temporary Modification Design basis earthquake Foreign Material Exclusion Exemption Request Earthquake Fuel cladding Scaffolding |
ML12056A052 | 12 March 2012 | Enclosure 6 - List of Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status | |
ML111360103 | 10 May 2011 | 2011 Salem/Hope Creek Annual Assessment Meeting Attendance List | |
ML103000338 | 22 October 2010 | Document: Salem NRC Punchlist | |
ML103000337 | 22 October 2010 | Document: Configuration Change #80101381 Rev 1 | Safe Shutdown Probabilistic Risk Assessment Coatings Cyber Security Tornado Generated Missile Foreign Material Exclusion Moisture barrier Through-Wall Leak Fire Protection Program |
ML103000339 | 22 October 2010 | Document: Operability Evaluation, Opeval, Rev 0 Salem Unit 2 | Safe Shutdown Coatings Finite Element Analysis |
ML103000340 | 22 October 2010 | Document: Operability Evaluation, Opeval, Rev 0, Salem Unit 2, Draft | Safe Shutdown Tornado Missile Hydrostatic Coatings Finite Element Analysis |
ML103000341 | 22 October 2010 | Document: Operability Evaluation, Opeval, Rev 0, Salem Unit 2, with Handwritten Notes | Safe Shutdown Hydrostatic Coatings Finite Element Analysis Tornado Generated Missile |
ML103000342 | 22 October 2010 | Document: Operability Evaluation, Opeval, Rev 0, Salem Unit 2 with Handwritten Notes | Safe Shutdown Tornado Missile Coatings Finite Element Analysis |
ML103000406 | 22 October 2010 | Document: SAP685996 | Past operability |
ML103000407 | 22 October 2010 | Large Bore Pipe Detail Index List Psbp No. 132419, Aux Feedwater | |
ML103000409 | 22 October 2010 | Document: Label Request Form, Label 12AF155 S1 Aix | |
ML103000405 | 22 October 2010 | Document: Operability Evaluation, Opeval, Rev 0, Salem Unit 2 with Handwritten Notes | Safe Shutdown Tornado Missile Coatings Finite Element Analysis |
ML103000402 | 21 September 2010 | Document PSEG Notification 20462034 Basis AFW Discharge Line Design Pressure | |
ML103010496 | 18 August 2010 | Document: 1R20 AF Buried Pipe Insp Results, Notification #20457262, Salem 1- Auxiliary Feedwater | Past operability Coatings Finite Element Analysis Downpower |
ML103010497 | 18 August 2010 | Document: Operation Key Info, Buried Pipe Program Inspection Reports for 12 and 14 Aux Feedwater Lines | Past operability Coatings Finite Element Analysis |
ML101600275 | 17 June 2010 | List of Attendees for NRC Public Management No. Nm 10-019; Salem Nuclear Generating Station Discussion of Independent Spent Fuel Storage on 05/27/10 | |
ML103000204 | 24 May 2010 | Document: Design Analysis Minor Revision, Subject: Qualification of Safety-Related Buried Commodities for Tornado Missile and Seismic Evaluation | Tornado Generated Missile |
ML103000403 | 5 May 2010 | Document: PSEG Notification 2041785 | Dissimilar Metal Weld |
ML102950239 | 29 April 2010 | Branch 3 Daily Status | Finite Element Analysis |
ML103440448 | 24 April 2010 | Document: Salem Unit 1 12/14 AF Piping Reroute, #80101382 Rev 2 | Tornado Missile Fire Protection Program |
ML102980465 | 23 April 2010 | RM Documentation No. SA-SURV-2010-001, Rev. 1, Risk Assessment of Missed Surveillance - Auxiliary Feedwater Discharge Line Underground Piping Pressure Testing. | Missed surveillance |
ML103440451 | 23 April 2010 | Document: Ansys Input Files and Calculation Package Drafts | Safe Shutdown Tornado Missile Hydrostatic Coatings Finite Element Analysis |
ML103000203 | 22 April 2010 | Document: Stress and Support Summary | |
ML102980489 | 22 April 2010 | Operability Evaluation with Tracked Changes | Safe Shutdown Tornado Missile Coatings Finite Element Analysis |
ML102980261 | 21 April 2010 | Notification 000020459689, Submitted by Edley Giles | VT-2 |
ML103000201 | 20 April 2010 | Document: Ultrasonic Thickness Examination Record, Order #60084266, Procedure #OU-AA-335-004 | |
ML102950541 | 12 April 2010 | Branch 3 Daily Status | Finite Element Analysis |
ML102950394 | 7 April 2010 | Branch 3 Daily Status | |
ML101930460 | 25 March 2010 | List of Historical Leaks and Spills at Us Commercial Nuclear Power Plants | |
ML091320110 | 5 May 2009 | Aam Sign-in Sheets, 05/05/2009 | |
ML081220745 | 1 May 2008 | Sign-In Sheet, April 30, 2008 | |
ML080670419 | 7 March 2008 | CDBI Findings | Reactor Vessel Water Level Stroke time Past operability Battery sizing |