ML15013A249

From kanterella
Jump to navigation Jump to search
Initial Exam 2014-302 Draft Administrative JPM
ML15013A249
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 01/13/2015
From:
NRC/RGN-II
To:
Progress Energy Carolinas
Shared Package
ML15013A407 List:
References
50-400/OL-14
Download: ML15013A249 (86)


Text

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: Harris Nuclear Plant Task No.: 001004H101 Task

Title:

Perform A Manual Shutdown Margin JPM No.: 2014 NRC Exam Calculation Admin JPM RO A1-2 K/A

Reference:

G 2.1.25 RO 3.9 SRO 4.2 Alternate Path - NO Examinee: ________________________ NRC Examiner: _________________

Facility Evaluator: ________________________ Date: ________

Method of testing:

Simulated Performance: Actual Performance: X Classroom X Simulator Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate, discuss or perform, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

The plant has been operating at 92% power for 2 weeks.

OST-1005, Control Rod and Rod Position Indicator Exercise Quarterly Interval Modes 1 - 3, was just performed and one rod in Initial Conditions: Control Bank B was determined to be immovable/stuck.

  • Core burnup is 350 EFPD
  • POWERTRAX is NOT available The CRS has entered Tech Spec 3.1.1.1 and has directed you to complete OST-1036, Shutdown Margin Calculation Modes 1-5, Section 7.3, Manual SDM Calculation (Modes 1 and 2) for current plant Initiating Cue: conditions.

NOTE: For this JPM notify evaluator when independent verification is required to be performed.

2014 NRC Admin Exam RO A1-2 Rev. 3

Appendix C Job Performance Measure Form ES-C-1 Worksheet Task Standard: OST-1036, Attachment 3, Manual SDM Calculation (Modes 1 and 2),

completed with SDM of 2872 + 100 pcm (tolerance based on total of curves used and their division readability)

Required Materials: Calculator, ruler General

References:

OST-1036, Shutdown Margin Calculation Modes 1-5 (Rev. 48)

Curve Book (Cycle 19)

Handouts: OST-1036, Shutdown Margin Calculation Modes 1-5 (Rev. 48), pg 19, 24 and 25 Time Critical Task: No Validation Time: 20 minutes Critical Step Justification Must determine correct rod insertion limit based on curve value. The Step 4 number of rod steps will be an input to the calculation.

Must determine correct power defect based on curve value. The power Step 7 defect will provide one of the inputs to the calculation.

Must determine the correct rod worth based on curve value. The rod Step 8 worth will provide one of the inputs to the calculation.

The total shutdown margin was the task that the CRS directed applicant Step 10 to perform.

2014 NRC Admin Exam RO A1-2 Rev. 3

Appendix C Page 3 of 15 Form ES-C-1 PERFORMANCE INFORMATION START TIME:

OST-1036 Performance Step: 1 OBTAIN PROCEDURE Standard: Reviews Procedure Evaluator Cue: Provide OST-1036 Section 7.3 and Attachment 3.

Comment:

NOTE: The curve numbers provided in this JPM are Evaluator Note: numbers from the 2014 NRC Exam Frozen Procedures Curve Book folder.

OST-1036 Section 7.3.1 Performance Step: 2 Enter the absolute value for each parameter on Attachment 3.

Standard: Reviews Attachment 3 and determines value for each parameter.

Comment:

OST-1036 Attachment 3 Step 1 Performance Step: 3 Enters Reactor Power Level Standard: Refers to given conditions and enters 92%

Comment:

- Denotes Critical Steps 2014 NRC Admin Exam RO A1-2 Rev. 3

Appendix C Page 4 of 15 Form ES-C-1 PERFORMANCE INFORMATION OST-1036 Attachment 3 Step 2 Performance Step: 4 Determine Rod Insertion Limit for power level Standard: Refers to Curve F-19-1 and determines TS limit for RIL to be 170 steps (165 - 175 steps, tolerance based on curve division readability)

Comment:

OST-1036 Attachment 3 Step 3 Performance Step: 5 Enters core Burn Up Standard: Refers to given conditions and enters 350 EFPD Comment:

OST-1036 Attachment 3 Step 4 Performance Step: 6 Enters RCS Boron Concentration Standard: Refers to initial conditions and enters 600 ppm Comment:

ATT 3, STEP 5 NOT PERFORMED SINCE VALUE IS Evaluator Note:

INCLUDED AS PART OF ATTACHMENT.

- Denotes Critical Steps 2014 NRC Admin Exam RO A1-2 Rev. 3

Appendix C Page 5 of 15 Form ES-C-1 PERFORMANCE INFORMATION OST-1036 Attachment 3 Step 6 Performance Step: 7 Determines Power Defect for current power level Standard: Refers to Curve C-19-3 and determines power defect to be 2520 + 50 pcm (tolerance based on curve division readability)

Comment:

OST-1036 Attachment 3 Step 7 Performance Step: 8 Determines Rod Worth for RIL position determined above Standard: Refers to Curve A-19-11 and determines rod worth to be 425 + 50 pcm (tolerance based on rod position tolerance from performance step 4 curve division readability)

Comment:

OST-1036 Attachment 3 Step 8 Performance Step: 9 Enters worth of any additional immovable or untrippable rods Standard: Refers to given conditions and enters 1294 pcm Comment:

- Denotes Critical Steps 2014 NRC Admin Exam RO A1-2 Rev. 3

Appendix C Page 6 of 15 Form ES-C-1 PERFORMANCE INFORMATION OST-1036 Attachment 3 Step 9 Performance Step: 10 Determines Total Shutdown Margin Standard: Determines Total Shutdown Margin to be 2872 + 75 pcm (tolerance based on total of all curves used and their division readability)

Comment:

OST-1036 Section 7.3.2 Performance Step: 11 Perform the calculation listed on Attachment 3 Item 9 for the required SDM boron concentration for the projected conditions.

Standard: Refers to Attachment 3 Item 9 to document SDM Comment:

OST-1036 Section 7.3.3 Performance Step: 12 Perform an independent verification of Attachment 3..

Standard: Contacts evaluator to perform Independent Verification per initial conditions Comment:

When independent verification of OST-1036, Attachment 3, Evaluator Cue: Manual SDM Calculation is requested.

END OF JPM STOP TIME:

- Denotes Critical Steps 2014 NRC Admin Exam RO A1-2 Rev. 3

Appendix C Page 7 of 15 Form ES-C-1 PERFORMANCE INFORMATION KEY

- Denotes Critical Steps 2014 NRC Admin Exam RO A1-2 Rev. 3

Appendix C Page 8 of 15 Form ES-C-1 PERFORMANCE INFORMATION KEY

- Denotes Critical Steps 2014 NRC Admin Exam RO A1-2 Rev. 3

Appendix C Page 9 of 15 Form ES-C-1 PERFORMANCE INFORMATION KEY

- Denotes Critical Steps 2014 NRC Admin Exam RO A1-2 Rev. 3

Appendix C Page 10 of 15 Form ES-C-1 PERFORMANCE INFORMATION EXAMINER CALCULATION KEY (SHADED AREA BELOW INDICATES DATA ALREADY PROVIDED)

Manual SDM Calculation (Modes 1 and 2)

1. Reactor power level. 92  %
2. Rod insertion limit for the above power level 170 steps on bank D (165-175)
3. Burn up (POWERTRAX/MCR Status Board). 350 EFPD
4. Present RCS Boron Concentration 600 ppm NOTE: Use absolute values of numbers obtained from curves.
5. Total worth of all control and shutdown banks, minus the worth of the most reactive rod for Fuel Cycle 19.

7111 pcm (a)

6. Cycle 19 Power defect for the power level recorded in Step 1.

(Refer to Curves C-X-1 to C-X-3).

Curve used C-19-3 2520 + 50 pcm (b)

NOTE: HFP curves are used for power levels of 10% or greater.

7. Inserted control rod worth at the rod insertion limit recorded in Step 2.

(Refer to Curves A-X-6 to A-X-11)

Curve used A-19-11 425 + 50 pcm (c)

8. Worth of any additional immovable or untrippable rods (for each stuck rod, use the most reactive single rod worth (1294 pcm) or obtain individual withdrawn rod worth from the Reactor Engineer).

