PNO-I-86-087:on 861022,approx 3,000 Gallons of Liquid Radwaste Spilled on Floor of Radwaste Bldg.Caused by Isolation Valve Leak.Spill Cleaned Up.Decontamination of Affected Areas Underway
ML20197A732
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 10/22/1986
From: Strosnider J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
References
PNO-I-86-087, PNO-I-86-87, NUDOCS 8610270382
Download: ML20197A732 (1)


_ _-_ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ . __ _ - - _ _

DCS No: 5038861022 Date: October 22, 1986 PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE--PNO-I-86-87 This preliminary notification constitutes EARLY notice of events of POSSIBLE safety or public interest significance. The information is as initially received without verification or evaluation, and is basically all that is known by the Region I staff on this date.

Facility: Licensee Emergency Classification:

Pennsylvania Power and Light Notiffcation of Unusual Event Susquehanna Steam Electric Station Alert Berwick, Pennsylvania Site Area Emergency Docket No. 50-387/388 General Emergency.

X Not Applicable

Subject:

Radwaste Spill At 6:30 a.m. on October 22, 1986 approximately 3000 gallons of liquid radioactive waste was spilled on the floor of the Radwaste Building. The spill was contained in the Radwaste Building and there was no offsite release of radiation or personnel contami-nation. The spill occurred during routine processing of a set of liquid radioactive l

waste collection tanks when an isolation valve to the solid radwaste system "B" waste mixing tank leaked by. Approximately 8000 gallons of liquid radwaste filled the mixing tank and overflowed onto the floor., The' spill covered approximately 1000 Ft 2 of floor in the waste tank mixing. room and in the radwaste building basement where the liquid waste backed up through the floor drains. The spill was mostly contaminated water, but also included some crud and resin with an average contamination level of 25,000 DPM/100cm2 and a maximum contact reading of 120 mR/hr. The liquid radwaste processing was terminated upon discovery of the spill, stopping the leakage. The spill l

has been cleaned up and decontamination of the affected areas is in progress.

l The licensee plans to make a press release and the Commonwealth of Pennsylvania has been notified.

CONTACT: J. Strosnider l (488-1128)

DISTRIBUTION:

I H. St. MNBB Phillips E/W Willste Mail: ADM:DMB Chairman Zech EDO NRR IE NMSS DOT:Trans only Comm. Bernthal PA DIA RES Comm. Roberts ELD AEOD Comm. Asselstine Comm. Carr ACRS Air Rights INP0----

SECY SP NSAC----

CA PDR Regional Offices TMI Resident Section RI Resident Office PA0 SLO Licensee: