MONTHYEARNRC 2023-0013, Response to Regulatory Information Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-07-0707 July 2023 Response to Regulatory Information Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations NRC 2023-0006, Post-Exam Submittal Cover Letter2023-03-0101 March 2023 Post-Exam Submittal Cover Letter NRC 2023-0005, Report of Changes to Emergency Plan2023-02-21021 February 2023 Report of Changes to Emergency Plan NRC 2022-0032, Sixth 10-Year Interval Inservice Testing (1ST) Program Plan2022-09-30030 September 2022 Sixth 10-Year Interval Inservice Testing (1ST) Program Plan NRC 2022-0025, License Amendment Request 295, Beacon Power Distribution Monitoring System2022-09-26026 September 2022 License Amendment Request 295, Beacon Power Distribution Monitoring System NRC 2022-0019, Report of Changes to Emergency Plan2022-07-13013 July 2022 Report of Changes to Emergency Plan NRC 2022-0022, Response to Request for Supplemental Information (Rsi) Regarding License Amendment Request (LAR) 297, Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2,2022-07-11011 July 2022 Response to Request for Supplemental Information (Rsi) Regarding License Amendment Request (LAR) 297, Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, NRC 2022-0015, Fall 2021 Unit 2 (U2R38) Steam Generator Tube Inspection Report2022-04-27027 April 2022 Fall 2021 Unit 2 (U2R38) Steam Generator Tube Inspection Report NRC 2022-0014, 2021 Annual Monitoring Report2022-04-14014 April 2022 2021 Annual Monitoring Report NRC 2021-0012, Core Operating Limits Report (COLR) Unit 1 Cycle 41 (U 1 C41)2022-04-0707 April 2022 Core Operating Limits Report (COLR) Unit 1 Cycle 41 (U 1 C41) NRC 2022-0003, License Amendment Request 296, Application for Technical Specification Improvement to Eliminate Requirements for Post-Accident Systems Using the Consolidated Line Item Improvement Process2022-03-25025 March 2022 License Amendment Request 296, Application for Technical Specification Improvement to Eliminate Requirements for Post-Accident Systems Using the Consolidated Line Item Improvement Process NRC 2022-0006, Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP-17451-P, Revision 1, Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections2022-02-22022 February 2022 Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP-17451-P, Revision 1, Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections NRC 2022-0004, Report of Changes to Emergency Plan2022-02-0909 February 2022 Report of Changes to Emergency Plan NRC 2022-0005, Refueling Outage U2R38 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations2022-02-0101 February 2022 Refueling Outage U2R38 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations NRC 2022-0001, Report of Changes to Emergency Plan2022-01-11011 January 2022 Report of Changes to Emergency Plan NRC 2021-0046, Core Operating Limits Report (COLR) Unit 2 Cycle 39 (U2C39) and Changes to Unit 1 COLR Unit 1 Cycle 40 (U1C40)2021-10-28028 October 2021 Core Operating Limits Report (COLR) Unit 2 Cycle 39 (U2C39) and Changes to Unit 1 COLR Unit 1 Cycle 40 (U1C40) NRC 2021-0031, Registration of Holtec Hi STORM Casks HI-STORM-37-054, HI-STORM-37-055, and HI-STORM-37-0562021-07-15015 July 2021 Registration of Holtec Hi STORM Casks HI-STORM-37-054, HI-STORM-37-055, and HI-STORM-37-056 NRC 2021-0027, Registration of Holtec Historm Casks HISTORM-37-051, HISTORM-37-052, and HISTORM-37-0532021-06-30030 June 2021 Registration of Holtec Historm Casks HISTORM-37-051, HISTORM-37-052, and HISTORM-37-053 NRC 2021-0028, Generic Letter 2004-02 Containment Sump Debris Transport Calculation Non-Conservatism2021-06-23023 June 2021 Generic Letter 2004-02 Containment Sump Debris Transport Calculation Non-Conservatism NRC 2021-0021, 2020 Annual Monitoring Report2021-04-29029 April 2021 2020 Annual Monitoring Report NRC 2021-0019, Response to Regulatory Information Summary 2021-01 Preparation and Scheduling of Operator Licensing Examinations2021-04-22022 April 2021 Response to Regulatory Information Summary 2021-01 Preparation and Scheduling of Operator Licensing Examinations NRC-2021-0010, CFR 50.59 Evaluation and Commitment Change Summary