Similar Documents at Salem |
---|
Category:- No Document Type Applies
MONTHYEARML22207A0312022-07-22022 July 2022 NRC-2022-000092 - Resp 1 - Final, Agency Records Subject to the Request Are Enclosed LR-N22-0016, Radiological Survey of Site Property to Be Used for Offshore Wind Port Facility2022-02-24024 February 2022 Radiological Survey of Site Property to Be Used for Offshore Wind Port Facility RS-20-140, Proposed Changes to Decommissioning Trust Agreements2020-10-30030 October 2020 Proposed Changes to Decommissioning Trust Agreements ML19101A4052019-04-10010 April 2019 Annual Assessment Meeting Attendee List ML18156A0142018-05-30030 May 2018 30-2018 Annual Assessment Meeting Attendee List ML17097A2102017-04-0707 April 2017 List of Attendees for Annual Assessment Meeting for Salem, Hope Creek ML16096A0412016-03-30030 March 2016 Attendance List for Salem_Hope Creek Aam March 30, 2016 ML16049A4582016-02-18018 February 2016 FOIA/PA-2016-0261 - Resp 1 - Final, Salem 2011 Annual Environmental Operating Report ML13364A2832013-12-30030 December 2013 Announcement of 2014 Generic Fundamentals Examination Administration Dates-Letter Dated Dec 30, 2013 ML13059A2972013-02-26026 February 2013 SL-011725, Rev. 0, Salem, Mitigation Strategies for Beyond Design Basis External Events, EA-12-049 Overall Integrated Plan Response. ML13052A7942013-02-21021 February 2013 Complete Set of NRC Questions_2-21-13 ML12334A4512012-11-21021 November 2012 SL-2012-10795, Rev. 0, Sgs Flood Walkdown Report, 10 CFR 50.54(f) Section 2.3 (Flood) Response. ML12366A2972012-11-0808 November 2012 Bypass Testing Information ML12290A1442012-10-0404 October 2012 EN-AA-602-0006, Revision 0, Cultural and Historic Resources ML12138A0062012-05-15015 May 2012 Aam Attendance Sheet, May 15, 2012 ML12129A3892012-04-27027 April 2012 Attachment 1 to LR-N12-0124, Generic Letter 2004-02, Updated Supplemental Response for Salem Regarding Generic Letter 2004-02 LR-N12-0124, Salem Generating Station, Units 1 and 2 - Attachment 1 to LR-N12-0124, Generic Letter 2004-02, Updated Supplemental Response for Salem Regarding Generic Letter 2004-022012-04-27027 April 2012 Salem Generating Station, Units 1 and 2 - Attachment 1 to LR-N12-0124, Generic Letter 2004-02, Updated Supplemental Response for Salem Regarding Generic Letter 2004-02 ML12129A3902012-04-27027 April 2012 Attachments 1 Through Attachment 8, Response to Generic Letter 2004-02 ML12056A0522012-03-12012 March 2012 Enclosure 6 - List of Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status ML1113601032011-05-10010 May 2011 2011 Salem/Hope Creek Annual Assessment Meeting Attendance List ML1030003382010-10-22022 October 2010 Document: Salem NRC Punchlist ML1030003372010-10-22022 October 2010 Document: Configuration Change #80101381 Rev 1 ML1030003392010-10-22022 October 2010 Document: Operability Evaluation, Opeval, Rev 0 Salem Unit 2 ML1030003402010-10-22022 October 2010 Document: Operability Evaluation, Opeval, Rev 0, Salem Unit 2, Draft ML1030003412010-10-22022 October 2010 Document: Operability Evaluation, Opeval, Rev 0, Salem Unit 2, with Handwritten Notes ML1030003422010-10-22022 October 2010 Document: Operability Evaluation, Opeval, Rev 0, Salem Unit 2 with Handwritten Notes ML1030004062010-10-22022 October 2010 Document: SAP685996 ML1030004072010-10-22022 October 2010 Large Bore Pipe Detail Index List Psbp No. 132419, Aux Feedwater ML1030004092010-10-22022 October 2010 Document: Label Request Form, Label 12AF155 S1 Aix ML1030004052010-10-22022 October 2010 Document: Operability Evaluation, Opeval, Rev 0, Salem Unit 2 with Handwritten Notes ML1030004022010-09-21021 September 2010 Document PSEG Notification 20462034 Basis AFW Discharge Line Design Pressure ML1030104962010-08-18018 August 2010 Document: 1R20 AF Buried Pipe Insp Results, Notification #20457262, Salem 1- Auxiliary Feedwater ML1030104972010-08-18018 August 2010 Document: Operation Key Info, Buried Pipe Program Inspection Reports for 12 and 14 Aux Feedwater Lines