Letter Sequence Request |
---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance, Acceptance, Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Results
Other: ML071620334, ML073320383, ML073390289, ML073390306, ML081000038, PLA-6187, Response for Additional Information Requested in Regard to Proposed License Amendment No. 285, Constant Pressure Power Uprate Environmental, PLA-6255, Proposed License Amendments 285 and 253, Constant Pressure Power Uprate Application Regarding Steam Dryer Flow Effects Verbal and Confirmatory Requests for Additional Information Responses, PLA-6266, Proposed License Amendment No. 285 for Unit 1, License No. NPF-14 & Proposed License Amendment No. 253 for Unit 2, License No. NPF-22, Extended Power Uprate Application Regarding Change to Technical Specification SR 3.7.1 - RHRSW and UHS, PLA-6370, License Renewal Application, Amendment to Section 4.2.2, PLA-6633, Providing Notice That the License Conditions 2.C.(36)(a)3, 2.C.(36(b)7 & 2.C.(36)(f) Have Been Met, PLA-6876, Th Rio Steam Dryer Visual Inspection Report, PLA-7047, Th Rio Steam Dryer Visual Inspection Report
|
MONTHYEARML0716203342006-01-24024 January 2006 GE Ne 0000-0038-8052 Susq-EPU-T506-MSLHiFlo-Calc-2006, Revision 0, Instrument Limits Calculation, PPL Susquehanna, LLC Susquehanna Steam Electric Station Units 1 and 2, Main Steam Line High Flow MSIV Isolation. Project stage: Other ML0632500922006-11-21021 November 2006 Extended Power Uprate Acceptance Review Project stage: Acceptance Review PLA-6138, Proposed License Amendments 285 & 253, Constant Pressure Power Uprate - Supplement2006-12-0404 December 2006 Proposed License Amendments 285 & 253, Constant Pressure Power Uprate - Supplement Project stage: Supplement ML0710400302006-12-12012 December 2006 Pennsylvania Fish and Boat Commission Threatened and Endangered Species Project stage: Request PLA-6146, Proposed License Amendment No. 285 for Unit 1 Operating License No. NPF-14 and Proposed License Amendment No. 253 for Unit 2 Operating License No. NPF-22 Re Constant Pressure Power Uprate -Supplement2006-12-26026 December 2006 Proposed License Amendment No. 285 for Unit 1 Operating License No. NPF-14 and Proposed License Amendment No. 253 for Unit 2 Operating License No. NPF-22 Re Constant Pressure Power Uprate -Supplement Project stage: Supplement ML0700800322007-01-0505 January 2007 Extended Power Uprate (EPU) Acceptance Review Results Project stage: Acceptance Review ML0703201532007-02-0808 February 2007 PPL Susquehanna, LLC - Request for Withholding of Proprietary Information from Public Disclosure for Susquehanna Steam Electric Station, Units 1 and 2 Project stage: Withholding Request Acceptance ML0703201762007-02-0808 February 2007 PPL Susquehanna, LLC - Request for Withholding of Proprietary Information from Public Disclosure for Susquehanna Steam Electric Station, Units 1 and 2 Project stage: Withholding Request Acceptance PLA-6155, Proposed License Amendment Nos. 285 and 253, Constant Pressure Power Uprate Supplement2007-02-13013 February 2007 Proposed License Amendment Nos. 285 and 253, Constant Pressure Power Uprate Supplement Project stage: Supplement ML0704301392007-03-0101 March 2007 PPL Susquehanna, LLC-Request for Withholding Information from Public Disclosure for Susquehanna Steam Electric Station, Units 1 and 2 (TAC Nos. MD3309 and MD3310) Project stage: Withholding Request Acceptance PLA-6163, Proposed License Amendment Re Constant Pressure Power Uprate - Supplement2007-03-14014 March 2007 Proposed License Amendment Re Constant Pressure Power Uprate - Supplement Project stage: Supplement ML0707304972007-03-15015 March 2007 Request for Additional Information - Extended Power Uprated Application Regarding Turbine Generator Review Project stage: RAI ML0707303892007-03-19019 March 2007 Request for Additional Information (RAI) - Susquehanna, Units 1 and 2 - Extended Power Uprate Application Project stage: RAI ML0707305682007-03-20020 March 2007 (SSES 1 and 2), Request for Additional Information (RAI) - Extended Power Uprate Application Regarding Steam Dryer and Flow Effects Project stage: RAI PLA-6172, Proposed License Amendment for Constant Pressure Power Uprate - Supplement PLA-61722007-03-22022 March 2007 Proposed License Amendment for Constant Pressure Power Uprate - Supplement PLA-6172 Project stage: Supplement ML0708608662007-03-29029 March 2007 RAI, Extended Power Uprate Application; Vessels and Internals Technical Review (TAC Nos. MD3309 and Md3310) Project stage: RAI ML0710001412007-04-10010 April 2007 