MONTHYEARML24023A6952024-01-26026 January 2024 Westinghouse Columbia Fuel Fabrication Facility, U.S. Nuclear Regulatory Commission Inspection Report Number 07001151/2023004 ML24017A2252024-01-22022 January 2024 Westinghouse Electric Company, LLC, Conveyance of Revised Standby Trust Agreement to Support the Decommissioning Funding Plan (Enterprise Project Identifier L-2023-DFA-0009) ML23349A2722023-12-14014 December 2023 Westinghouse, Submittal of Monthly Progress Reports Under Consent Agreement 19-02-HW with the South Carolina Department of Health and Environmental Control ML23338A3372023-12-0404 December 2023 Submittal of Amendment 4 to Standby Trust Agreement (STA) for License Nu. SNM-1107, Replacement of Trust Fund with Additional Surety Bonds, and Certification of Financial Assurance for SNM-1107 ML23311A0032023-11-0606 November 2023 Westinghouse Columbia Fuel Fabrication Facility, U.S. Nuclear Regulatory Commission Inspection Report Number 70-1151/2023-402 (Cover Letter) ML23296A0362023-10-24024 October 2023 Westinghouse Columbia Fuel Fabrication Facility - Integrated Inspection Report 07001151/2023003 ML23240A5082023-08-28028 August 2023 Westinghouse Electric Company LLC - NRC Semi-Annual Discharge Report (January- June 2023) ML23230B2022023-08-18018 August 2023 Westinghouse, Supplemental Information for Request for Modification to Temporary License Conditions for Sampling, Analysis and Disposition of Hematite Ash Material ML23216A0712023-08-0404 August 2023 Westinghouse Columbia Fuel Fabrication Facility Physical Security Core Inspection Report 07001151/202340 ML23202A1472023-07-24024 July 2023 Westinghouse Columbia Fuel Fabrication Facility Integrated Inspection Report 07001151/2023002 ML23150A2362023-07-0303 July 2023 Letter to Westinghouse Regarding Effluent Testing Issue ML23184A1512023-06-29029 June 2023 Westinghouse Columbia Fuel 2023 Special Nuclear Material Inventory Summary Report Revision ML23171B1502023-06-20020 June 2023 Westinghouse Columbia Fuel 2023 Special Nuclear Material Inventory Summary Report ML23160A2612023-06-0909 June 2023 Westinghouse, Request for Modification to Temporary License Conditions for Sampling, Analysis and Disposition of Hematite Ash Material ML23139A1942023-06-0505 June 2023 Westinghouse Electric Company LLC - Approval of Environmental Sampling and Monitoring Program ML23138A3762023-05-18018 May 2023 Westinghouse Submittal of Columbia Fuel Fabrication Facility Site Emergency Plan, Revision 23 ML23096A2812023-05-15015 May 2023 Letter - Transfer of Control Approval 2023 ML23094A1582023-05-0505 May 2023 Westinghouse Electric Company, LLC - Revision to Temporarily Store Hematite Ash Above License Limits and Removal of Uranium Flywheel ML23115A2382023-04-26026 April 2023 Westinghouse Columbia Fuel Fabrication Facility - Integrated Inspection Report 07001151/2023001 ML23114A3592023-04-24024 April 2023 Westinghouse Submittal of Environmental Sampling and Monitoring Program for NRC Review and Approval ML23114A3612023-03-23023 March 2023 Enclosures 2 & 3 - SCDHEC Approval Letter of Westinghouse Ri Report, Dated March 23, 2023 and Environmental Sampling and Monitoring Program Section of SNM-1107 License Application ML23058A4482023-02-27027 February 2023 Request for Threshold Determination for Interim Transaction Included in December 20, 2022 Application for Consent to Indirect Change of Control with Respect to a Materials License, Export Licenses, and Notification Regarding Other Approvals ML23058A2722023-02-27027 February 2023 Westinghouse, NRC Semiannual Discharge Report July - December 2022 ML23053A0712023-02-17017 