MONTHYEARNLS2024006, Response to Nuclear Regulatory Commission'S Request for Additional Information for Relief Request RC3-022024-01-25025 January 2024 Response to Nuclear Regulatory Commission'S Request for Additional Information for Relief Request RC3-02 NLS2024007, Emergency Plan Implementing Procedure 5.7.1, Revision 732024-01-16016 January 2024 Emergency Plan Implementing Procedure 5.7.1, Revision 73 NLS2024003, 30 Day Report - Unauthorized Disassembly of Liquid Scintillation Detector2024-01-15015 January 2024 30 Day Report - Unauthorized Disassembly of Liquid Scintillation Detector NLS2024004, Annual Report of Changes and Errors in Emergency Core Cooling System Evaluation Models for 20232024-01-10010 January 2024 Annual Report of Changes and Errors in Emergency Core Cooling System Evaluation Models for 2023 NLS2023053, ISFSI, Supplement to Exemption Request from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-30030 November 2023 ISFSI, Supplement to Exemption Request from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation NLS2023050, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-22022 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation NLS2023045, Application to Revise Technical Specifications to Adopt TSTF-374, Revision to Diesel Fuel Oil Testing Program2023-11-15015 November 2023 Application to Revise Technical Specifications to Adopt TSTF-374, Revision to Diesel Fuel Oil Testing Program NLS2023051, Response to Nuclear Regulatory Commission Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements2023-10-10010 October 2023 Response to Nuclear Regulatory Commission Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements NLS2023049, 10 CFR Part 21 Report Regarding HGA Relays2023-09-0606 September 2023 10 CFR Part 21 Report Regarding HGA Relays NLS2023029, License Amendment Request to Revise Technical Specifications to Support Inspection of Diesel Fuel Oil Storage Tanks2023-09-0606 September 2023 License Amendment Request to Revise Technical Specifications to Support Inspection of Diesel Fuel Oil Storage Tanks NLS2023047, Licensee Guarantees of Payment of Deferred Premiums2023-07-26026 July 2023 Licensee Guarantees of Payment of Deferred Premiums NLS2023033, 10 CFR 50.55a Relief Request RC3-022023-06-27027 June 2023 10 CFR 50.55a Relief Request RC3-02 NLS2023039, Preparation and Scheduling of Operator Licensing Examinations2023-06-0101 June 2023 Preparation and Scheduling of Operator Licensing Examinations NLS2023038, Nebraska Public Power District 2022 Financial Report2023-05-22022 May 2023 Nebraska Public Power District 2022 Financial Report NLS2023031, Annual Radiological Environmental Report2023-05-11011 May 2023 Annual Radiological Environmental Report NLS2023017, Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements2023-05-0303 May 2023 Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements NLS2023018, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-0303 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling NLS2023030, Annual Radioactive Effluent Release Report2023-04-27027 April 2023 Annual Radioactive Effluent Release Report NLS2023007, Technical Specification Bases Changes2023-04-17017 April 2023 Technical Specification Bases Changes NLS2023027, Annual Report of Individual Exposure Monitoring2023-04-13013 April 2023 Annual Report of Individual Exposure Monitoring NLS2023021, Quality Assurance Program Changes2023-04-10010 April 2023 Quality Assurance Program Changes NLS2023020, Decommissioning Funding2023-03-29029 March 2023 Decommissioning Funding NLS2023019, Property Insurance Coverage2023-03-23023 March 2023 Property Insurance Coverage NLS2023010, Inservice Inspection OAR-1 Owner'S Activity Report for Cooper Nuclear Station2023-02-0909 February 2023 Inservice Inspection OAR-1 Owner'S Activity Report for Cooper Nuclear Station NLS2023005, Annual Report of Changes and Errors in Emergency Core Cooling System Evaluation Models for 20222023-01-19019 January 2023 Annual Report of Changes and Errors in Emergency Core Cooling System Evaluation Models for 2022 NLS2022054, Preparation and Scheduling of Operator Licensing Examinations2023-01-0505 January 2023 Preparation and Scheduling of Operator Licensing Examinations NLS2022055, Emergency Plan, Revision 812023-01-0404 January 2023 Emergency Plan, Revision 81 NLS2022053, CNS-2022-11 Post Exam Submittal2022-11-22022 November 2022 CNS-2022-11 Post Exam Submittal NLS2022050, Notification of Revision to Cooper Nuclear Station Emergency Response Data System Data Point Library2022-11-0909 November 2022 Notification of Revision