Letter Sequence Other |
---|
|
|
MONTHYEARML22294A1792022-10-21021 October 2022 Westinghouse, Request to Amend License SNM-1107 and Submittal of SNM-1107 License Application Page Changes Project stage: Other ML22336A1742022-12-0202 December 2022 Westinghouse Request for Temporary License Amendment for Storage of Hematite Ash Project stage: Request ML23045A2052023-02-0909 February 2023 RAIs WEC Ash Part 1 Project stage: RAI ML23045A2032023-02-0909 February 2023 Westinghouse Hematite Ash Part I Email_Request for Additional Information Project stage: Request ML23045A2042023-02-0909 February 2023 Email - RAI for Westinghouse Hematite Ash Part I EPID L-2022-LLA-0177 Project stage: RAI ML23047A4562023-02-16016 February 2023 Westinghouse, Response to Request for Additional Information - Request for Temporary License Amendment for Storage of Hematite Ash Project stage: Response to RAI ML23094A1582023-05-0505 May 2023 Westinghouse Electric Company, LLC - Revision to Temporarily Store Hematite Ash Above License Limits and Removal of Uranium Flywheel Project stage: Other ML23094A1572023-05-0505 May 2023 Westinghouse License Amendment Hematite Ash Part 1 Project stage: Request ML23094A1592023-05-0505 May 2023 SER: Westinghouse License Amendment for Hematite Ash Part 1 Project stage: Other 2023-02-16
[Table View] |
|
---|
Category:Letter
MONTHYEARML24289A0062024-10-21021 October 2024 Westinghouse Columbia Fuel Fabrication Facility Integrated Inspection Report 07001151/2024003 ML24289A2372024-10-15015 October 2024 Transmittal of Revision 1 Additional Errata Pages for WCAP-18830-P (Proprietary) and WCAP-18830-NP (Non-Proprietary), Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles ML24262A2272024-09-18018 September 2024 Transmittal of Additional Errata Pages for WCAP-18830-P (Proprietary) and WCAP-18830-NP (Non-Proprietary), Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles ML24228A2952024-08-15015 August 2024 Westinghouse Electric Company, LLC - NRC Semi-Annual Discharge Report (Jan - June 2024) ML24176A2762024-06-24024 June 2024 Westinghouse Electric Company LLC, Submittal of Slides for the June 27, 2024, Partially Closed Meeting with NRC Staff on the Designation of Buildings as Items Relied on for Safety ML24173A2992024-06-24024 June 2024 Westinghouse Columbia Fuel Fabrication Facility – Inspection Schedule for Calendar Year 2025 ML24138A1152024-05-21021 May 2024 Cover Letter - the U.S. Nuclear Regulatory Commission Approval Letter for Westinghouse Emergency Plan Change Request for Columbia Fuel Fabrication Facility ML24134A2742024-05-13013 May 2024 Submittal of Slide Packages for the May 16, 2024 Pre-Application Meeting with NRC on the Proposed License Amendment Request Re Low Enriched Uranium Plus Expansion at Columbia Fuel Fabrication Facility ML24128A2662024-05-13013 May 2024 Notification of New Licensing Project Manager for Westinghouses SNM-1151 for the Columbia Fuel Fabrication Facility ML24130A2492024-05-0909 May 2024 Submittal of Information in Support of Surry Power Station Unit 1 Thermal Shield Flexure Replacement Campaign ML24110A0502024-04-22022 April 2024 Westinghouse Columbia Fuel Fabrication Facility - Integrated Inspection Report 07001151/2024001 ML24109A0002024-04-19019 April 2024 Public Meeting Summary - Licensee Performance Review for Westinghouse Columbia Fuel Fabrication Facility, Docket Number 70-1151 ML24110A1442024-04-19019 April 2024 Response to Request for Additional Information - Westinghouse Request for Prior Approval of Revision 24 of the Columbia Fuel Fabrication Facility (CFFF) Site Emergency Plan ML24080A5072024-03-20020 March 2024 Westinghouse, Request for Prior Approval of Revision 24 of the Columbia Fuel Fabrication Facility (CFFF) Site Emergency Plan ML24074A2962024-03-19019 March 2024 Cover Letter for WEC Correction to Amendment 3 ML24064A2542024-03-0707 March 2024 Westinghouse Electric Company, Licensee Performance Review of Licensed Activities - Nuclear Regulatory Commission Inspection Report No 70-1151/2024-005 ML24025A1292024-02-23023 February 2024 Westinghouse Electric Company, LLC, - Amendment 2, Request for Exemption from 24-Hour Reporting Requirement of Title 10 of the Code of Federal Regulations Paragraph 70.50(B)(1) ML24023A6952024-01-26026 January 2024 Westinghouse Columbia Fuel Fabrication