1294 pcm (d)

9. Determine the Total Shutdown Margin using the following formula:

Total SDM C B = 7111 - 2520 + 50 - 425 + 50 - 1294 (e) (a) (b) (c) (d) 2872 + 100 pcm (e)

- Denotes Critical Steps 2014 NRC Admin Exam RO A1-2 Rev. 3

Appendix C Page 11 of 15 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2014 NRC Exam Admin JPM RO A1-2 Perform A Manual Shutdown Margin Calculation OST-1036 Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: SAT UNSAT Examiners Signature: Date:

2014 NRC Admin Exam JPM RO A1-2 Rev. 3

Appendix C Form ES-C-1 JPM CUE SHEET Name:

Date:

The plant has been operating at 92% power for 2 weeks.

OST-1005, Control Rod and Rod Position Indicator Exercise Quarterly Interval Modes 1 - 3, was just performed and one rod in Initial Conditions: Control Bank B was determined to be immovable/stuck.

  • Core burnup is 350 EFPD
  • POWERTRAX is NOT available The CRS has entered Tech Spec 3.1.1.1 and has directed you to complete OST-1036, Shutdown Margin Calculation Modes 1-5, Section 7.3, Manual SDM Calculation (Modes 1 and 2) for current plant Initiating Cue: conditions.

NOTE: For this JPM notify evaluator when independent verification is required to be performed.

2014 NRC Admin Exam JPM RO A1-2 Rev. 3

Appendix C Form ES-C-1 JPM CUE SHEET 2014 NRC Admin Exam JPM RO A1-2 Rev. 3

Appendix C Form ES-C-1 JPM CUE SHEET 2014 NRC Admin Exam JPM RO A1-2 Rev. 3

Appendix C Form ES-C-1 JPM CUE SHEET 2014 NRC Admin Exam JPM RO A1-2 Rev. 3

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: Harris Nuclear Plant Task No.: 015004H201 Task

Title:

Perform the Quadrant Power Tilt JPM No.: 2014 NRC Exam Ratio Surveillance Admin JPM RO A2 K/A

Reference:

G2.2.12 RO 3.7 SRO 4.1 Alternate Path - NO Examinee: _________________________ NRC Examiner: _________________

Facility Evaluator: _________________________ Date: _________________

Method of testing:

Simulated Performance: Actual Performance: X Classroom X Simulator Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate, discuss or perform, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

  • The plant is operating at 90% power when a rod in Control Bank A (P-10) dropped.
  • The crew is performing AOP-001, MALFUNCTION OF ROD CONTROL AND INDICATION SYSTEM.

Initial Conditions:

  • There are NO deficiency tags on PR NIs.
  • ERFIS points ANM9112U and ANM9113L have a BAD quality code. HNP IT has been notified and they are evaluating the ERFIS points.

The CRS has directed you to perform a manual QPTR IAW OST-1039, CALCULATION OF QPTR. The Power Range NI indications are provided.

Initiating Cue:

NOTE: Show values of your work. For this JPM notify evaluator when independent verification is required to be performed.

2014 NRC Exam Admin JPM RO A2 Rev. 3

Appendix C Job Performance Measure Form ES-C-1 Worksheet Task Standard: Calculations within required band.

Required Materials: Calculator General

References:

OST-1039, CALCULATION OF QPTR, Revision 16 Handouts:

  • OST-1039
  • Power Range NI - Current and Voltage Set point Table Time Critical Task: No Validation Time: 15 minutes Critical Step Justification Must accurately determine the correct calculation based on collecting Step 10 and inputting either provided data or visual inspection data. The calculation will yield an unsatisfactory QPTR.

Must accurately determine the correct calculation based on collecting Step 11 and inputting either provided data or visual inspection data. The calculation will yield an unsatisfactory QPTR.

Must accurately determine the correct calculation based on collecting Step 12 and inputting either provided data or visual inspection data. The calculation will yield an unsatisfactory QPTR.

2014 NRC Exam Admin JPM RO A2 Rev. 3

Appendix C Page 3 of 15 Form ES-C-1 PERFORMANCE INFORMATION Start Time: __________.

Performance Step: 1 Obtain procedure.

Standard: Reviews procedure.

Evaluator Cue: Provide OST-1039.

A KEY is provided for your use on JPM prior to candidate Evaluator Note:

pages.

Comment:

NOTE: The NI curve numbers provided in this JPM are Evaluator Note: numbers from the 2014 NRC Exam Frozen Procedures Curve Book folder.

OST-1039 Section 3.0 Note prior to step 1 Performance Step: 2 NOTE: Precaution and Limitation 4.0.1 has guidance if performing this OST with one Power Range Channel inoperable.

Standard: Operator reads and placekeeps any note or caution (initials, checks or circle/slash at each bulleted item to indicate read and understood)

Comment:

- Denotes Critical Steps 2014 NRC Exam Admin JPM RO A2 Rev. 3

Appendix C Page 4 of 15 Form ES-C-1 PERFORMANCE INFORMATION OST-1039 Section 3.0 Performance Step: 3 Completes Prerequisites section:

  • Verify instrumentation needed for the performance of this test is free of deficiencies that affect instrument indication.
  • Verify the most recent Curve F-X-8 is used in the performance of this procedure. (Reference 2.1.1 and 2.1.2)
  • OBTAIN CRS permission to perform this OST.

Standard:

  • Logs F-19-8 revision number : 5
  • Initials/signs all blocks Comment:

OST-1039 Section 7.0 Performance Step: 4

  • IF Quadrant Power Tilt Ratio Calculation Computer Program is used, THEN PERFORM the following:
  • MARK Step 7.0.2 N/A.
  • MARK Section 7.2 N/A.
  • PERFORM Section 7.1.
  • IF manual calculation of the Quadrant Power Tilt Ratio is used, THEN PERFORM the following:
  • MARK Section 7.1 N/A.
  • PERFORM Section 7.2.

Standard:

  • Marks Section 7.1 N/A
  • Proceeds to Section 7.2 Comment:

- Denotes Critical Steps 2014 NRC Exam Admin JPM RO A2 Rev. 3

Appendix C Page 5 of 15 Form ES-C-1 PERFORMANCE INFORMATION OST-1039 Section 7.2 Note prior to step 1 Performance Step: 5 NOTE: The detector current meters on each power range channel drawer are designated as left-upper, right-lower.

Standard: Operator reads and placekeeps any note or caution (initials, checks or circle/slash at each bulleted item to indicate read and understood)

Comment:

OST-1039 Section 7.2, Step 1 Performance Step: 6 Prior to reading the value of detector current, VERIFY the meter range/rate switch is in the 400 µA/SLOW position.

Standard: Prior to reading the value of detector current, VERIFIES the Meter Range/Rate switch is in the 400 A/SLOW position.

Evaluator Note: This information is on the JPM Cue Sheet Comment:

OST-1039 Section 7.2, Step 2 Performance Step: 7 RECORD on Attachment 2, in column A, the upper and lower detector currents from all operable power range channels as read on the Nuclear Instrumentation Cabinet.

Standard: Transposes readings from PRNIs Readings Table onto Attachment 2.

Comment:

- Denotes Critical Steps 2014 NRC Exam Admin JPM RO A2 Rev. 3

Appendix C Page 6 of 15 Form ES-C-1 PERFORMANCE INFORMATION OST-1039 Section 7.2, Step 3 Performance Step: 8 RECORD on Attachment 2, in column B, the 100% power normalized current for each channel from Curve F-X-8.

Standard: Transposes TOP and BOTTOM 100% current values from the Curve F-19-8.

Comment:

OST-1039 Section 7.2, Note prior to Step 4 Performance Step: 9 NOTE: When recording all fractions and ratios, record to four decimal places, dropping the fifth and subsequent decimal places.

Standard: Operator reads and placekeeps any note or caution (initials, checks or circle/slash at each bulleted item to indicate read and understood)

Comment:

OST-1039 Section 7.2, Step 4 Performance Step: 10 Divide values in Column A by the respective normalized current in Column B and record the result in Column C as the Normalized Fraction.

Standard: Divides each Upper and Lower reading by the respective 100%

normalized current value and records in Column C.