ML1016002752010-06-17017 June 2010 List of Attendees for NRC Public Management No. Nm 10-019; Salem Nuclear Generating Station Discussion of Independent Spent Fuel Storage on 05/27/10 ML1030002042010-05-24024 May 2010 Document: Design Analysis Minor Revision, Subject: Qualification of Safety-Related Buried Commodities for Tornado Missile and Seismic Evaluation ML1030004032010-05-0505 May 2010 Document: PSEG Notification 2041785 ML1029502392010-04-29029 April 2010 Branch 3 Daily Status ML1034404482010-04-24024 April 2010 Document: Salem Unit 1 12/14 AF Piping Reroute, #80101382 Rev 2 ML1029804652010-04-23023 April 2010 RM Documentation No. SA-SURV-2010-001, Rev. 1, Risk Assessment of Missed Surveillance - Auxiliary Feedwater Discharge Line Underground Piping Pressure Testing. ML1034404512010-04-23023 April 2010 Document: Ansys Input Files and Calculation Package Drafts ML1030002032010-04-22022 April 2010 Document: Stress and Support Summary ML1029804892010-04-22022 April 2010 Operability Evaluation with Tracked Changes ML1029802612010-04-21021 April 2010 Notification 000020459689, Submitted by Edley Giles ML1030002012010-04-20020 April 2010 Document: Ultrasonic Thickness Examination Record, Order #60084266, Procedure #OU-AA-335-004 ML1029505412010-04-12012 April 2010 Branch 3 Daily Status ML1029503942010-04-0707 April 2010 Branch 3 Daily Status ML1019304602010-03-25025 March 2010 List of Historical Leaks and Spills at Us Commercial Nuclear Power Plants ML0913201102009-05-0505 May 2009 Aam Sign-in Sheets, 05/05/2009 ML0812207452008-05-0101 May 2008 Sign-In Sheet, April 30, 2008 ML0806704192008-03-0707 March 2008 CDBI Findings 2022-07-22
[Table view] |
Text
Y ULTRASONIC THICKNESS EXAMINATION RECORD C,'
ISI ID:
NDE Lab Station Unit Outage Order Procedure # Rev. Couplant Exam Date,.
Type Batch MISTRAS Salem 1 RFO# 20 60084266 IOU-AA-335-004 1 SONOTRACE 40 96243 4/20/2010 EXAMINATION AREA MATERIAL Component I.D. System Location Fab. Isometric Elev. (Type/Spec) Dia. Size Component Type Surface Temp.
Aux Fd Water Bounding AF Yard N/A 100' P-1 4" Pi e AMBIENT SEARCH UNIT DESCRIPTION EQUIPMENT WALL THICKNESS Size X Y Brand Serial # Size Frequency Instr. Brand/type Serial # Nominal .875 Nom. T min.
1" 6 Panametric 636328 0.312 5mhz PANAMETRICS 071474104 0.337 0,295 0.278 D 790RL 37 DL I PLUS
'alibration Block # I S/N ______ _________ CalibrationBlock Temp. AMBIENT Actual Effective Initial Final 0.250 0.250 0.250 0.250 CALIBRATION TIME 0.500 0.500 0.500 0.500 Initial Calibration 9:00 AM 0.750 0.750 0.750 0.750 CalibrationCheck N/A-1.000 1.000 1.000 1.000 Final CalibrationCheck 9:30 AM calibration Block # 2 S/N CalibrationBlock Temp..
Actual Effective Initial Final Thermometer Serial # Cal. Due 217591 01113/11 Min. Max.
LIMITATIONS: None File Name Thickness Thickness 0.077 is A4 reading. Aux. Feed 0.077 @ A4 0.319 ( L2 COMMENTS: Readings taken in 1" grid pattern. BoundingI Notified:
Technician: P. Mendonca Date: 04/20110 Cert. Exp. 3/6/11 SNT-TC-IA LEVEL II Eye Test Exp. 4/1/11 B. Montgomery Attachment AZ'x Yes No PSE&G Review: Adam Burke Date: 04/20/10 SNT-TC-1A LEVEL II Page 1 of 2
Unit: Salem 1 RFO 20 Date: 04120/10 T-MIN= 0.278 87.5% Nom. Wall= 0.295 Nom. Wall = 0.337 iSI ID. Aux. Fd Bounding Component ID. Aux. Feed Bounding Lowest Reading 0.077 Highest reading 0.319 Color Code: 0.000 to T-MIN >87.5% Nom. Wall to Nom. Wall >Nom. Wall A B C D E F G H I J K L M N 1 0.251 0.270 0.318 0.242 0.279 0.272 0.293 0.278 0.261 0.255 0.250 0.274 0.288 0.296 2 0.272 0.305 0.255 0.253 0.258 0.283 0.277 0.256 0.245 0.267 0.256 0.258 0.260 3 0.163 0.259 0.258 0.245 0.257 0.277 0.168 0.258 0.243 0.254 0.227 0.298 0.287 0.267 4 0.242 0.255 0.243 0.141 0.258 0.281 0.301 0.272 0.269 0.233 0.285 0.290 0.292 5 0.191 0.271 0.250 0.287 0.244 0.274 0.303 0.296 0.269 0.265 0.229 0.285 0.297 0.257 6 0.279 0:267 0.247 0.279 0.256 0.284 0.305 0.295 0.274 0.264 0.234 0.287 0.298 0.258 7 0.276 0.261 0.256 0.256 0.256 0.278 0.302 0.300 0.274 0.268 0.239 0.283 0.316 0.252