Report2021-04-0202 April 2021 CFR 50.59 Evaluation and Commitment Change Summary Report NRC-2021-0011, Technical Specification Bases and Technical Requirement Manual Change Summary2021-04-0202 April 2021 Technical Specification Bases and Technical Requirement Manual Change Summary NRC 2021-0006, Report of Changes to Emergency Plan2021-03-18018 March 2021 Report of Changes to Emergency Plan NRC 2021-0005, Withdrawal of Exemption Request Supporting Updated Final Response to NRC Generic Letter 2004-022021-02-11011 February 2021 Withdrawal of Exemption Request Supporting Updated Final Response to NRC Generic Letter 2004-02 NRC 2021-0002, Refueling Outage U1 R39 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations2021-01-21021 January 2021 Refueling Outage U1 R39 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations NRC 2021-0003, Refueling 39 (U1 R39) Reactor Coolant Pump Analytical Evaluation Report2021-01-21021 January 2021 Refueling 39 (U1 R39) Reactor Coolant Pump Analytical Evaluation Report NRC 2021-0001, Report of Changes to Emergency Plan2021-01-13013 January 2021 Report of Changes to Emergency Plan NRC 2020-0044, Response to Request for Additional Information Request for Exemption from 10 CFR 73, Appendix B, Section VI Regarding Annual Force-On-Force Exercise2020-12-0808 December 2020 Response to Request for Additional Information Request for Exemption from 10 CFR 73, Appendix B, Section VI Regarding Annual Force-On-Force Exercise NRC 2020-0032, Application for Subsequent Renewed Facility Operating Licenses2020-11-16016 November 2020 Application for Subsequent Renewed Facility Operating Licenses NRC 2020-0039, Core Operating Limits Report (COLR) Unit 1 Cycle 40 (U1 C40)2020-11-0202 November 2020 Core Operating Limits Report (COLR) Unit 1 Cycle 40 (U1 C40) NRC 2020-0031, NextEra Energy Point Beach, LLC Response to Apparent Violation in NRC Inspection Report 05000266/2020012, 05000301/2020012: EA-20-0812020-10-0505 October 2020 NextEra Energy Point Beach, LLC Response to Apparent Violation in NRC Inspection Report 05000266/2020012, 05000301/2020012: EA-20-081 NRC 2020-0029, Supplement to License Amendment Request (LAR) 293, One-Time Extension of Renewed Facility Operating License Condition 4.1, Containment Building Construction Truss2020-09-15015 September 2020 Supplement to License Amendment Request (LAR) 293, One-Time Extension of Renewed Facility Operating License Condition 4.1, Containment Building Construction Truss NRC 2020-0024, Response to Request for Additional Information Request for Exemption from Certain Operator Requalification Requirements2020-08-17017 August 2020 Response to Request for Additional Information Request for Exemption from Certain Operator Requalification Requirements NRC 2020-0020, License Amendment Request (LAR) 293, One-Time Extension of Renewed Facility Operating License Condition 4.1, Containment Building Construction Truss2020-08-13013 August 2020 License Amendment Request (LAR) 293, One-Time Extension of Renewed Facility Operating License Condition 4.1, Containment Building Construction Truss NRC 2020-0023, NextEra Energy Point Beach, LLC - Revised Response to Regulatory Information Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations2020-08-12012 August 2020 NextEra Energy Point Beach, LLC - Revised Response to Regulatory Information Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations NRC 2020-0021, Response to NRC Inspection Report and Preliminary White Finding2020-08-12012 August 2020 Response to NRC Inspection Report and Preliminary White Finding NRC 2020-0018, Report of Changes to Emergency Plan2020-07-15015 July 2020 Report of Changes to Emergency Plan NRC-2020-0016, Supplement to Exemption Request for Access Authorization and Fitness for Duty Requirements Due to COVID-19 Pandemic2020-06-12012 June 2020 Supplement to Exemption Request for Access Authorization and Fitness for Duty Requirements Due to COVID-19 Pandemic NRC 2020-0012, Refueling Outage U2R37 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations2020-05-20020 May 2020 Refueling Outage U2R37 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations NRC 2020-0008, Report