to Cooper Nuclear Station Emergency Response Data System Data Point Library NLS2022048, Management Change and Correspondence Update2022-11-0101 November 2022 Management Change and Correspondence Update NLS2022047, Core Operating Limits Report, Cycle 33, Revision 02022-10-14014 October 2022 Core Operating Limits Report, Cycle 33, Revision 0 NLS2022042, 10 CFR 50.59(d)(2) and 10 CFR 72.48(d)(2) Summary Report2022-10-0707 October 2022 10 CFR 50.59(d)(2) and 10 CFR 72.48(d)(2) Summary Report NLS2022037, Emergency Plan, Revision 80, Summary of 50.54(q) Analyses2022-08-18018 August 2022 Emergency Plan, Revision 80, Summary of 50.54(q) Analyses NLS2022035, Evacuation Time Estimate Report for Cooper Nuclear Station2022-08-16016 August 2022 Evacuation Time Estimate Report for Cooper Nuclear Station NLS2022031, Licensee Guarantees of Payment of Deferred Premiums2022-07-19019 July 2022 Licensee Guarantees of Payment of Deferred Premiums NLS2022005, Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2022-06-16016 June 2022 Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements NLS2022025, Nebraska Public Power District Letter (NLS2022010) to U.S. Nuclear Regulatory Commission Dated April 5, 2022, Annual Report of Individual Exposure Monitoring2022-06-0606 June 2022 Nebraska Public Power District Letter (NLS2022010) to U.S. Nuclear Regulatory Commission Dated April 5, 2022, Annual Report of Individual Exposure Monitoring NLS2022016, Annual Radiological Environmental Report2022-05-10010 May 2022 Annual Radiological Environmental Report NLS2022020, Nebraska Public Power District, Cooper Nuclear Station, 2021 Financial Report2022-05-0202 May 2022 Nebraska Public Power District, Cooper Nuclear Station, 2021 Financial Report NLS2022014, Annual Radioactive Effluent Release Report2022-04-27027 April 2022 Annual Radioactive Effluent Release Report NLS2022010, Annual Report of Individual Exposure Monitoring2022-04-0505 April 2022 Annual Report of Individual Exposure Monitoring NLS2022009, Property Insurance Coverage2022-03-23023 March 2022 Property Insurance Coverage NLS2022011, Preparation and Scheduling of Operator Licensing Examinations2022-03-18018 March 2022 Preparation and Scheduling of Operator Licensing Examinations NLS2022004, Response to Nuclear Regulatory Commission'S Request for Additional Information Regarding Relief Request RR5-01, Revision 12022-02-0707 February 2022 Response to Nuclear Regulatory Commission'S Request for Additional Information Regarding Relief Request RR5-01, Revision 1 NLS2022003, Annual Report of Changes and Errors in Emergency Core Cooling System Evaluation Models for 20212022-01-20020 January 2022 Annual Report of Changes and Errors in Emergency Core Cooling System Evaluation Models for 2021 NLS2021067, ISFSI - Independent Spent Fuel Storage Installation Decommissioning Funding Plan2021-12-16016 December 2021 ISFSI - Independent Spent Fuel Storage Installation Decommissioning Funding Plan NLS2021069, Withdrawal of Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements2021-12-15015 December 2021 Withdrawal of Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements NLS2021066, Response to Nuclear Regulatory Commission'S Request for Additional Information Regarding Alternative Request RI5-02, Revision 32021-12-10010 December 2021 Response to Nuclear Regulatory Commission'S Request for Additional Information Regarding Alternative Request RI5-02, Revision 3 NLS2021065, Clarification of Response to Nuclear Regulatory Commission'S Request for Additional Information for Alternative Request RS-012021-12-0606 December 2021 Clarification of Response to Nuclear Regulatory Commission'S Request for Additional Information for Alternative Request RS-01 NLS2021056, Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements2021-11-16016 November 2021 Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements 2024-01-25
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARNLS2023045, Application to Revise Technical Specifications to Adopt TSTF-374, Revision to Diesel Fuel Oil Testing Program2023-11-15015 November 2023 Application to Revise Technical Specifications to Adopt TSTF-374, Revision to Diesel Fuel Oil Testing Program NLS2023029, License Amendment Request to Revise Technical Specifications to Support Inspection of Diesel Fuel Oil Storage Tanks2023-09-0606 September 2023 License Amendment Request to Revise Technical Specifications to Support Inspection of Diesel Fuel Oil Storage Tanks NLS2023017, Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements2023-05-0303 May 2023 Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements NLS2023007, Technical Specification Bases Changes2023-04-17017 April 2023 Technical Specification Bases Changes ML21350A0582021-12-21021 December 2021 Withdrawal of an Amendment Request ML21340A2362021-12-20020 December 2021 Issuance of Amendment No. 270 Adoption of Technical Specifications Task Force Traveler TSTF-582, Revision 0, RPV WIC Enhancements NLS2021056, Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements2021-11-16016 November 2021 Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements NLS2021018, Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements2021-05-11011 May 2021 Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements NLS2021015, (CNS) - Technical Specification Bases Changes2021-04-16016 April 2021 (CNS) - Technical Specification Bases Changes NLS2020007, Application to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems Using the Consolidated Line Item Improvement Process2020-04-0101 April 2020 Application to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems Using the Consolidated Line Item Improvement Process NLS2020004, Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules2020-04-0101 April 2020 Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules NLS2019022, Application for Technical Specifications Improvement to Eliminate Requirements for Hydrogen/Oxygen Monitors (TSTF-447, Rev. 1)2019-05-23023 May 2019 Application for Technical Specifications Improvement to Eliminate Requirements for Hydrogen/Oxygen Monitors (TSTF-447, Rev. 1) NLS2019020, Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit Mcpr.2019-05-23023 May 2019 Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit Mcpr. NLS2019011, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation.2019-02-28028 February 2019 License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation. NLS2018010, License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control.2018-06-11011 June 2018 License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control. ML18137A2102018-05-10010 May 2018 License Amendment Request to Revise Technical Specifications - Safety Limit Minimum Critical Power Ratio NLS2016046, Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal and Clarify Surveillance Requirement Usage Rule Application to Section 5.5 Testing.2016-08-26026 August 2016 Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal and Clarify Surveillance Requirement Usage Rule Application to Section 5.5 Testing. NLS2016038, Supplement to License Amendment Request to Replace Figure with Text in Technical Specifications2016-06-13013 June 2016 Supplement to License Amendment Request to Replace Figure with Text in Technical Specifications ML16120A3702016-04-21021 April 2016 License Amendment Request to Revise Technical Specifications - Safety Limit Minimum Critical Power Ratio NLS2016010, Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program2016-03-22022 March 2016 Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program NLS2016002, Application to Revise Technical Specifications to Adopt TSTF 535, Revise Shutdown Margin Definition to Address Advanced Fuel Designs.2016-03-11011 March 2016 Application to Revise Technical Specifications to Adopt TSTF 535, Revise Shutdown Margin Definition to Address Advanced Fuel Designs. NLS2015103, License Amendment Request to Replace Figure with Text in Technical Specifications2015-09-0808 September 2015 License Amendment Request to Replace Figure with Text in Technical Specifications NLS2014087, License Amendment Request to Revise Technical Specifications to Add Residual Heat Removal System Containment Spray Function2015-01-15015 January 2015 License Amendment Request to Revise Technical Specifications to Add Residual Heat Removal System Containment Spray Function NLS2014030, License Amendment Request to Delete Condensate Storage Tank as an Alternate Source of Makeup Water2014-08-26026 August 2014 License Amendment Request to Delete Condensate Storage Tank as an Alternate Source of Makeup Water NLS2014028, License Amendment Request to Move Linear Heat Generation Rate (LHGR) and Single Loop Operation LHGR Limit from Technical Requirements Manual to Technical Specifications2014-07-17017 July 2014 License Amendment Request to Move Linear Heat Generation Rate (LHGR) and Single Loop Operation LHGR Limit from Technical Requirements Manual to Technical Specifications NLS2014035, License Amendment Request to Eliminate Requirements for Post Accident Sampling System for Boiling Water Reactors Using the Consolidated Line Item Improvement Process2014-07-14014 