MONTHYEARML22207A0312022-07-22022 July 2022 NRC-2022-000092 - Resp 1 - Final, Agency Records Subject to the Request Are Enclosed LR-N22-0016, Radiological Survey of Site Property to Be Used for Offshore Wind Port Facility2022-02-24024 February 2022 Radiological Survey of Site Property to Be Used for Offshore Wind Port Facility RS-20-140, Proposed Changes to Decommissioning Trust Agreements2020-10-30030 October 2020 Proposed Changes to Decommissioning Trust Agreements ML19101A4052019-04-10010 April 2019 Annual Assessment Meeting Attendee List ML18156A0142018-05-30030 May 2018 30-2018 Annual Assessment Meeting Attendee List ML17097A2102017-04-0707 April 2017 List of Attendees for Annual Assessment Meeting for Salem, Hope Creek ML16096A0412016-03-30030 March 2016 Attendance List for Salem_Hope Creek Aam March 30, 2016 ML16049A4582016-02-18018 February 2016 FOIA/PA-2016-0261 - Resp 1 - Final, Salem 2011 Annual Environmental Operating Report ML13364A2832013-12-30030 December 2013 Announcement of 2014 Generic Fundamentals Examination Administration Dates-Letter Dated Dec 30, 2013 ML13059A2972013-02-26026 February 2013 SL-011725, Rev. 0, Salem, Mitigation Strategies for Beyond Design Basis External Events, EA-12-049 Overall Integrated Plan Response. ML13052A7942013-02-21021 February 2013 Complete Set of NRC Questions_2-21-13 ML12334A4512012-11-21021 November 2012 SL-2012-10795, Rev. 0, Sgs Flood Walkdown Report, 10 CFR 50.54(f) Section 2.3 (Flood) Response. ML12366A2972012-11-0808 November 2012 Bypass Testing Information ML12290A1442012-10-0404 October 2012 EN-AA-602-0006, Revision 0, Cultural and Historic Resources ML12138A0062012-05-15015 May 2012 Aam Attendance Sheet, May 15, 2012 ML12129A3892012-04-27027 April 2012 Attachment 1 to LR-N12-0124, Generic Letter 2004-02, Updated Supplemental Response for Salem Regarding Generic Letter 2004-02 LR-N12-0124, Salem Generating Station, Units 1 and 2 - Attachment 1 to LR-N12-0124, Generic Letter 2004-02, Updated Supplemental Response for Salem Regarding Generic Letter 2004-022012-04-27027 April 2012 Salem Generating Station, Units 1 and 2 - Attachment 1 to LR-N12-0124, Generic Letter 2004-02, Updated Supplemental Response for Salem Regarding Generic Letter 2004-02 ML12129A3902012-04-27027 April 2012 Attachments 1 Through Attachment 8, Response to Generic Letter 2004-02 ML12056A0522012-03-12012 March 2012 Enclosure 6 - List of Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status ML1113601032011-05-10010 May 2011 2011 Salem/Hope Creek Annual Assessment Meeting Attendance List ML1030003382010-10-22022 October 2010 Document: Salem NRC Punchlist ML1030003372010-10-22022 October 2010 Document: Configuration Change #80101381 Rev 1 ML1030003392010-10-22022 October 2010 Document: Operability Evaluation, Opeval, Rev 0 Salem Unit 2 ML1030003402010-10-22022 October 2010 Document: Operability Evaluation, Opeval, Rev 0, Salem Unit 2, Draft ML1030003412010-10-22022 October 2010 Document: Operability Evaluation, Opeval, Rev 0, Salem Unit 2, with Handwritten Notes ML1030003422010-10-22022 October 2010 Document: Operability Evaluation, Opeval, Rev 0, Salem Unit 2 with Handwritten Notes ML1030004062010-10-22022 October 2010 Document: SAP685996 ML1030004072010-10-22022 October 2010 Large Bore Pipe Detail Index List Psbp No. 132419, Aux Feedwater ML1030004092010-10-22022 October 2010 Document: Label Request Form, Label 12AF155 S1 Aix ML1030004052010-10-22022 October 2010 Document: Operability Evaluation, Opeval, Rev 0, Salem Unit 2 with Handwritten Notes ML1030004022010-09-21021 September 2010 Document PSEG Notification 20462034 Basis AFW Discharge Line Design Pressure ML1030104962010-08-18018 August 2010 Document: 1R20 AF Buried Pipe Insp Results, Notification #20457262, Salem 1- Auxiliary Feedwater ML1030104972010-08-18018 August 2010 Document: Operation Key Info, Buried Pipe Program Inspection Reports for 12 and 14 Aux Feedwater Lines ML1016002752010-06-17017 June 2010 