Request for Additional Information (RAI) - Susquehanna Steam Electric Station, Units 1 and 2 (SSES 1 and 2) - Extended Power Uprate Application Piping and Nondestructive Examination Technical Review Project stage: RAI ML0710001262007-04-12012 April 2007 Request for Additional Information (RAI) - Susquehanna Steam Electric Station, Units 1 and 2 (SSES 1 and 2) - Extended Power Uprate Application Operator Licensing and Human Performance Technical Review (TAC Nos. MD3309 and MD3310) Project stage: RAI ML0710300402007-04-12012 April 2007 Request for Additional Information (RAI) - Susquehanna Steam Electric Station, Units 1 and 2 (SSES 1 and 2) - Extended Power Uprate Application Electrical Engineering Technical Review (TAC Nos. MD3309 and MD3310) Project stage: RAI ML0710300312007-04-12012 April 2007 Request for Additional Information (RAI) - Susquehanna Steam Electric Station, Units 1 and 2 (SSES 1 and 2) - Extended Power Uprate Application Materials and Chemical Engineering Technical Review Project stage: RAI ML0710202982007-04-12012 April 2007 Request for Additional Information (RAI) - Susquehanna Steam Electric Station, Units 1 and 2 (SSES 1 and 2) - Extended Power Uprate Application Health Physics Technical Review Project stage: RAI ML0710400322007-04-12012 April 2007 Pennsylvania Fish and Boat Commission Threatened and Endangered Species Project stage: Request ML0710400252007-04-12012 April 2007 Pennsylvania Efacts Project stage: Request ML0710400222007-04-12012 April 2007 PA Dcnr Wild Resource Conservation Program - Regal Fritillary Project stage: Request ML0710400262007-04-12012 April 2007 EPA Envirofacts Project stage: Request PLA-6174, Constant Pressure Power Uprate - PLA-61742007-04-13013 April 2007 Constant Pressure Power Uprate - PLA-6174 Project stage: Request ML0710203152007-04-16016 April 2007 (SSES 1 and 2), Request for Additional Information (Rai), - Extended Power Uprate Application Balance-of-Plant Physics Technical Review Project stage: RAI ML0710601352007-04-18018 April 2007 Request for Additional Information, Extended Power Uprate Application Safety-Related Pumps and Valves and Mechanical Equipment Environmental Qualification Project stage: RAI PLA-6187, Response for Additional Information Requested in Regard to Proposed License Amendment No. 285, Constant Pressure Power Uprate Environmental2007-04-23023 April 2007 Response for Additional Information Requested in Regard to Proposed License Amendment No. 285, Constant Pressure Power Uprate Environmental Project stage: Other PLA-6186, Proposed License Amendment Nos. 285 and 253, Extended Power Uprate Application Extended Power Uprate Application Vessels and Internals Technical Review Request for Additional Information Responses2007-04-26026 April 2007 Proposed License Amendment Nos. 285 and 253, Extended Power Uprate Application Extended Power Uprate Application Vessels and Internals Technical Review Request for Additional Information Responses Project stage: Request ML0711600672007-04-27027 April 2007 Request for Additional Information (RAI) Extended Power Uprate Application Probabilistic Risk Assessment Licensing Review Project stage: RAI ML0711504712007-04-27027 April 2007 Request for Additional Information (Rai), Extended Power Uprate Application Containment and Ventilation Technical Review Project stage: RAI ML0711403432007-04-27027 April 2007 Request for Additional Information (RAI) - Susquehanna Steam Electric Station, Units 1 and 2) - Extended Power Uprate Application Instrumentation and Controls Technical Review Project stage: RAI ML0711604062007-04-30030 April 2007 Request for Additional Information (Rai), Extended Power Uprate Application Vessels and Internals Integrity Technical Review Project stage: RAI ML0710900722007-04-30030 April 2007 Request for Additional Information (Rai), Extended Power Uprate Application Mechanical and Civil Engineering Technical Review Project stage: RAI PLA-6191, Proposed License Amendment Nos. 285 and 253, Extended Power Uprate Application Piping and Nondestructive Examination Technical Review Request for Additional Information Responses2007-05-0303 May 2007 Proposed License Amendment Nos. 285 and 253, Extended Power Uprate Application Piping and Nondestructive Examination Technical Review Request for Additional Information Responses Project stage: Request PLA-6194, Proposed License Amendments 285 and 253, Extended Power Uprate Application Health Physics Technical Review, Request for Additional Information Responses2007-05-0909 May 2007 Proposed License Amendments 285 and 