ST-HL-AE-2650, Forwards Rev 12 to Plant Physical Security Plan.Encl Withheld (Ref 10CFR73.21)

From kanterella
Jump to navigation Jump to search
Forwards Rev 12 to Plant Physical Security Plan.Encl Withheld (Ref 10CFR73.21)
ML20154A912
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 05/10/1988
From: Mcburnett M
HOUSTON LIGHTING & POWER CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
ST-HL-AE-2650, NUDOCS 8805160242
Download: ML20154A912 (4)


Text

.

The]AF ighi GUARDS t :0RMATON company * ""' #**'

flouston Lighting k Power May 10, 1988 ST-HL-AE-2650 File No.: G09.09 10CFR73.53 10CFR50.54(p)

U. S. Nuclear Regulatory Comission Attention: Document Control Desk Washington, DC 20555 South Texas Project Electric Generating Station Units 1 and 2 Docket No. STN 50-498, STN 50-499 Physical Security Plan, Revision 12 Enclosed are 4 copies of Rev. 12 to the South Texas Project Physical Security Plan. In addition, two copies of this revision are being forwarded to NRC Region IV. This document supersedes all previous revisions. None of the changes described in these revisions represent any lessening of plan effectiveness and most are enhancements; hence, these documents are being submitted in accordance with 10CFR50.54(p)(2).

Changes have been made to sectier,s 3, 4, 5, 6, and 7, and Appendices A, D, E. F, and G of the Physical Security Plan. Descriptions of the changes are provided in Attachment 1.

The revised sections and appendices of the Physical Security Plan provided with this letter require protection as safeguards information in accordance with 10CFR 73.21. When separated from the revised sections and appendices this letter is not considered safeguards information.

If you should have any questions on this matter, please contact me at

($12) 972-8530, i/-

M.

6/ #fv//AT

. McBurnett Manager Operations Support Licensing MAM/PLW/eg ENCLOSURE CONTAINS MFEGUARDSINFORA% TION

Attachment:

Physical Security Plan, Rev. 12 UPON SEPARATION THIS PAGE IS OFCONTROL LEO r.n n n .

\

SA tb J AiRsS m,ik, A. m i 014 ps3 NL.88.117.01 A Subsidiary of flouston industrin incorporated F805160242 G80510 PDR ADOCK 05000498 '

F DCD g

SAFEGLARDS llouston Lighting & Power Compan) lV0RVAT CN ST-HL-AE-2650 File No.: G26 Page 2 cci (2 copies with attachments)

Regional Administrator, Region IV R. J. Costello/M. T. Hardt Nuclear Regulatory Commission City Public Service Board 611 Ryan Plaza Drive, Suite 1000 P. O. Box 1771 Arlington, TX 76011 San Antonio, TX 78296 cci (without attachments) Rufus S. Scott Associated General Counsel N. Prasad Kadambi, Proj ect Manager Houston Lighting & Power Company U. S. Nuclear Regulatory Commirsion P. O. Box 1700 1 White Flint North Houston, TX 77001 11555 Rockville Pike Rockville, HD 20859 INFO Records Center Dan R. Carpenter 1100 Circle 75 Parkway Senior Resident Inspector / Operations Atlanta, Ga. 30339-3064 c/o U. S. Nuclear Regulatory Commission F. O. Box 910 Dr. Joseph H. Hendrie Bay City TX 77414 50 Billport Lane Be11 port, NY 11713 Don L. Garrison Resident Inspector / Construction c/o U. S. Nuclear Regulatory Commission P. O. Box 910 Bay City, TX 77414 J. R. Newman, Esquire Nev=an & Holtzinger, P.C.

