ST-HL-AE-2213, Forwards Proprietary & Nonproprietary Addl Info in Support of Elimination of Postulated Pipe Ruptures in Accumulator Lines of South Texas Projects Units 1 & 2 (WCAP-11383/11351) (10-Inch & 8-Inch RHR Piping Attached to Accumulator Line

From kanterella
Jump to navigation Jump to search
Forwards Proprietary & Nonproprietary Addl Info in Support of Elimination of Postulated Pipe Ruptures in Accumulator Lines of South Texas Projects Units 1 & 2 (WCAP-11383/11351) (10-Inch & 8-Inch RHR Piping Attached to Accumulator Line)
ML20214P204
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 05/29/1987
From: Wisenburg M
HOUSTON LIGHTING & POWER CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML19292H322 List:
References
ST-HL-AE-2213, NUDOCS 8706030250
Download: ML20214P204 (3)


Text

- - - _

. o The Light company IInuston Lighting & Power * * * " " 'I " ' **** ( '

May 29, 1987 ST-HL-AE-2213 File No.: C9.10 10CFR50, Appendix A U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 South Texas Project Units 1 and 2 Docket Nos. STN 50-498, STN 50-499 Additional Information In Support of the Elimination of Postulated Ruptures in the Accumulator Lines (10-Inch and 8-Inch RIIR Piping Attached to the Accumulator Line)

Reference:

(1) Letter from H14P to NRC, M. R. Wisenburg to Document Control Desk, May 26, 1987, ST-HL AE-2190 By letter dated May 26, 1987 (Reference 1) Houston Lighting & Power Company (HIAP) provided additional information in support of our exemption request to CDC-4 for the pressurizer surge lines and the accumulator lines.

Subsequent to that submittal the NRC requested specific additional information on the 10 inch and 8 inch lines from the accumulator line to the first check valve. The 10 inch and 8 inch lines are branch line connections to the residual heat removal (RHR) system. This additional information dockets technical results which have previously been reviewed with the NRC in meetings and telephone discussions.

The information in Attachment 1 of this submittal confirms that the 10 inch and 8 inch piping connected to the STP accumulator lines for both Units 1 and 2 meet all the criteria for break elimination as specified by NUREC 1061.

Because Attachment I cc,ntains information proprietary to Westinghouse Electric Corporation, the attached affidavit signed by Westinghouse management sets forth the basis on which the information may be withheld from public disclosure by the NRC in ecordance with the requirements of 10CFR2.790(b)(1).

This affidavit addresses with specificity the considerations of 10CFR2.790(b)(4). Correspondence with respect to the proprietary aspects of the affidavit and Application for Withholding of Attachment 1 should reference CAW-87-054 and should be addressed to R. A. Wiesemann, Manager Regulatory and Legislature Affairs, Westinghouse Electric Corporation, P. O. Box 355, Pittsburgh, Pennsylvania 15230.

8706030250 870529 -

[

PDR ADOCK 05000498 b A PDR hggstAf O(/.f04

,' i 3lNb Ll/NRC/oi go j i N@

A Division of Ilouston Industries Inw rated

( j

e ST-HL.AE-2213 Houmon Lighting & Pbwer Cornpany - File No.: C9.10 Page 2 The Attachment 1 information is submitted to support HIAI"s request for exemption from the requirements of 10CFR50 Appendix A GDC 4. The schedular exemption would be in effect until 6 months following the issuance of the broad scope rule or through 2 cycles of operation of Unit l 'and 1 cycle. of operation of. Unit 2, whichever occurs first. ~The exemption would eliminate the requirement to provide protection on South Texas Project Units 1 and 2 from the dynamic effects associated with postulated pipe breaks in the connecting 10 inch and'8 inch lines from the three accumulator ILnes to the first check valve.

If you should have any questions on this matter, please contact Mr.

J. N. Bailey at (713) 993-1335.

n l

. . Wis nburg Manager, ngineeri and censing ABP/yd Attachments: (1) " Additional Information in Support of the Elimination of Postulated Pipe Ruptures in the Accumulator Lines of South Texas Project Units 1 & 2 (10-Inch and 8-Inch RHR Piping Attached to the Accumulator Line)," Westinghouse Proprietary Class 2, May, 1987.

Also enclosed is a Westinghouse authorization letter, CAW 87-054, Proprietary Information Notice, and accompanying Affidavit.

(2) " Additional Information in Support of the Elimination of Postulated Pipe Ruptures in the Accumulator Lines of South Texas Project Units 1 & 2 (10 Inch and 8-Inch RHR Piping Attached to the Accumulator Line)", Westinghouse Proprietary Class 3, May, 1987.

L1/NRC/oi m

.ST HL-AE-2213 File No.: C9.10 Houston Lighting & Power Cornpany p.g. 3

.cc:'

. Regional Administrator, Region IV M.B. Lee /J.E. Malaski Nuclear Regulatory Commission City of Austin 611 Ryan Plaza Drive, Suite 1000 P.O. Box 1088 Arlington .TX 76011 Austin, TX 78767-8814

  • N. Prasad Kadambi, Project Manager A. von Rosenbert.M.T. Hardt U.S. Nuclear Regulatory Commission City Public Service Board 7920 Norfolk Avenue P.O. Box 1771-Bethesda, MD 20814 San Antonio, TX 78296 o Robert L. Perch, Project Manager Advisory Committee on Reactor Safeguards U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission 7920 Norfolk Avenue 1717 H Street Bethesda..MD 20814 Washington, DC 20555 Dan R. Carpenter Senior Resident Inspector / Operations c/o U.S. Nuclear Regulatory Commission P.O. Box 910 Bay City, TX 77414 Claude E. Johnson Senior Resident Inspector / Construction c/o U.S. Nuclear Regulatory Commission P.O. Box 910 Bay City, TX 77414 N.D. Schwarz, Jr. ' Esquire Baker & Botts One Shell Plaza Houston, TX 77002 J.R. Newman, Esquire Newman & Holtzinger, P.C.

1615 L Street, N.W.

Washington, DC 20036 T.V. Shockley/R.L. Range Central Power & Light Company P. O. Box 2121 Corpus Christi, TX -78403

  • With Attachments; all others without Attachments L1/NRC/oi Revised 2/3/87