253, Extended Power Uprate Application Health Physics Technical Review, Request for Additional Information Responses Project stage: Request PLA-6195, Extended Power Uprate Application Electrical Engineering Technical Review Request for Additional Information Responses2007-05-0909 May 2007 Extended Power Uprate Application Electrical Engineering Technical Review Request for Additional Information Responses Project stage: Request ML0712906522007-05-14014 May 2007 Request for Additional Information (RAI) - Susquehanna Steam Electric Station, Units 1 and 2 (SSES 1 and 2) - Extended Power Uprate Application Reactor Systems Technical Review Project stage: RAI PLA-6198, Proposed License Amendments 285 and 253, Extended Power Uprate Application Balance-of-Plant Safety Systems Request for Additional Information Responses2007-05-14014 May 2007 Proposed License Amendments 285 and 253, Extended Power Uprate Application Balance-of-Plant Safety Systems Request for Additional Information Responses Project stage: Request PLA-6210, Extended Power Uprate Application Vessels and Internals Integrity Technical Review Request for Additional Information Responses2007-05-21021 May 2007 Extended Power Uprate Application Vessels and Internals Integrity Technical Review Request for Additional Information Responses Project stage: Request PLA-6196, Proposed License Amendments 285 and 253, Extended Power Uprate Application Safety Related Pumps and Valves and Mechanical Equipment Environmental Qualification Review Request for Additional Information Responses2007-06-0101 June 2007 Proposed License Amendments 285 and 253, Extended Power Uprate Application Safety Related Pumps and Valves and Mechanical Equipment Environmental Qualification Review Request for Additional Information Responses Project stage: Request PLA-6200, Proposed License Amendment Nos. 285 and 253, Extended Power Uprate Application Mechanical and Civil Engineering Technical Review Request for Additional Information Responses2007-06-0101 June 2007 Proposed License Amendment Nos. 285 and 253, Extended Power Uprate Application Mechanical and Civil Engineering Technical Review Request for Additional Information Responses Project stage: Request PLA-6204, Proposed License Amendment Nos. 285 and 253, Extended Power Uprate Application Instrumentation and Controls Technical Review Request for Additional Information Responses2007-06-0101 June 2007 Proposed License Amendment Nos. 285 and 253, Extended Power Uprate Application Instrumentation and Controls Technical Review Request for Additional Information Responses Project stage: Request PLA-6212, Extended Power Uprate Application Materials and Chemical Engineering Technical Review Request for Additional Information Responses2007-06-0101 June 2007 Extended Power Uprate Application Materials and Chemical Engineering Technical Review Request for Additional Information Responses Project stage: Request PLA-6203, Proposed License Amendment Extended Power Uprate Application Containment and Ventilation Technical Review Request for Additional Information Responses, PLA-62032007-06-0404 June 2007 Proposed License Amendment Extended Power Uprate Application Containment and Ventilation Technical Review Request for Additional Information Responses, PLA-6203 Project stage: Request PLA-6225, Proposed License Amendment Nos. 285 and 253, Extended Power Uprate Application Supplement to Request for Additional Information Responses2007-06-0808 June 2007 Proposed License Amendment Nos. 285 and 253, Extended Power Uprate Application Supplement to Request for Additional Information Responses Project stage: Supplement PLA-6231, Proposed License Amendment No. 285 for Unit 1 and Proposed License Amendment No. 253 for Unit 2, Extended Power Uprate Application Electrical Engineering Technical Review Request for Additional Information Response Supplement, PLA-62312007-06-20020 June 2007 Proposed License Amendment No. 285 for Unit 1 and Proposed License Amendment No. 253 for Unit 2, Extended Power Uprate Application Electrical Engineering Technical Review Request for Additional Information Response Supplement, PLA-6231 Project stage: Supplement PLA-6230, Proposed License Amendment for Units 1 and 2, Extended Power Uprate Application & Supplement to Request for Additional Information Responses2007-06-27027 June 2007 Proposed License Amendment for Units 1 and 2, Extended Power Uprate Application & Supplement to Request for Additional Information Responses Project stage: Supplement PLA-6232, Proposed License Amendments 285 & 253, Extended Power Uprate Application Supplement to Operator Licensing & Human Performance, Health Physics & Piping and Nondestructive Examination Request for Additional Information Responses2007-06-27027 June 2007 Proposed License Amendments 285 & 253, Extended Power Uprate Application Supplement to Operator Licensing & Human Performance, Health Physics & Piping and Nondestructive Examination Request for Additional Information Responses Project stage: Supplement 2007-04-12