Facility, U.S. Nuclear Regulatory Commission Inspection Report Number 07001151/2023004 ML24026A1512024-01-25025 January 2024 Westinghouse Electric Company, LLC, Notice of Intent to Fabricate Low Enriched Uranium (Leu+) ML24017A2252024-01-22022 January 2024 Westinghouse Electric Company, LLC, Conveyance of Revised Standby Trust Agreement to Support the Decommissioning Funding Plan (Enterprise Project Identifier L-2023-DFA-0009) ML23349A2722023-12-14014 December 2023 Westinghouse, Submittal of Monthly Progress Reports Under Consent Agreement 19-02-HW with the South Carolina Department of Health and Environmental Control ML23338A3372023-12-0404 December 2023 Submittal of Amendment 4 to Standby Trust Agreement (STA) for License Nu. SNM-1107, Replacement of Trust Fund with Additional Surety Bonds, and Certification of Financial Assurance for SNM-1107 ML23311A0032023-11-0606 November 2023 Westinghouse Columbia Fuel Fabrication Facility, U.S. Nuclear Regulatory Commission Inspection Report Number 70-1151/2023-402 (Cover Letter) ML23296A0362023-10-24024 October 2023 Westinghouse Columbia Fuel Fabrication Facility - Integrated Inspection Report 07001151/2023003 ML23240A5082023-08-28028 August 2023 Westinghouse Electric Company LLC - NRC Semi-Annual Discharge Report (January- June 2023) ML23230B2022023-08-18018 August 2023 Westinghouse, Supplemental Information for Request for Modification to Temporary License Conditions for Sampling, Analysis and Disposition of Hematite Ash Material ML23216A0712023-08-0404 August 2023 Westinghouse Columbia Fuel Fabrication Facility Physical Security Core Inspection Report 07001151/202340 ML23202A1472023-07-24024 July 2023 Westinghouse Columbia Fuel Fabrication Facility Integrated Inspection Report 07001151/2023002 ML23150A2362023-07-0303 July 2023 Letter to Westinghouse Regarding Effluent Testing Issue ML23184A1512023-06-29029 June 2023 Westinghouse Columbia Fuel 2023 Special Nuclear Material Inventory Summary Report Revision ML23171B1502023-06-20020 June 2023 Westinghouse Columbia Fuel 2023 Special Nuclear Material Inventory Summary Report ML23160A2612023-06-0909 June 2023 Westinghouse, Request for Modification to Temporary License Conditions for Sampling, Analysis and Disposition of Hematite Ash Material ML23139A1942023-06-0505 June 2023 Westinghouse Electric Company LLC - Approval of Environmental Sampling and Monitoring Program ML23138A3762023-05-18018 May 2023 Westinghouse Submittal of Columbia Fuel Fabrication Facility Site Emergency Plan, Revision 23 ML23096A2812023-05-15015 May 2023 Letter - Transfer of Control Approval 2023 ML23094A1582023-05-0505 May 2023 Westinghouse Electric Company, LLC - Revision to Temporarily Store Hematite Ash Above License Limits and Removal of Uranium Flywheel ML23115A2382023-04-26026 April 2023 Westinghouse Columbia Fuel Fabrication Facility - Integrated Inspection Report 07001151/2023001 ML23114A3592023-04-24024 April 2023 Westinghouse Submittal of Environmental Sampling and Monitoring Program for NRC Review and Approval ML23114A3612023-03-23023 March 2023 Enclosures 2 & 3 - SCDHEC Approval Letter of Westinghouse Ri Report, Dated March 23, 2023 and Environmental Sampling and Monitoring Program Section of SNM-1107 License Application ML23055A3022023-03-0808 March 2023 Letter - Westinghouse License Transfer Interim Threshold Determination ML23058A4482023-02-27027 February 2023 Request for Threshold Determination for Interim Transaction Included in December 20, 2022 Application for Consent to Indirect Change of Control with Respect to a Materials License, Export Licenses, and Notification Regarding Other Approvals ML23058A2722023-02-27027 February 2023 Westinghouse, NRC Semiannual Discharge Report July - December 2022 ML23053A0712023-02-17017 February 2023 Westinghouse Electric Company LLC, Supplement to Application for Consent to Indirect Change of Control with Respect to a Materials License, Export Licenses, and Notification Regarding Other Approvals and Request for Threshold Determination ML23053A0752023-02-17017 February 2023 Westinghouse Electric Co. - Supplement 2 to Application for Consent to Indirect Change of Control with Respect to a Materials License, Export Licenses, and Notification Regarding Other Approvals and Request for Threshold Determination ML23047A4562023-02-16016 February 