July 2014 License Amendment Request to Eliminate Requirements for Post Accident Sampling System for Boiling Water Reactors Using the Consolidated Line Item Improvement Process NLS2014022, License Amendment Request - Revision of Cyber Security Plan Implementation Schedule2014-03-14014 March 2014 License Amendment Request - Revision of Cyber Security Plan Implementation Schedule NLS2013014, License Amendment Request to Revise License Renewal License Condition 2.E2013-02-12012 February 2013 License Amendment Request to Revise License Renewal License Condition 2.E NLS2012042, Nebraska Public Power District (NPPD) - License Amendment Request for DPR- 46 for Cooper Nuclear Station to Revise the Physical Protection Protection License Condition Related to the Cyber Security Plan2012-06-14014 June 2012 Nebraska Public Power District (NPPD) - License Amendment Request for DPR- 46 for Cooper Nuclear Station to Revise the Physical Protection Protection License Condition Related to the Cyber Security Plan ML12157A2062012-05-30030 May 2012 License Amendment Request to Revise Technical Specifications - Safety Limit Minimum Critical Power Ratio NLS2012006, Nebraska Public Power District - Cooper Nuclear Station, License Amendment Request to Revise the Fire Protection Licensing Basis to NFPA 805 Per 10 CFR 50.48(c)2012-04-24024 April 2012 Nebraska Public Power District - Cooper Nuclear Station, License Amendment Request to Revise the Fire Protection Licensing Basis to NFPA 805 Per 10 CFR 50.48(c) NLS2011071, License Amendment Request for Implementing a 24-Month Fuel Cycle and Adoption of TSTF-493, Revision 4, Option a2011-09-16016 September 2011 License Amendment Request for Implementing a 24-Month Fuel Cycle and Adoption of TSTF-493, Revision 4, Option a NLS2011026, License Amendment Request for Administrative Revisions to Technical Specifications and to Remove an Expired One-Time Exception to the Five-Year Test Frequency for a Single Safety Valve2011-03-26026 March 2011 License Amendment Request for Administrative Revisions to Technical Specifications and to Remove an Expired One-Time Exception to the Five-Year Test Frequency for a Single Safety Valve ML1101002912011-01-0505 January 2011 Cooper - License Amendment Request for Reducing the Number of Technical Specification 3.4.3 Required Safety Relief Valves NLS2010043, License Amendment Request on Non-Conservative Battery Terminal Voltage and Specific Gravity in Technical Specification Surveillance Requirements2010-10-29029 October 2010 License Amendment Request on Non-Conservative Battery Terminal Voltage and Specific Gravity in Technical Specification Surveillance Requirements NLS2010006, License Amendment Request to Correct Power Factor Limit and to Incorporate a Generic Revision in Technical Specification Surveillance Requirement 3.8.1.92010-02-25025 February 2010 License Amendment Request to Correct Power Factor Limit and to Incorporate a Generic Revision in Technical Specification Surveillance Requirement 3.8.1.9 ML1001900422010-02-0303 February 2010 Summary of Telephone Conference Call Held on 1/8/2010, Between the U.S. NRC and Nebraska Public Power District Related to a Clarification for Certain Responses to Requests for Additional Information for Cooper Nuclear Station ML0934309332009-12-0707 December 2009 SAMA Meteorological Anomaly Related to the Cooper Nuclear Station License Renewal Application Cooper Nuclear Station, Docket No. 50-298, DPR-46 NLS2009084, License Amendment Request for Approval of the Cyber Security Plan2009-11-19019 November 2009 License Amendment Request for Approval of the Cyber Security Plan NLS2009034, Application for Technical Specification Change Regarding Revision of Control Rod Notch Surveillance Test Frequency and Clarification of a Frequency Example Using the Consolidated Line Item Improvement Process2009-06-0202 June 2009 Application for Technical Specification Change Regarding Revision of Control Rod Notch Surveillance Test Frequency and Clarification of a Frequency Example Using the Consolidated Line Item Improvement Process NLS2009010, License Amendment Request to Revise Nonconservative Battery Resistance Technical Specification Surveillance Requirements2009-03-11011 March 2009 License Amendment Request to Revise Nonconservative Battery Resistance Technical Specification Surveillance Requirements ML0829107682008-10-13013 October 2008 Cooper Nuclear Station - License Amendment Request for Application of the Alternative Source Term for Calculating Loss-of-Coolant Accident Dose Consequences ML0830302502008-09-24024 September 2008 Copper Nuclear