[Table View] |
|
---|
Category:Letter type:PLA
MONTHYEARPLA-8145, Biennial 10 CFR 50.59 and 72.48 Summary Report and Changes to Regulatory Commitments - PLA-81452024-10-21021 October 2024 Biennial 10 CFR 50.59 and 72.48 Summary Report and Changes to Regulatory Commitments - PLA-8145 PLA-8148, Registration for the Use of Spent Fuel Storage Casks 311, 308, and 3102024-10-15015 October 2024 Registration for the Use of Spent Fuel Storage Casks 311, 308, and 310 PLA-8141, Response to Request for Additional Information Regarding Relief Request 1RR06, PLA-81412024-09-18018 September 2024 Response to Request for Additional Information Regarding Relief Request 1RR06, PLA-8141 PLA-8142, Registration for the Use of Spent Fuel Storage Casks 306, 309, and 307 - PLA-81422024-09-18018 September 2024 Registration for the Use of Spent Fuel Storage Casks 306, 309, and 307 - PLA-8142 PLA-8117, 23rd Refueling Outage Owners Activity Report (PLA-8117)2024-07-23023 July 2024 23rd Refueling Outage Owners Activity Report (PLA-8117) PLA-8126, Response to Request for Confirmation of Information Regarding Relief Request 1RR062024-05-29029 May 2024 Response to Request for Confirmation of Information Regarding Relief Request 1RR06 PLA-8122, Annual Radiological Environmental Operating Report (PLA-8122)2024-05-28028 May 2024 Annual Radiological Environmental Operating Report (PLA-8122) PLA-8115, Relief Request IRR06 One Time Extension to the Fourth 10-Year Inservice Testing Program Interval (PLA-8115)2024-05-23023 May 2024 Relief Request IRR06 One Time Extension to the Fourth 10-Year Inservice Testing Program Interval (PLA-8115) PLA-8101, Re 2023 Annual Report of Radiation Exposure2024-04-22022 April 2024 Re 2023 Annual Report of Radiation Exposure PLA-8095, 2023 Annual Radiological Environmental Operating Report (PLA-8095)2024-04-22022 April 2024 2023 Annual Radiological Environmental Operating Report (PLA-8095) PLA-8094, Radioactive Effluent Release Report and Offsite Dose Calculation Manual PLA-80942024-04-22022 April 2024 Radioactive Effluent Release Report and Offsite Dose Calculation Manual PLA-8094 PLA-8113, Response to Request for Additional Information Regarding Relief Request 4RR-11 (PLA-8113)2024-04-11011 April 2024 Response to Request for Additional Information Regarding Relief Request 4RR-11 (PLA-8113) PLA-8102, Annual Environmental Operating Report (Nonradiological) PLA-81022024-04-11011 April 2024 Annual Environmental Operating Report (Nonradiological) PLA-8102 PLA-8112, Relief Request 4RR-11 Relief from End of Interval Boundary Leakage Test PLA-81122024-04-0909 April 2024 Relief Request 4RR-11 Relief from End of Interval Boundary Leakage Test PLA-8112 PLA-8110, Submittal of Unit 1 Cycle 24 Core Operating License Report (Pla 8110)2024-04-0404 April 2024 Submittal of Unit 1 Cycle 24 Core Operating License Report (Pla 8110) PLA-8100, Property Insurance Program (PLA-8100)2024-04-0101 April 2024 Property Insurance Program (PLA-8100) PLA-8109, Supplement to Request for Exemption from Certain Requirements of 10 CR 72.212 and 10 CFR 72.214 Resulting from Fuel Basket Design Control Compliance (PLA-8109)2024-03-21021 March 2024 Supplement to Request for Exemption from Certain Requirements of 10 CR 72.212 and 10 CFR 72.214 Resulting from Fuel Basket Design Control Compliance (PLA-8109) PLA-8107, Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 Resulting from Fuel Basket Design Control Compliance2024-03-19019 March 2024 Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 Resulting from Fuel Basket Design Control Compliance PLA-8099, Proof of Financial Protection and Guarantee of Payment of Deferred Premiums (PLA-8099)2024-02-13013 February 2024 Proof of Financial Protection and Guarantee of Payment of Deferred Premiums (PLA-8099) PLA-8096, Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval2024-01-0404 January 2024 Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval PLA-8077, Emergency Plan Revision 67 (PLA-8077)2023-12-27027 December 2023 Emergency Plan Revision 67 (PLA-8077) PLA-8088, Request for Exemption from Enhanced