Comment:

- Denotes Critical Steps 2014 NRC Exam Admin JPM RO A2 Rev. 3

Appendix C Page 7 of 15 Form ES-C-1 PERFORMANCE INFORMATION OST-1039 Section 7.2, Step 5 Performance Step: 11 CALCULATE the average value for the upper and the lower Normalized Fractions as follows:

  • ADD the Normalized Fraction in each section of column C, recording the sum in the space provided.
  • DIVIDE the sum obtained in Step 7.2.5.a by the number of operable NI channels, recording the result in column D of Attachment 2.

Standard: Adds all Normalized Fractions for the same plane and records the sum in the space provided.

Divides by the sum by four and records result in Column D.

Comment:

OST-1039 Section 7.2, Step 6 Performance Step: 12 Using the formula and values from Attachment 2, CALCULATE the Upper and Lower Ratios.

Standard:

  • Divides the Maximum Normalized Fraction by the Average Normalized Fraction on each plane.
  • Determines the UPPER ratio is 1.02
  • QPTR value as 1.0763 to 1.0773 (N43 UPPER) Identifies Upper as outside the band The applicant may inform the CRS as soon as any Evaluator Note: calculation is > 1.02. If so, acknowledge and evaluation on this JPM is complete.

Comment: Acceptable band is +/- .0005.

UPPER calculated band is 1.0763 to 1.0773 LOWER calculated band is 1.0682 to 1.0692

- Denotes Critical Steps 2014 NRC Exam Admin JPM RO A2 Rev. 3

Appendix C Page 8 of 15 Form ES-C-1 PERFORMANCE INFORMATION OST-1039 Section 7.2, Step 7 Performance Step: 13 PERFORM independent verification of all calculations made on Attachment 2.

Standard: Requests Independent Verifier.

Independent verifications complete, I agree with your Evaluator Cue: calculations.

Evaluation on this JPM is complete.

Comment:

STOP Time: __________.

- Denotes Critical Steps 2014 NRC Exam Admin JPM RO A2 Rev. 3

Appendix C Page 9 of 15 Form ES-C-1 PERFORMANCE INFORMATION KEY Determines QPTR = 1.0768 Acceptable band is +/- .0005 (1.0763 to 1.0773)

A B C D UPPER UPPER AVERAGE UPPER 100% POWER NORMALIZED UPPER UPPER DETECTOR NORMALIZED FRACTION NORMALIZED DETECTOR CURRENT CURRENT (NOTE 1) FRACTION N-41 145.6 161.4 0.9021 N-42 162.5 181.6 0.8948 0.9055 N-43 199.8 204.9 0.9751 N-44 138.4 162.8 0.8501 SUM 3.5360 Maximum Upper Normalized Fraction 0.9751 Upper Ratio = = = 1.0768*

Average Upper Normalized Fraction 0.9055

  • Standard for this calculation is 1.0763 to 1.0773 A B C D LOWER LOWER AVERAGE LOWER 100% POWER NORMALIZED LOWER LOWER DETECTOR NORMALIZED FRACTION NORMALIZED DETECTOR CURRENT CURRENT (NOTE 1) FRACTION N-41 159.6 179.3 0.8901 N-42 172.1 204.1 0.8432 0.8845 N-43 209.3 221.4 0.9453 N-44 165.2 192.2 0.8595 SUM 3.5381 Maximum Lower Normalized Fraction 0.9453 Lower Ratio = = = 1.0687**

Average Lower Normalized Fraction 0.8845

    • Standard for this calculation is 1.0682 to 1.0692

- Denotes Critical Steps 2014 NRC Exam Admin JPM RO A2 Rev. 3

Appendix C Page 10 of 15 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2014 NRC Exam Admin JPM RO A2 Perform a Quadrant Power Tilt Ratio Surveillance OST-1039 Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: SAT UNSAT Examiners Signature: Date:

2014 NRC Exam Admin JPM RO A2 Rev. 3

Appendix C Form ES-C-1 JPM CUE SHEET Name:

Date:

  • The plant is operating at 90% power when a rod in Control Bank A (P-10) dropped.
  • The crew is performing AOP-001, MALFUNCTION OF ROD CONTROL AND INDICATION SYSTEM.

Initial Conditions:

  • There are NO deficiency tags on PR NIs.
  • ERFIS points ANM9112U and ANM9113L have a BAD quality code. HNP IT has been notified and they are evaluating the ERFIS points.

The CRS has directed you to perform a manual QPTR IAW OST-1039, CALCULATION OF QPTR. The Power Range NI indications are provided.

Initiating Cue:

NOTE: Show values of your work. For this JPM notify evaluator when independent verification is required to be performed.

2014 NRC Exam Admin JPM RO A2 Rev. 3

Appendix C Form ES-C-1 JPM CUE SHEET 145.6 159.6 N41B 400 µA/SLOW 400 µA/SLOW 2014 NRC Exam Admin JPM RO A2 Rev. 3

Appendix C Form ES-C-1 JPM CUE SHEET 162.5 172.1 N42B 400 µA/SLOW 400 µA/SLOW 2014 NRC Exam Admin JPM RO A2 Rev. 3

Appendix C Form ES-C-1 JPM CUE SHEET 199.8 209.3 N43B 400 µA/SLOW 400 µA/SLOW 2014 NRC Exam Admin JPM RO A2 Rev. 3

Appendix C Form ES-C-1 JPM CUE SHEET 138.4 165.2 N44B 400 µA/SLOW 400 µA/SLOW 2014 NRC Exam Admin JPM RO A2 Rev. 3

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: Harris Nuclear Plant Task No.: 119015H301 Task

Title:

Perform RCS Average Temperature JPM No.: 2014 NRC Exam Data Sheet and Determine Inverse Admin JPM RO SRO A1-1 Count Rate Ratio (1/M)

K/A

Reference:

004 A4.03 RO 2.7 SRO 3.2 Alternate Path - NO Examinee: ________________________ NRC Examiner: _________________

Facility Evaluator: ________________________ Date: ________

Method of testing:

Simulated Performance: Actual Performance: X Classroom X Simulator Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate, discuss or perform, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

The unit is in Mode 2, with a plant startup in progress per GP-004, REACTOR STARTUP (MODE 3 TO MODE 2). The OATC has just Initial Conditions:

completed the 3rd doubling.

The CRS has assigned you to complete Attachment 2, Inverse Count Initiating Cue: Rate Ratio (1/M) and RCS Average Temperature Data Sheet and Attachment 3, 1/M Data Plot to predict when reactor will become critical.

2014 NRC Admin Exam RO SRO A1-1 Rev. 3

Appendix C Job Performance Measure Form ES-C-1 Worksheet Task Standard: Determines the predicted criticality will occur below the 500 pcm ECC rod height of 36 steps on CBD.

Required Materials: Calculator General

References:

GP-004, Rev 58 Handouts: JPM Cue Sheets Pages 8 and 9, GP-004 Attachment 3 pg 32 Time Critical Task: No Validation Time: 15 minutes Critical Step Justification Critical to correctly calculate inverse count ratio in order to predict the Step 3 estimated critical rod position following the doubling of source range counts Critical to correctly plot the inverse count ratio and controlling rod Step 4 position in order to predict the estimated critical rod position following the doubling of source range counts Critical to correctly calculate inverse count ratio in order to predict the Step 5 estimated critical rod position following the doubling of source range counts Critical to correctly plot the inverse count ratio and controlling rod Step 6 position in order to predict the estimated critical rod position following the doubling of source range counts Critical to correctly calculate inverse count ratio in order to predict the Step 7 estimated critical rod position following the doubling of source range counts Critical to correctly plot the inverse count ratio and controlling rod Step 8 position in order to predict the estimated critical rod position following the doubling of source range counts 2014 NRC Admin Exam RO SRO A1-1 Rev. 3

Appendix C Page 3 of 9 Form ES-C-1 PERFORMANCE INFORMATION Start Time: __________.

Performance Step: 1 OBTAIN PROCEDURE (GP-002 Attachment 2 and 3 will be provided to allow candidates to write on)

Standard: Obtains GP-004 and refers to Attachment 2 and 3.