of Changes to Emergency Plan2020-04-0606 April 2020 Report of Changes to Emergency Plan NRC 2020-0007, Core Operating Limits Report (COLR) Unit 2 Cycle 28 (U2C38)2020-03-27027 March 2020 Core Operating Limits Report (COLR) Unit 2 Cycle 28 (U2C38) NRC 2020-0003, License Amendment Request 289: Tornado Missile Protection Licensing Basis2020-02-0606 February 2020 License Amendment Request 289: Tornado Missile Protection Licensing Basis NRC 2020-0001, Pressure Temperature Limits Report (PTLR)2020-01-0909 January 2020 Pressure Temperature Limits Report (PTLR) NRC 2019-0044, Report of Changes to Emergency Plan2019-11-0101 November 2019 Report of Changes to Emergency Plan NRC 2019-0036, Submittal of 2018 Update to Final Safety Analysis Report2019-10-18018 October 2019 Submittal of 2018 Update to Final Safety Analysis Report NRC 2019-0037, Technical Specification Bases Change Summary2019-10-18018 October 2019 Technical Specification Bases Change Summary NRC 2019-0034, Technical Requirements Manual Change Summary2019-10-18018 October 2019 Technical Requirements Manual Change Summary NRC 2019-0032, CFR 50.59 Evaluation and Commitment Change Summary Report2019-10-18018 October 2019 CFR 50.59 Evaluation and Commitment Change Summary Report NRC 2019-0042, NextEra Energy Point Beach, LLC, Relief Request 1-RR-13 and 2-RR-13, Response to Request for Additional Information2019-10-17017 October 2019 NextEra Energy Point Beach, LLC, Relief Request 1-RR-13 and 2-RR-13, Response to Request for Additional Information 2023-07-07
[Table view] Category:Licensee Response to Notice of Violation
MONTHYEARNRC 2020-0031, NextEra Energy Point Beach, LLC Response to Apparent Violation in NRC Inspection Report 05000266/2020012, 05000301/2020012: EA-20-0812020-10-0505 October 2020 NextEra Energy Point Beach, LLC Response to Apparent Violation in NRC Inspection Report 05000266/2020012, 05000301/2020012: EA-20-081 ML20255A1422020-09-11011 September 2020 NextEra Energy Point Beach LLC (NextEra) Response to Apparent Violation in NRC Inspection Report 05000266/2020012, 05000301/2020012; EA-20-081 NRC 2020-0021, Response to NRC Inspection Report and Preliminary White Finding2020-08-12012 August 2020 Response to NRC Inspection Report and Preliminary White Finding NRC 2015-0026, Response to Inspection Report 05000266/2014403 and 05000301/20144032015-07-15015 July 2015 Response to Inspection Report 05000266/2014403 and 05000301/2014403 NRC 2013-0054, Response to Inspection Report 05000266/2013011 and 05000301/2013011 Preliminary Yellow Finding2013-06-28028 June 2013 Response to Inspection Report 05000266/2013011 and 05000301/2013011 Preliminary Yellow Finding NRC 2010-0064, Reply to a Notice of Violation, Inspection Report 05000266/2010-010; 05000301/2010-010, EA-09-2972010-05-0303 May 2010 Reply to a Notice of Violation, Inspection Report 05000266/2010-010; 05000301/2010-010, EA-09-297 L-2009-115, Response to Apparent Violations Inspection Report2009-05-0707 May 2009 Response to Apparent Violations Inspection Report NRC 2006-0080, Response to Apparent Violation in Inspection Report 05000266/2006011; 0500301/2006011; EA-06-2742006-12-19019 December 2006 Response to Apparent Violation in Inspection Report 05000266/2006011; 0500301/2006011; EA-06-274 NRC 2004-0002, Reply to a Notice of Violation EA-03-057 NRC Inspection Report2004-01-12012 January 2004 Reply to a Notice of Violation EA-03-057 NRC Inspection Report NRC 2003-0040, Reply to a Notice of Violation NRC Special Inspection Report No. 50-266/02-015 (Drs); 50-301/02-015 (DRS)2003-05-0202 May 2003 Reply to a Notice of Violation NRC Special Inspection Report No. 50-266/02-015 (Drs); 50-301/02-015 (DRS) NRC-2002-0068, Reply to NOV (EA-02-031), IR 05000266-01-017 (DRS) & IR 05000301-01-017 (Drs), 08/12/2002, Kewaunee & Point Beach Nuclear Power Plants2002-08-12012 August 2002 Reply to NOV (EA-02-031), IR 05000266-01-017 (DRS) & IR 05000301-01-017 (Drs), 08/12/2002, Kewaunee & Point Beach Nuclear Power Plants NRC 2002-0068, Reply to Notice of Violation (EA-02-031) to IRs 05000266-01-017 & 05000301-01-0172002-08-12012 August 2002 Reply to Notice of Violation (EA-02-031) to IRs 05000266-01-017 & 05000301-01-017 