'5 '5 ~2. '~~

~-

Outside K of Scope K

BRANCH 34120 DAILY4120 STATUS H-ignlighted Rems were discussed at LnRILII1-1 i1.6orur~dnaion I muotin OJutsie ol acope LEM I ýA EM ONE. Weekend Coverage: AL1=(9x')>0,07;! ii-' AL2.=(2of3)>0;1 1.. AL=1,>'1 Outside of Scope AFW Piping Degradation

  • Buried AFW piping to the 12 and 14 S/Gs appears to have significant degradation of the protective coating and piping.

The preliminary guided wave inspection results indicate that the ASME Class 2 piping is degraded below min wall.

The pipe is schedule 80 4" inside diameter carbon steel piping with a coal tar type coating that appears to been hand applied. The piping run of concern involves about 150 ft of pipe that is buried at depths ranging from 4 ft adjacent to the out side of containment to 17 ft deep in a covered area adjacent to the containment

'The UT resul 4ts confirmredthetguided wave resuilts. Engineering deter mined theycould not support operability of Ithe piping through the next cycle. PSEG is pla~nning to replace thie shallow sectioni of affected piping~and periformling further evaluations of the deeppingwithIacontingency to replace if needed. Enginee ring evaluatinogaboveor below ground installation and expects a decisi*n on 4/9/10. Piping repairs scheduled for completion on 4/25.

EO - is in better condition; *documentation exists that proyes the piijng wasiopened and inspected -10ve~ars agoand found "to be iipristine i condition;

.IS code gives more allowance to an operating unit (they can take credit for up to 90% of the yield stress). DRS has provided access to the information and will review. FPSEG is currently evaluating n~eed for inspections of the piping ~at Unit 2 and expects a decision to be made by Monday (4/12). On eaqh unit there arethreesafety-related systems with. buried piping (ASW, S.W. air). and aonptrol

  • PS EG has begun evaluatilon of pasit operalbility for Unit I Including a finite element analysis; expect t~o'have, conclusions on 4112; Based oInresults consider whlether MC,'O$09, 'entriry conditio~ns are me't (IIf pipilng was inop need to, perfg~m arnMC 0-3O9 review)

Degraded Equipment V\

fomration In this record was deleted in accordance with the Freedom Innfomalon/ AO.

FOLM%

V

Outside of Scope of' Scope

  • us Otieof  :* * *n a. . * -w w aieu* e: iw a. - *o a am a w a-Scope

Outside of Scope