Station, License Renewal Application, Environmental Report, Figure 2.1-1 - Figure 2.3.3 ML0830302462008-09-24024 September 2008 Copper Nuclear Station, License Renewal Application, Appendix E, Environmental Report ML0830302512008-09-24024 September 2008 Copper Nuclear Station, License Renewal Application, Environmental Report, Figure 2.4-1 - Figure 2.12-2 ML0830302442008-09-24024 September 2008 Copper Nuclear Station, License Renewal Application, Appendix D, Technical Specification Changes ML0830302362008-09-24024 September 2008 Cooper Nuclear Station, License Renewal Application, Cover Page ML0830302412008-09-24024 September 2008 Cooper Nuclear Station, License Renewal Application, Appendix a, Updated Safety Analysis Report Supplement ML0830302422008-09-24024 September 2008 Cooper Nuclear Station, License Renewal Application, Appendix B, Aging Management Programs and Activities ML0830302432008-09-24024 September 2008 Cooper Nuclear Station, License Renewal Application, Appendix C, Response to BWRVIP Applicant Action Items 2023-09-06
[Table view] |
Text
H Nebraska Public Power District "Always there when you need us" 50.90 NLS2023017 May 3,2023 Attention: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001
Subject:
Application to Revise Technical Specifications to Adopt TSTF-551, "Revise Secondary Containment Surveillance Requirements" Cooper Nuclear Station, Docket No. 50-298, License No. DPR-46
Dear Sir or Madam:
Pursuant to 10 CFR 50.90, Nebraska Public Power District is submitting a request for an amendment to the Technical Specifications (TS) for Cooper Nuclear Station.
The proposed change revises TS 3.6.4.1, "Secondary Containment," Surveillance Requirement (SR) 3 .6.4.1.1. The SR is revised to address conditions during which the secondary containment pressure may not meet the SR pressure requirements. In addition, SR 3.6.4.1.3 is modified to acknowledge that secondary containment access openings may be open for entry and exit. provides a description and assessment of the proposed changes. Attachment 2 provides the existing TS page marked up to show the proposed changes. Attachment 3 provides the revised ( clean) TS page. Attachment 4 provides existing TS Bases pages marked up to show the associated TS Bases changes and is provided for information only.
Approval of the proposed amendment is requested by May 3, 2024. Once approved, the amendment shall be implemented within 60 days.
There are no regulatory commitments made in this submittal.
The proposed TS changes have been reviewed by the necessary safety review committees (Station Operations Review Committee and Safety Review and Audit Board). In accordance with 10 CFR 50.91, "Notice for public comment; State consultation," a copy of this application, with attachments, is being provided to the designated State of Nebraska Official.
If you should have any questions regarding this submittal, please contact Linda Dewhirst, Regulatory Affairs and Compliance Manager, at (402) 825-5416.
COOPER NUCLEAR STATION 72676 648A Ave/ P.O. Box 98 / Brownville, NE 68321 http://www.nppd.com
NLS2023017 Page 2 of2 I declare under penalty of perjury that the foregoing is true and correct.
Executed On: St/ 31/ 2u L-"3 Date Sincerely,
~
Site Vice President
/dv Attachments: 1. Description and Assessment
- 2. Proposed Technical Specifications Change (Mark-up)
- 3. Revised Technical Specifications Page
- 4. Proposed Technical Specifications Bases Changes (Mark-up) -
Information Only cc: Regional Administrator w/ attachments USNRC - Region IV Cooper Project Manager w/ attachments USNRC - NRR Plant Licensing Branch IV Senior Resident Inspector w/ attachments USNRC-CNS Nebraska Health and Human Services w/ attachments Department of Regulation and Li censure NPG Distribution w/ attachments CNS Records w/ attachments
NLS2023017 Page 1 of 5 Attachment 1 Description and Assessment Cooper Nuclear Station, Docket No. 50-298, License No. DPR-46 1.0 Description 2.0 Assessment 2.1 Applicability of Safety Evaluation 2.2 Variations 3 .0 Regulatory Analysis 3.1 No Significant Hazards Consideration Determination Analysis 3.2 Conclusion 4.0 Environmental Consideration
NLS2023017 Attachment 1 Page 2 of 5
1.0 DESCRIPTION
The proposed change revises Technical Specification (TS) 3.6.4.1, "Secondary Containment,"
Surveillance Requirement (SR) 3 .6.4.1.1. The SR is revised to allow conditions during which the secondary containment pressure may not meet the SR pressure requirements. In addition, SR 3.6.4.1.3 is modified to acknowledge that secondary containment access openings may be open for entry and exit.
