RC-95-0048, Forwards Rev 1 to Cycle 9 Core Operating Limts Rept

From kanterella
Jump to navigation Jump to search
Forwards Rev 1 to Cycle 9 Core Operating Limts Rept
ML20080L073
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 02/21/1995
From: Gabe Taylor
SOUTH CAROLINA ELECTRIC & GAS CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20080L075 List:
References
RC-95-0048, RC-95-48, NUDOCS 9503020057
Download: ML20080L073 (1)


Text

, _..

4'N .p' South Carolina Electric & Ga3 Company Gary J. Taylor P.O. Box 88 Vice Preseoent C Jenkinsville. SC 29065 Nuclear Operations (803) 345-4344 l

Ascusiconw f'

February 21, 1995 Refer ton' RC-95-0048 l

l Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555 Gentlemen:  !

i l i

Subject:

VIRGIL C. SUMMER NUCLEAR STATION J DOCKET NO. 50/395 OPERATING LICENSE NO. NPF-12 REVISION TO CORE OPERATING UMITS REPORT (RFL 100)

In accordance with Section 6.9.1.11 of the Virgil C. Summer Nuclear Station Technical Specifications, South Carolina Electric & Gas Company (SCE&G) hereby submits Revision 1 to the Cycle 9 Core Operating Limits Report.

The COLR FAh limit is being increased from 1.56 to 1.62 by allocations from DNB and l PCT margins under the provisions of 10CFR50.59. The evaluations utilized approved i methodologies, with the large break LOCA crediting the revised Burst Strain Limit l reported in the V. C. Summer Nuclear 3tation 1993 Annual '

Model as previously(Reference 10CFR50.46 Report letter RC-94-0152, dated June 6,1994).

Should you have any questions concerning this report, please call Mr. Philip Rose at (803) 345-4052 at your convenience.

Very truly yours, I Gary . raylor l

PAR /GJT/nkk Attachment c: O. W. Dixon R. R. Mahan (w/o Attachment)

R. J. White S. D. Ebneter ,

S. Dembek ,

NRC Resident inspector J. B. Knotts Jr.

NSRC CFS RTS (RFL 100) i File (818.23-1) 95o3o20o57 DR 95o221 k ADDCK 05ooo395 '

0

\

.. . PDR NUCLEAR EXCELLENCE - A SUMMER TRADITIONI