ML15013A275

From kanterella
Jump to navigation Jump to search
Initial Exam 2014-302 General Correspondence
ML15013A275
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 01/13/2015
From:
NRC/RGN-II
To:
Progress Energy Carolinas
Shared Package
ML15013A407 List:
References
50-400/OL-14
Download: ML15013A275 (5)


Text

[

DUKE Harris Nuclear Plant 5413 Shearon Harris Rd ENERGY New Hill NC 27562-9300 December 2, 2014 Serial: HNP-14-131 Mr. Gerald J. McCoy U.S. Nuclear Regulatory Commission, Region II 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, GA 30303-1257 Shearon Harris Nuclear Power Plant, Unit 1 Docket No. 50-400/Renewed License No. NPF-63

Subject:

Reactor and Senior Reactor Operator Initial Examinations 05000400/2014302

Dear Mr. McCoy:

Enclosed is the post-examination package for the Reactor and Senior Reactor Operator Initial Examinations given at the Harris Nucl ear Plant November 17, 2014, through November 25, 2014.

Included from the administration of the written examination are the student cover sheets, answer sheets, master examinations, answer key, log of applicant questions and answers, and the student seating chart. Also included, perta ining to the written examination, are four post-examination comments (Question #5, #27,

  1. 51, and #73).

If you have any questions regarding this subm ittal, please contact me at (984) 229-6021 Sincerely, Simon Schwindt Manager Nuclear Operations Training Harris Nuclear Plant Enclosures C: Mr. J. D. Austin, NRC Senior Resident Inspector

, HNP (w/o Enclosures)

Ms. M. Barillas, NRC Project Manager, HNP (w/o Enclosures)

Mr. V. M. McCree, NRC Regional Administrator, Region II (w/o Enclosures) 0