Comment:

Performance Step: 2 Complete Attachment 3 Startup Information Standard: Transfers the following information from Attachment 2 to Attachment 3:

  • Date
  • Startup Number
  • Rod Insertion Limit
  • 500 pcm below ECC
  • 500 pcm above ECC
  • Control Operator The above information has been provided to the candidate as part of the JPM Cue sheet for Attachment 2.

Evaluator Note: The transfer of this information from Attachment 2 to Attachment 3 may be performed at any time before the completion of the JPM Comment:

Performance Step: 3 Calculation of 1/M data point at 0515 Standard: Divides initial source range count rate by source range count reading for 0515

  • 150 cps / 305 cps = 0.49 Comment:

- Denotes a Critical Step 2014 NRC Admin Exam RO SRO A1-1 Rev. 3

Appendix C Page 4 of 9 Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 4 Plot 1/M data point to determine predicted Criticality position at 0515 Standard: Manually plots 1/M data point on Attachment 3 using data from Attachment 2 and interpolates data to determine predicted critical position is 216 steps on Control Bank D.

(208 - 224 steps, tolerance based on curve division readability)

Comment:

Performance Step: 5 Calculation of 1/M data point at 0530 Standard: Divides initial source range count rate by source range count reading for 0530

  • 150 cps / 625 cps = 0.24 Comment:

Performance Step: 6 Plot 1/M data point to determine predicted Criticality position at 0530 Standard: Manually plots 1/M data point on Attachment 3 using data from Attachment 2 and interpolates data to determine predicted critical position is 96 steps on Control Bank D.

(88 - 104 steps, tolerance based on curve division readability)

Comment:

- Denotes a Critical Step 2014 NRC Admin Exam RO SRO A1-1 Rev. 3

Appendix C Page 5 of 9 Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 7 Calculation of 1/M data point at 0545 Standard: Divides initial source range count rate by source range count reading for 0545

  • 150 cps / 1275 cps = 0.12 Comment:

Performance Step: 8 Plot 1/M data point to determine predicted Criticality position at 0545 Standard: Manually plots 1/M data point on Attachment 3 using data from Attachment 2 and interpolates data to determine predicted critical position is 24 steps on Control Bank D.

(16 - 32 steps, tolerance based on curve division readability)

Determines the predicted criticality position is below the 500 pcm ECC value of 36 steps on Control Bank D Comment:

Performance Step: 9 Documents Attachment 3 results of predicted rod height for criticality Standard: Documents the predicted rod height is 24 steps on Control Bank D Comment:

Candidate determines the predicted rod height is below the Evaluator Note: 500 pcm ECC.

END OF JPM Comment:

Stop Time: _________

- Denotes a Critical Step 2014 NRC Admin Exam RO SRO A1-1 Rev. 3

Appendix C Page 6 of 9 Form ES-C-1 PERFORMANCE INFORMATION KEY 2014 NRC Admin Exam RO SRO A1-1 Rev. 3

Appendix C Page 7 of 9 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2014 NRC JPM Common RO SRO A1-1 Perform RCS Average Temperature Data Sheet and Determine Inverse Count Rate Ratio (1/M)

GP-004 Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: SAT UNSAT Examiners Signature: Date:

2014 NRC Admin Exam RO SRO A1-1 Rev. 3

Appendix C Form ES-C-1 JPM CUE SHEET Name:

Date:

The unit is in Mode 2, with a plant startup in progress per GP-004, REACTOR STARTUP (MODE 3 TO MODE 2). The OATC has just Initial Conditions:

completed the 3rd doubling.

The CRS has assigned you to complete Attachment 2, Inverse Count Initiating Cue: Rate Ratio (1/M) and RCS Average Temperature Data Sheet and Attachment 3, 1/M Data Plot to predict when reactor will become critical.

Predicted Rod Height for Reactor Criticality 2014 NRC Admin Exam RO SRO A1-1 Rev. 3

Appendix C Form ES-C-1 JPM CUE SHEET 2014 NRC Admin Exam RO SRO A1-1 Rev. 3

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: Harris Nuclear Plant Task No.: 34502H601 Task

Title:

Determine TEDE While Working in a JPM No.: 2014 NRC Exam High Airborne Area Admin JPM RO SRO A3 K/A

Reference:

G2.3.4 RO 3.2 SRO 3.7 Alternate Path - NO Examinee: ________________________ NRC Examiner: _________________

Facility Evaluator: ________________________ Date: ________

Method of testing:

Simulated Performance: Actual Performance: X Classroom X Simulator Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate, discuss or perform, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

  • The plant is shut down for refueling
  • The RAB AO is being directed to enter an area to inspect several malfunctioning valves.
  • While doing contract work the operator received a combined 1,325 mRem TEDE this calendar year.
  • In the same calendar year, the operator has received another 495 mRem TEDE at the Harris plant.

Initial Conditions:

  • The estimated dose rate in the work area is 465 mRem/hr.
  • An airborne contamination concern exists.
  • It is estimated that it will take 25 minutes to complete the inspection if the operator uses a respirator.
  • If the operator does NOT wear a respirator, the inspection will take 12 minutes, but Radiation Protection projects that the internal exposure will be 10 DAC-hrs.

1.a. Calculate the resultant total effective dose equivalent for with a respirator for this job and the accumulated dose for the year.

1.b. Calculate the resultant total effective dose equivalent for without a respirator for this job and the accumulated dose for the year.

Initiating Cue:

2. Using the lowest dose determined in number 1, determine if the individual can perform the task without exceeding Duke Energys Annual Administrative Dose Limit.

Show your calculations on the next page 2014 NRC Admin Exam RO SRO A3 Rev. 3

Appendix C Job Performance Measure Form ES-C-1 Worksheet Task Standard: Determination made that NOT wearing a respirator will result in a lower TEDE and that the individual can perform the task without exceeding Duke Energys Annual Administrative Dose Limit.

Required Materials: Laptop with General Reference PD-RP-ALL-0001, Radiation Worker Responsibilities, Rev 3 or hard copy General

References:

PD-RP-ALL-0001, Radiation Worker Responsibilities, Rev 3 Handouts: JPM Cue Sheet Pages 9 and 10 Time Critical Task: No Validation Time: 15 minutes Critical Step Justification Determining external exposure while wearing a respirator is required to Step 2 complete the calculations and answer.

Determining internal exposure while NOT wearing a respirator is Step 4 required to complete the calculations and answer.

Determining external exposure while NOT wearing a respirator is Step 5 required to complete the calculations and answer.

Determining individuals total exposure for the year if the work is allowed Step 8 without a respirator is required to complete the calculations and answer.

Determining individuals total exposure for the year if the work is allowed Step 9 with a respirator is required to complete the calculations and answer.

Determining if the individual can perform the work without exceeding Step 10 Duke Energys Annual Administrative Dose Limit of 2000 mRem is required to complete the calculations and answer.

2014 NRC Admin Exam RO SRO A3 Rev. 3

Appendix C Page 3 of 10 Form ES-C-1 PERFORMANCE INFORMATION Start Time: __________.

NOTE: Steps in this JPM may be performed in any order.