2.0 ASSESSMENT 2.1 Applicability of Safety Evaluation Nebraska Public Power District (NPPD) has reviewed the safety evaluation for TSTF-551 provided to the Technical Specifications Task Force (TSTF) in a letter dated September 21, 2017 (Accession No. MLl 7236A367). This review included a review of the Nuclear Regulatory Commission (NRC) staff's evaluation, as well as the information provided in TSTF-551. NPPD has concluded that the justifications presented in TSTF-551 and the safety evaluation prepared by the NRC staff are applicable to Cooper Nuclear Station (CNS) and justify this amendment for the incorporation of the changes to the CNS TS.
The radiological consequence analysis for CNS was approved by the NRC on September 15, 2009 (Accession No. ML092310349), was updated by CNS under 10 CFR 50.59 on January 23, 2023 and is documented in the Updated Safety Analysis Report (USAR) Section XIV-6.3.
NPPD has confirmed that the brief, inadvertent, simultaneous opening of both an inner and outer personnel access door during normal entry and exit conditions, and their prompt closure by normal means, is bounded by the radiological dose consequence analysis. In the unlikely event that an accident would occur when both personnel access doors are open for entry or exit, the brief time required to close one of the doors is small compared to the 657 seconds assumed in the accident analysis for reducing the post-accident secondary containment pressure to less than 0 inches of vacuum water gauge, and will not result in an increase in any onsite or offsite dose.
2.2 Variations NPPD is proposing the following variations from the TS changes described in TSTF-551 or the applicable parts of the NRC staff's safety evaluation. These variations do not affect the applicability ofTSTF-551 or the NRC staff's safety evaluation to the proposed license amendment.
The CNS TS do not contain an SR equivalent to the STS 3.6.4.1.4 modified by TSTF-551.
Therefore, the revision of the SR 3.6.4.1.4 is not applicable.
The traveler and safety evaluation discuss the applicable regulatory requirement and guidance, including the 10 CFR 50, Appendix A, General Design Criteria (GDC). CNS was not licensed to the 10 CFR 50, Appendix A, GDC. The CNS equivalents of the referenced GDC are located in Appendix F of the CNS USAR. The USAR concludes that CNS meets the intent of the criteria
NLS2023017 Page 3 of 5 contained in the 1971 10 CFR 50 Appendix A Final Rule. This difference does not alter the conclusion that the proposed change is applicable to CNS.
The final safety evaluation for TSTF-551 discusses that the NRC staff review determined that there are two design basis accidents that take credit for the secondary containment and are possibly impacted by the brief, inadvertent, and simultaneous opening of both an inner and outer access doors during normal entry and exit conditions: loss of coolant accident and the fuel handling accident (FHA) in secondary containment. The CNS FHA does not credit the secondary containment for the mitigation of FHAs occurring beyond 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> following reactor shutdown. However, the ability to use these systems to mitigate an FHA beyond this time period has been retained as a defense in depth measure. This difference does not alter the conclusion that the proposed change is applicable to CNS.
3.0 REGULATORY ANALYSIS
3.1 No Significant Hazards Consideration Determination Analysis Nebraska Public Power District (NPPD) requests adoption ofTSTF-551, "Revise Secondary Containment Surveillance Requirements," which is an approved change to the standard technical specifications, into the Cooper Nuclear Station Technical Specifications (TS). The proposed change revises TS Surveillance Requirement (SR) 3.6.4.1.1. The SR is revised to permit conditions during which the secondary containment may not meet the SR acceptance criterion for a period ofup to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> if an analysis demonstrates that one standby gas treatment (SGT) subsystem remains capable of establishing the required secondary containment vacuum. In addition, SR 3.6.4.1.3 is modified to acknowledge that secondary containment access openings may be open for entry and exit.
NPPD has evaluated the proposed change against the criteria of 10 CFR 50.92(c) to determine if the proposed change results in any significant hazards. The following is the evaluation of each of the 10 CFR 50.92(c) criteria:
- 1. Does the proposed change involve a significant increase in the probability or consequences of an accident previously evaluated?
