Letter Sequence Other |
---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance, Acceptance, Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Results
Other: ML071620334, ML073320383, ML073390289, ML073390306, ML081000038, PLA-6187, Response for Additional Information Requested in Regard to Proposed License Amendment No. 285, Constant Pressure Power Uprate Environmental, PLA-6255, Proposed License Amendments 285 and 253, Constant Pressure Power Uprate Application Regarding Steam Dryer Flow Effects Verbal and Confirmatory Requests for Additional Information Responses, PLA-6266, Proposed License Amendment No. 285 for Unit 1, License No. NPF-14 & Proposed License Amendment No. 253 for Unit 2, License No. NPF-22, Extended Power Uprate Application Regarding Change to Technical Specification SR 3.7.1 - RHRSW and UHS, PLA-6370, License Renewal Application, Amendment to Section 4.2.2, PLA-6633, Providing Notice That the License Conditions 2.C.(36)(a)3, 2.C.(36(b)7 & 2.C.(36)(f) Have Been Met, PLA-6876, Th Rio Steam Dryer Visual Inspection Report, PLA-7047, Th Rio Steam Dryer Visual Inspection Report
|
MONTHYEARML0716203342006-01-24024 January 2006 GE Ne 0000-0038-8052 Susq-EPU-T506-MSLHiFlo-Calc-2006, Revision 0, Instrument Limits Calculation, PPL Susquehanna, LLC Susquehanna Steam Electric Station Units 1 and 2, Main Steam Line High Flow MSIV Isolation. Project stage: Other ML0632500922006-11-21021 November 2006 Extended Power Uprate Acceptance Review Project stage: Acceptance Review PLA-6138, Proposed License Amendments 285 & 253, Constant Pressure Power Uprate - Supplement2006-12-0404 December 2006 Proposed License Amendments 285 & 253, Constant Pressure Power Uprate - Supplement Project stage: Supplement ML0710400302006-12-12012 December 2006 Pennsylvania Fish and Boat Commission Threatened and Endangered Species Project stage: Request PLA-6146, Proposed License Amendment No. 285 for Unit 1 Operating License No. NPF-14 and Proposed License Amendment No. 253 for Unit 2 Operating License No. NPF-22 Re Constant Pressure Power Uprate -Supplement2006-12-26026 December 2006 Proposed License Amendment No. 285 for Unit 1 Operating License No. NPF-14 and Proposed License Amendment No. 253 for Unit 2 Operating License No. NPF-22 Re Constant Pressure Power Uprate -Supplement Project stage: Supplement ML0700800322007-01-0505 January 2007 Extended Power Uprate (EPU) Acceptance Review Results Project stage: Acceptance Review ML0703201532007-02-0808 February 2007 PPL Susquehanna, LLC - Request for Withholding of Proprietary Information from Public Disclosure for Susquehanna Steam Electric Station, Units 1 and 2 Project stage: Withholding Request Acceptance ML0703201762007-02-0808 February 2007 PPL Susquehanna, LLC - Request for Withholding of Proprietary Information from Public Disclosure for Susquehanna Steam Electric Station, Units 1 and 2 Project stage: Withholding Request Acceptance PLA-6155, Proposed License Amendment Nos. 285 and 253, Constant Pressure Power Uprate Supplement2007-02-13013 February 2007 Proposed License Amendment Nos. 285 and 253, Constant Pressure Power Uprate Supplement Project stage: Supplement ML0704301392007-03-0101 March 2007 PPL Susquehanna, LLC-Request for Withholding Information from Public Disclosure for Susquehanna Steam Electric Station, Units 1 and 2 (TAC Nos. MD3309 and MD3310) Project stage: Withholding Request Acceptance PLA-6163, Proposed License Amendment Re Constant Pressure Power Uprate - Supplement2007-03-14014 March 2007 Proposed License Amendment Re Constant Pressure Power Uprate - Supplement Project stage: Supplement ML0707304972007-03-15015 March 2007 Request for Additional Information - Extended Power Uprated Application Regarding Turbine Generator Review Project stage: RAI ML0707303892007-03-19019 March 2007 Request for Additional Information (RAI) - Susquehanna, Units 1 and 2 - Extended Power Uprate Application Project stage: RAI ML0707305682007-03-20020 March 2007 (SSES 1 and 2), Request for Additional Information (RAI) - Extended Power Uprate Application Regarding Steam Dryer and Flow Effects Project stage: RAI PLA-6172, Proposed License Amendment for Constant Pressure Power Uprate - Supplement PLA-61722007-03-22022 March 2007 Proposed License Amendment for Constant Pressure Power Uprate - Supplement PLA-6172 Project stage: Supplement ML0708608662007-03-29029 March 2007 RAI, Extended Power Uprate Application; Vessels and Internals Technical Review (TAC Nos. MD3309 and Md3310) Project stage: RAI ML0710001412007-04-10010 April 2007 Request for Additional Information (RAI) - Susquehanna Steam Electric Station, Units 1 and 2 (SSES 1 and 2) - Extended Power Uprate Application Piping and Nondestructive Examination Technical Review Project stage: RAI ML0710001262007-04-12012 April 2007 Request for Additional Information (RAI) - Susquehanna Steam Electric Station, Units 1 and 2 (SSES 1 and 2) - Extended Power Uprate Application Operator Licensing and Human Performance Technical Review (TAC Nos. MD3309 and MD3310) Project stage: RAI ML0710300402007-04-12012 April 2007 Request for Additional Information (RAI) - Susquehanna Steam Electric Station, Units 1 and 2 (SSES 1 and 2) - Extended Power Uprate Application Electrical Engineering Technical Review (TAC Nos. MD3309 and MD3310) Project stage: RAI ML0710300312007-04-12012 April 2007 Request for Additional Information (RAI) - Susquehanna Steam Electric Station, Units 1 and 2 (SSES 1 and 2) - Extended Power Uprate Application Materials and Chemical Engineering Technical Review Project stage: RAI ML0710202982007-04-12012 April 2007 Request for Additional Information (RAI) - Susquehanna Steam Electric Station, Units 1 and 2 (SSES 1 and 2) - Extended Power Uprate Application Health Physics Technical Review Project stage: RAI ML0710400322007-04-12012 April 2007 Pennsylvania Fish and Boat Commission Threatened and Endangered Species Project stage: Request ML0710400252007-04-12012 April 2007 Pennsylvania Efacts Project stage: Request ML0710400222007-04-12012 April 2007 PA Dcnr Wild Resource Conservation Program - Regal Fritillary Project stage: Request ML0710400262007-04-12012 April 2007 EPA Envirofacts Project stage: Request PLA-6174, Constant Pressure Power Uprate - PLA-61742007-04-13013 April 2007 Constant Pressure Power Uprate - PLA-6174 Project stage: Request ML0710203152007-04-16016 April 2007 (SSES 1 and 2), Request for Additional Information (Rai), - Extended Power Uprate Application Balance-of-Plant Physics Technical Review Project stage: RAI ML0710601352007-04-18018 April 2007 Request for Additional Information, Extended Power Uprate Application Safety-Related Pumps and Valves and Mechanical Equipment Environmental Qualification Project stage: RAI PLA-6187, Response for Additional Information Requested in Regard to Proposed License Amendment No. 285, Constant Pressure Power Uprate Environmental2007-04-23023 April 2007 Response for Additional Information Requested in Regard to Proposed License Amendment No. 285, Constant Pressure Power Uprate Environmental Project stage: Other PLA-6186, Proposed License Amendment Nos. 285 and 253, Extended Power Uprate Application Extended Power Uprate Application Vessels and Internals Technical Review Request for Additional Information Responses2007-04-26026 April 2007 Proposed License Amendment Nos. 285 and 253, Extended Power Uprate Application Extended Power Uprate Application Vessels and Internals Technical Review Request for Additional Information Responses Project stage: Request ML0711600672007-04-27027 April 2007 Request for Additional Information (RAI) Extended Power Uprate Application Probabilistic Risk Assessment Licensing Review Project stage: RAI ML0711504712007-04-27027 April 2007 Request for Additional Information (Rai), Extended Power Uprate Application Containment and Ventilation Technical Review Project stage: RAI ML0711403432007-04-27027 April 2007 Request for Additional Information (RAI) - Susquehanna Steam Electric Station, Units 1 and 2) - Extended Power Uprate Application Instrumentation and Controls Technical Review Project stage: RAI ML0711604062007-04-30030 April 2007 Request for Additional Information (Rai), Extended Power Uprate Application Vessels and Internals Integrity Technical Review Project stage: RAI ML0710900722007-04-30030 April 2007 Request for Additional Information (Rai), Extended Power Uprate Application Mechanical and Civil Engineering Technical Review Project stage: RAI PLA-6191, Proposed License Amendment Nos. 285 and 253, Extended Power Uprate Application Piping and Nondestructive Examination Technical Review Request for Additional Information Responses2007-05-0303 May 2007 Proposed License Amendment Nos. 285 and 253, Extended Power Uprate Application Piping and Nondestructive Examination Technical Review Request for Additional Information Responses Project stage: Request PLA-6194, Proposed License Amendments 285 and 253, Extended Power Uprate Application Health Physics Technical Review, Request for Additional Information Responses2007-05-0909 May 2007 Proposed License Amendments 285 and 253, Extended Power Uprate Application Health Physics Technical Review, Request for Additional Information Responses Project stage: Request PLA-6195, Extended Power