Text
'5
'5 ~2.
'~~
~-
K K
Outside of Scope BRANCH 34120 DAILY4120 STATUS H-ignlighted Rems were discussed at LnRILII1-1 i1.6orur~d I naion muotin OJutsie ol acope LEM ONE Weekend Coverage:
AL1S(9X)?O.07 AL2(2of3)>O.1 1 AL3(1X)>O.13..
I
ýA EM ONE.
Weekend Coverage:
AL1=(9x')>0,07;!
ii-' AL2.=(2of3)>0;1 1..
AL=1,>'1 Outside of Scope AFW Piping Degradation Buried AFW piping to the 12 and 14 S/Gs appears to have significant degradation of the protective coating and piping.
The preliminary guided wave inspection results indicate that the ASME Class 2 piping is degraded below min wall.
The pipe is schedule 80 4" inside diameter carbon steel piping with a coal tar type coating that appears to been hand applied. The piping run of concern involves about 150 ft of pipe that is buried at depths ranging from 4 ft adjacent to the out side of containment to 17 ft deep in a covered area adjacent to the containment
'The UT resul 4 ts confirmredthe tguided wave resuilts. Engineering deter mined the ycould not support operability of I the piping through the next cycle. PSEG is pla~nning to replace thie shallow sectioni of affected piping~and periformling further evaluations of the deeppingwithIacontingency to replace if needed. Enginee ring evaluatinogaboveor below ground installation and expects a decisi*n on 4/9/10. Piping repairs scheduled for completion on 4/25.
EO -
is in better condition; *documentation exists that proyes the piijng wasiopened and inspected -10ve~ars agoand found " to i
be iipristine condition;
.IS code gives more allowance to an operating unit (they can take credit for up to 90% of the yield stress). DRS has provided access to the information and will review. FPSEG is currently evaluating n~eed for inspections of the piping ~at Unit 2 and expects a decision to be made by Monday (4/12). On eaqh unit there arethreesafety-related systems with. buried piping (ASW, S.W.
and aonptrol air).
- PS EG has begun evaluatilon of pasit operalbility for Unit I Including a finite element analysis; expect t~o'have, conclusions on 4112; Based o In results consider whlether MC,'O$09, 'entriry conditio~ns are me't (IIf pipilng was inop need to, perfg~m arnMC 0-3O9 review)
Degraded Equipment V\\
fomration In this record was deleted in accordance with the Freedom Innfomalon/ AO.