Performance Step: 1 Determines internal exposure while wearing a respirator Standard: Determines internal exposure to be ZERO while wearing a respirator Comment:

Performance Step: 2 Determines external exposure while wearing a respirator Standard: Determines external exposure to be 193.8 mRem TEDE while wearing a respirator (465 mRem / hr x 25 min = 193.8 mRem)

(NOTE: Could round to 194)

Comment:

Performance Step: 3 Determines TOTAL exposure while wearing a respirator Standard: Determines total exposure to be 193.8 mRem while wearing a respirator (0 mRem internal + 193.8 mRem external = 193.8 mRem total)

(NOTE: Could round to 194)

Comment:

- Denotes a Critical Step 2014 NRC Admin Exam RO SRO A3 Rev. 3

Appendix C Page 4 of 10 Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 4 Determines internal exposure while NOT wearing a respirator Standard: Determines internal exposure to be 25 mRem while not wearing a respirator (2.5 mRem / hr x 10 DAC-hr = 25 mRem)

(NO tolerance)

Comment:

Performance Step: 5 Determines external exposure while NOT wearing a respirator Standard: Determines external exposure to be 93.0 mRem TEDE while not wearing a respirator (465 mRem / hr x 12 min = 93 mRem)

(NO tolerance)

Comment:

Performance Step: 6 Determines TOTAL exposure while NOT wearing a respirator Standard: Determines total exposure to be 118 mRem while not wearing a respirator (25 mRem internal + 93 mRem external = 118 mRem total)

(NO tolerance)

Comment:

Performance Step: 7 Determines individuals total exposure for the year Standard: Determines individuals total exposure for the year to be 1820 mRem (1325 mRem + 495 mRem = 1820 mRem)

Comment:

- Denotes a Critical Step 2014 NRC Admin Exam RO SRO A3 Rev. 3

Appendix C Page 5 of 10 Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 8 Determines individuals total exposure for the year if the work is allowed without a respirator Standard: Determines individuals total exposure for the year if the work is performed without a respirator to be 1938 mRem (1820 mRem + 118 mRem = 1938 mRem)

(NO tolerance)

Comment:

Performance Step: 9 Determines individuals total exposure for the year if the work is allowed with a respirator Standard: Determines individuals total exposure for the year if the work is performed with a respirator to be 2013.8 mRem (1820 mRem + 193.8 mRem = 2013.8 mRem)

Note: If calculated wearing a respirator the total exposure for the year will be 2013.8 mRem and work cannot be performed without an extension. The directions were to use the lowest dose and this represents UNSAT performance.

(NOTE: Could have rounded 193.8 to 194 and answer would be 2014 mRem)

Comment:

Performance Step: 10 Determines if the individual can perform the work without exceeding Duke Energys Annual Administrative Dose Limit of 2000 mRem without an administrative dose limit extension Standard: Determines the individual CAN perform the work without wearing a respirator will NOT exceed Duke Energys Annual Administrative Dose Limit of 2000 mRem (1820 mRem + 118mRem = 1938 mRem)

Comment:

When all calculations have been completed and the Evaluator Cue: determination that work can proceed, this JPM is complete.

Stop Time: _________

- Denotes a Critical Step 2014 NRC Admin Exam RO SRO A3 Rev. 3

Appendix C Page 6 of 10 Form ES-C-1 PERFORMANCE INFORMATION KEY 1.a Calculation for resultant total effective dose equivalent with a respirator.

Determines internal exposure to be ZERO while wearing a respirator Determines external exposure to be 193.8 mRem TEDE while wearing a respirator (465 mRem / hr x 25 min = 193.8 mRem)

(NOTE: Could round to 194)

Determines TOTAL exposure while wearing a respirator (0 mRem internal + 193.8 mRem external = 193.8 mRem total)

(NOTE: Could round to 194)

Determines individuals total exposure for the year to be 1820 mRem (1325 mRem + 495 mRem = 1820 mRem)

Determines individuals total exposure for the year if the work is allowed to be 2013.8 mRem (1820 mRem + 193.8 = 2013.8 mRem)

(NOTE: Could round to 2014 mRem)

Note: If calculated wearing a respirator the total exposure for the year will be 2013.8 mRem and work CANNOT be performed without an extension. The directions were to use the lowest dose and this represents UNSAT performance.

1.b Calculation for resultant total effective dose equivalent without a respirator.

Determines internal exposure to be 25 mRem while not wearing a respirator (2.5 mRem / hr x 10 DAC-hr = 25 mRem)

(NO tolerance)

Determines external exposure to be 118 mRem TEDE while not wearing a respirator (495 mRem / hr x 12 min = 93 mRem)

Determines total exposure to be 118 mRem while not wearing a respirator (25 mRem internal + 93 mRem external = 118 mRem total)

Determines individuals total exposure for the year if the work is allowed to be 1938 mRem (1820 mRem + 118 = 1938 mRem)

The individual CAN perform the task without exceeding Duke Energys Annual Admin Dose Limit if the task is performed WITHOUT a respirator.

- Denotes a Critical Step 2014 NRC Admin Exam RO SRO A3 Rev. 3

Appendix C Page 7 of 10 Form ES-C-1 PERFORMANCE INFORMATION KEY

2. Using the lowest dose determined from the above calculations (1a or 1b):

CAN the individual perform the task without exceeding Duke Energys Annual Administrative Dose Limit?

YES (without a respirator total dose would be 1,938 mRem which is < 2,000 mRem)

- Denotes a Critical Step 2014 NRC Admin Exam RO SRO A3 Rev. 3

Appendix C Page 8 of 10 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2014 NRC Exam JPM RO SRO A3 Determine TEDE While Working in a High Airborne Area PD-RP-ALL-0001 Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: SAT UNSAT Examiners Signature: Date:

2014 NRC Admin Exam RO SRO A3 Rev. 3

Appendix C Form ES-C-1 JPM CUE SHEET

  • The plant is shut down for refueling
  • The RAB AO is being directed to enter an area to inspect several malfunctioning valves.
  • While doing contract work the operator received a combined 1,325 mRem TEDE this calendar year.
  • In the same calendar year, the operator has received another 495 mRem TEDE at the Harris plant.

Initial Conditions:

  • The estimated dose rate in the work area is 465 mRem/hr.
  • An airborne contamination concern exists.
  • It is estimated that it will take 25 minutes to complete the inspection if the operator uses a respirator.
  • If the operator does NOT wear a respirator, the inspection will take 12 minutes, but Radiation Protection projects that the internal exposure will be 10 DAC-hrs.

1.a. Calculate the resultant total effective dose equivalent for with a respirator for this job and the accumulated dose for the year.

1.b. Calculate the resultant total effective dose equivalent for without a respirator for this job and the accumulated dose for the year.

Initiating Cue:

2. Using the lowest dose determined in number 1, determine if the individual can perform the task without exceeding Duke Energys Annual Administrative Dose Limit.
  • Show your calculations on the next page 2014 NRC Admin Exam RO SRO A3 Rev. 3

Appendix C Form ES-C-1 JPM CUE SHEET Name:

Date:

1.a Calculation for resultant total effective dose equivalent with a respirator.

1.b Calculation for resultant total effective dose equivalent without a respirator.

2. Using the lowest dose determined from the above calculations (1a or 1b):

CAN the individual perform the task without exceeding Duke Energys Annual Administrative Dose Limit?

2014 NRC Admin Exam RO SRO A3 Rev. 3

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: Harris Nuclear Plant Task No.: 344047H402 Task

Title:

Complete GP-002, Attachment 5 - JPM No.:

2014 NRC Exam Minimum Equipment List (MEL) for Admin JPM SRO A1-2 Entry into Mode 4 K/A

Reference:

G2.1.43 4.1 / 4.3 Alternate Path: NO Examinee: ________________________ NRC Examiner: _________________

Facility Evaluator: ________________________ Date: ________

Method of testing:

Simulated Performance: Actual Performance: X Classroom X Simulator Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate, discuss or perform, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

The unit is in Mode 5, making preparation to enter Mode 4 in accordance with GP-002, Normal Plant Heatup From Cold Solid To Hot Initial Conditions: Subcritical Mode 5 To Mode 3.

The current conditions for the plant are as listed on the data sheet.

The previous shift has completed a partial review of GP-002, Attachment 5 - MEL for Entry into Mode 4. The CRS has assigned you Initiating Cue: to review the remaining items to be completed on GP-002, Attachment 5 for any discrepancies AND identify any mode limiting items required by Technical Specifications.

2014 NRC Admin Exam SRO A1-2 Rev. FINAL

Appendix C Job Performance Measure Form ES-C-1 Worksheet Task Standard: All conditions not meeting Mode 4 requirement identified.

Required Materials: Technical Specifications General

References:

GP-002, rev 61 Handouts: JPM Cue Sheets Pages 7, Plant Conditions sheet matching the JPM content.

Partially completed GP-002, Attachment 5 matching the Plant Conditions handout.

Time Critical Task: No Validation Time: 25 minutes Critical Step Justification Critical to comply with Technical Specification requirements to ensure Step 2 proper safety system alignment is configured as designed per the accident analysis.

Critical to comply with Technical Specification requirements to ensure Step 3 proper safety system alignment is configured as designed per the accident analysis.

Critical to comply with Technical Specification requirements to ensure Step 4 proper safety system alignment is configured as designed per the accident analysis.