February 2023 Westinghouse Electric Company LLC, Supplement to Application for Consent to Indirect Change of Control with Respect to a Materials License, Export Licenses, and Notification Regarding Other Approvals and Request for Threshold Determination ML23053A0752023-02-17017 February 2023 Westinghouse Electric Co. - Supplement 2 to Application for Consent to Indirect Change of Control with Respect to a Materials License, Export Licenses, and Notification Regarding Other Approvals and Request for Threshold Determination ML23047A4562023-02-16016 February 2023 Westinghouse, Response to Request for Additional Information - Request for Temporary License Amendment for Storage of Hematite Ash ML23030B8552023-01-30030 January 2023 Westinghouse 10CFR70.72 Facility Change Report ML23024A2312023-01-30030 January 2023 Westinghouse Columbia Fuel Fabrication Facility - Integrated Inspection Report 07001151//2022004 ML23013A2122023-01-27027 January 2023 Acceptance Letter for Westinghouse License Transfer - Cac/Epid L-2022-LLM-0004 ML23026A3642023-01-26026 January 2023 Westinghouse, January 2023 Updated Integrated Safety Analysis Summary ML22354A0732023-01-19019 January 2023 Response to Westinghouse Revised Funding Instrument in Support of the Decommissioning Funding Plan ML22363A0152022-12-29029 December 2022 Westinghouse Electric Co - 60-Day Report Regarding the November 1, 2022, Incident Reported Under 10 CFR 70 Appendix a 24-Hr Report, Columbia Fuel Fabrication Facility (License No. SNM-1107, Docket No. 70-1151) ML22354A2912022-12-20020 December 2022 Application for Consent to Indirect Change of Control with Respect to a Materials License, Export Licenses, and Notification Regarding Other Approvals and Request for Threshold Determination ML22347A1162022-12-13013 December 2022 Westinghouse 2021-2022 Annual Groundwater Monitoring Report ML22336A1742022-12-0202 December 2022 Westinghouse Request for Temporary License Amendment for Storage of Hematite Ash ML22316A0052022-11-10010 November 2022 Westinghouse Electric Company LLC, Submittal of Amendment to Trust Agreement for License Number SNM-1107, Surety Bond Rider for SNM-1107, and Certification of Financial Assurance for SNM-1107 (Proprietary/Non-Proprietary) ML22298A0432022-10-28028 October 2022 Westinghouse Columbia Fuel Fabrication Facility Integrated Inspection Report 07001151/2022003 ML22294A1792022-10-21021 October 2022 Westinghouse, Request to Amend License SNM-1107 and Submittal of SNM-1107 License Application Page Changes ML22259A1802022-09-27027 September 2022 Letter -WEC 2022 DFP Approval MD ML22157A3492022-09-12012 September 2022 Westinghouse Electric Company, LLC - Renewal of Materials License SNM-1107 (Enterprise Project Identifier: L-2017-RNW-0016) ML22249A2252022-09-0606 September 2022 EPA Comments_Columbia Fuels Feis 2022 ML22228A1812022-08-16016 August 2022 Westinghouse, NRC Semi-Annual Discharge Report January - June 2022 ML22217A0422022-08-0505 August 2022 Response Ltr. to Mmitchum, Chief, Pine Hill Indian Tribe, the First People of Fort Jackson Re., Correspondence Related to the Proposed License Renewal for the WEC Cfff in Richland, Sc ML22214A1492022-08-0202 August 2022 Letter to Ms. Michelle Mitchum, Pine Hill Indian Tribe; Re. Westinghouse Cfff ML22215A1952022-08-0202 August 2022 Letter to USNRC and Schpo 8-2-22 from Pine Hill Indian Tribe Re Columbia Fuel Fabrication Facility ML22182A4352022-07-29029 July 2022 Letter to Applicant - Notice of Availability of the Final Environmental Impact Statement for Westinghouse Columbia Fuel Fabrication Facility 2024-01-26
[Table view] |
Text
