Th Refueling Outage Owner'S Activity Report
ML14241A322
Person / Time
Site: Susquehanna Talen Energy icon.png
Issue date: 08/28/2014
From: Franke J
Susquehanna
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
PLA-7232
Download: ML14241A322 (5)


Text

Jon A. Franke PPL Susquehanna, LLC Site Vice President 769 Salem Boulevard Berwick, PA 18603 Tel. 570.542.2904 Fax 570.542.1504 AUG 2 8 2014 jfranke@ pplweb.com U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 SUSQUEHANNA STEAM ELECTRIC STATION UNIT 118TH REFUELING OUTAGE OWNER'S ACTIVITY REPORT PLA-7232 Docket No. 50-387 The attached report is for the Susquehanna Unit 1 18th Refueling Outage, which is the second Unit 1 refueling outage for the third Inspection Period of the third Inspection Interval for Unit 1. This is the last outage of the third Inspection Interval.

The report was prepared and submitted in accordance with the requirements of ASME Code Case N-532-4.

By copy of this letter, we are transmitting the Owner's Activity Report to the Commonwealth of Pennsylvania.

This letter contains no new regulatory commitments.

If you have any questions, please contact Mr. John L. Tripoli, Manager-Nuclear Regulatory Affairs at (570) 542-3100.

J. . Franke

Attachment:

Susquehanna Unit 1 18th Refueling Outage Owner's Activity Report Copy: NRC Region I Mr. J. Greives, NRC Sr. Resident Inspector Mr. J. Whited, NRC Project Manager Mr. L. Winker, PA DEP/BRP

Attachment to PLA-7232 Owner's Activity Report Susquehanna Unit 1181h Refueling Outage

FORM OAR-1 OWNER'S ACTIVITY REPORT Report Number OAR-1-105 Plant Susquehanna Steam Electric Station, 769 Salem Blvd. , Berwick, PA 18603 (Name and Address of Plant)

Unit No. Commercial service date _ __:J..:;u.;.;.ne;;...;;;.8,:....1:....::9:....::8..:..3__ Refueling outage no. -------=1..:..8_ _ _ __

(if applicable)

Current inspection interval 3rd (1st, 2nd, 3rd, 4th, other)

Current inspection period 3rd (1st, 2nd, 3rd)

Edition and Addenda of Section XI applicable to the inspection plan. 1998 Edition through the 2000 Addenda Date and revision of inspection plan October 16, 2012 , Rev. 6 Edition and Addenda of Section XI applicable to replairs and replacements, if different than the inspection plans. N/A Code Cases used : N-532-4 (if applicable)

CERTIFICATE OF CONFORMANCE I certify that (a) the statments made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of Refueling Outage 18 conform to the requirements of Section XI.

Signed CERTIFICATE OF INSERVICE INSPECTION I, the Undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel inspectors and the State or Province of PENNSYLVANIA and employed by OneCJS Insurance Co. of Lynn , MA have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.

By signing this certificate neither the *inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from o connected with this inspection.

National Board, State, Province, and Endorsement Date

Ul-18RIO Owner's Activity Report Susquehanna Table 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Examination Category and Item Description Evaluation Description Item Number None Page 1 of 1

Ul-18 RIO Owner's Activity Report TABLE2 Abstract of Repair/Replacement Activities Required For Continued Service Code Class Item Description Description of Work Date Repair/Replacement Completed Plan Number Class 1 4" pipe and flange on 'A' Reactor Repair 4" pipe and flange leak 07/05/2012 12-164-1589336-147 Recirc Chern Decon Blank, VRRB31-l on decon blank Class 3 ESW Piping Downstream of Valve Replace ESW Piping 12/13/2012 12-024-1646632-182 011045 at the ' B' Diesel Generator, HRC3-2 Class 3 ESW Piping Downstream of Valve Replace ESW Piping 01/03/2013 12-024-1650983-183 011050 in OG501C Diesel Bay, HRC3-2 Class 3 ESWPiping, HRC105-l Perform Process Welding Repair 03/06/2014 13-154-1688084-019 to ESW Piping Class 3 ESW Piping Downstream of Valve Replace ESW Piping 10/01/2013 13-054-1655491 -020 011508 and 011509, HRC3302-l Class 3 ESW Piping at weld on tee downstream Repair ESW Piping 06/05/2013 13-154-1711072-022 ofTI-11158B, SPHRC126-l Class 3 ESW Piping downstream of Valve Replace ESW Piping 10/01/2013 13-054-1371290-026 011507,HRC3302-2 Class 3 Hanger HRC202-H9 Fabricate and Replace Hanger. 11114/2013 13-054-1753453-167 Class 3 ESW Piping Located in HPCI Room at Repair ESW Piping through wall 03/06/2014 13-154-1719754-199 Penetration X-28-1-15, HRC106-l leak by installing new piping spool Class 3 ESW 'A' Supply Piping Downstream Repair 14" ESW Piping near a 03/06/2014 14-154-1711112-018 oflsolation Valve 111102, HRC102-l weld Class 3 ESW ' B" Return Line HRC-14 Repair 6" ESW Piping near a 12/19/2013 13-154-1733132-186 Downstream ofValve 086123 valve. - - - --~ -- -- ---

I Form R-2 Report of Alteration:

None