2014 NRC Admin Exam SRO A1-2 Rev. FINAL

Appendix C Page 3 of 7 Form ES-C-1 PERFORMANCE INFORMATION Start Time: __________.

Performance Step: 1 Obtain procedure and determine existing plant conditions.

Standard: Reviews Attachment 5 and Plant Conditions.

Provide handout (Plant Conditions Sheet and partially Evaluator Cue:

completed GP-002, Attachment 5).

All conditions except the following meet the MEL Evaluator Note:

requirements.

Comment:

Performance Step: 2 Compare Plant Conditions to Attachment 5 requirements.

Standard: Boric Acid Tank and Associated Temperatures:

  • Identify that Boric Acid Tank needs to be filled to 74%.

Comment:

Performance Step: 3 Compare Plant Conditions to Attachment 5 requirements.

Standard: Reactor Coolant Loops/RHR Loops:

  • Identify the need to either restore RHR Loop B or increase at least one S/G NR level to >30%.

Comment:

- Denotes a Critical Step 2014 NRC Admin Exam SRO A1-2 Rev. 4

Appendix C Page 4 of 7 Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 4 Compare Plant Conditions to Attachment 5 requirements.

Standard: Safety Related Electrical Buses:

  • Identify need to restore S1 Inverter and supply 1DP-1A-SI through the inverter, connected to DC Bus DP-1A-SA.

Comment:

Performance Step: 5 Provide Attachment 5 to the CRS.

Standard: Provides Attachment 5 to the CRS and may make a verbal report.

Evaluator Cue: Acknowledge any verbal communication.

Comment:

After Attachment 5 and/or the optional report has been Evaluator Cue:

provided to the CRS: Evaluation on this JPM is complete.

STOP TIME: __________

- Denotes a Critical Step 2014 NRC Admin Exam SRO A1-2 Rev. 4

Appendix C Page 5 of 7 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2014 NRC Exam Admin JPM SRO A1-2 Complete GP-002, Attachment 5 - Minimum Equipment List (MEL) for Entry into Mode 4 Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: SAT UNSAT Examiners Signature: Date:

2014 NRC Admin Exam SRO A1-2 Rev. FINAL

Appendix C Page 6 of 7 Form ES-C-1 JPM CUE SHEET The unit is in Mode 5, making preparation to enter Mode 4 in accordance with GP-002, Normal Plant Heatup From Cold Solid To Hot Initial Conditions: Subcritical Mode 5 To Mode 3.

The current conditions for the plant are as listed on the data sheet.

The previous shift has completed a partial review of GP-002, Attachment 5 - MEL for Entry into Mode 4. The CRS has assigned you Initiating Cue: to review the remaining items to be completed on GP-002, Attachment 5 for any discrepancies AND identify any mode limiting items required by Technical Specifications.

2014 NRC Admin Exam SRO A1-2 Rev. FINAL

Appendix C Page 7 of 7 Form ES-C-1 JPM CUE SHEET 2014 NRC JPM SRO A1-2 PLANT CONDITIONS

  • DRPI indicates all rods inserted.
  • All ventilation systems are in normal alignment with nothing tagged.
  • RCS Temperature is 195 F with a bubble in the PRZ.
  • All PRZ Code Safety Valves are operable.
  • Chemistry has reported RCS Specific Activity, O, Cl, and Fl are within TS limits.
  • RHR Train A is providing cooling.
  • RHR Pump B is isolated and tagged due to mechanical seal leakage.
  • All RCPs are stopped.
  • CSIP B was stopped due to an oil leak 75 minutes ago and was declared inoperable, cleared and tagged 20 minutes later.
  • Operators removed the tags and started CSIP A 30 minutes ago.
  • Operable indicators indicate the following levels:
  • BAT - 20%
  • The BAT is at 93 F and 7450 ppm Boron.
  • The RWST is at 73 F and 2525 ppm.
  • Instrument Bus SI is powered from 1DP-S1, Alternate Supply from PP-1A211-SA, while a breaker is replaced in the inverter.
  • Two physically independent off-site power circuits are available.
  • All other AC buses are in normal alignment.
  • All DC buses are energized.
  • SG A - 28%
  • SG B - 26%
  • SG C - 26%
  • FHB Emergency Exhaust Train A and Train B are operable.

2014 NRC Admin Exam SRO A1-2 Rev. FINAL

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: Harris Nuclear Plant Task No.: 015004H201 Task

Title:

Perform the Quadrant Power Tilt JPM No.: 2014 NRC Exam Ratio Surveillance Admin JPM SRO A2 K/A

Reference:

G2.2.12 RO 3.7 SRO 4.1 Alternate Path - NO Examinee: _________________________ NRC Examiner: _________________

Facility Evaluator: _________________________ Date: _________________

Method of testing:

Simulated Performance: Actual Performance: X Classroom X Simulator Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate, discuss or perform, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

  • The plant is operating at 90% power when a rod in Control Bank A (P-10) dropped.
  • The crew is performing AOP-001, MALFUNCTION OF ROD CONTROL AND INDICATION SYSTEM.

Initial Conditions:

  • There are NO deficiency tags on PR NIs.
  • ERFIS points ANM9112U and ANM9113L have a BAD quality code. HNP IT has been notified and they are evaluating the ERFIS points.

The CRS has directed you to perform a manual QPTR IAW OST-1039, CALCULATION OF QPTR, AND evaluate the actions, if any, of the applicable Technical Specification. The Power Range NIS indications Initiating Cue: are provided.

NOTE: Show values of your work. For this JPM notify evaluator when independent verification is required to be performed.

2014 NRC Exam Admin JPM SRO A2 Rev. 3

Appendix C Job Performance Measure Form ES-C-1 Worksheet Task Standard: Calculations within required band.

Correct Tech Spec actions are identified.

Required Materials: Calculator General

References:

OST-1039, CALCULATION OF QPTR, Revision 16 Technical Specifications Handouts:

  • OST-1039
  • Power Range NI - Current and Voltage Set point Table
  • Technical Specifications Time Critical Task: No Validation Time: 25 minutes Critical Step Justification Must accurately determine the correct calculation based on collecting Step 10 and inputting either provided data or visual inspection data. The calculation will yield an unsatisfactory QPTR.

Must accurately determine the correct calculation based on collecting Step 11 and inputting either provided data or visual inspection data. The calculation will yield an unsatisfactory QPTR.

Must accurately determine the correct calculation based on collecting Step 12 and inputting either provided data or visual inspection data. The calculation will yield an unsatisfactory QPTR.

Must accurately identify associated Technical Specifications with a Step 14 QPTR that has exceeded the limits specified in HNP Technical Specifications.

2014 NRC Exam Admin JPM SRO A2 Rev. 3

Appendix C Page 3 of 17 Form ES-C-1 PERFORMANCE INFORMATION Start Time: __________.

Performance Step: 1 Obtain procedure.

Standard: Reviews procedure.

Evaluator Cue: Provide OST-1039.

Evaluator Note: A KEY is provided for your use on JPM prior to candidate pages.

Comment:

NOTE: The NI curve numbers provided in this JPM are Evaluator Note: numbers from the 2014 NRC Exam Frozen Procedures Curve Book folder.

OST-1039 Section 3.0 Note prior to step 1 Performance Step: 2 NOTE: Precaution and Limitation 4.0.1 has guidance if performing this OST with one Power Range Channel inoperable.

Standard: Operator reads and placekeeps any note or caution (initials, checks or circle/slash at each bulleted item to indicate read and understood)

Comment:

- Denotes Critical Steps 2014 NRC Exam Admin JPM SRO A2 Rev. 3

Appendix C Page 4 of 17 Form ES-C-1 PERFORMANCE INFORMATION OST-1039 Section 3.0 Performance Step: 3 Completes Prerequisites section:

  • Verify instrumentation needed for the performance of this test is free of deficiencies that affect instrument indication.
  • Verify the most recent Curve F-X-8 is used in the performance of this procedure. (Reference 2.1.1 and 2.1.2)
  • OBTAIN CRS permission to perform this OST.

