Jeffrey M. Helsel Nuclear Plant Manager PPL Susquehanna, LLC 769 Salem Boulevard

~

\

\ I I

I I I I I I

I

~

ppl .~~~~

Berwick, PA 18603 Tel. 570.542.3510 Fax 570.542.1504 jmhelsel@pplweb.com

' TM U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 SUSQUEHANNA STEAM ELECTRIC STATION UNIT 117' REFUELING OUTAGE OWNER'S ACTIVITY REPORT PLA-6871 Docket No. 50. .387 The attached repo1t is for the Susquehanna Unit 1 17th Refueling Outage, which is the first Unit 1 refueling outage for the 3rd Inspection Period of the 3rd Inspection Interval for Unit 1.

The report was prepared and submitted in accordance with the requirements of ASME Code Case N-532-4.

By copy of this letter, we are transmitting the Owner's Activity Repott to the Commonwealth of Pennsylvania.

This letter contains no new regulatory commitments.

If you have any questions, please contact Mr. John L. Tripoli, Manager, Nuclear Regulatory Affairs, at (570) 542-3100.

Unit 117th Refueling Outage Owner's Activity Repott Copy: NRC Region I Mr. P. W. Finney, NRC Sr. Resident Inspector Ms. C. J. Sanders, NRC Project Manager Mr. L. J. Winker, DEP/BRP

ATTACHMENT TO PLA-6871 OWNER'S ACTIVITY REPORT SUSQUEHANNA UNIT 117THREFUEL OUTAGE

FORM OARM1 OWNER'S ACTIVITY REPORT Report Number OAR-1-104 Plant Susquehanna Steam Electric Station, 769 Salem Blvd., Berwick. PA 18603 (Name and Address of Plant)

Unit No. Commercial service date __J_u_ne___,8,._1_98._3__ Refueling outage no. _____1...,7_ _ __

(if applicable)

Current inspection Interval 3rd (1st. 2nd. 3rd, 4th, other)

Current inspecUon period 3rd (1st, 2nd, 3rd)

EdiUon and Addenda of Section XI applicable to the Inspection plan. 1998 Edition through the 2000 Addenda Date and revision of Inspection plan December 21. 2011. Rev. 5 EdiUon and Addenda of Section XI applicable to replairs and replacements, 1r different than the Jnspeotlon plans. NIA Code Cases used:

(if applicable)

CERTIFICATE OF CONFORMANCE I certlry that (a) the statments made In this report are correct, (b) the examinations and tests meet the fnspeoUon Plan as required by lhe ASME Code,Section XI; and (c) the repair/replacement actMties and evaluations supporting the completion of Refueling Outage 17 conform to the requirements of Section XI.

/-~*~~

Signed ~(/"" ~ "'"** ..- A 4!.. ...._,Gen. Manager-Nuclear Engineering Dale _ _,7.,_0,_YJ__.0:.....-~-:f/._~-------l

/ owners or Owner's Designee, Title CERTIFICATE OF lNSERVICE INSPECTlON I, the Undersigned. holding a valid comm1sston Issued by the National Board of Boller and Pressure Vessel Inspectors and the State or Province of PENNSYLVANIA and employed by OneCIS Insurance Co. of lynn, MA have Inspected the Items described In this Owne(s Activity Report, and state Hlat, to the best of my knowledge and bener, the Owner has performed all activities represented by this report In accordance with the requirements of Section Xl.

U 1-17RIO Owner's Activity Report Susquehanna Table 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Examination Category and Item Description Evaluation Description Item Number None ~ ~~

    • -*--*--*~

Page 1 ofl

Ul-17RIO Owner's Activity Report TABLE2 Abstract ofRepair/Replacement Activities Required For Continued Service Code Class Item Description Description of Work Date Repair/Replacement Plan number .

Completed 3 NPS2, SPHRC118~2, Welded replacement ofpipe 4ni20I1 11~134-1372552~06 ESW retm:n line from section due to through wall leak BPCI Room Cooler Form R-2 Report of Alteration:

None