Weapons, Firearms Background Checks and Security Event Notifications Implementation (PLA-8088)2023-12-0505 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks and Security Event Notifications Implementation (PLA-8088) PLA-8089, Submittal of Revision to Inservice Testing Program Plan2023-12-0505 December 2023 Submittal of Revision to Inservice Testing Program Plan PLA-8084, Application to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.22023-11-29029 November 2023 Application to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 PLA-8091, Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inseervice Inspection Interval (PLA-8091)2023-11-0808 November 2023 Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inseervice Inspection Interval (PLA-8091) PLA-8082, Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2023-11-0202 November 2023 Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program PLA-8080, Proposed Relief for Valve 251130 (PLA-8080)2023-08-14014 August 2023 Proposed Relief for Valve 251130 (PLA-8080) PLA-8074, Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval2023-08-0303 August 2023 Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval PLA-8076, Unit 2 - 21st Refueling Outage Owner'S Activity Report (PLA-8076)2023-07-20020 July 2023 Unit 2 - 21st Refueling Outage Owner'S Activity Report (PLA-8076) PLA-8078, Submittal of Unit 2 Cycle 22 Core Operating Limits Report, Revision 1, PLA-80782023-07-0505 July 2023 Submittal of Unit 2 Cycle 22 Core Operating Limits Report, Revision 1, PLA-8078 PLA-8054, Proposed Amendment to Licenses NPF-14 and NPF-22: Remove Control Rod Operability Separation Criteria and Replace Reference to Banked Position Withdrawal Sequence with the Analyzed Rod Position Sequence2023-06-0808 June 2023 Proposed Amendment to Licenses NPF-14 and NPF-22: Remove Control Rod Operability Separation Criteria and Replace Reference to Banked Position Withdrawal Sequence with the Analyzed Rod Position Sequence PLA-8073, Proposed Relief Request for the Fifth 10-Year Inservice Inspection Interval2023-06-0101 June 2023 Proposed Relief Request for the Fifth 10-Year Inservice Inspection Interval PLA-8067, Notification of Completion of Emergence from Bankruptcy (PLA-8067)2023-05-17017 May 2023 Notification of Completion of Emergence from Bankruptcy (PLA-8067) PLA-8064, Response to NRC Regulatory Issue Summary 2023-01 (PLA-8064)2023-05-17017 May 2023 Response to NRC Regulatory Issue Summary 2023-01 (PLA-8064) PLA-8066, Notification of Planned Closing Date and Information Identified in March 30, 2023 Order, PLA-80662023-05-0808 May 2023 Notification of Planned Closing Date and Information Identified in March 30, 2023 Order, PLA-8066 PLA-8053, Radiation Exposure Information and Reporting System2023-04-27027 April 2023 Radiation Exposure Information and Reporting System PLA-8058, Annual Radiological Environmental Operating Report (PLA-8058)2023-04-26026 April 2023 Annual Radiological Environmental Operating Report (PLA-8058) PLA-8041, Radioactive Effluent Release Report and Offsite Dose Calculation Manual (PLA-8041)2023-04-25025 April 2023 Radioactive Effluent Release Report and Offsite Dose Calculation Manual (PLA-8041) PLA-8047, 2022 Annual Environmental Operating Report (Nonradiological), PLA-80472023-04-19019 April 2023 2022 Annual Environmental Operating Report (Nonradiological), PLA-8047 PLA-8062, Supplement to Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 252F007B, PLA-80622023-04-11011 April 2023 Supplement to Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 252F007B, PLA-8062 PLA-8061, Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 25F007B, PLA-80612023-04-10010 April 2023 Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 25F007B, PLA-8061 PLA-8060, Submittal of Unit 2 Cycle 22 Core Operating Limits Report (PLA-8060)2023-03-30030 March 2023 Submittal of Unit 2 Cycle 22 Core Operating Limits Report (PLA-8060) PLA-8057, Application for Order Approving Indirect Transfer of Control of Licenses and Approving Conforming License Amendments- Supplemental Information, PLA-80572023-03-15015 March 2023 Application for Order Approving Indirect Transfer of Control of Licenses and Approving Conforming License Amendments- Supplemental Information, PLA-8057 PLA-8052, (Sses), Proof of Financial Protection and Guarantee of Payment of Deferred Premiums2023-02-13013 February 2023 (Sses), Proof of Financial Protection and Guarantee of Payment of Deferred Premiums PLA-8048, Response to Request for Additional Information Regarding License