Response: No The proposed change addresses conditions during which the secondary containment SRs are not met. The secondary containment is not an initiator of any accident previously evaluated. As a result, the probability of any accident previously evaluated is not increased. The consequences of an accident previously evaluated while utilizing the proposed changes are no different than the consequences of an accident while utilizing the existing four-hour Completion Time for an inoperable secondary containment. In addition, the proposed Note for SR 3 .6.4.1.1 provides an alternative means to ensure the secondary containment safety function is met. As a result, the consequences of an accident previously evaluated are not significantly increased.
NLS2023017 Attachment 1 Page 4 of 5 Therefore, the proposed change does not involve a significant increase in the probability or consequences of an accident previously evaluated.
- 2. Does the proposed change create the possibility of a new or different kind of accident from any previously evaluated?
Response: No The proposed change does not alter the protection system design, create new failure modes, or change any modes of operation. The proposed change does not involve a physical alteration of the plant; and no new or different kind of equipment will be installed. Consequently, there are no new initiators that could result in a new or different kind of accident.
Therefore, the proposed change does not create the possibility of a new or different kind of accident from any previously evaluated.
- 3. Does the proposed change involve a significant reduction in a margin of safety?
Response: No The proposed change addresses conditions during which the secondary containment SRs are not met. Conditions in which the secondary containment vacuum is less than the required vacuum are acceptable provided the conditions do not affect the ability of the SGT System to establish the required secondary containment vacuum under post-accident conditions within the time assumed in the accident analysis. This condition is incorporated in the proposed change by requiring an analysis of actual environmental and secondary containment pressure conditions to confirm the capability of the SGT System is maintained within the assumptions of the accident analysis. Therefore, the safety function of the secondary containment is not affected. The allowance for both an inner and outer secondary containment door to be open simultaneously for entry and exit does not affect the safety function of the secondary containment as the doors are promptly closed after entry or exit, thereby restoring the secondary containment boundary.
Therefore, the proposed change does not involve a significant reduction in a margin of safety.
Based on the above, NPPD concludes that the proposed amendment presents no significant hazards consideration under the standards set forth in 10 CFR 50.92(c), and, accordingly, a finding of "no significant hazards consideration" is justified.
NLS2023017 Page 5 of 5 3 .2 Conclusion In conclusion, based on the considerations discussed above, (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
- 4. ENVIRONMENTAL CONSIDERATION The proposed amendment would change a requirement with respect to installation or use of a facility component located within the restricted area, as defined in 10 CFR 20, or would change an inspection or surveillance requirement. However, the proposed amendment does not involve (i) a significant hazards consideration, (ii) a significant change in the types or significant increase in the amounts of any effluents that may be released offsite, or (iii) a significant increase in individual or cumulative occupational radiation exposure. Accordingly, the proposed amendment meets the eligibility criterion for categorical exclusion set forth in 10 CFR 51.22(c)(9). Therefore, pursuant to 10 CFR 51.22(b ), no environmental impact statement or environmental assessment need be prepared in connection with the proposed amendment.
NLS2023017 Page 1 of2 Attachment 2 Proposed Technical Specifications Change (Mark-up)
Cooper Nuclear Station, Docket No. 50-298, License No. DPR-46 Revised Page 3.6-35
Secondary Containment 3.6.4.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.4.1.1 -------------------------------NOTE------------------------------
Not required to be met for 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> if analysis demonstrates one standby gas treatment (SGT) subsystem is capable of establishing the required secondary containment vacuum.
Verify secondary containment vacuum is ~ 0.25 inch In accordance with of vacuum water gauge. the Surveillance Frequency Control Program SR 3.6.4.1.2 Verify all secondary containment equipment hatches In accordance with are closed and sealed. the Surveillance Frequency Control Program SR 3.6.4.1.3 Verify one secondary containment access door in In accordance with each access opening is closed, except when the the Surveillance access opening is being used for entry and exit. Frequency Control Program SR 3.6.4.1.4 Verify each SGT subsystem can maintain ~ 0.25 inch In accordance with of vacuum water gauge in the secondary containment the Surveillance for 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> at a flow rate :5 1780 cfm. Frequency Control Program Cooper 3.6-35 Amendment No.
NLS2023017 Page 1 of2 Attachment 3 Revised Technical Specifications Page Cooper Nuclear Station, Docket No. 50-298, License No. DPR-46 Revised Page 3.6-35
Secondary Containment 3.6.4.1 SURVEILLANCE REQUIREMENTS SURVEILL ANCE FREQUENCY SR 3.6.4.1.1 -------------------------------NO TE------------------------------
Not required to be met for 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> if analysis demonstrates one standby gas treatment (SGT) subsystem is capable of establishing the required secondary containment vacuum.
