NLS2016044, Form 536, Operator Licensing Examination Data, for Calendar Years 2018-2021

From kanterella
Jump to navigation Jump to search
Form 536, Operator Licensing Examination Data, for Calendar Years 2018-2021
ML16209A203
Person / Time
Site: Cooper Entergy icon.png
Issue date: 07/15/2016
From: Shaw J
Nebraska Public Power District (NPPD)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NLS2016044, RIS-16-009
Download: ML16209A203 (2)


Text

Nebraska Public Power District Alwa)'s there when )'OU need us NLS2016044 July 15, 2016 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 .

Subject:

Preparation and Scheduling of Operator Licensing Examinations Cooper Nuclear Station, Docket No. 50-298, DPR-46

Reference:

Nuclear Regulatory Commission Regulatory Issue Summary2016-09, "Preparation and Scheduling of Operator Licensing Examinations"

Dear Sir or Madam:

The purpose of this letter is to trfil1smit to the U.S. Nuclear Regulatory Commission (NRC) a completed NRC Form 536 for Co6per Nuclear Station as requested in the reference above.

This letter contains no new commitments.

Should you have any questions or require additional information, please contact me at (402) 825-2788 or Mike Maness, Operations Initial Training Superintendent, at (402) 825-5402.

Sincerely, Licensing Manager

/jo

Attachment:

NRG Form 536, "Operator Licensing Examination Data" cc: Regional Administrator w/attachment Training Manager w/o attachment USNRC - Region IV Cooper Nuclear Station Operations Initial Training Superintendent CNS Records w/attachment w/attachment Cooper Nuclear Station COOPER NUCLEAR STATION P.O. Box 98 /Brownville, NE 68321-0098*

Telephone: (402) 825-3811 /Fax: (402) 825-5211 www.nppd.com

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2017 (05-2016) Estimated burden per response to comply with this voluntary information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This

~'U'-~p.R REC(t(..q_,,

information collection is used to plan budgets and resources for operator examinations. Send

~

~

I!!

    • 101)"'

0 0

OPERATOR LICENSING EXAMINATION DATA comments regarding burden estimate to the FOIA, Privacy, and lnfonmation Collections Branch (T-5 F53). U.S. Nuclear Regulatory Commission, Washington, DC20555-0001, or by e-mail to lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office or Information and Regulatory Affairn,

~.;.,,

....... NEOB-10202, (3150-0131), Office of Management and BudgeL Washington, DC 20503. If a means used to impose an infonmatian collection does not display a currently valid OMS control number, the NRC may not conduct or sponsor, and a pernon is not required to respond to, the infonnation collection.

FACILITY NRCREGION Cooper Nuclear Station IV 72676 648 A Ave, PO Box 98 Brownville, NE 68321 A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY2018 CY2019 CY2020 CY2021 PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED I 0 I 0 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS CY2018 CY2019 CY2020 CY2021 PROPOSED NUMBER NUMBER OF REACTOR OPERATORS 6 0 6 0 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 3 0 3 0 NUMBER OF SENIOR REACTOR .., ..,

OPERATORS-UPGRADE

.) 0 .) 0 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0 0 0 0 PROPOSED OATES PRIMARY DATE 91312018 NIA 811712020 NIA ALTERNATE DATE 911012018 NIA 812412020 NIA

c. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER MARCH CY

- 2017 SEPTEMBER MARCH CY 2018 SEPTEMBER ESTIMATED NUMBER OF 6 0 0 0 CANDIDATES NRC FORM 536 (05-2016)