NRC 2002-0061, IR 05000266-02-003, IR 05000301-02-003, and IR 05000266-02-005, IR 05000301-02-005, Point Beach Nuclear Plant, Unit 2, Reply to a Notice of Violation2002-07-15015 July 2002 IR 05000266-02-003, IR 05000301-02-003, and IR 05000266-02-005, IR 05000301-02-005, Point Beach Nuclear Plant, Unit 2, Reply to a Notice of Violation NRC 2002-0007, Response to Non-Cited Violation Concerning Adequacy of Fire Suppression System, Per IRs 05000266/2001-012 (DRS) & 05000301/2001-012 (DRS)2002-01-14014 January 2002 Response to Non-Cited Violation Concerning Adequacy of Fire Suppression System, Per IRs 05000266/2001-012 (DRS) & 05000301/2001-012 (DRS) 2020-09-11
[Table view] |
Text
May 3,2010 NRC 2010-0064
' 10 CFR 50.9 EA-09-297 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Point Beach Nuclear Plant, Units 1 and 2 Dockets 50-266 and 50-301 Renewed License Nos. DPR-24 and DPR-27 Reply to a Notice of Violation Inspection Report 0500026612010-010: 0500030112010-010 EA-09-297
Reference:
NRC letter to FPL Energy Point Beach, dated April 7, 2010, Point Beach Nuclear Plant, Units 1 and 2 Inspection Report 0500026612010-010 and 0500030112010-010 Containing Results of NRC Investigation Report No. 3-2009-01Iand Notice of Violation. (ML100980367)
On February 17, 2010, the NRC completed a review of circumstances surrounding the completion of ignition control permits. Based upon the results of the review, one Severity Level IV, Notice of Violation involving 10 CFR 50.9, "Completeness and Accuracy of Information," was identified.
In accordance with 10 CFR 2.201, NextEra Energy Point Beach, LLC, (NextEra) has prepared a written response to the Notice of Violation (EA-09-0297) for the Point Beach Nuclear Plant. The response is provided as an enclosure to this letter.
This letter contains no new Regulatory Commitments or revisions to existing Regulatory Commitments.
If there are any questions regarding this letter, please contact James Costedio at 9201755-7427 Very truly yours, NextEra Energy Point Beach, LLC f lMeyer q .
Site Vice President Enclosure cc: Administrator, Region Ill, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC NextEra Energy Point Beach, LLC, 6610 Nuclear Road, Two Rivers, WI 54241
ENCLOSURE NEXTERA ENERGY POINT BEACH, LLC POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 RESPONSE TO NOTICE OF VIOLATION IN NRC INSPECTION REPORT 0500026612010-010; 0500030112010-010 CONTAINING RESULTS OF NRC INVESTIGATION REPORT NO 3-2009-011 EA-09-297 In accordance with 10 CFR 2.201, the NextEra Energy Point Beach, LLC, (NextEra) response to Inspection Report 05000266/2010-010 and 05000301I2010-010 is provided as requested in the Commission's letter dated April 7, 2010.
Violation Title 10 CFR 50.9(a) requires, in part, that information required by the Commission's regulations, orders, or license conditions to be maintained by the licensee shall be complete and accurate in all material respects.
Technical Specification, Section 5.4.1 .h, requires that written procedures be established, implemented, and maintained covering fire protection implementation. As part of its fire protection implementation, Point Beach has procedures*addressingignition control.
Point Beach Procedure NP I.9.13, "lgnition Control Procedure," Revision 13, Step 3.0, identified the responsibilities for the individuals performing as an lgnition Control Permit (ICP) authorized person.
Step 3.1.3 stated that the ICP authorized person shall visit the site initially and each shift prior to hot work commencing to ensure that flammable and combustible materials are removed or adequately protected from the hot work activities. Step 4.2 also specified that the ICP authorized person shall visit the work site. A Note immediately preceding Step 4.2 required that the activities in Section 4.2 be documented on Form PBF 0068 each shift prior to commencing hot work. Step 4.5 indicated that the authorized person shall forward the ICP to the Work Control Center (WCC) for approval.
lgnition Control Permit Form PBF 0068, Section 3.0 "Authorization" required the authorized person's signature prior to the approval of the permit in Section 4, "Approval."
