Withdrawal of Relief Requests 1RR07 and 2RR07 for Third Ten-Year Interval Inservice Testing Program Plans for Susquehanna Ses (SSES) Unit 1 and Unit 2, PLA-7092
ML13284A017
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 10/10/2013
From: Franke J
Susquehanna
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
PLA-7092
Download: ML13284A017 (2)


Text

Jon A . Franke PPL Susquehanna, LLC Site Vice President 769 Salem Boulevard Berwick, PA 18603 Tel. 570.542.2904 Fax 570.542.1504 jfranke@pplweb.com OCT 1 0 2013 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 SUSQUEHANNA STEAM ELECTRIC STATION WITHDRAWAL OF RELIEF REQUESTS 1RR07 AND 2RR07 FOR THIRD TEN-YEAR INTERVAL INSERVICE TESTING PROGRAM PLANS FOR SUSQUEHANNA SES (SSES) UNIT 1 AND UNIT 2 Docket No. 50-387 PLA-7092 and No. 50-388

Reference:

1. PLA-7065, Letter from J. A. Franke (PPL) to Document Control Desk (USNRC),

Titled: "Relief Requests 1RR07 and 2RR07 for Third Ten-Year Interval /nservice Testing Program Plans for Susquehanna SES Unit 1 and Unit 2," dated September 9, 2013.

2. PLA-6977, Letter from J. M. Helsel (PPL) to Document Control Desk (USNRC), Titled, "Proposed Amendment No. 313 to License NPF-14 and Proposed Amendment No. 285 to License NPF-22: Change to Technical Specification Surveillance Requirement (SR) 3.5.1.12," dated June 6, 2013.

The purpose of this letter is to withdraw proposed Relief Requests 1RR07 and 2RR07, submitted by Reference 1, from NRC review. These proposed Relief Requests are applicable to the Third Ten-Year Interval IST Program Plans for SSES Unit 1 and Unit 2.

The approval dates for these relief requests were developed to support the SSES Unit 1 Spring outage.

These Relief Requests are associated with proposed Technical Specification (TS)

Amendments (Reference 2) which would eliminate the testing requirement for the Automatic Depressurization System (ADS) valves to open during manual actuation of the ADS circuitry and these amendments are scheduled to be completed in May 2014. Since these Relief Requests cannot be fully implemented during the scheduled Spring 2014 outage, PPL Susquehanna, LLC (PPL) requests that NRC not review these Relief Requests.

These Relief Requests are included in the proposed Relief Requests for the Fourth Ten-Year Interval Inservice Testing Program Plans for Susquehanna SES Unit 1 and Unit 2, which starts in June 2014.

Document Control Desk PLA-7092 There are no new regulatory commitments contained in this submittal.

Should you have any questions, please contact J. L. Tripoli at (570) 542-3100 .

. A. Franke Copy: NRC Region I Mr. J. E. Greives, NRC Sr. Resident Inspector Mr. J. A. Whited, NRC Project Manager Mr. L. J. Winker, PA DEP/BRP