Uprate Application Electrical Engineering Technical Review Request for Additional Information Responses2007-05-0909 May 2007 Extended Power Uprate Application Electrical Engineering Technical Review Request for Additional Information Responses Project stage: Request ML0712906522007-05-14014 May 2007 Request for Additional Information (RAI) - Susquehanna Steam Electric Station, Units 1 and 2 (SSES 1 and 2) - Extended Power Uprate Application Reactor Systems Technical Review Project stage: RAI PLA-6198, Proposed License Amendments 285 and 253, Extended Power Uprate Application Balance-of-Plant Safety Systems Request for Additional Information Responses2007-05-14014 May 2007 Proposed License Amendments 285 and 253, Extended Power Uprate Application Balance-of-Plant Safety Systems Request for Additional Information Responses Project stage: Request PLA-6210, Extended Power Uprate Application Vessels and Internals Integrity Technical Review Request for Additional Information Responses2007-05-21021 May 2007 Extended Power Uprate Application Vessels and Internals Integrity Technical Review Request for Additional Information Responses Project stage: Request PLA-6196, Proposed License Amendments 285 and 253, Extended Power Uprate Application Safety Related Pumps and Valves and Mechanical Equipment Environmental Qualification Review Request for Additional Information Responses2007-06-0101 June 2007 Proposed License Amendments 285 and 253, Extended Power Uprate Application Safety Related Pumps and Valves and Mechanical Equipment Environmental Qualification Review Request for Additional Information Responses Project stage: Request PLA-6200, Proposed License Amendment Nos. 285 and 253, Extended Power Uprate Application Mechanical and Civil Engineering Technical Review Request for Additional Information Responses2007-06-0101 June 2007 Proposed License Amendment Nos. 285 and 253, Extended Power Uprate Application Mechanical and Civil Engineering Technical Review Request for Additional Information Responses Project stage: Request PLA-6204, Proposed License Amendment Nos. 285 and 253, Extended Power Uprate Application Instrumentation and Controls Technical Review Request for Additional Information Responses2007-06-0101 June 2007 Proposed License Amendment Nos. 285 and 253, Extended Power Uprate Application Instrumentation and Controls Technical Review Request for Additional Information Responses Project stage: Request PLA-6212, Extended Power Uprate Application Materials and Chemical Engineering Technical Review Request for Additional Information Responses2007-06-0101 June 2007 Extended Power Uprate Application Materials and Chemical Engineering Technical Review Request for Additional Information Responses Project stage: Request PLA-6203, Proposed License Amendment Extended Power Uprate Application Containment and Ventilation Technical Review Request for Additional Information Responses, PLA-62032007-06-0404 June 2007 Proposed License Amendment Extended Power Uprate Application Containment and Ventilation Technical Review Request for Additional Information Responses, PLA-6203 Project stage: Request PLA-6225, Proposed License Amendment Nos. 285 and 253, Extended Power Uprate Application Supplement to Request for Additional Information Responses2007-06-0808 June 2007 Proposed License Amendment Nos. 285 and 253, Extended Power Uprate Application Supplement to Request for Additional Information Responses Project stage: Supplement PLA-6231, Proposed License Amendment No. 285 for Unit 1 and Proposed License Amendment No. 253 for Unit 2, Extended Power Uprate Application Electrical Engineering Technical Review Request for Additional Information Response Supplement, PLA-62312007-06-20020 June 2007 Proposed License Amendment No. 285 for Unit 1 and Proposed License Amendment No. 253 for Unit 2, Extended Power Uprate Application Electrical Engineering Technical Review Request for Additional Information Response Supplement, PLA-6231 Project stage: Supplement PLA-6230, Proposed License Amendment for Units 1 and 2, Extended Power Uprate Application & Supplement to Request for Additional Information Responses2007-06-27027 June 2007 Proposed License Amendment for Units 1 and 2, Extended Power Uprate Application & Supplement to Request for Additional Information Responses Project stage: Supplement PLA-6232, Proposed License Amendments 285 & 253, Extended Power Uprate Application Supplement to Operator Licensing & Human Performance, Health Physics & Piping and Nondestructive Examination Request for Additional Information Responses2007-06-27027 June 2007 Proposed License Amendments 285 & 253, Extended Power Uprate Application Supplement to Operator Licensing & Human Performance, Health Physics & Piping and Nondestructive Examination Request for Additional Information Responses Project stage: Supplement 2007-04-12
[Table View] |
|
---|
Category:Inservice/Preservice Inspection and Test Report
MONTHYEARPLA-8089, Submittal of Revision to Inservice Testing Program Plan2023-12-0505 December 2023 Submittal of Revision to Inservice Testing Program Plan PLA-8019, Nd Refueling Outage Owner'S Activity Report, PLA-80192022-07-13013 July 2022 Nd Refueling Outage Owner'S Activity Report, PLA-8019 PLA-7876, 21st Refueling Outage Owner'S Activity Report (PLA-7876)2020-07-21021 July 2020 21st Refueling Outage Owner'S Activity Report (PLA-7876) PLA-7797, Th Refueling Outage Owner'S Activity Report (PLA-7797)2019-07-0909 July 2019 Th Refueling Outage Owner'S Activity Report (PLA-7797) PLA-7724, 20th Refueling Outage Owner'S Activity Report (PLA-7724)2018-07-23023 July 2018 20th Refueling Outage Owner'S Activity Report (PLA-7724) PLA-7507, Transmittal of 19th Refueling Outage Owner'S Activity Report2016-07-27027 July 2016 Transmittal of 19th Refueling Outage Owner'S Activity Report PLA-7368, Submittal of 17th Refueling Outage Owner'S Activity Report2015-08-11011 August 2015 Submittal of 17th Refueling Outage Owner'S Activity Report PLA-7193, Request to Continue Use of a Risk-Informed Inservice Inspection Alternative in a Proposed Relief Request No. 4RR-01 to the Fourth 10-Year Inservice Inspection Program2014-10-29029 October 2014 Request to Continue Use of a Risk-Informed Inservice Inspection Alternative in a Proposed Relief Request No. 4RR-01 to the Fourth 10-Year Inservice Inspection Program PLA-7232, Th Refueling Outage Owner'S Activity Report2014-08-28028 August 2014 Th Refueling Outage Owner'S Activity Report PLA-7194, Susequehanna Steam Electric Station, Unit 2 - Inservice Testing Program Plan2014-06-18018 June 2014 Susequehanna Steam Electric Station, Unit 2 - Inservice Testing Program Plan PLA-7178, Inservice Inspection Program Plan for the Fourth Ten-Year Interval2014-06-0202 June 2014 Inservice Inspection Program Plan for the Fourth Ten-Year Interval PLA-7179, Snubber Program Plan for the Fourth Ten-Year Inservice Inspection Interval, PLA-71792014-06-0202 June 2014 Snubber Program Plan for the Fourth Ten-Year Inservice Inspection Interval, PLA-7179 PLA-7154, Response to Request for Additional Information on Fourth Ten-Year Inservice Inspection Interval Proposed Relief Requests2014-04-28028 April 2014 Response to Request for Additional Information on Fourth Ten-Year Inservice Inspection Interval Proposed Relief Requests PLA-7092, Withdrawal of Relief Requests 1RR07 and 2RR07 for Third Ten-Year Interval Inservice Testing Program Plans for Susquehanna Ses (SSES) Unit 1 and Unit 2, PLA-70922013-10-10010 October 2013 Withdrawal of Relief Requests 1RR07 and 2RR07 for Third Ten-Year Interval Inservice Testing Program Plans for Susquehanna Ses (SSES) Unit 1 and Unit 2, PLA-7092 PLA-7047, Th Rio Steam Dryer Visual Inspection Report2013-07-25025 July 2013 Th Rio Steam Dryer Visual Inspection Report PLA-6871, Th Refueling Outage Owner'S Activity Report2012-08-30030 August 2012 Th Refueling Outage Owner'S Activity Report PLA-6847, Proposed Relief Request No. 3RR-19 to the Third 10-Year Inservice Inspection Program2012-04-24024 April 2012 Proposed Relief Request No. 3RR-19 to the Third 10-Year Inservice Inspection Program PLA-6814, Request in Accordance with 10 CFR 50.55a(f)(4)(iv) for IST Components to Use Subsequent ASME OM Code Edition and Addenda for the Remainder of the Third Ten-Year IST Interval Revision 1, PLA-68142012-02-13013 February 2012 Request in Accordance with 10 CFR 50.55a(f)(4)(iv) for IST Components to Use Subsequent ASME OM Code Edition and Addenda for the Remainder of the Third Ten-Year IST Interval Revision 1, PLA-6814 PLA-6404, Relief Request 2RR07 for Third Ten-Year Interval Inservice Testing Program Plan2008-08-0505 August 2008 Relief Request 2RR07 for Third Ten-Year Interval Inservice Testing Program Plan PLA-6099, Notification of Changes to Snubber Inspection and Testing Requirements for Third 10-Year Interval In-Service Inspection Program Plan2007-03-19019 March 2007 Notification of Changes to Snubber Inspection and Testing Requirements for Third 10-Year Interval In-Service Inspection Program Plan ML0634501312006-11-30030 November 2006 Fourth Ten-Year Inservice Inspection Interval Request for Alternate (Relief Request 2004-ON-001) PLA-5960, Relief Requests 1RR06 and 2RR06 for Third Ten-Year Interval Inservice Testing Program