Amendment Requesting Temporary Addition of Analyzed Rod Position Sequence2023-01-14014 January 2023 Response to Request for Additional Information Regarding License Amendment Requesting Temporary Addition of Analyzed Rod Position Sequence PLA-8042, Proposed Emergency Amendment to License NPF-22: Temporary Addition of Analyzed Rod Position Sequence2023-01-10010 January 2023 Proposed Emergency Amendment to License NPF-22: Temporary Addition of Analyzed Rod Position Sequence PLA-8039, Application for Order Approving Indirect Transfer of Control of License Amendments - Supplemental Information2022-12-22022 December 2022 Application for Order Approving Indirect Transfer of Control of License Amendments - Supplemental Information PLA-8038, Notification of Petition for Bankruptcy (PLA-8038)2022-12-14014 December 2022 Notification of Petition for Bankruptcy (PLA-8038) PLA-8036, Registration for the Use of Spent Fuel Storage Casks 203, 202, and 204, PLA-80362022-11-30030 November 2022 Registration for the Use of Spent Fuel Storage Casks 203, 202, and 204, PLA-8036 PLA-8035, Registration for the Use of Spent Fuel Storage Casks 205, 200, and 201, PLA-80352022-11-0808 November 2022 Registration for the Use of Spent Fuel Storage Casks 205, 200, and 201, PLA-8035 2024-09-18
[Table view] |
Text
Britt T. McKinney PPL Susquehanna, LLC Sr. Vice President & Chief Nuclear Officer 769 Salem Boulevard Berwick, PA 18603 Tel. 570.542.3149 Fax 570.542.1504 btmckinney@pplweb.com
.. 'IITM APR 1 3 2007 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop OP 1-17 Washington, DC 20555 SUSQUEHANNA STEAM ELECTRIC STATION PROPOSED LICENSE AMENDMENT NO. 285 FOR UNIT 1 OPERATING LICENSE NO. NPF-14 AND PROPOSED LICENSE AMENDMENT NO. 253 FOR UNIT 2 OPERATING LICENSE NO. NPF-22 CONSTANT PRESSURE POWER UPRATE -
SUPPLEMENT Docket Nos. 50-387 PLA-6174 and 50-388 References." 1) PPL Letter PLA-6076, B. T McKinney (PPL)to USNRC, "ProposedLicense Amendment Numbers 285for Unit 1 Operating License No. NPF-14 and 253for Unit 2 OperatingLicense No. NPF-22 Constant PressurePower Uprate,"dated October 11, 2006.
- 2) Letter, R. V Guzman (NRC) to B. T McKinney (PPL),
"Requestfor Additional Information (RAI) -
SusquehannaSteam Electric Station, Units 1 and 2 (SSES 1 and 2)
- Extended Power Uprate Application Regarding Turbine GeneratorReview (TAC Nos. MD3309 and MD3310), "dated March 15, 2007.
Pursuant to 10 CFR 50.90, PPL Susquehanna LLC (PPL) requested in Reference 1 approval of amendments to the Susquehanna Steam Electric Station (SSES) Unit 1 and Unit 2 Operating Licenses (OLs) and Technical Specifications (TS) to increase the maximum power level authorized from 3489 Megawatts Thermal (MWt) to 3952 MWt, an approximate 13% increase in thermal power. The proposed Constant Pressure Power Uprate (CPPU) represents an increase of approximately 20% above the Original Licensed Thermal Power (OLTP).
The purpose of this letter is to provide responses to the Request for Additional Information transmitted to PPL in Reference 2.
The Enclosure contains the PPL responses.
There are no new regulatory commitments associated with this submittal.
4ooi
Document Control Desk PLA-6174 PPL has reviewed the "No Significant Hazards Consideration" and the "Environmental Consideration" submitted with Reference 1 relative to the Enclosure. We have determined that there are no changes required to either of these documents.
If you have any questions or require additional information, please contact Mr. Michael H. Crowthers at (610) 774-7766.
I declare under perjury that the foregoing is true and correct.
Executed on: -'--f-O B. T. McKinney
Enclosure:
Request for Additional Information Responses.
Copy: NRC Region I Mr. A. J. Blarney, NRC Sr. Resident Inspector Mr. R. V. Guzman, NRC Project Manager Mr. R. R. Janati, DEP/BRP
PPL EPU Request for Additional Information Responses
Enclosure to PLA-6174 Page 1 of 6 NRC Question 1:
On page 7-2 of the SSES 1 and 2 Power Uprate Safety Analysis Report (PUSAR), the licensee stated that in 2003 for Unit 2, and 2004 for Unit 1, the low pressure rotors were changed from a monoblock design to a shrunk-on wheel design. The keyway of the shrunk-on wheel has been known to be susceptible to stress-corrosion cracking. The monoblock rotor has no keyway and is considered to be less susceptible to stress-corrosion cracking than the shrunk-on wheel. Discuss why the low-pressure rotors were changed to a shrunk-on wheel design and how the shrunk-on wheel design addresses the keyway cracking that has been experienced in the past.