1615 L Street, N.V.

Washington, DC 20036 R. L. Range /R. P. Verret Central Power & Light Company P. O. Box 2121 Corpus Christi, TX 78403 R. John Hiner (2 copies)

Chief Operating Officer ENCLOSURE CONTAINC City of Austin Electric Utility EEGUARDSINFORMAll0N 721 Barton Springs Road N SEPARATION THIS Austin, TX 78704 GE IS DECONTROLLED

& l 9 '

"O fT RhL Revised 03/18/88 SAr= l f j h NL.DIST

~

SAFEGUARDS F.0RM@QL, PHYSICAL SECURITY PLAN Revision 12 50.54? Changes Page 1 of 2 Change M tion 3.2.2 Revised to specifically state that the Nuclear Security Department (NSD) Manager reports to the V.P. Nuclear Operations. (requested by management) 3.2.4 Nuclear Security Operations Division Manager's duties removed from sectica 3.2.2. and placed in this section.

(proper location for this function) 3.5 Revised to indicate Local Law Enforcement Agency "Letter of Agreement" storage and update. (requested by management) 3.6.4 Revised to indicate correct radio frequency. (VHF to UHF -

typographical error) 4.1.1 Revised "35 to 40 degree angles" to "30 to 45 degree angles" (corrected typographical error).

4.1.9 Removed "type" of luminaries (unnecessary and not correct).

4.2.1 Revised to clarify exception to two barrier concept. (added "except as noted below")

4.2.1.3 Revised to indi;cte "armed" member of security force (regulatory requirement).

5.2.4.1 Revised to clarify "visitor" lettering on badges. (removed "bold" - actual lettering is not considered "bold")

5.4.1.2 Revised to clarify Plant Manager / Designee authorization of "Visitor".

5.4.1.3 Revised to clarify control of turnstiles that are not part of the FA when portal has been secured.

5.4.1.4 Revised to indicate correct radio trequency. (VHF to UHF -

typographical error) 5.5.1.2 Revised to clarify "visitor" criteria. (delineates badge requiremments for individuals not authorized unescorted access to P.A..)

5.6.8 Revised to reflect wording of 10CFR 50.54(Y) as to authorization for emergency exceptions to security commitments. ENCLOSURE CONTAINS CAFEGUARDSINFORMATION 6.2.1 Revised to clarify usage of pan-tilt-zoom ca." t#% SEPARATION THIS (developement of better CCTV system) PAGE IS OECONTR0llED SAFEGUARDS ECBME1

~

'SA iGUAR38 3:0RMA79N

. 2 PHTSICAL SECURITY PLAN

. Revision 12 *50.54P Changes Page 2 of 2 6.2.5 This section, dealing with alarm response to "wall effect" zones, deleted entirely (no longer necessary per NRC Reg. IV).

6.3.1 Removed commitment of barbed wire fence immediately behind E-Field wires (no longer necessary per NRC Reg. IV).

6.3.3 Revised te, clarify UPS components. (LDGB removed because it is a secondary system) 6.3.3.3 Added "day tank" to vital island structure. (needed for clarity) 7.1.1.1 Revised to indicate correct radio frequency (UHF not VHF- typo) and that base radios are on security UFS.

7.1.2.2 Revised to clarify secondary offsite communications system.

7.1.2.3 Revised to indicate HL&P microwave telephone system as a tertiary offsite LLEA communication link. Section switched with 7.1.2.4.

7.1.2.4 Hoved to proper location Section 7.1.2.4 is nov 7.1.2.3. (no change to contents of section).

7.2.2 Deleted test commitment at "end" of shift (required by regulations at start cf shift).

App. A.24 Revised to clarify definition and restrictions of Temporary Designated Vehicles.

App. D Revised to include "Plant Superintendent".

App. E Reference to App. "G" in sections 2.0 and 3.0 changed to App. "F" due to deletion of App. "G".

App. F Deleted entirely as per Section 3.5 (allowed by regulations).

App. G Changed App. G to App. F. Item 7 commitment in appendix changed to extend completion date to April 15, 1988.

Revised Cor.raitment Schedule to show completions.

ENCLOSURE CONTAINS SAFEGUARDSINFORMAT10N UPON SEPARATION THIS PAGE IS DECONTROLLD SAcEGUARDS V0nlA~ Oh