Plans2005-09-29029 September 2005 Relief Requests 1RR06 and 2RR06 for Third Ten-Year Interval Inservice Testing Program Plans PLA-5905, Reconciliation of the Second 10-Year Interval Inservice Inspection Program Plan, PLA-59052005-05-31031 May 2005 Reconciliation of the Second 10-Year Interval Inservice Inspection Program Plan, PLA-5905 ML0427303382004-09-20020 September 2004 Third Ten Year Inservice Inspection Interval Request for Relief No. 04-ON-006 PLA-5805, Relief Requests 1RR05 and 2RR05 for Third Ten-year Interval Inservice Testing Program Plans for Susquehanna Ses Units 1&22004-09-10010 September 2004 Relief Requests 1RR05 and 2RR05 for Third Ten-year Interval Inservice Testing Program Plans for Susquehanna Ses Units 1&2 ML0421801822004-07-26026 July 2004 Proposed Relief Request No. 3RR-12 to the Third 10-year Inservice Inspection Program PLA-5775, Thirteenth Refueling and Inspection Outage ISI Summary Report2004-07-16016 July 2004 Thirteenth Refueling and Inspection Outage ISI Summary Report PLA-5783, Proposed Relief Request No. 3RR-13 to the Third 10-year Inservice Inspection Program for Plant Units 1 and 2 PLA-57832004-07-14014 July 2004 Proposed Relief Request No. 3RR-13 to the Third 10-year Inservice Inspection Program for Plant Units 1 and 2 PLA-5783 PLA-5753, Response to NRC Request for Additional Information Relating to Relief Request 3RR-032004-05-27027 May 2004 Response to NRC Request for Additional Information Relating to Relief Request 3RR-03 PLA-5743, Supplemental Information for Proposed Relief Requests No. 29 and 30 to the Second 10-Year Inservice Inspection Program for Susquehanna Ses Unit 12004-04-0707 April 2004 Supplemental Information for Proposed Relief Requests No. 29 and 30 to the Second 10-Year Inservice Inspection Program for Susquehanna Ses Unit 1 PLA-5662, Proposed Third Ten-Year Inservice Inspection, Interval Inservice Inspection Program Plan2003-09-16016 September 2003 Proposed Third Ten-Year Inservice Inspection, Interval Inservice Inspection Program Plan PLA-5649, Eleventh Refueling & Inspection Outage ISI Summary Report, PLA-56492003-07-18018 July 2003 Eleventh Refueling & Inspection Outage ISI Summary Report, PLA-5649 PLA-5503, Twelfth Refueling & Inspection Outage ISI Summary Report, Appendix D.2, Modification Group NIS-2 Forms2002-07-19019 July 2002 Twelfth Refueling & Inspection Outage ISI Summary Report, Appendix D.2, Modification Group NIS-2 Forms 2023-12-05
[Table view] Category:Letter type:PLA
MONTHYEARPLA-8096, Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval2024-01-0404 January 2024 Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval PLA-8077, Emergency Plan Revision 67 (PLA-8077)2023-12-27027 December 2023 Emergency Plan Revision 67 (PLA-8077) PLA-8089, Submittal of Revision to Inservice Testing Program Plan2023-12-0505 December 2023 Submittal of Revision to Inservice Testing Program Plan PLA-8084, Application to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.22023-11-29029 November 2023 Application to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 PLA-8091, Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inseervice Inspection Interval (PLA-8091)2023-11-0808 November 2023 Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inseervice Inspection Interval (PLA-8091) PLA-8082, Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2023-11-0202 November 2023 Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program PLA-8080, Proposed Relief for Valve 251130 (PLA-8080)2023-08-14014 August 2023 Proposed Relief for Valve 251130 (PLA-8080) PLA-8074, Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval2023-08-0303 August 2023 Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval PLA-8076, Unit 2 - 21st Refueling Outage Owner'S Activity Report (PLA-8076)2023-07-20020 July 2023 Unit 2 - 21st Refueling Outage Owner'S Activity Report (PLA-8076) PLA-8078, Submittal of Unit 2 Cycle 22 Core Operating Limits Report, Revision 1, PLA-80782023-07-0505 July 2023 Submittal of Unit 2 Cycle 22 Core Operating Limits Report, Revision 1, PLA-8078 PLA-8054, Proposed Amendment to Licenses NPF-14 and NPF-22: Remove Control Rod Operability Separation Criteria and Replace Reference to Banked Position Withdrawal Sequence with the Analyzed Rod Position Sequence2023-06-0808 June 2023 Proposed Amendment to Licenses NPF-14 and NPF-22: Remove Control Rod Operability Separation Criteria and Replace Reference to Banked Position Withdrawal Sequence with the Analyzed Rod Position Sequence PLA-8073, Proposed Relief Request for the Fifth 10-Year Inservice Inspection Interval2023-06-0101 June 2023 Proposed Relief Request for the Fifth 10-Year Inservice Inspection Interval PLA-8067, Notification of Completion of Emergence from Bankruptcy (PLA-8067)2023-05-17017 May 2023 Notification of Completion of Emergence from Bankruptcy (PLA-8067) PLA-8064, Response to NRC Regulatory Issue Summary 2023-01 (PLA-8064)2023-05-17017 May 2023 Response to NRC Regulatory Issue Summary 2023-01 (PLA-8064) PLA-8066, Notification of Planned Closing Date and Information Identified in March 30, 2023 Order, PLA-80662023-05-0808 May 2023 Notification of Planned Closing Date and Information Identified in March 30, 2023 Order, PLA-8066 PLA-8053, Radiation Exposure Information and Reporting System2023-04-27027 April 2023 Radiation Exposure Information and Reporting System PLA-8058, Annual Radiological Environmental Operating Report (PLA-8058)2023-04-26026 April 2023 Annual Radiological Environmental Operating Report (PLA-8058) PLA-8041, Radioactive Effluent Release Report and Offsite Dose Calculation Manual (PLA-8041)2023-04-25025 April 2023 Radioactive Effluent Release Report and Offsite Dose Calculation Manual (PLA-8041) PLA-8047, 2022 Annual Environmental Operating Report (Nonradiological), PLA-80472023-04-19019 April 2023 2022 Annual Environmental Operating Report (Nonradiological), PLA-8047 PLA-8062, Supplement to Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 252F007B, PLA-80622023-04-11011 April 2023 Supplement to Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 252F007B, PLA-8062 PLA-8061, Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 25F007B, PLA-80612023-04-10010 April 2023 Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 25F007B, PLA-8061 PLA-8060, Submittal of Unit 2 Cycle 22 Core Operating Limits Report (PLA-8060)2023-03-30030 March 2023 Submittal of Unit 2 Cycle 22 Core Operating Limits Report (PLA-8060) PLA-8057, Application for Order Approving Indirect Transfer of Control of Licenses and Approving Conforming License Amendments- Supplemental Information, PLA-80572023-03-15015 March 2023 Application for Order Approving Indirect Transfer of Control of Licenses and Approving Conforming License Amendments- Supplemental Information, PLA-8057 PLA-8052, (Sses), Proof of Financial Protection and Guarantee of Payment of Deferred Premiums2023-02-13013 February 2023 (Sses), Proof of Financial Protection and Guarantee of Payment of Deferred Premiums PLA-8048, Response to Request for Additional Information Regarding License Amendment Requesting Temporary Addition of Analyzed Rod Position Sequence2023-01-14014 January 2023 Response to Request for Additional Information Regarding License Amendment Requesting Temporary Addition of Analyzed Rod Position Sequence PLA-8042, Proposed Emergency Amendment to License NPF-22: Temporary Addition of Analyzed Rod Position Sequence2023-01-10010 January 2023 Proposed Emergency Amendment to License NPF-22: Temporary Addition of Analyzed Rod Position Sequence PLA-8039, Application for Order Approving Indirect Transfer of Control of License Amendments - Supplemental Information2022-12-22022 December 2022 Application for Order Approving Indirect Transfer of Control of License Amendments - Supplemental Information PLA-8038, Notification of Petition for Bankruptcy (PLA-8038)2022-12-14014 December 2022 Notification of Petition for Bankruptcy (PLA-8038) PLA-8036, Registration for the Use of Spent Fuel Storage Casks 203, 202, and 204, PLA-80362022-11-30030 November 2022 Registration for the Use of Spent Fuel Storage Casks 203, 202, and 204, PLA-8036 PLA-8035, Registration for the Use of Spent Fuel Storage Casks 205, 200, and 201, PLA-80352022-11-0808 November 2022 Registration for the Use of Spent Fuel Storage Casks 205, 200, and 201, PLA-8035 PLA-8031, Emergency Plan Revision 66 (PLA-8031)2022-11-0707 November 2022 Emergency Plan Revision 66 (PLA-8031) PLA-8032, Application for Order Approving Indirect Transfer of Control of Licenses and Approving Conforming License Amendments - Supplemental Information (PLA-8032)2022-10-28028 October 2022 Application for Order Approving Indirect Transfer of Control of Licenses and Approving Conforming License Amendments - Supplemental Information (PLA-8032) PLA-8026, Biennial 10 Crf 50.59 and 72.48 Summary Report and Changes to Regulatory Commitment (PLA-8026)2022-10-19019 October 2022 Biennial 10 Crf 50.59 and 72.48 Summary Report and Changes to Regulatory Commitment (PLA-8026) PLA-8015, Application for Order Approving Indirect Transfer of Control of Licenses2022-09-29029 September 2022 Application for Order Approving Indirect Transfer of Control of Licenses PLA-8030, Evacuation Time Estimate Report PLA-80302022-09-15015 