PPL Response:
The low-pressure (LP) rotor replacement was part of a turbine upgrade project implemented to increase electric generation output and improve turbine reliability. In 2003 and 2004, the Unit 2 and Unit 1 LP and High Pressure (HP) turbine sections were replaced. A competitive bid process determined the best turbine design. The process evaluated three designs. The bids submitted contained three different LP rotor designs:
- Advanced Disk-type Shrunk-on wheel rotors The bid evaluation included an extensive technical evaluation of the different LP rotor designs. The bid evaluation resulted in the selection of the Siemens design that utilizes their Advanced Disk-type shrunk-on wheel LP rotors.
The technical portion of the bid evaluation investigated the susceptibility of the Siemens design to keyway cracking. The Siemens LP rotor design is an acceptable design for the prevention of keyway cracking since their LP design has incorporated features to prevent Stress Corrosion Cracking (SCC) in the keyway. The Siemens Advanced Disk-type design includes the following features to prevent SCC:
- 1. No keyway on two of the three disks,
- 2. Locating the key on the 3rd disk in a low temperature zone,
- 3. Higher compressive stresses induced in the disk hub bore during heat treatment
- 4. Shot peening of two of the three disks to provide a compressive stress on the disk surface.
An extensive operating experience review of the Siemens Advanced Disk design performed during the bid evaluation identified no SSC reports. Based on the design features and operating history, PPL concluded that the Siemens shrunk-on wheel design acceptably addressed the keyway SCC concern.
Enclosure to PLA-6174 Page 2 of 6 NRC Question 2:
On page 7-2 of the SSES 1 and 2 PUSAR, the licensee stated that prior to constant pressure power uprate (CPPU), the high pressure turbines in SSES 1 and 2 were replaced in 2004 and 2003, respectively. The licensee stated further that "...For CPPU, the existing 12-stage high pressure monoblock rotor is being replaced by an 11-stage high pressure monoblock rotor while the existing low pressure turbine rotors are being retained..."
NRC Question 2a:
Discuss why the high pressure turbines in both units will be replaced again after only 3 to 4 years of operation and why the low pressure turbines in both units do not need to be replaced or modified for the power uprate.
PPL Response:
During the specification and procurement of the HP and LP turbines installed in 2003 and 2004, evaluations were performed to determine the possibility of building additional flow passing capability into the turbine design for a possible future power uprate.
The evaluation concluded that that the LP turbine sections could be designed to pass steam flows in excess of 120% of Original Licensed Thermal Power (OLTP) with no generation performance degradation, but that the HP turbine would experience a generation performance impact. Specifically, a higher flow HP design would result in a generation decrease of approximately 37 megawatts electric when operating at Current Licensed Thermal Power (CLTPC) steam flows. An economic evaluation determined that the HP turbine should be designed for CLTP steam flows and then replaced should an additional power uprate be implemented in the future.
The Constant Pressure Power Uprate (CPPU) evaluation of the HP turbine indicated that the flow area of the HP turbine would have to be increased in order to pass the additional CPPU steam flow. This increase in flow area will be accommodated in the new HP turbine by:
- 1. Removing a stage.
- 2. Opening up the flow area of the remaining 11 stages.
Thus, the LP turbines were originally designed for the higher steam flows and higher stresses than what they will see at full CPPU conditions and thus do not need to be replaced. The current HP turbine design was optimized for CLTP steam flows. The HP Turbine was evaluated and it was well understood that HP turbine replacement would be necessary for CPPU implementation.
Enclosure to PLA-6174 Page 3 of 6 NRC Question 2b:
Confirm that Siemens is the turbine vendor for the 11-stage high pressure turbine rotor.
PPL Response:
Siemens is the turbine vendor for the existing HP section, the new 11-stage turbine rotor, and the existing LP sections.
NRC Question 2c:
Discuss whether the structural integrity of the last stages of the low turbine blades and discs will be affected due to increased steam flow as a result of CPPU in terms of (1) corrosion on the blade surfaces, (2) stress-corrosion cracking at the root of blades, and (3) vibration of the blades and discs.
PPL Response:
The last stages of the LP turbines were designed for flows higher than the full CPPU conditions as discussed in the response to 2a above. This includes the corresponding slightly higher operating temperatures and pressures. Therefore, the increased CPPU steam flow will have no effects on the structural integrity of the low-pressure turbine blades for the following reasons:
- 1. For CLTP all nine stages of LP blades, including the airfoil and the roots, were manufactured from 12 Cr materials. 12 Cr materials are resistant to corrosion in this application, including the blade surfaces.
