RAI, Extended Power Uprate Application; Vessels and Internals Technical Review (TAC Nos. MD3309 and Md3310)
ML070860866
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 03/29/2007
From: Richard Guzman
NRC/NRR/ADRO/DORL/LPLI-1
To: Mckinney B
Susquehanna
johnny hughey NRR/DORL 415-3204
References
TAC MD3309, TAC MD3310
Download: ML070860866 (4)


Text

March 29, 2007 Mr. Britt T. McKinney Sr. Vice President and Chief Nuclear Officer PPL Susquehanna, LLC 769 Salem Blvd., NUCSB3 Berwick, PA 18603-0467

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION (RAI) - SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 (SSES 1 AND 2) - EXTENDED POWER UPRATE APPLICATION RE: VESSELS AND INTERNALS TECHNICAL REVIEW (TAC NOS. MD3309 AND MD3310)

Dear Mr. McKinney:

In reviewing your letter dated October 11, 2006, concerning the request to increase the maximum steady-state power level at the SSES 1 and 2 from 3489 megawatts thermal (MWt) to 3952 MWt, the Nuclear Regulatory Commission staff has determined that additional information contained in the enclosure to this letter is needed to complete its review. These questions were discussed with your staff during a teleconference on March 19, 2007. As agreed to by your staff, we request you respond by April 30, 2007.

If you have any questions, please contact me at 301-415-1030.

Sincerely,

/RA/

Richard V. Guzman, Senior Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-387 and 50-388

Enclosure:

RAI cc w/encl: See next page

March 29, 2007 Mr. Britt T. McKinney Sr. Vice President and Chief Nuclear Officer PPL Susquehanna, LLC 769 Salem Blvd., NUCSB3 Berwick, PA 18603-0467

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION (RAI) - SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 (SSES 1 AND 2) - EXTENDED POWER UPRATE APPLICATION RE: VESSELS AND INTERNALS TECHNICAL REVIEW (TAC NOS. MD3309 AND MD3310)

Dear Mr. McKinney:

In reviewing your letter dated October 11, 2006, concerning the request to increase the maximum steady-state power level at the SSES 1 and 2 from 3489 megawatts thermal (MWt) to 3952 MWt, the Nuclear Regulatory Commission staff has determined that additional information contained in the enclosure to this letter is needed to complete its review. These questions were discussed with your staff during a teleconference on March 19, 2007. As agreed to by your staff, we request you respond by April 30, 2007.

If you have any questions, please contact me at 301-415-1030.

Sincerely,

/RA/

Richard V. Guzman, Senior Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-387 and 50-388

Enclosure:

RAI cc w/encl: See next page DISTRIBUTION:

Public RidsOgcMailCenter RidsNrrPmRGuzman RidsNrrCvibBC JHughey LPLI-1 R/F RidsNrrDorlLpl1-1 RidsAcrsAcnwMailCenter RidsNrrLaSLittle ABlack Accession Number: ML070860866 OFFICE NRR/LPLI-1/PM NRR/LPLI-2/PM NRR/LPLI-1/LA NRR/CVIB/BC NRR/LPLI-1/BC(A)

NAME JHughey JShea SLittle MMitchell DPickett DATE 3/28/07 3/28/07 3/28/07 3/29/07 3/29/07 OFFICIAL RECORD COPY

REQUEST FOR ADDITIONAL INFORMATION RELATING TO THE APPLICATION FOR EXTENDED POWER UPRATE (EPU)

SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 (SSES 1 AND 2)

PPL SUSQUEHANNA, LLC DOCKET NOS. 50-387 AND 50-388 The Nuclear Regulatory Commission (NRC) staff is reviewing the request from PPL Susquehanna, LLC (PPL, the licensee) to support the application of the EPU for SSES 1 and 2.

The NRC staff has determined that additional information requested below will be needed to complete its review. The following RAIs pertain to supplemental PPL submittal PLA-6163 dated March 14, 2007.

1. Regarding the section titled "Integrated Surveillance Program (ISP)" of the licensee's submittal which addresses the implementation of the Boiling Water Reactor Vessel and Internals Project (BWRVIP) ISP to meet the requirements of 10 CFR Part 50, Appendix H:
a. What is the projected fluence for the Susquehanna, Unit 1 120 degrees azimuth capsule at its scheduled withdrawal date (2012), taking into account EPU conditions?
b. Provide an evaluation of the acceptability of removing the Susquehanna, Unit 1 120 degrees azimuth capsule in 2012 based upon its updated projected fluence and intended purpose within the BWRVIP ISP. In particular, explain how removing the capsule in 2012 will result in data from the capsule adequately representing those facilities who are identified as relying on it in BWRVIP-78 and BWRVIP-86-A.
2. Regarding the section titled "Upper Shelf Energy (USE)" of the licensee's submittal which addresses the evaluation of reactor pressure vessel (RPV) USE values to demonstrate compliance with 10 CFR Part 50, Appendix G:
a. Provide a table which demonstrates how the end-of-license USE values (or USE drop values where initial USE values are not available) were calculated for all RPV beltline materials considering EPU conditions. Sufficient detail regarding input parameters should be provided to allow the NRC staff to independently verify the results.
b. Demonstrate how the requirements of 10 CFR Part 50, Appendix G are directly met, or met through application of the equivalent margins analysis of BWRVIP-74-A, for the limiting plate/forging and weld materials for each of the Susquehanna RPVs.

Enclosure

Susquehanna Steam Electric Station, Unit Nos. 1 and 2 cc:

Robert A. Saccone Vice President - Nuclear Operations PPL Susquehanna, LLC 769 Salem Blvd., NUCSB3 Berwick, PA 18603-0467 Terry L. Harpster General Manager - Plant Support PPL Susquehanna, LLC 769 Salem Blvd., NUCSA4 Berwick, PA 18603-0467 Rocco R. Sgarro Manager - Nuclear Regulatory Affairs PPL Susquehanna, LLC Two North Ninth Street, GENPL4 Allentown, PA 18101-1179 Walter E. Morrissey Supervising Engineer Nuclear Regulatory Affairs PPL Susquehanna, LLC 769 Salem Blvd., NUCSA4 Berwick, PA 18603-0467 Michael H. Crowthers Supervising Engineer Nuclear Regulatory Affairs PPL Susquehanna, LLC Two North Ninth Street, GENPL4 Allentown, PA 18101-1179 Steven M. Cook Manager - Quality Assurance PPL Susquehanna, LLC 769 Salem Blvd., NUCSB2 Berwick, PA 18603-0467 Luis A. Ramos Community Relations Manager, Susquehanna PPL Susquehanna, LLC 634 Salem Blvd., SSO Berwick, PA 18603-0467 Bryan A. Snapp, Esq Assoc. General Counsel PPL Services Corporation Two North Ninth Street, GENTW3 Allentown, PA 18101-1179 Supervisor - Document Control Services PPL Susquehanna, LLC Two North Ninth Street, GENPL4 Allentown, PA 18101-1179 Richard W. Osborne Allegheny Electric Cooperative, Inc.

212 Locust Street P.O. Box 1266 Harrisburg, PA 17108-1266 Director, Bureau of Radiation Protection Pennsylvania Department of Environmental Protection Rachel Carson State Office Building P.O. Box 8469 Harrisburg, PA 17105-8469 Senior Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 35, NUCSA4 Berwick, PA 18603-0035 Regional Administrator, Region 1 U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Board of Supervisors Salem Township P.O. Box 405 Berwick, PA 18603-0035 Dr. Judith Johnsrud National Energy Committee Sierra Club 443 Orlando Avenue State College, PA 16803