September 2022 Evacuation Time Estimate Report PLA-8030 PLA-8025, Supplement to License Amendment to Revise Reactor Steam Dome Pressure - Low Instrumentation Function Allowable Value2022-08-10010 August 2022 Supplement to License Amendment to Revise Reactor Steam Dome Pressure - Low Instrumentation Function Allowable Value PLA-8019, Nd Refueling Outage Owner'S Activity Report, PLA-80192022-07-13013 July 2022 Nd Refueling Outage Owner'S Activity Report, PLA-8019 PLA-8013, Response to Request for Additional Information Regarding License Amendment Requesting Adoption of TSTF-505, Revision 2 PLA-80132022-06-27027 June 2022 Response to Request for Additional Information Regarding License Amendment Requesting Adoption of TSTF-505, Revision 2 PLA-8013 PLA-8012, 10 CFR 50.46 Annual Report2022-06-10010 June 2022 10 CFR 50.46 Annual Report PLA-8005, Response to Request for Additional Information Regarding License Amendment to Revise Reactor Steam Dome Pressure - Low Instrumentation Function Allowable Value (PLA-8005)2022-05-23023 May 2022 Response to Request for Additional Information Regarding License Amendment to Revise Reactor Steam Dome Pressure - Low Instrumentation Function Allowable Value (PLA-8005) PLA-8001, Radiation Exposure Information and Reporting System - PLA-80012022-04-28028 April 2022 Radiation Exposure Information and Reporting System - PLA-8001 PLA-7987, Radioactive Effluent Release Report and Offsite Dose Calculation Manual - (PLA-7987)2022-04-26026 April 2022 Radioactive Effluent Release Report and Offsite Dose Calculation Manual - (PLA-7987) PLA-7986, 2021 Annual Environmental Operating Report (Nonradiological) Docket No. 50-387, PLA-79862022-04-26026 April 2022 2021 Annual Environmental Operating Report (Nonradiological) Docket No. 50-387, PLA-7986 PLA-7985, Annual Radiological Environmental Operating Report2022-04-22022 April 2022 Annual Radiological Environmental Operating Report PLA-7883, Proposed Amendment to Licenses NPF-14 and NPF-22: Relocate Technical Specification Unit Staff Qualification Requirements to Quality Assurance Program (PLA-7883)2022-03-31031 March 2022 Proposed Amendment to Licenses NPF-14 and NPF-22: Relocate Technical Specification Unit Staff Qualification Requirements to Quality Assurance Program (PLA-7883) PLA-7995, Property Insurance Program (PLA-7995)2022-03-30030 March 2022 Property Insurance Program (PLA-7995) PLA-7998, Submittal of Unit 1 Cycle 23 Core Operating Limits Report and Reload Safety Analysis Report2022-03-29029 March 2022 Submittal of Unit 1 Cycle 23 Core Operating Limits Report and Reload Safety Analysis Report PLA-7991, Proof of Financial Protection and Guarantee of Payment of Deferred Premium2022-03-24024 March 2022 Proof of Financial Protection and Guarantee of Payment of Deferred Premium PLA-7984, Supplement to License Amendment Requesting Adoption of TSTF-505, Revision 22022-03-0808 March 2022 Supplement to License Amendment Requesting Adoption of TSTF-505, Revision 2 PLA-7962, Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR PLA-79622022-01-0505 January 2022 Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR PLA-7962 2024-01-04
[Table view] |
Text
Jon A. Franke PPL Susquehanna, LLC Site Vice President 769 Salem Boulevard JUL 2 5 2013 Berwick, PA 18603 Tel. 570.542.2904 Fax 570.542. 1504 jfranke@pp1web.com
' TM U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 SUSQUEHANNA STEAM ELECTRIC STATION UNIT 2 16TH RIO STEAM DRYER VISUAL INSPECTION REPORT PLA-7047 Docket No. 50-388
Reference:
Letter, R. V. Guzman (NRC) to B. T. McKinney (PPL), Susquehanna Steam Electric Station, Units I and 2- Issuance of Amendment Regarding the 13-Percent Extended Power Uprate (TAC Nos. MD3309 and MD33/0)," dated January 30, 2008.
This submittal provides the results of the steam dryer visual inspections conducted during the Susquehanna SES (SSES) Unit 2 161h Refueling and Inspection Outage (RIO). The results are contained in Enclosure 1 and meet the intent of SSES Unit 2 License Condition 2.C.(20)(f) from the above reference.
Additionally, SSES Unit 2 License Condition 2.C.(20)(e) requires that visual inspections be conducted of all accessible, susceptible locations of the steam dryer during the first two scheduled refueling outages after reaching full CPPU (Constant Pressure Power Uprate) conditions. This report is for the first of the two outages after reaching full CPPU conditions. The last inspection in accordance with this License Condition will be performed in the SSES Unit 2 refueling and inspection outage in 2015.
There are no new regulatory commitments contained in this submittal.
If you have questions, please contact D. L. Filchner at (610) 774-7819 .
. A. Franke -Unit 2 License Condition 2.C.(20)(f) Steam Dryer Inspection Results Copy: NRC Region I Mr. P. W. Finney, NRC Sr. Resident Inspector Mr. J. A. Whited, NRC Project Manager Mr. L. J. Winker, PA DEP/BRP
ENCLOSURE 1 TO PLA-7047 "Unit 2 License Condition 2.C.(20)(f)
Steam Dryer Inspection Results"
Enclosure 1 to PLA-7047 Page 1 of 26 License Condition 2.C. (20) (f)
Susquehanna Unit 2 Steam Dryer Inspection Results
Purpose:
To report the results of the Unit 2 16RIO Steam Dryer visual inspections to satisfy Unit 2 License Condition 2.C. (20) (f).
Executive Summary: The Unit 2 Steam Dryer was inspected in accordance with the requirements of BWRVIP-139 and the manufacturer, General Electric, recommendations.
Three hundred sixty four (364) visual examinations were performed on welds and components. Newly discovered non-conforming conditions were identified as follows:
- Minor IGSCC on DRYER WELD DC-C-2. Reference CR 1693833. Indication has been dispositioned as use-as-is.
- Swirl patterns, discoloration and surface roughness areas discovered on Dryer Hood A and Dryer Hood F. Reference CR 1697522 and 1699122. Indications have been dispositioned as use-as-is.
- Minor IGSCC in the heat affected zone of components Dryer Lug LL-C 220 Deg Lower Bracket and Dryer Lug LL-D 320 Deg Middle bracket. Reference CR 1692786. Indications have been dispositioned as use-as-is.
- Minor IGSCC indications on the Dryer ID component Skirt Panel 0 Deg Left Side.
Reference CR 1697229. Indications have been dispositioned as use-as-is.
- Dryer Skirt gouges and anomalies found at different azimuths. Reference CR 1697237, 1697451 and 1700339. Indications have been dispositioned as use-as-Is.
- Fatigue cracks in components Dryer 140-Deg Lifting Lug to Eye Fillet Welds and Dryer 320-Deg Lifting Lug to Eye Fillet Welds. Reference CR 1693833 and 1692786. Indications have been dispositioned as use-as-is.
Previously identified indications that showed growth or other changes during Unit 2 16RIO were the following:
- Dryer Lug LL-B 140 Deg Lower Bracket component indication removed by flapping in 2011 was re-discovered in 2013. Reference CR 1692786. Indication has been dispositioned as use-as-is.
- Dryer Skirt Weld 135 Deg multiple IGSCC indications identified in 2011 showed additional growth. Reference CR 1692786. Indications were dispositioned as use-as-Is.
All locations listed above are scheduled for re-inspection during the Unit 2 17RIO in 2015 to determine if changes have occurred.
Enclosure 1 to PLA-7047 Page 2 of26 License Condition 2.C. (20) (f)
Susquehanna Unit 2 Steam Dryer Inspection Results The following areas were previously identified in 2011 (PLA-6751) as containing defects. There has been no change in condition identified in 2013 inspection.
- Dryer Skirt 4 Degree Seismic Ring Drill Hole Repair ID and OD.
- Dryer Skirt non-service induced gouges and anomalies.
No other non-conformities were identified during the inspection process.
The entire inspections scope will be repeated during the Unit 2 17RIO in 2015 to meet the requirements of License Condition 2.C. (20) (e). A sampling program will be utilized for dryer visual inspection in subsequent RIOs.
Inspection Methods Used:
The VT -1 visual examination is utilized to visually determine the condition of a part, component or surface and to reveal such conditions as cracks, wear, corrosion, erosion and/or physical damage to such parts, especially welded joints.
The VT -3 visual examination is utilized to determine structural integrity, the measurement of clearances, detection of physical displacement, determination of the structural adequacy of supporting elements, the soundness of connections between load carrying structural members, and tightness of bolting.
Inspection Results Identification:
- NRI- No recordable Indication. The weld or component was in compliance with the inspection acceptance criteria, no cracks or deformation during inspection was discovered. No further actions required.
- RI- Recordable Indication. The weld or component contained a defect such as a crack or deformation that resulted in further evaluation and disposition in the Corrective Action Program. A component with a Recordable Indication discovered in 2011 with no change in condition detected in 2013 is reported in 2013 as an RI, however, a Condition Report is not required.
Note: EWR 1716365 provides evaluation of previous operating cycle(s) to determine if plant conditions were representative of the upcoming cycle and that indications with no growth during Unit 2 16RIO are still acceptable.
