ML22146A167
ML22146A167 | |
Person / Time | |
---|---|
Site: | Perry |
Issue date: | 06/27/2017 |
From: | Randy Baker NRC/RGN-III/DRS/OLB |
To: | |
Baker R | |
Shared Package | |
ML17142A152 | List: |
References | |
Download: ML22146A167 (1) | |
Text
ES-301 Administrative Topics Outline Form ES-301-1
Facility: Perry Date of Examination: Jul 2017 Examination Level: SRO Operating Test Number: 01a
Administrative Topic Type Describe activity to be performed (see Note) Code*
Conduct of Operations R, D, P 2.1.35 Knowledge of the fuel -handling responsibilities of OT-3701-ADM_025 SRO SROs.
Importance SRO 3.9 Verify proper placement of in-core components during Refuel Operations.
Conduct of Operations R, N 2.1.5 Ability to use procedures related to shift staffing, OT-3701-ADM_031SRO such as minimum crew complement, overtime limitations, etc.
Importance SRO 3.9 Determine if on-coming crew can assume the shift.
Equipment Control R, D 2.2.23 Ability to track Technical Specification limiting OT-3701-C11_014SRO conditions for operations.
Importance SRO 4.6 Evaluate SCRAM time data.
Radiation Control R, N 2.3.15 Knowledge of radiation monitoring systems, such OT-3701-ADM_032SRO as fixed radiation monitors and alarms, portable survey instruments, personnel monitoring equipment, etc..
Importance SRO 3.1 Determine requirements for rad monitor out of service.
Emergency Procedures/Plan R, N 2.4.40 Knowledge of SRO responsibilities in emergency OT-3701-ADM_321SRO plan implementation.
Importance SRO 4.5 Complete the Follow-Up Notification.
NOTE: All items (five total) are required for SROs. RO applicants require only four items unless they are retaking only the administrative topics (which would require all five items).
- Type Codes & Criteria: (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs; 4 for SROs & RO retakes)
(N)ew or (M)odified from bank ( 1)
(P)revious 2 exams ( 1; randomly selected)
NUREG 1021, Rev. 10 Page 1 of 1 FENOC Facsimile