ML22146A186
| ML22146A186 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 06/27/2017 |
| From: | Randy Baker NRC/RGN-III/DRS/OLB |
| To: | |
| Baker R | |
| Shared Package | |
| ML17142A152 | List: |
| References | |
| Download: ML22146A186 (1) | |
Text
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 NUREG 1021, Rev. 10 Page 1 of 1 FENOC Facsimile Facility:
Perry Date of Examination: Jul 2017 Exam Level: SRO-U Operating Test No.: 01a Control Room Systems:* 8 for RO; 7 for SRO-I; 2 or 3 for SRO-U System / JPM Title Type Code*
Safety Function
- a. Residual Heat Removal System OT-3701-E12_506 Initiate SDC after loss of SDC A, D, S, E, L, EN 4
- b. Suppression Pool Makeup System OT-3037-G43_001 Initiate Suppression Pool Makeup D,S,E 5
- d.
- e.
- f.
g h
In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
- i.
Emergency Service Water System OT-3701-D51_303 Assess earthquake damage D, E 2
- j.
Fire Protection System OT-3701-P54_003 Initiate Main Transformer Deluge N, R, E 8
- k.
All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all five SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A)
(P)revious 2 exams (R)CA (S)imulator 4-6 / 4-6 / 2-3 9 / 8 / 4 1 / 1 / 1 1 / 1/ 1(control room system) 1 / 1 / 1 2 / 2 / 1 3 / 3 / 2 (randomly selected) 1 / 1 / 1