Enclosure 1 to PLA-7047 Page 3 of26 License Condition 2.C. (20) (f)
Susquehanna Unit 2 Steam Dryer Inspection Results Component Name Method Inspection Inspection Condition Description Disposition Date Result Report (If Rl) '
DRYER LUG LL-A 40 DEG VT-3 19-Apr-13 NRI DRYER LUG LL-B 140 DEG VT-3 19-Apr-13 NRI DRYER LUG LL-C 220 DEG VT-3 16-Apr-13 NRI DRYER LUG LL-D 320 DEG VT-3 17-Apr-13 NRI DRYER SEISMIC RING LUG VT-1 16-Apr-13 NRI A
DRYER SEISMIC RING LUG VT-1 16-Apr-13 NRI A
DRYER SEISMIC RING LUG VT-3 16-Apr-13 Rl NA WEAR PATTERN NOCR A ON UNDERSIDE GENERATE-OF SEISMIC NO CHANGE BLOCK IN CONDITION FROM 2011 DRYER SEISMIC RING LUG VT-1 25-Apr-13 NRI B
DRYER SEISMIC RING LUG VT-1 25-Apr-13 NRI B
DRYER SEISMIC RING LUG VT-3 25-Apr-13 Rl NA CONTACT MARKS NOCR B FROM DRYER GENERATE-SUPPORT NO CHANGE BRACKET AT 94 IN DEGREES CONDITION FROM 2011 DRYER SEISMIC RING LUG VT-1 18-Apr-13 NRI c
DRYER SEISMIC RING LUG VT-1 18-Apr-13 NRI c
Enclosure 1 to PLA-7047 Page 4 of26 License Condition 2.C. (20) (f)
Susquehanna Unit 2 Steam Dryer Inspection Results Component Name Method Inspection Inspection Condition Description Disposition Date Result Report (IfRI)
DRYER SEISMIC RING LUG VT-3 18-Apr-13 RI NA WEAR PATTERN NOCR c ON UNDERSIDE GENERATE-OF SEISMIC NO CHANGE BLOCK IN CONDITION FROM 2011 DRYER SEISMIC RING LUG VT-1 24-Apr-13 RI 1699205 ADDITIONAL USE-AS-IS D WEAR PATTERN ON UNDERSIDE OF SEISMIC BLOCK AND SUPPORT LUG DRYER SEISMIC RING LUG VT-1 24-Apr-13 NRI D
DRYER SEISMIC RING LUG VT-3 24-Apr-13 RI 1699205 ADDITIONAL USE-AS-IS D WEAR PATTERN ON UNDERSIDE OF SEISMIC BLOCK AND SUPPORT LUG DRYER WELD DC-A-I VT-1 16-Apr-13 NRI DRYER WELD DC-A-2 VT-1 17-Apr-13 NRI DRYER WELD DC-A-3 VT-1 17-Apr-13 NRI DRYER WELD DC-B-1 VT-1 17-Apr-13 NRI DRYER WELD DC-B-2 VT-1 17-Apr-13 NRI DRYER WELD DC-B-3 VT-1 17-Apr-13 NRI DRYER WELD DC-C-1 VT-1 18-Apr-13 NRI DRYER WELD DC-C-2 VT-1 18-Apr-13 RI 1693833 AXIAL USE-AS-IS INDICATION LEFT OF HEAT AFFECTED ZONE APPROXIMATELY 0.55 INCHES
Enclosure 1 to PLA-7047 Page 5 of26 License Condition 2.C. (20) (f)
Susquehanna Unit 2 Steam Dryer Inspection Results Component Name Method Inspection Inspection Condition Description Disposition Date Result Report (If Rl)
DRYER WELD DC-C-3 VT-1 18-Apr-13 NRI DRYER WELD DC-D-1 VT-1 16-Apr-13 NRI DRYER WELD DC-D-2 VT-1 19-Apr-13 NRI DRYER WELD DC-D-3 VT-1 19-Apr-13 NRI DRYER WELD HE-A-l VT-1 22-Apr-13 NRI DRYER WELD HE-A-2 VT-1 21-Apr-13 NRI DRYER WELD HE-B-1 VT-1 20-Apr-13 NRI DRYER WELD HE-B-2 VT-1 20-Apr-13 NRI DRYER WELD HE-C-1 VT-1 21-Apr-13 NRI DRYER WELD HE-C-2 VT-1 20-Apr-13 NRI DRYER WELD HE-D-1 VT-1 21-Apr-13 NRI DRYER WELD HE-D-2 VT-1 20-Apr-13 NRI DRYER WELD HE-E-l VT-1 21-Apr-13 NRI DRYER WELD HE-E-2 VT-1 21-Apr-13 NRI DRYER WELD HE-F-1 VT-1 21-Apr-13 NRI DRYER WELD HE-F-2 VT-1 22-Apr-13 NRI DRYER WELD TB-AB-1A VT-1 18-Apr-13 NRI DRYER WELD TB-AB-1B VT-1 18-Apr-13 NRI DRYER WELD TB-AB-2A VT-1 18-Apr-13 NRI DRYER WELD TB-AB-2B VT-1 18-Apr-13 NRI DRYER WELD TB-AB-3A VT-1 18-Apr-13 NRI DRYER WELD TB-AB-3B VT-1 18-Apr-13 NRI
Enclosure 1 to PLA-7047 Page 6 of26 License Condition 2.C. (20) (f)
Susquehanna Unit 2 Steam Dryer Inspection Results Component Name Method Inspection Inspection Condition Description Disposition Date Result Report (If Rl)
DRYER WELD TB-AB-4A VT-1 18-Apr-13 NRI DRYER WELD TB-AB-4B VT-1 18-Apr-13 NRI DRYER WELD TB-AB-5A VT-1 18-Apr-13 NRI DRYER WELD TB-AB-5B VT-1 18-Apr-13 NRI DRYER WELD TB-AB-6A VT-1 18-Apr-13 NRI DRYER WELD TB-AB-6B VT-1 18-Apr-13 NRI DRYER WELD TB-BC-IA VT-1 18-Apr-13 NRI DRYER WELD TB-BC-1B VT-1 18-Apr-13 NRI DRYER WELD TB-BC-2A VT-1 18-Apr-13 NRI DRYER WELD TB-BC-2B VT-1 18-Apr-13 NRI DRYER WELD TB-BC-3A VT-1 18-Apr-13 NRI DRYER WELD TB-BC-3B VT-1 18-Apr-13 NRI DRYER WELD TB-BC-4A VT-1 18-Apr-13 NRI DRYER WELD TB-BC-4B VT-1 18-Apr-13 NRI DRYER WELD TB-BC-5A VT-1 18-Apr-13 NRI DRYER WELD TB-BC-5B VT-1 18-Apr-13 NRI DRYER WELD TB-BC-6A VT-1 18-Apr-13 NRI DRYER WELD TB-BC-6B VT-1 18-Apr-13 NRI DRYER WELD TB-BC-7A VT-1 18-Apr-13 NRI DRYER WELD TB-BC-7B VT-1 18-Apr-13 NRI DRYER WELD TB-BC-8A VT-1 18-Apr-13 NRI DRYER WELD TB-BC-8B VT-1 18-Apr-13 NRI
Enclosure 1 to PLA-7047 Page 7 of26 License Condition 2.C. (20) (f)
Susquehanna Unit 2 Steam Dryer Inspection Results Component Name Method Inspection Inspection Condition Description Disposition Date Result Report (If Rl)
DRYER WELD TB-CD-1A VT-1 18-Apr-13 NRI DRYER WELD TB-CD-lB VT-1 17-Apr-13 NRI DRYER WELD TB-CD-2A VT-1 18-Apr-13 NRI DRYER WELD TB-CD-2B VT-1 17-Apr-13 NRI DRYER WELD TB-CD-3A VT-1 18-Apr-13 NRI DRYER WELD TB-CD-3B VT-1 18-Apr-13 NRI DRYER WELD TB-CD-4A VT-1 18-Apr-13 NRI DRYER WELD TB-CD-4B VT-1 18-Apr-13 NRI DRYER WELD TB-CD-5A VT-1 18-Apr-13 NRI DRYER WELD TB-CD-5B VT-1 18-Apr-13 NRI DRYER WELDTB-DE-1A VT-1 17-Apr-13 NRI DRYER WELD TB-DE-1B VT-1 17-Apr-13 NRI DRYER WELD TB-DE-2A VT-1 17-Apr-13 NRI DRYER WELD TB-DE-2B VT-1 17-Apr-13 NRI DRYER WELD TB-DE-3A VT-1 17-Apr-13 NRI DRYER WELD TB-DE-3B VT-1 17-Apr-13 NRI DRYER WELD TB-DE-4A VT-1 17-Apr-13 NRI DRYER WELD TB-DE-4B VT-1 19-Apr-13 NRI DRYER WELD TB-DE-5A VT-1 17-Apr-13 NRI DRYER WELD TB-DE-5B VT-1 18-Apr-13 NRI DRYER WELD TB-DE-6A VT-1 17-Apr-13 NRI DRYER WELD TB-DE-6B VT-1 17-Apr-13 NRI
Enclosure 1 to PLA-7047 Page 8 of26 License Condition 2.C. (20) (f)
Susquehanna Unit 2 Steam Dryer Inspection Results Component Name Method Inspection Inspection Condition Description Disposition Date Result Report (If Rl)
DRYER WELD TB-DE-7A VT-1 17-Apr-13 NRI DRYER WELD TB-DE-7B VT-1 17-Apr-13 NRI DRYER WELD TB-DE-8A VT-1 17-Apr-13 NRI DRYER WELD TB-DE-8B VT-1 17-Apr-13 NRI DRYER WELD TB-EF-1A VT-1 17-Apr-13 NRI DRYER WELD TB-EF-1B VT-1 17-Apr-13 NRI DRYER WELD TB-EF-2A VT-1 17-Apr-13 NRI DRYER WELD TB-EF-2B VT-1 17-Apr-13 NRI DRYER WELD TB-EF-3A VT-1 17-Apr-13 NRI DRYER WELD TB-EF-3B VT-1 17-Apr-13 NRI DRYER WELD TB-EF-4A VT-1 17-Apr-13 NRI DRYER WELD TB-EF-4B VT-1 17-Apr-13 NRI DRYER WELD TB-EF-5A VT-1 17-Apr-13 NRI DRYER WELD TB-EF-5B VT-1 17-Apr-13 NRI DRYER WELD TB-EF-6A VT-1 17-Apr-13 NRI DRYER WELD TB-EF-6B VT-1 17-Apr-13 NRI DRYER WELD VS-A-1 VT-1 20-Apr-13 NRI DRYER WELD VS-A-2 VT-1 20-Apr-13 NRI DRYER WELD VS-B-1 VT-1 20-Apr-13 NRI DRYER WELD VS-B-2 VT-1 20-Apr-13 NRI DRYER WELD VS-C-1 VT-1 20-Apr-13 NRI DRYER WELD VS-C-2 VT-1 21-Apr-13 NRI