- 2. Included in the PPL contract with Siemens for both CLTP and CPPU steam conditions was the requirement that the design for both the rotating and the stationary parts account for SCC. Hence, the Siemens design includes features to account for SCC. These design features are discussed in the answer to questions 1 and 2a.
- 3. Since there is no change in LP blade or rotor mass, there is no change in LP blade or rotor natural frequency. Both the new and the existing Siemens turbine designs exclude natural frequencies that are coincident with operating resonance frequencies.
Enclosure to PLA-6174 Page 4 of 6 NRC Question 2d:
Discuss whether a vibration analysis has been performed, and provide details of the analysis to demonstrate that the power uprate will not cause excessive vibration on the low- and high-pressure turbines and the generator.
PPL Response:
Both lateral and torsional vibration analysis were performed by Siemens at CPPU conditions. For the LP turbine, there is no mass change and therefore no change in natural frequencies. For the HP turbine, there is a minor mass reduction due to the 11 stage versus a 12 stage design. Both the CLTP and CPPU lateral and the torsional analyses identified natural frequencies within the operating range, but outside of the operating speed. Operating restrictions were furnished by Siemens that will be implemented by PPL to assure operation at speeds other than at speeds within the natural frequency ranges.
NRC Question 3:
On page 7-2 of the SSES 1 and 2 PUSAR, the licensee states, "...the missile analysis for the turbine replacement is supported by the Siemens Technical Report CT-27332, Revision 2 which was approved by the Nuclear Regulatory Commission (NRC)
(Reference 28)." Reference 28 is listed on page 11-2 of the PUSAR as TP-04124-NP-A, dated June 7, 2000. The licensee states that Reference 28 refers to a prior NRC safety evaluation (Reference 54); however, Reference 54 was issued after the above referenced date. Clarify the statement on page 7-2 in terms of these two references.
PPL Response:
The PUSAR reference 28 date is wrong and needs to be corrected. The correct date for TP-04124-NP-A is June 7, 2004 (ADAMS: ML042100095). Hence, reference 28 is dated later than the March 30, 2004 date for reference 54.
NRC Question 4:
On page 7-3 of the SSES 1 and 2 PUSAR, the licensee stated that the results of revised turbine missile analysis showed that the turbine missile probability remains below the NRC-specified limit of 1E-05 per year.
Enclosure to PLA-6174 Page 5 of 6 NRC Question 4a:
Provide the exact missile probability value (i.e., the P1 value) after CPPU.
PPL Response:
The P1 probability for CPPU for SSES 1 and 2 is 3.00 x 1Oe-6 per year per unit.
NRC Question 4b:
Discuss whether under CPPU, the high- and low-pressure turbine rotors in SSES 1 and 2 will satisfy the guidance in Standard Review Plan Section 10.2.3, "Turbine Rotor Integrity."
PPL Response:
The Unit 1 and Unit 2 HP and LP turbine rotors will satisfy SRP 10.2.3 Rev. 1 "Turbine Rotor Integrity." The SRP contains requirements for materials selection, fracture toughness, preservice inspection, turbine disk design and inservice inspection. Each SRP topic is addressed as follows:
- Materials Selection - Materials used for both the HP and LP rotors is based upon both a Finite Element analysis and successful operating experience with the rotor materials. The CPPU HP rotors and the CLTP HP rotors use the same material.
- Fracture Toughness - This is determined using Siemens specifications. For both the HP monoblock rotors and the LP shrunk-on disk rotors, PPL reviewed all disk and rotor properties and confirmed that they were within Siemens specification limits.
" Preservice Inspection - The Siemens Quality Steam Turbine (QST) plan details all of the preservice inspection requirements. PPL reviewed and approved the Siemens QST. Contained in the CLTP QST are the actual material properties for all rotors and LP disks. Overspeed testing of the two CLTP HP rotors and all six CLTP LP rotors was performed at 125% of running speed. The 125% represents testing 5% above the 120% speed used in the turbine missile analysis as the highest expected speed. PPL witnessed overspeed testing of all six CLTP LP rotors. The CPPU QST plan contains the 125% overspeed test requirement for the HP rotors.
- Turbine Disk Design - The design complies with Siemens design procedures. For both the CLTP HP monoblock rotors and the CPPU HP monoblock rotor design does not have separate disks.
Enclosure to PLA-6174 Page 6 of 6
- Inservice Inspection - The requirements for CPPU will be the same as those for CLTP. Hence, the CLTP inservice inspection requirements currently described in SSES FSAR section 10.2.3.6.a will not change for CPPU.