2023 Westinghouse, Response to Request for Additional Information - Request for Temporary License Amendment for Storage of Hematite Ash ML23024A2312023-01-30030 January 2023 Westinghouse Columbia Fuel Fabrication Facility - Integrated Inspection Report 07001151//2022004 ML23030B8552023-01-30030 January 2023 Westinghouse 10CFR70.72 Facility Change Report ML23013A2122023-01-27027 January 2023 Acceptance Letter for Westinghouse License Transfer - Cac/Epid L-2022-LLM-0004 ML23026A3642023-01-26026 January 2023 Westinghouse, January 2023 Updated Integrated Safety Analysis Summary ML22354A0732023-01-19019 January 2023 Response to Westinghouse Revised Funding Instrument in Support of the Decommissioning Funding Plan 2024-09-18
[Table view] |
Text
WESTINGHOUSE NON-PROPRIETARY CLASS 3 Westinghouse Director, Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Document Control Desk 11555 Rockville Pike Rockville, Maryland 20852-2738 Security-Related Information Notice Westinghouse Electric Company LLC Columbia Fuel Site 5801 BluffRoad Hopkins, South Carolina 29061-9121 USA Directtel: 803-647-1957 e-mail: donnelpb@westinghouse.com Your ref:
Our ref: LTR-RAC-22-50 to this letter contains security related information October 21, 2022 which is to be withheld from public disclosure in accordance with RIS 2005-31. The balance of this letter may be considered public upon removal of Enclosure 3
SUBJECT:
REQUEST TO AMEND LICENSE SNM-1107 AND SUBMITTAL OF SNM-1107 LICENSE APPLICATION PAGE CHANGES
Dear Sir or Madam:
Westinghouse Electric Company LLC (Westinghouse) requests approval for an amendment to SNM-1107 in accordance with 10 CFR 70.34 to remove Item Gin the SNM-1107 Possession Limits. Enclosure 1 contains copies of the Certificate of Disposal and the relevant NRC Forms 540, 541 and 741 as documentation of the removal of the depleted uranium flywheel component from the Columbia Fuel Fabrication Facility (CFFF) site.
Westinghouse is also providing the enclosed revision to the SNM-1107 License Application. The revision in Enclosure 2 provides updates to the following information in the SNM-1107 License Application:
The depleted uranium flywheel was removed from the material possession limits within Section 1.1.4.
Names and addresses of principal officers and licensing contacts within Section 1.1.5.
Figure 2.1 was updated to reflect the consolidation of the Regulatory Component Functions under a single Plant Staff Manager.
Deleted repetitive phrase from third paragraph of Section 10.1.4.
To assure alignment with SNM-1107 License Condition S-16 and Authorization 12.1.1 of the SNM-1107 License Application, Section 10.1.7.2 was re-inserted after inadvertent omission in the previous revision of the License Application.
Table 10.2 was updated to correct a typographical error in the list of monitoring wells and to make table text font uniform. The total number of monitoring wells remains unchanged from the previous revision. Table 10.2 footnote 1 a updated to reflect current upstream well monitoring locations.
"Type of Sample" updated from "Well Water" to "Groundwater" in Tables 10.1 and 10.3.
Sections 11.1.1 and 11.1.2, regarding Decommissioning Planning and the Decommissioning Funding Plan, were combined into a single section for clarity.
© 2022 Westinghouse Electric Company LLC All Rights Reserved
WESTINGHOUES NON-PROPRIETARY CLASS 3 Page 2 of2 Our ref: L TR-RAC-22-50 October 21, 2022 This page change revision does not result in a degradation of any safety commitments in the License Application, does not impair Westinghouse's ability to meet applicable Federal Regulations, and does not conflict with any License Condition.
As such, the enclosed administrative update is processed in accordance with SNM-1107 License Condition S-4 and Authorization 12.1.1 of the SNM-1107 License Application.
If you have any questions, please contact me at (803) 647-1957.
Patrick B. Donnelly (Oct 21, 202214:4 DT)
Patrick B. Donnelly Regulatory Affairs Manager Westinghouse Columbia Fuel Fabrication Facility Docket 70-1151, License SNM-1107 : Supporting Documentation for SNM-1107 Amendment Request ( 5 pages) : SNM-1107 License Application, Revision 1 (113 pages) : SNM-1107 License Application, Page 11 (Security Related Information, 2 pages) cc:
NRC, Ms. Jennifer Tobin NRC, Mr. Thomas Vukovinsky