Enclosure 1 to PLA-7047 Page 9 of26 License Condition 2.C. (20) (f)
Susquehanna Unit 2 Steam Dryer Inspection Results Component Name Method Inspection Inspection Condition Description Disposition Date Result Report (HRI)
DRYER WELD VS-D-1 VT-1 20-Apr-13 NRI DRYER WELD VS-D-2 VT-1 21-Apr-13 NRI DRYER WELD VS-E-1 VT-1 20-Apr-13 NRI DRYER WELD VS-E-2 VT-1 21-Apr-13 NRI DRYER WELD VS-F-1 VT-1 20-Apr-13 NRI DRYER WELD VS-F-2 VT-1 21-Apr-13 NRI DRYER WELD SN-B-1 VT-1 20-Apr-13 NRI DRYER WELD SN-B-1 VT-1 26-Apr-13 NRI DRYER WELD SN-B-2 VT-1 20-Apr-13 NRI DRYER WELD SN-C-1 VT-1 24-Apr-13 NRI DRYER WELD SN-C-1 VT-1 20-Apr-13 NRI DRYER WELD SN-C-2 VT-1 21-Apr-13 NRI DRYER WELD SN-D-1 VT-1 20-Apr-13 NRI DRYER WELD SN-D-2 VT-1 21-Apr-13 NRI DRYER WELD SN-E-1 VT-1 20-Apr-13 NRI DRYER WELD SN-E-2 VT-1 21-Apr-13 NRI DRYER WELD 90 DEG VT-1 23-Apr-13 NRI COVER PLATE DRYER WELD 90 DEG VT-1 19-Apr-13 NRI COVER PLATE DRYER WELD 270 DEG VT-1 20-Apr-13 NRI COVER PLATE DRYER WELD 270 DEG VT-1 23-Apr-13 NRI COVER PLATE
Enclosure 1 to PLA-7047 Page 10 of 26 License Condition 2.C. (20) (f)
Susquehanna Unit 2 Steam Dryer Inspection Results Component Name Method Inspection Inspection Condition Description Disposition Date Result Report (If Rl)
DRYER HOOD A VT-3 25-Apr-13 RI 1697522 TWO AREAS OF USE-AS-IS INTEREST NOTED AS DISCOLORATION, SWIRL PATTERNS AND SURFACE ROUGHNESS MEASURING 6" AND 5" IN WIDTH DRYER HOOD A VT-3 29-Apr-13 NRI DRYER HOOD A VT-3 01-May-13 NRI DRYERHOODF VT-3 23-Apr-13 NRI DRYERHOODF VT-3 01-May-13 RI 1699122 TWO AREAS OF USE-AS-IS INTEREST DISPLAYING SWIRL PATTERNS DRYERHOODB VT-3 23-Apr-13 NRI DRYERHOODD VT-3 23-Apr-13 NRI DRYERHOODE VT-3 23-Apr-13 NRI DRYERHOODC VT-3 23-Apr-13 NRI DRYERHOODC VT-3 03-May-13 NRI DRYER WELD ER-A-I VT-1 22-Apr-13 NRI DRYER WELD ER-A-I VT-1 22-Apr-13 NRI DRYER WELD ER-A-2 VT-1 22-Apr-13 NRI DRYER WELD ER-B-1 VT-1 22-Apr-13 NRI DRYER WELD ER-B-2 VT-1 22-Apr-13 NRI DRYER WELD ER-C-1 VT-1 22-Apr-13 NRI DRYER WELD ER-C-2 VT-1 22-Apr-13 NRI
Enclosure 1 to PLA-7047 Page 11 of 26 License Condition 2.C. (20) (f)
Susquehanna Unit 2 Steam Dryer Inspection Results Component Name Method Inspection Inspection Condition Description Disposition Date Result Report (If Rl)
DRYER WELD ER-D-1 VT-1 22-Apr-13 NRI DRYER WELD ER-D-2 VT-1 22-Apr-13 NRI DRYER WELD ER-E-I VT-1 22-Apr-13 NRI DRYER WELD ER-E-2 VT-1 22-Apr-13 NRI DRYER WELD ER-F-1 VT-1 22-Apr-13 NRI DRYER WELD ER-F-2 VT-1 22-Apr-13 NRI DRYER HOOD A 0 DEG VT-1 17-Apr-13 NRI SEAM WELD DRYER HOOD A 180 DEG VT-1 19-Apr-13 NRI SEAM WELD DRYER HOOD A UPPER VT-1 19-Apr-13 NRI HORIZONTAL WELD DRYER HOOD F UPPER VT-1 19-Apr-13 NRI HORIZONTAL WLED DRYER HOOD F 0 DEG VT-1 19-Apr-13 NRI SEAM WELD DRYER HOOD F 180 DEG VT-1 19-Apr-13 NRI SEAM WELD DRYER HOOD B 0 DEG VT-1 19-Apr-13 NRI SEAM WELD DRYER HOOD B 180 DEG VT-1 19-Apr-13 NRI SEAM WELD DRYER HOOD B CENTER VT-1 19-Apr-13 NRI SEAM WELD DRYER HOOD C 0 DEG SEA VT-1 19-Apr-13 NRI WELD DRYER HOOD C 180 DEG VT-1 19-Apr-13 NRI SEAM WELD
Enclosure 1 to PLA-7047 Page 12 of 26 License Condition 2.C. (20) (f)
Susquehanna Unit 2 Steam Dryer Inspection Results Component Name Method Inspection Inspection Condition Description Disposition Date Resnlt Report (ffRI)
DRYER HOOD C CENTER VT-1 19-Apr-13 NRI SEAM WELD DRYER HOOD D 0 DEG VT-1 19-Apr-13 NRI SEAM WELD DRYER HOOD D 180 DEG VT-1 19-Apr-13 NRI SEAM WELD DRYER HOOD D CENTER VT-1 19-Apr-13 NRI SEAM WELD DRYER HOOD E 0 DEG VT-1 19-Apr-13 NRI SEAM WELD DRYER HOOD E 180 DEG VT-1 19-Apr-13 NRI SEAM WELD DRYER HOOD E CENTER VT-1 19-Apr-13 NRI SEAM WELD DRYER LUG LL-A 40 DEG VT-1 19-Apr-13 NRI UPPER BRACKET DRYER LUG LL-A 40 DEG VT-1 19-Apr-13 NRI MIDDLE BRACKET DRYER LUG LL-A 40 DEG VT-1 19-Apr-13 NRI LOWER BRACKET DRYER LUG LL-B 140 DEG VT-1 19-Apr-13 NRI UPPER BRACKET DRYER LUG LL-B 140 DEG VT-1 19-Apr-13 NRI MIDDLE BRACKET DRYER LUG LL-B 140 DEG VT-1 16-Apr-13 RI 1692786 INDICATION USE-AS-IS LOWER BRACKET REMOVED BY FLAPPING IN 2011 IS VISIBLE MEASURING 5/8 INCHES IN 2013 DRYER LUG LL-C 220 DEG VT-1 16-Apr-13 NRI UPPER BRACKET
Enclosure 1 to PLA-7047 Page 13 of 26 License Condition 2.C. (20) (f)
Susquehanna Unit 2 Steam Dryer Inspection Results Component Name Method Inspection Inspection Condition Description Disposition Date Result Report (If Rl)
DRYER LUG LL-C 220 DEG VT-1 17-Apr-13 NRI MIDDLE BRACKET DRYER LUG LL-C 220 DEG VT-1 17-Apr-13 RI 1692786 IGSCC USE-AS-IS LOWER BRACKET INDICATION IN UPPER HEAT AFFECTED ZONE 7
/16 INCHES LONG DRYER LUG LL-D 320 DEG VT-1 17-Apr-13 NRI UPPER BRACKET DRYER LUG LL-D 320 DEG VT-1 17-Apr-13 RI 1692786 IGSCC USE-AS-IS MIDDLE BRACKET INDICATION IN UPPER HEAT AFFECTED ZONE 1
/2 INCHES LONG DRYER LUG LL-D 320 DEG VT-1 17-Apr-13 NRI LOWER BRACKET DRYER BASE PLATE E-F VT-1 16-Apr-13 NRI DRYER BASE PLATE A-B VT-1 16-Apr-13 NRI DRYER BASE PLATE D-E VT-1 16-Apr-13 NRI DRYER BASE PLATE C-B VT-1 16-Apr-13 NRI DRYER HOOD A TROUGH VT-1 16-Apr-13 NRI DRYER HOOD A TROUGH VT-1 16-Apr-13 NRI DRYER HOOD F TROUGH VT-1 17-Apr-13 NRI DRYER HOOD F TROUGH VT-1 17-Apr-13 NRI DRYER HOOD B TROUGH VT-1 16-Apr-13 NRI DRYER HOOD B TROUGH VT-1 16-Apr-13 NRI DRYER HOOD E TROUGH VT-1 17-Apr-13 NRI DRYER HOOD E TROUGH VT-1 17-Apr-13 NRI
Enclosure 1 to PLA-7047 Page 14 of 26 License Condition 2.C. (20) (f)
Susquehanna Unit 2 Steam Dryer Inspection Results Component Name Method Inspection Inspection Condition Description Disposition Date Result Report (If Rl)