Contrary to the above, on October 17, 20, and 28, 2008, the licensee failed to maintain complete and accurate information required by the Commission in all material respects. Specifically,
- a. On October 17, 2008, a contract foreman, who was not an ICP authorized person, signed his supervisor's initials on an ICP (Form PBF 0068) without an ICP authorized person visiting the work site;
- b. On October 20, 2008, a contract foreman signed his own initials on an ICP (Form PBF 0068) without an ICP authorized person visiting the work site;
- c. On October 28, 2008, a contract supervisor, who was an ICP authorized person, initialed two lCPs (Form PBF 0068) without visiting the work site.
Page 1 of 3
- d. On October 25, 2008, a Point Beach Nuclear Plant lead maintenance mechanic, who was an ICP authorized person, signed an ICP without visiting the work site after learning that another ICP authorized person had performed the required inspection and no problems were identified.
This is a Severity Level IV violation (Supplement VII).
NextEra Response to Violation NextEra concurs with the violation as stated in Point Beach Nuclear Plant, Units 1 and 2 Inspection Report 05000266/2010-010 and 05000301/2010-010 Containing Results of NRC Investigation Report No. 3-2009-01 Iand Notice of Violation, dated April 7, 2010.
Reason for the Violation:
The violation occurred because three individuals approved ignition control permits in a manner that violated procedure and regulatory requirements. The two contract individuals intentionally did not follow procedure requirements. The Maintenance individual did not fully understand the procedure requirements.
The NextEra investigation, which included personnel interviews and record reviews, revealed that:
I. There were several examples where a comparison of ignition control permit approvals and card reader access data for the affected work areas were not consistent.
- 2. Authorized persons signed ignition control permit-required inspections as complete based on verbal reports from non-qualified individuals who had performed the physical inspection.
- 3. There were inconsistencies in how authorized persons were implementing the requirements of NP 1.9.13 with regard to when the initial work site inspection was completed.
- 4. There were weaknesses in the ignition control permit administrative procedure.
Corrective Stem Taken and Results Achieved
- 1. Site access for the two contract individuals was suspended during the investigation. Site access for the contract supervisor was terminated on November 8,2008. Site access for the contract foreman was terminated on November 20, 2008.
- 2. The Fire Watch Authorized Person qualification was revoked for the NextEra Maintenance employee. The employee's qualification has not been restored.
- 3. An extent of condition review was performed that included interviews of 13 qualified "Fire Watch Authorized Persons." No other instances were identified where personnel had signed ignition control permits as a "Fire Watch Authorized Person" without conducting the required physical inspection prior to commencement of work.
- 4. Procedure NP 1.9.13 and its associated ignition control permit form were revised to clarify that only a person who has received "Authorized Person" training may sign the permit after having first performed an inspection of the work site. The revised documents were issued on March 26, 2009.
Page 2 of 3
- 5. An information sharing was conducted with Fire Watch and Fire Watch Authorized Persons in the Maintenance Department and the affected contractor organization regarding 10 CFR 50.9, and ignition control permit procedure requirements. Additionally, it was stressed that ALARA concerns are not a valid reason to deviate from the requirement that only a "Fire Watch Authorized Person" may sign the ignition control permit.
- 6. A site-wide communication was issued on March 10, 2010. The communication discussed the following critical elements of the ignition control procedure: purpose of the ignition control permit, importance of affected area walkdowns, and function of the fire watch.
- 7. Based on a review of the corrective action program, no other instances were identified where personnel had signed ignition control permits as a "Fire Watch Authorized Person" without conducting the required physical inspection prior to commencement of work, since October 28, 2008. This includes the fall 2009 Unit 2 and the spring 2010 Unit 1 refueling outages.
- 8. During the spring 2010 Unit Irefueling outage, supervision performed daily human performance observations of site personnel and affected contractor personnel. Based on a review of the corrective action program, no other instances were identified where personnel had signed ignition control permits as a "Fire Watch Authorized Person" without conducting the required physical inspection prior to commencement of work.
Corrective S t e ~ That s Will Be Taken None.
Date Full Com~lianceWill Be Achieved Full compliance with NRC requirements was achieved upon issuance of the revision to NP 1.9.13 on March 26,2009.