Standard:

  • Logs F-19-8 revision number : 5
  • Initials/signs all blocks Comment:

OST-1039 Section 7.0 Performance Step: 4

  • IF Quadrant Power Tilt Ratio Calculation Computer Program is used, THEN PERFORM the following:
  • MARK Step 7.0.2 N/A.
  • MARK Section 7.2 N/A.
  • PERFORM Section 7.1.
  • IF manual calculation of the Quadrant Power Tilt Ratio is used, THEN PERFORM the following:
  • MARK Section 7.1 N/A.
  • PERFORM Section 7.2.

Standard:

  • Marks Section 7.1 N/A
  • Proceeds to Section 7.2 Comment:

- Denotes Critical Steps 2014 NRC Exam Admin JPM SRO A2 Rev. 3

Appendix C Page 5 of 17 Form ES-C-1 PERFORMANCE INFORMATION OST-1039 Section 7.2 Note prior to step 1 Performance Step: 5 NOTE: The detector current meters on each power range channel drawer are designated as left-upper, right-lower.

Standard: Operator reads and placekeeps any note or caution (initials, checks or circle/slash at each bulleted item to indicate read and understood)

Comment:

OST-1039 Section 7.2, Step 1 Performance Step: 6 Prior to reading the value of detector current, VERIFY the meter range/rate switch is in the 400 µA/SLOW position.

Standard: Prior to reading the value of detector current, VERIFIES the Meter Range/Rate switch is in the 400 A/SLOW position.

Evaluator Note: This information is on the JPM Cue Sheet Comment:

OST-1039 Section 7.2, Step 2 Performance Step: 7 RECORD on Attachment 2, in column A, the upper and lower detector currents from all operable power range channels as read on the Nuclear Instrumentation Cabinet.

Standard: Transposes readings from PRNIs Readings Table onto Attachment 2.

Comment:

- Denotes Critical Steps 2014 NRC Exam Admin JPM SRO A2 Rev. 3

Appendix C Page 6 of 17 Form ES-C-1 PERFORMANCE INFORMATION OST-1039 Section 7.2, Step 3 Performance Step: 8 RECORD on Attachment 2, in column B, the 100% power normalized current for each channel from Curve F-X-8.

Standard: Transposes TOP and BOTTOM 100% current values from the Curve F-19-8.

Comment:

OST-1039 Section 7.2, Note prior to Step 4 Performance Step: 9 NOTE: When recording all fractions and ratios, record to four decimal places, dropping the fifth and subsequent decimal places.

Standard: Operator reads and placekeeps any note or caution (initials, checks or circle/slash at each bulleted item to indicate read and understood)

Comment:

OST-1039 Section 7.2, Step 4 Performance Step: 10 Divide values in Column A by the respective normalized current in Column B and record the result in Column C as the Normalized Fraction.

Standard: Divides each Upper and Lower reading by the respective 100%

normalized current value and records in Column C.

Comment:

- Denotes Critical Steps 2014 NRC Exam Admin JPM SRO A2 Rev. 3

Appendix C Page 7 of 17 Form ES-C-1 PERFORMANCE INFORMATION OST-1039 Section 7.2, Step 5 Performance Step: 11 CALCULATE the average value for the upper and the lower Normalized Fractions as follows:

  • ADD the Normalized Fraction in each section of column C, recording the sum in the space provided.
  • DIVIDE the sum obtained in Step 7.2.5.a by the number of operable NI channels, recording the result in column D of Attachment 2.

Standard: Adds all Normalized Fractions for the same plane and records the sum in the space provided.

Divides by the sum by four and records result in Column D.

Comment:

OST-1039 Section 7.2, Step 6 Performance Step: 12 Using the formula and values from Attachment 2, CALCULATE the Upper and Lower Ratios.

Standard:

  • Divides the Maximum Normalized Fraction by the Average Normalized Fraction on each plane.
  • Determines the UPPER ratio is 1.02
  • QPTR value as 1.0763 to 1.0773 (N43 UPPER) Identifies Upper as outside the band The applicant may inform the CRS as soon as any Evaluator Note: calculation is > 1.02. If so, acknowledge and direct applicant to Identify the T.S. LCO affected, if any?

Comment: Acceptable band is +/- .0005.

UPPER calculated band is 1.0763 to 1.0773 LOWER calculated band is 1.0682 to 1.0692

- Denotes Critical Steps 2014 NRC Exam Admin JPM SRO A2 Rev. 3

Appendix C Page 8 of 17 Form ES-C-1 PERFORMANCE INFORMATION OST-1039 Section 7.2, Step 7 Performance Step: 13 PERFORM independent verification of all calculations made on Attachment 2.

Standard: Requests Independent Verifier.

Independent verifications complete, I agree with your Evaluator Cue:

calculations. Identify the T.S. LCO affected, if any?

Comment:

- Denotes Critical Steps 2014 NRC Exam Admin JPM SRO A2 Rev. 3

Appendix C Page 9 of 17 Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 14 Identify the Technical Specification LCOs that would be in effect.

Standard: Identifies that Technical Specification 3.2.4, Quadrant Power Tilt Ratio has been exceeded

  • Identifies the following ACTION statements to be implemented and the required time limitation (see page 12) o 3.2.4.a.1 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> o 3.2.4.a.2 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, reduce thermal power to < 76.96%

(7.68% x 3% = 23.04% 100% - 24% = 76.96%)

o 3.2.4.a.3 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Technical Specification 3.2.4.a.4 is not required to be Evaluator Note: identified since no direction is provided in the cue for raising thermal power.

Comment:

After identification of the Tech Spec LCOs affected:

Terminating Cue:

Evaluation on this JPM is complete.

STOP Time: __________.

- Denotes Critical Steps 2014 NRC Exam Admin JPM SRO A2 Rev. 3

Appendix C Page 10 of 17 Form ES-C-1 PERFORMANCE INFORMATION KEY Determines QPTR = 1.0768 Acceptable band is +/- .0005 (1.0763 to 1.0773)

A B C D UPPER UPPER AVERAGE UPPER 100% POWER NORMALIZED UPPER UPPER DETECTOR NORMALIZED FRACTION NORMALIZED DETECTOR CURRENT CURRENT (NOTE 1) FRACTION N-41 145.6 161.4 0.9021 N-42 162.5 181.6 0.8948 0.9055 N-43 199.8 204.9 0.9751 N-44 138.4 162.8 0.8501 SUM 3.5360 Maximum Upper Normalized Fraction 0.9751 Upper Ratio = = = 1.0768*

Average Upper Normalized Fraction 0.9055

  • Standard for this calculation is 1.0763 to 1.0773 A B C D LOWER LOWER AVERAGE LOWER 100% POWER NORMALIZED LOWER LOWER DETECTOR NORMALIZED FRACTION NORMALIZED DETECTOR CURRENT CURRENT (NOTE 1) FRACTION N-41 159.6 179.3 0.8901 N-42 172.1 204.1 0.8432 0.8845 N-43 209.3 221.4 0.9453 N-44 165.2 192.2 0.8595 SUM 3.5381 Maximum Lower Normalized Fraction 0.9453 Lower Ratio = = = 1.0687**

Average Lower Normalized Fraction 0.8845

    • Standard for this calculation is 1.0682 to 1.0692

- Denotes Critical Steps 2014 NRC Exam Admin JPM SRO A2 Rev. 3

Appendix C Page 11 of 17 Form ES-C-1 PERFORMANCE INFORMATION KEY

- Denotes Critical Steps 2014 NRC Exam Admin JPM SRO A2 Rev. 3

Appendix C Page 12 of 17 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2014 NRC Exam Admin JPM SRO A2 Perform a Quadrant Power Tilt Ratio Surveillance OST-1039 Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: SAT UNSAT Examiners Signature: Date:

2014 NRC Exam Admin JPM SRO A2 Rev. 3

Appendix C Form ES-C-1 JPM CUE SHEET Name:

Date:

  • The plant is operating at 90% power when a rod in Control Bank A (P-10) dropped.
  • The crew is performing AOP-001, MALFUNCTION OF ROD CONTROL AND INDICATION SYSTEM.

Initial Conditions:

  • There are NO deficiency tags on PR NIs.
  • ERFIS points ANM9112U and ANM9113L have a BAD quality code. HNP IT has been notified and they are evaluating the ERFIS points.