DRYER HOOD C TROUGH VT-1 16-Apr-13 NRI DRYER HOOD C TROUGH VT-1 16-Apr-13 NRI DRYER HOOD D TROUGH VT-1 17-Apr-13 NRI DRYER HOOD D TROUGH VT-1 17-Apr-13 NRI DRYER WELD VS-B-1 VT-1 20-Apr-13 NRI INTERIOR DRYER WELD VS-B-2 VT-1 21-Apr-13 NRI INTERIOR DRYER WELD VS-E-1 VT-1 20-Apr-13 NRI INTERIOR DRYER WELD VS-E-2 VT-1 21-Apr-13 NRI INTERIOR DRYER WELD VS-D-2 VT-1 21-Apr-13 NRI INTERIOR DRYER WELDVS-D-1 VT-1 20-Apr-13 NRI INTERIOR DRYER WELD VS-C-2 VT-1 21-Apr-13 NRI INTERIOR DRYER WELD VS-C-1 VT-1 20-Apr-13 NRI INTERIOR DRYER WELD PLATE TO VT-1 01-May-13 NRI RING 180DEG DRYER WELD PLATE TO VT-1 22-Apr-13 NRI RING 180DEG DRYER WELD PLATE TO VT-1 22-Apr-13 NRI RING 180DEG DRYER WELD PLATE TO VT-1 22-Apr-13 NRI RINGODEG
Enclosure 1 to PLA-7047 Page 15 of 26 License Condition 2.C. (20) (f)
Susquehanna Unit 2 Steam Dryer Inspection Results Component Name Method Inspection Inspection Condition Description Disposition Date Result Report (If Rl)
DRYER WELD PLATE TO VT-1 01-May-13 NRI RINGODEG DRYER WELD PLATE TO VT-1 22-Apr-13 NRI RINGODEG DRYER WELD VS-A-1 VT-1 20-Apr-13 NRI INTERIOR DRYER WELD VS-A-2 VT-1 21-Apr-13 NRI INTERIOR DRYER WELD VS-F-1 VT-1 21-Apr-13 NRI INTERIOR DRYER WELD VS-F-2 VT-1 21-Apr-13 NRI INTERIOR DRYER WELD SN-C-1 VT-1 20-Apr-13 NRI INTERIOR DRYER WELD SN-C-2 VT-1 21-Apr-13 NRI INTERIOR DRYER WELD SN-D-1 VT-1 21-Apr-13 NRI INTERIOR DRYER WELD SN-D-2 VT-1 21-Apr-13 NRI INTERIOR DRYER WELD SN-B-1 VT-1 20-Apr-13 NRI INTERIOR DRYER WELD SN-B-2 VT-1 20-Apr-13 NRI INTERIOR DRYER WELD SN-B-2 VT-1 25-Apr-13 NRI INTERIOR DRYER WELD SN-E-1 VT-1 21-Apr-13 NRI INTERIOR DRYER WELD SN-E-2 VT-1 22-Apr-13 NRI INTERIOR
Enclosure 1 to PLA-7047 Page 16 of 26 License Condition 2.C. (20) (f)
Susquehanna Unit 2 Steam Dryer Inspection Results Component Name Method Inspection Inspection Condition Description Disposition Date Result Report (If RI)
DRYER WELD SN-E-2 VT-1 25-Apr-13 NRI INTERIOR DRYER SKIRT WELD 45 VT-1 17-Apr-13 NRI DEG DRYER SKIRT WELD 135 VT-1 15-Apr-13 RI 1692786 NEW GROWTH IN USE-AS-IS DEG PREVIOUSLY IDENTIFIED IGSCC INDICATIONS DRYER SKIRT WELD 225 VT-1 18-Apr-13 NRI DEG DRYER SKIRT WELD 315 VT-1 18-Apr-13 NRI DEG SKIRT PANEL 180 DEG VT-1 18-Apr-13 NRI LEFT SIDE SKIRT PANEL 180 DEG VT-1 21-Apr-13 NRI LEFT SIDE SKIRT PANEL 180 DEG VT-1 17-Apr-13 NRI RIGHT SIDE SKIRT PANEL TO MID VT-1 17-Apr-13 NRI RING 180 DEG SKIRT PANEL TO LOWER VT-1 18-Apr-13 NRI SUPPORT RING 180 DEG SKIRT PANEL 0 DEG RIGHT VT-1 16-Apr-13 NRI SIDE SKIRT PANEL 0 DEG LEFT VT-1 16-Apr-13 NRI SIDE
Enclosure 1 to PLA-7047 Page 17 of 26 License Condition 2.C. (20) (f)
Susquehanna Unit 2 Steam Dryer Inspection Results Component Name Method Inspection Inspection Condition Description Disposition Date Result Report (If RI)
SKIRT PANEL 0 DEG LEFT VT-1 21-Apr-13 RI 1697229 TWO USE-AS-IS SIDE INDICATIONS ON ID DRYER AT THE INTERSECTION OF THE SKIRT WELD TPIECEANDT PIECE TO SUPPORT RING AREA SKIRT PANEL TO MID VT-1 16-Apr-13 NRI RING ODEG SKIRT PANEL TO LOWER VT-1 16-Apr-13 NRI SUPPORT RING 0 DEG DRYER SKIRT-00-90 VT-3 21-Apr-13 RI 1697237 NO CHANGE IN USE-AS-IS DEGREES ORIGINAL ANOMALY FROM 2011. NEW INDICATION ON THE MID SUPPORT RING AT40 DEGREES APPROXIMATELY 0.25 INCHES .
SURFACE ANOMALY AT 42 DEGREES DRYER SKIRT-90-180 VT-3 22-Apr-13 RI 1697451 NO CHANGE IN USE-AS-IS DEGREES GOUGES AND ANOMALY SEEN IN 2011. TWO NEW GOUGES AT 180 DEGREES. FOUR NEW ANOMALIES AT 98, 97,96 DGREES OF THE SKIRT DRYER SKIRT-270-360 VT-3 24-Apr-13 NRI DEGREES
Enclosure 1 to PLA-7047 Page 18 of 26 License Condition 2.C. (20) (f)
Susquehanna Unit 2 Steam Dryer Inspection Results Component Name Method Inspection Inspection Condition Description Disposition Date Result Report (If Rl)
DRYER SKIRT-270-000 .vT-3 24-Apr-13 RI 1700339 MULTIPLE DRYER USE-AS-IS SKIRT SURFACE ANOMALIES DRYER HOOD A DRAIN VT-1 17-Apr-13 NRI PIPEO DEG DRYER HOOD A DRAIN VT-1 17-Apr-13 NRI PIPEODEG DRYER HOOD A DRAIN VT-1 17-Apr-13 NRI PIPEODEG DRYER HOOD A DRAIN VT-1 18-Apr-13 NRI PIPE 180 DEG DRYER HOOD A DRAIN VT-1 18-Apr-13 NRI PIPE 180 DEG DRYER HOOD A DRAIN VT-1 18-Apr-13 NRI PIPE 180 DEG DRYER HOOD B DRAIN VT-1 17-Apr-13 NRI PIPEODEG DRYER HOOD B DRAIN VT-1 17-Apr-13 NRI PIPEO DEG DRYER HOOD B DRAIN VT-1 17-Apr-13 NRI PIPE 0 DEG DRYER HOOD B DRAIN VT-1 18-Apr-13 NRI PIPE 180 DEG DRYER HOOD B DRAIN VT-1 18-Apr-13 NRI PIPE 180DEG DRYER HOOD B DRAIN VT-1 18-Apr-13 NRI PIPE 180DEG DRYER HOOD C DRAIN VT-1 17-Apr-13 NRI PIPEODEG DRYER HOOD C DRAIN VT-1 17-Apr-13 NRI PIPEO DEG
Enclosure 1 to PLA-7047 Page 19 of 26 License Condition 2.C. (20) (f)
Susquehanna Unit 2 Steam Dryer Inspection Results Component Name Method Inspection Inspection Condition Description Disposition Date Result Report (If Rl)
DRYER HOOD C DRAIN VT-1 17-Apr-13 NRI PIPEODEG DRYER HOOD C DRAIN VT-1 18-Apr-13 NRI PIPE 180 DEG DRYER HOOD C DRAIN VT-1 18-Apr-13 NRI PIPE 180 DEG DRYER HOOD C DRAIN VT-1 18-Apr-13 NRI PIPE 180 DEG DRYER HOOD D DRAIN VT-1 17-Apr-13 NRI PIPE ODEG DRYER HOOD D DRAIN VT-1 17-Apr-13 NRI PIPEODEG DRYER HOOD D DRAIN VT-1 17-Apr-13 NRl PIPEODEG DRYER HOOD D DRAIN VT-1 18-Apr-13 NRI PIPE 180 DEG DRYER HOOD D DRAIN VT-1 18-Apr-13 NRI PIPE 180 DEG DRYER HOOD D DRAIN VT-1 18-Apr-13 NRI PIPE 180 DEG DRYER HOOD E DRAIN VT-1 18-Apr-13 NRI PIPE ODEG DRYER HOOD E DRAIN VT-1 17-Apr-13 NRI PIPE ODEG DRYER HOOD E DRAIN VT-1 17-Apr-13 NRI PIPEODEG DRYER HOOD E DRAIN VT-1 18-Apr-13 NRI PIPE 180 DEG DRYER HOOD E DRAIN VT-1 18-Apr-13 NRI PIPE 180 DEG
Enclosure 1 to PLA-7047 Page 20 of26 License Condition 2.C. (20) (f)
Susquehanna Unit 2 Stearn Dryer Inspection Results Component Name Method Inspection Inspection Condition Description Disposition Date Result Report (If Rl)
DRYER HOOD E DRAIN VT-1 18-Apr-13 NRI PIPE 180 DEG DRYER HOOD F DRAIN VT-1 18-Apr-13 NRI PIPEODEG DRYER HOOD F DRAIN VT-1 18-Apr-13 NRI PIPEO DEG DRYER HOOD F DRAIN VT-1 18-Apr-13 NRI PIPE ODEG DRYER HOOD F DRAIN VT-1 18-Apr-13 NRI PIPE 180 DEG DRYER HOOD F DRAIN VT-1 18-Apr-13 NRI PIPE 180 DEG DRYER HOOD F DRAIN VT-1 18-Apr-13 NRI PIPE 180 DEG DRYER WELD DC-A-4 VT-1 17-Apr-13 NRI DRYER WELD DC-B-4 VT-1 17-Apr-13 NRI DRYER WELD DC-C-4 VT-1 18-Apr-13 NRI DRYER WELD DC-D-4 VT-1 18-Apr-13 NRI LOWER SKIRT RING 0-180 VT-1 23-Apr-13 NRI DEG LOWER SKIRT RING 0-180 VT-1 23-Apr-13 NRI DEG LOWER SKIRT RING 180- VT-1 24-Apr-13 NRI 360 DEG LOWER SKIRT RING 180- VT-1 24-Apr-13 NRI 360DEG MID SUPPORT RING VT-1 23-Apr-13 NRI LOWER WELD 0-180 DEG