List of Attendees for NRC Public Management No. Nm 10-019; Salem Nuclear Generating Station Discussion of Independent Spent Fuel Storage on 05/27/10 ML1030002042010-05-24024 May 2010 Document: Design Analysis Minor Revision, Subject: Qualification of Safety-Related Buried Commodities for Tornado Missile and Seismic Evaluation ML1030004032010-05-0505 May 2010 Document: PSEG Notification 2041785 ML1029502392010-04-29029 April 2010 Branch 3 Daily Status ML1034404482010-04-24024 April 2010 Document: Salem Unit 1 12/14 AF Piping Reroute, #80101382 Rev 2 ML1029804652010-04-23023 April 2010 RM Documentation No. SA-SURV-2010-001, Rev. 1, Risk Assessment of Missed Surveillance - Auxiliary Feedwater Discharge Line Underground Piping Pressure Testing. ML1034404512010-04-23023 April 2010 Document: Ansys Input Files and Calculation Package Drafts ML1030002032010-04-22022 April 2010 Document: Stress and Support Summary ML1029804892010-04-22022 April 2010 Operability Evaluation with Tracked Changes ML1029802612010-04-21021 April 2010 Notification 000020459689, Submitted by Edley Giles ML1030002012010-04-20020 April 2010 Document: Ultrasonic Thickness Examination Record, Order #60084266, Procedure #OU-AA-335-004 ML1029505412010-04-12012 April 2010 Branch 3 Daily Status ML1029503942010-04-0707 April 2010 Branch 3 Daily Status ML1019304602010-03-25025 March 2010 List of Historical Leaks and Spills at Us Commercial Nuclear Power Plants ML0913201102009-05-0505 May 2009 Aam Sign-in Sheets, 05/05/2009 ML0812207452008-05-0101 May 2008 Sign-In Sheet, April 30, 2008 ML0806704192008-03-0707 March 2008 CDBI Findings 2022-07-22
[Table view] |
Text
Highlighted items were discussed at DRPIDRS Coordination meeting BOLD items are new --
Outside of Scope SALEM ONE,.,, Weekend Coverage: Harry/Dan A 1(XD.7 AL-2=(2of3)O.1 1 AL,3=t1X)>O13 Outside of Scope AFW piping degradation and Tritium discovery, see below Outside of Scope
/*rv 1-iping LPegrdUuauunI
- Buried AFW piping to the 12 and 14 S/Gs appears to have si*nificant degradation ohfthe protective coating and piping, The. preliminary guided wave inspection results indicate that the ASMEIClass 2 piping is degraded below min wall The pipe is schedule 80 4" inside diamete carbon steel piping with a coal tartype coating that appears to been hand applied, The piping run of concern involves abo&ut 150 ft of pipe that is buried at depths'ranging from 4 ft adjacent to" the dut side of containmhto17 ft deep. inacoveredarea adjacerit:to-the containment Licensee is assembling teams, making plans for excavation to conduct UT (the official test method accepted by NRC).
Note (per DRS staff) guided wave is effective for long straight runs without valves and flanges and bends. UT is still the methodology of record to meet Code inspection requirements. Industry (EPRI) is in the process of building future mockup test facility in NC to qualify the guided wave technique, but for now guided wave technique is not a reliable indicator for some pipes in nuclear applications.
The residents walked the buried AFW pipe excavation down and observed standing water and four services.
Followed-up with PSEG and learned the following:
o Two excavations planned to cornIelte te wave form coverage and to co~rroborate the< first wave form test results with independent UY*T Current (back of the envelope calcs) indicate PSEG will be able to demonstrate operability with the current degradation of 35% of wall thickness (65% remaining). This Op Eval will probably rely on BOTH the strength of the remaining material and the lower pressures AFW would typically see.
EOC -Unit 2 ha girates mai rtne* pl*antisa presumably pr irn bettr conditin;, documrentatibn eicists. that proves ettlpiping was opepned and nspected[-10_years ago and foundto be-in pristine condition; ISI code gives more
,* allowance to an operating unit (they can take credit for up to 90% of the yield stress)
Outside of Scope Wmivon in"o1 record was deleted In