WESTINGHOUSE NON-PROPRIETARY CLASS 3 Westinghouse Westinghouse Electric Company LLC Columbia Fuel Site 5801 BluffRoad Hopkins, South Carolina 29061-9121 USA Director, Office of Nuclear Material Safety and Directtel: 803-647-1957 Safeguards U.S. Nuclear Regulatory Commission e-mail: donnelpb@westinghouse.com Document Control Desk 11555 Rockville Pike Your ref:
Rockville, Maryland 20852-2738 Our ref: LTR-RAC-22-50 Security-Related Information Notice Enclosure 3 to this letter contains security related information October 21, 2022 which is to be withheld from public disclosure in accordance with RIS 2005-31. The balance of this letter may be considered public upon removal ofEnclosure 3
SUBJECT:
REQUEST TO AMEND LICENSE SNM-1107 AND SUBMITTAL OF SNM-1107 LICENSE APPLICATION PAGE CHANGES
Dear Sir or Madam:
Westinghouse Electric Company LLC (Westinghouse) requests approval for an amendment to SNM-1107 in accordance with 10 CFR 70.34 to remove Item Gin the SNM-1107 Possession Limits. Enclosure 1 contains copies of the Certificate of Disposal and the relevant NRC Forms 540, 541 and 741 as documentation of the removal of the depleted uranium flywheel component from the Columbia Fuel Fabrication Facility (CFFF) site.
Westinghouse is also providing the enclosed revision to the SNM-1107 License Application. The revision in Enclosure 2 provides updates to the following information in the SNM-1107 License Application:
- The depleted uranium flywheel was removed from the material possession limits within Section 1.1.4.
- Names and addresses of principal officers and licensing contacts within Section 1.1.5.
- Figure 2.1 was updated to reflect the consolidation of the Regulatory Component Functions under a single Plant Staff Manager.
- Deleted repetitive phrase from third paragraph of Section 10 .1.4.
- To assure alignment with SNM-1107 License Condition S-16 and Authorization 12.1.1 of the SNM-1107 License Application, Section 10.1.7.2 was re-inserted after inadvertent omission in the previous revision of the License Application.
- Table 10.2 was updated to correct a typographical error in the list of monitoring wells and to make table text font uniform. The total number of monitoring wells remains unchanged from the previous revision. Table 10.2 footnote 1a updated to reflect current upstream well monitoring locations.
- "Type of Sample" updated from "Well Water" to "Groundwater" in Tables 10.1 and 10.3.
- Sections 11.1.1 and 11.1.2, regarding Decommissioning Planning and the Decommissioning Funding Plan, were combined into a single section for clarity.
© 2022 Westinghouse Electric Company LLC All Rights Reserved
WESTINGHOUES NON-PROPRIETARY CLASS 3 Page 2 of2 Our ref: L TR-RAC-22-50 October 21, 2022 This page change revision does not result in a degradation of any safety commitments in the License Application, does not impair Westinghouse's ability to meet applicable Federal Regulations, and does not conflict with any License Condition. As such, the enclosed administrative update is processed in accordance with SNM-1107 License Condition S-4 and Authorization 12.1.1 of the SNM-1107 License Application.
If you have any questions, please contact me at (803) 647-1957.
Patrick B. Donnelly (Oct 21, 202214:4 DT)
Patrick B. Donnelly Regulatory Affairs Manager Westinghouse Columbia Fuel Fabrication Facility Docket 70-1151, License SNM-1107 : Supporting Documentation for SNM-1107 Amendment Request (5 pages) : SNM-1107 License Application, Revision 1 (113 pages) : SNM-1107 License Application, Page 11 (Security Related Information, 2 pages) cc:
NRC, Ms. Jennifer Tobin NRC, Mr. Thomas Vukovinsky