Enclosure 1 to PLA-7047 Page 21 of 26 License Condition 2.C. (20) (f)
Susquehanna Unit 2 Steam Dryer Inspection Results Component Name Method Inspection Inspection Condition Description Disposition Date Result Report (If Rl)
MID SUPPORT RING VT-1 22-Apr-13 NRI LOWER WELD 0-180 DEG MID SUPPORT RING VT-1 23-Apr-13 NRI LOWER WELD 180-360 DEG MID SUPPORT RING VT-1 24-Apr-13 NRI LOWER WELD 180-360 DEG DRYER WELD TB-CD-6B VT-1 18-Apr-13 NRI DRYER WELD TB-CD-6A VT-1 18-Apr-13 NRI TRANS BRACE VT-3 19-Apr-13 NRI DRYER TRANS BRACE VT-1 19-Apr-13 NRI BRACKET I DRYER TRANS BRACE VT-1 19-Apr-13 NRI BRACKET2 DRYER TRANS BRACE VT- 1 19-Apr-13 NRI BRACKET3 DRYER TRANS BRACE VT-1 19-Apr-13 NRI BRACKET4 DRYER TRANS BRACE VT-1 19-Apr-13 NRI BRACKETS DRYER TRANS BRACE VT-1 19-Apr-13 NRI BRACKET6 DRYER HOOD B UPPER VT-1 20-Apr-13 NRI HORIZONTAL WELD DRYER HOOD E UPPER VT-1 20-Apr-13 NRI HORIZONTAL WELD DRYER HOOD C UPPER VT-1 20-Apr-13 NRI HORIZONTAL WELD DRYER HOOD D UPPER VT-1 19-Apr-13 NRI HORIZONTAL WELD
Enclosure 1 to PLA-7047 Page 22 of26 License Condition 2.C. (20) (f)
Susquehanna Unit 2 Steam Dryer Inspection Results Component Name Method Inspection Inspection Condition Description Disposition Date Result Report (If RI)
DRYER HOOD B 0 DEG VT-1 19-Apr-13 NRI DIVIDER PLATE DRYER HOOD B MID VT-1 19-Apr-13 NRI DIVIDER PLATE DRYER HOOD B 180 DEG VT-1 19-Apr-13 NRI DIVIDER PLATE DRYER HOOD C 0 DEG VT-1 20-Apr-13 NRI DIVIDER PLATE DRYER HOOD C MID VT-1 20-Apr-13 NRI DIVIDER PLATE DRYER HOOD C 180 DEG VT-1 20-Apr-13 NRI DIVIDER PLATE DRYER HOOD D 0 DEG VT-1 19-Apr-13 NRI DIVIDER PLATE DRYER HOOD D MID DEG VT-1 20-Apr-13 NRI DIVIDER PLATE DRYER HOOD D 180 DEG VT-1 20-Apr-13 NRI DIVIDER PLATE DRYER HOOD E 0 DEG VT-1 20-Apr-13 NRI DIVIDER PLATE DRYER HOOD E MID VT-1 20-Apr-13 NRI DIVIDER PLATE DRYER HOOD E 180 DEG VT-1 20-Apr-13 NRI DIVIDER PLATE DRYER HOOD A 0 DEG VT-1 19-Apr-13 NRI DIVIDER PLATE DRYER HOOD A 180 DEG VT-1 19-Apr-13 NRI DIVIDER PLATE DRYER HOOD F 0 DEG VT-1 20-Apr-13 NRI DIVIDER PLATE
Enclosure 1 to PLA-7047 Page 23 of26 License Condition 2.C. (20) (f)
Susquehanna Unit 2 Steam Dryer Inspection Results Component Name Method Inspection Inspection Condition Description Disposition Date Result Report (If Rl)
DRYER HOOD F 180 DEG VT-1 20-Apr-13 NRI DIVIDER PLATE DRYER HOOD B 0 DEG VT-1 20-Apr-13 NRI HOOD SUPPORT DRYER HOOD B MID HOOD VT-1 20-Apr-13 NRI SUPPORT DRYER HOOD B 180 DEG VT-1 20-Apr-13 NRI HOOD SUPPORT DRYER HOOD C 0 DEG VT-1 20-Apr-13 NRI HOOD SUPPORT DRYER HOOD C MID HOOD VT-1 20-Apr-13 NRI SUPPORT DRYER HOOD C 180 DEG VT-1 20-Apr-13 NRI HOOD SUPPORT DRYER HOOD D 0 DEG VT-1 20-Apr-13 NRI HOOD SUPPORT DRYER HOOD D MID VT-1 20-Apr-13 NRI HOOD SUPPORT DRYER HOOD D 180 DEG VT-1 20-Apr-13 NRI HOOD SUPPORT DRYER HOOD E 0 DEG VT-1 21-Apr-13 NRI HOOD SUPPORT DRYER HOOD E MID HOOD VT-1 21-Apr-13 NRI SUPPORT DRYER HOOD E 180 DEG VT-1 21-Apr-13 NRI HOOD SUPPORT DRYER HOOD A 0 DEG VT-1 19-Apr-13 NRI HOOD SUPPORT DRYER HOOD A 180 DEG VT-1 19-Apr-13 NRI HOOD SUPPORT
Enclosure 1 to PLA-7047 Page 24 of26 License Condition 2.C. (20) (f)
Susquehanna Unit 2 Steam Dryer Inspection Results Component Name Method Inspection Inspection Condition Description Disposition Date Result Report (If Rl)
DRYER HOOD F 0 DEG VT-1 21-Apr-13 NRI HOOD SUPPORT DRYER HOOD F 180 DEG VT- 1 21-Apr-13 NRI HOOD SUPPORT DRYER LIFTING ROD 40 VT-1 17-Apr-13 NRI DEG LIFT ROD TO LIFT ANCHOR WELD DRYER 40-DEG LIFTING VT-3 16-Apr-13 NRI EYE WELDS DRYER LIFTING ROD 140 VT-1 17-Apr-13 NRI DEG LIFT ROD TO LIFT ANCHOR WELD DRYER 140-DEG LIFTING VT-3 18-Apr-13 RI 1692786 TWO OF FOUR USE-AS-IS EYE WELDS FILLET WELDS ARE CRACKED: 0 DEGREE WELD AND 90 DEGREE WELD DRYER LIFTING ROD 220 VT-1 18-Apr-13 NRI DEG LIFT ROD TO LIFT ANCHOR WELD DRYER 220-DEG LIFTING VT-3 16-Apr-13 NRI EYE WELDS DRYER LIFTING ROD 320 VT-1 18-Apr-13 NRI DEG LIFT ROD TO LIFT ANCHOR WELD DRYER 320-DEG LIFTING VT-3 17-Apr-13 NRI EYE WELDS DRYER 320-DEG LIFT VT-1 18-Apr-13 NRI ANCHOR WELDS DRYER 320-DEG LIFT VT-1 21-Apr-13 NRI ANCHOR WELDS
Enclosure 1 to PLA-7047 Page 25 of 26 License Condition 2.C. (20) (f)
Susquehanna Unit 2 Steam Dryer Inspection Results Component Name Method Inspection Inspection Condition Description Disposition Date Result Report (IfRI)
DRYER 40-DEG LIFT VT-1 20-Apr-13 NRI ANCHOR WELDS DRYER 40-DEG LIFT VT-1 17-Apr-13 NRI ANCHOR WELDS DRYER 220-DEG LIFT VT-1 21-Apr-13 NRI ANCHOR WELDS DRYER 220-DEG LIFT VT-1 18-Apr-13 NRI ANCHOR WELDS DRYER 140-DEG LIFT VT-1 17-Apr-13 NRI ANCHOR WELDS DRYER 140-DEG LIFT VT-1 20-Apr-13 NRI ANCHOR WELDS DRYER LOWER GUIDE 0 VT-3 20-Apr-13 NRI DEG DRYER LOWER GUIDE 180 VT-3 20-Apr-13 NRI DEG DRYER 40-DEG LIFTING VT-1 19-Apr-13 NRI LUG TO EYE FILLET WELDS DRYER 140-DEG LIFTING VT-1 19-Apr-13 RI 1693833 TWOOFFOUR USE-AS-IS LUG TO EYE FILLET FILLET WELDS WELDS ARE CRACKED: 0 DEGREE WELD AND90DEGREE WELD DRYER 220-DEG LIFTING VT-1 16-Apr-13 NRI LUG TO EYE FILLET WELDS DRYER 320-DEG LIFTING VT-1 17-Apr-13 RI 1692786 90 DEGREE FILLET USE-AS-IS LUG TO EYE FILLET WELD IS WELDS CRACKED MEASURING 1.75 INCHES
Enclosure 1 to PLA-7047 Page 26 of26 License Condition 2.C. (20) (f)
Susquehanna Unit 2 Steam Dryer Inspection Results Component Name Method Inspection Inspection Condition Description Disposition Date Resnlt Report (If Rl)
DRYER SKIRT 4 DEG MID VT-1 15-Apr-13 RI NA DRILL HOLE NOCR SUPPORT RING ID REPAIR FROM GENERATE-2011-ID OF DRYER NO CHANGE IN CONDITION FROM 2011 DRYER SKIRT DEFECT VT-1 16-Apr-13 RI NA DRILL HOLE NOCR REMOVAL AREA REPAIR FROM GENERATE-2011-0D OF NO CHANGE DRYER IN CONDITION FROM 2011