Verify secondary containment vacuum is ~ 0.25 inch In accordance with of vacuum water gauge. the Surveillance Frequency Control Program SR 3.6.4.1.2 Verify all secondary containment equipment hatches In accordance with are closed and sealed. the Surveillance Frequency Control Program SR 3.6.4.1.3 Verify one secondary containment access door in In accordance with each access opening is closed, except when the the Surveillance access opening is being used for entry and exit. Frequency Control Program SR 3.6.4.1.4 Verify each SGT subsystem can maintain ~ 0.25 inch In accordance with of vacuum water gauge in the secondary containment the Surveillance for 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> at a flow rate s 1780 cfm. Frequency Control Program Cooper 3.6-35 Amendment No.
NLS2023017 Page 1 of 3 Attachment 4 Proposed Technical Specifications Bases Changes (Mark-up) -
Information Only Cooper Nuclear Station, Docket No. 50-298, License No. DPR-46 Revised Pages B 3.6-73 B 3.6-74
Secondary Containme nt B 3.6.4.1 BASES SURVEILL ANCE REQUIREM ENTS SR 3.6.4.1.1 This SR ensures that the secondary containment boundary is sufficiently leak tight to preclude exfiltration under expected wind conditions.
The SR is modified by a Note which states the SR is not required to be met for up to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> if an analysis demonstrat es that one SGT subsystem remains capable of establishing the required secondary containmen t vacuum. Use of the Note is expected to be infrequent but may be necessitated by situations in which secondary containmen t vacuum may be less than the required containmen t vacuum. such as. but not limited to. wind gusts or failure or change of operating normal ventilation subsystems. These conditions do not indicate any change in the leak tightness of the secondary containmen t boundary. The analysis should consider the actual conditions (equipmen t configuration.
temperature. atmospher ic pressure. wind conditions, measured secondary containmen t vacuum. etc.} to determine whether. if an accident requiring secondary containmen t to be OPERABLE were to occur, one train of SGT could establish the assumed secondary containmen t vacuum within the time assumed in the accident analysis. If so, the SR may be considered met for a period up to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />. The 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> limit is based on the expected short duration of the situations when the Note would be applied.
The Surveillance Frequency is controlled under the Surveillance Frequency Control Program.
SR 3.6.4.1.2 and SR 3.6.4.1.3 Verifying that secondary containmen t equipment hatches df-H+-B-H:e--d S1~;:s eoGf-!--R-/43a-Efr173-G-E;es&reE}Fl-+Fm are closed ensures that the infiltration of outside air of such a magnitude as to prevent maintaining the desired negative pressure does not occur and. Verifying that all such openings a-F-E~:35-EK=l provides adequate assurance that exfiltration from the secondary containmen t will not occur. SR 3.6.4.1.2 also requires equipment hatches to be sealed. In this application, the term "sealed" has no connotation of leak tightness.
Cooper B 3.6-73
Secondary Containment B 3.6.4.1 BASES QGGOS&
The Surveillance Frequency is controlled under the Surveillance Frequency Control Program.
SR 3.6.4.1.3 Verifying that one secondary containment access door in each access opening is closed provides adequate assurance that exfiltration from the secondary containment will not occur. An access opening contains at least one inner and one outer door. The intent is to not breach the secondary containment, which is achieved by maintaining the inner or outer portion of the barrier closed except when the access opening is being used for entry and exit.
The Surveillance Frequency is controlled under the Surveillance Frequency Control Program.
SR 3.6.4.1.4 The SGT System exhausts the secondary containment atmosphere to the environment through appropriate treatment equipment. SR 3.6.4.1.4 demonstrates that one SGT subsystem can maintain ~ 0.25 inches of vacuum water gauge for 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> at a flow rate s; 1780 cfm. The 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> test period allows secondary containment to be in thermal equilibrium at steady state conditions. Therefore, this test is used to ensure secondary containment boundary integrity. Since this SR is a secondary containment test, it need not be performed with each SGT subsystem.
The Surveillance Frequency is controlled under the Surveillance Frequency Control Program.
Cooper B 3.6-74