The CRS has directed you to perform a manual QPTR IAW OST-1039, CALCULATION OF QPTR, AND evaluate the actions, if any, of the applicable Technical Specification. The Power Range NIS indications Initiating Cue: are provided.

NOTE: Show values of your work. For this JPM notify evaluator when independent verification is required to be performed.

2014 NRC Exam Admin JPM SRO A2 Rev. 3

Appendix C Form ES-C-1 JPM CUE SHEET 145.6 159.6 N41B 400 µA/SLOW 400 µA/SLOW 2014 NRC Exam Admin JPM SRO A2 Rev. 3

Appendix C Form ES-C-1 JPM CUE SHEET 162.5 172.1 N42B 400 µA/SLOW 400 µA/SLOW 2014 NRC Exam Admin JPM SRO A2 Rev. 3

Appendix C Form ES-C-1 JPM CUE SHEET 199.8 209.3 N43B 400 µA/SLOW 400 µA/SLOW 2014 NRC Exam Admin JPM SRO A2 Rev. 3

Appendix C Form ES-C-1 JPM CUE SHEET 138.4 165.2 N44B 400 µA/SLOW 400 µA/SLOW 2014 NRC Exam Admin JPM SRO A2 Rev. 3

Appendix C Job Performance Measure Form ES-C-1 Worksheet

`Facility: Harris Nuclear Plant Task No.: 345001H602 Task

Title:

Classify an EAL JPM No.: 2014 NRC Exam Admin JPM SRO A4 K/A

Reference:

G2.4.41 RO 2.9 SRO 4.6 Alternate Path - NO Examinee: _______________________ NRC Examiner: _________________

Facility Evaluator: _______________________ Date: _________________

Method of testing:

Simulated Performance: Actual Performance: X Classroom X Simulator Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate, discuss or perform, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

This is a TIME CRITICAL JPM.

Given the following plant conditions:

  • The unit is operating at 100% power
  • The 'A' CNMT Spray Pump is under clearance
  • AOP-025, Loss of One Emergency AC Bus (6.9KV) Or One Emergency DC Bus (125V) is in progress:
  • Breaker 125 is tripped open
  • The 'B' EDG is failed to start The following occurs:
  • 15 minutes ago, the crew entered AOP-016, Excessive Primary Initial Conditions: Plant Leakage and based on plant conditions, the Reactor was tripped and Safety Injection was actuated
  • RCPs were secured based on RCP Trip foldout criteria
  • 12 minutes ago the 'A' CSIP tripped on overcurrent
  • 10 minutes ago the following conditions existed
  • CNMT Pressure was 12 psig
  • Core Exit TCs were 628°F
  • RCS Pressure was 1200 psig
  • RVLIS Full Range Level was 33%
  • Wind speed was 10 mph and wind direction was 185 degrees 2014 NRC Exam Admin JPM SRO A4 Rev. 3

Appendix C Job Performance Measure Form ES-C-1 Worksheet The time is now 0554 Evaluate the EAL Matrix and determine the highest classification Initiating Cue: required for these plant conditions. NOTE: Do not use SEC judgment.

NOTE: Write out EAL classification in blank provided then raise your hand and return your page to the Evaluator.

Task Standard: Classify the highest EAL as an Site Area Emergency FS1.1.

Required Materials: None General

References:

PEP-110 EAL Matrix PEP-110 EP-EAL (allowed reference)

Handouts:

  • Attached Initial Conditions
  • PEP-110
  • PEP-110 EAL Matrix
  • EP-EAL Time Critical Task: YES - 15 minutes for classification.

Validation Time: 15 minutes for classification CRITICAL STEP JUSTIFICATION Classification of the event is critical for determining State and County Step 2 notifications, public information notices, site information notices, and event reportability to the Nuclear Regulatory Commission.

2014 NRC Exam Admin JPM SRO A4 Rev. 3

Appendix C Page 3 of 13 Form ES-C-1 PERFORMANCE INFORMATION Start Time for this portion of JPM begins when the Evaluator Cue:

individual has been briefed.

START TIME:

Performance Step: 1 OBTAINS EP-EAL and EAL Matrix.

Standard : Obtains EP-EAL and EAL Matrix Comments:

Performance Step: 2 Identify EAL Classification for events in progress.

Standard : The correct EAL is: Site Area Emergency FS1.1 Loss or potential loss of any two barriers (Table F-1)):

  • Fuel barrier is determined to be a POTENTIAL LOSS based on CSFST Core Cooling ORANGE
  • RCS barrier is determined to be LOSS based on RCS leak rate > ECCS capability due to the loss of subcooling
  • CNMT barrier is determined to be POTENTIAL LOSS based CNMT Pressure > 10 psig with less than one full train of depressurization equipment. Neither CNMT Pump is available.

Comments:

Evaluator Cue: Event classification sheet provided to evaluator.

STOP TIME:

After the candidate returns this JPM classification record the Examiners Cue: stop time and then announce.

END of JPM.

- Denotes Critical Steps 2014 NRC Exam Admin JPM SRO A4 Rev. 3

Appendix C Page 4 of 13 Form ES-C-1 PERFORMANCE INFORMATION

- Denotes Critical Steps 2014 NRC Exam Admin JPM SRO A4 Rev. 3

Appendix C Page 5 of 13 Form ES-C-1 PERFORMANCE INFORMATION

- Denotes Critical Steps 2014 NRC Exam Admin JPM SRO A4 Rev. 3

Appendix C Page 6 of 13 Form ES-C-1 PERFORMANCE INFORMATION

- Denotes Critical Steps 2014 NRC Exam Admin JPM SRO A4 Rev. 3

Appendix C Page 7 of 13 Form ES-C-1 PERFORMANCE INFORMATION

- Denotes Critical Steps 2014 NRC Exam Admin JPM SRO A4 Rev. 3

Appendix C Page 8 of 13 Form ES-C-1 PERFORMANCE INFORMATION

- Denotes Critical Steps 2014 NRC Exam Admin JPM SRO A4 Rev. 3

Appendix C Page 9 of 13 Form ES-C-1 PERFORMANCE INFORMATION

- Denotes Critical Steps 2014 NRC Exam Admin JPM SRO A4 Rev. 3

Appendix C Page 10 of 13 Form ES-C-1 PERFORMANCE INFORMATION

- Denotes Critical Steps 2014 NRC Exam Admin JPM SRO A4 Rev. 3

Appendix C Page 11 of 13 Form ES-C-1 PERFORMANCE INFORMATION

- Denotes Critical Steps 2014 NRC Exam Admin JPM SRO A4 Rev. 3

Appendix C Page 12 of 13 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2014 NRC Exam Admin JPM SRO A4 Classify an Event PEP-110 and EP-EAL Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: SAT UNSAT Examiners Signature: Date:

2014 NRC Exam Admin JPM SRO A4 Rev. 3

Appendix C Form ES-C-1 JPM CUE SHEET This is a TIME CRITICAL JPM.

Given the following plant conditions:

  • The unit is operating at 100% power
  • The 'A' CNMT Spray Pump is under clearance
  • AOP-025, Loss of One Emergency AC Bus (6.9KV) Or One Emergency DC Bus (125V) is in progress:
  • Breaker 125 is tripped open
  • The 'B' EDG is failed to start The following occurs:
  • 15 minutes ago, the crew entered AOP-016, Excessive Primary Initial Conditions: Plant Leakage and based on plant conditions, the Reactor was tripped and Safety Injection was actuated
  • RCPs were secured based on RCP Trip foldout criteria
  • 12 minutes ago the 'A' CSIP tripped on overcurrent
  • 10 minutes ago the following conditions existed
  • CNMT Pressure was 12 psig
  • Core Exit TCs were 628°F
  • RCS Pressure was 1200 psig
  • RVLIS Full Range Level was 33%
  • Wind speed was 10 mph and wind direction was 185 degrees Evaluate the EAL Matrix and determine the highest classification required for these plant conditions. NOTE: Do not use SEC judgment.

Initiating Cue:

NOTE: Write out EAL classification in blank provided then raise your hand and return your page to the Evaluator.

Name:

Date:

Start Time:

EAL Classification Time:

EAL:

2014 NRC Exam Admin JPM SRO A4 Rev. 3