Letter Sequence Acceptance Review |
---|
EPID:001028, Holtec International - HI-STORM 100 Storage CoC Renewal Application (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance, Acceptance
- Supplement, Supplement
Results
Other: L-23-005, Independent Spent Fuel Storage Installation License Renewal Application, Revision 1 (Cac/Epid No. 001028/L-2022-RNW-0007), ML20049A082, ML20099A180, ML20182A700, ML20261H420, ML20269A259, ML20289A493, ML21216A273, ML21216A274, ML22249A095, ML22297A266
|
MONTHYEARML20049A0812020-01-31031 January 2020 Holtec International - HI-STORM 100 Storage CoC Renewal Application Project stage: Request ML20049A0822020-01-31031 January 2020 Holtec International - HI-STORM 100 Storage CoC Renewal Application Project stage: Other ML20066K2702020-03-0606 March 2020 Updated GEH Morris Operation (Mo) Decommissioning Funding Plan (DFP) Project stage: Request ML20099A1802020-04-0606 April 2020 Application for Renewal of the Certificate of Compliance No. 1014 for the Hi-Storm 100 Storage Cask System Accepted for Review (Cac/Epid Nos. 001028/L-2020-RNW-0007) Project stage: Other ML20134H8852020-04-30030 April 2020, 13 May 2020 GEH-Morris Operation Independent Spent Fuel Storage Installation Exemption from 10 CFR 72.42(c) Project stage: Request ML20150A2682020-05-28028 May 2020 Request for Additional Information for the Technical Review of the Application for Renewal of the Certificate of Compliance No. 1029 (Cac/Epid Nos. 001028/L-2019-RNW-0014) Project stage: RAI ML20150A2672020-05-28028 May 2020 CoC 1029 RAI Transmittal Letter Package Project stage: Request ML20182A7002020-06-30030 June 2020 GEH Morris Operation (Mo) Submittal of License Renewal Application Project stage: Other ML20192A1272020-07-10010 July 2020 Response to Request for Additional Information for the Technical Review of the Application for Renewal of the Certificate of Compliance No. 1029 (Docket No. 72-1029, Cac/Epid Nos. 001028/L-2019-RNW-0014) Project stage: Response to RAI ML20213C3252020-07-31031 July 2020 7-31-2020 Email Acknowledgement of NRC Receipt of GEH Morris Operation LRA and Start of Acceptance Review.Pdf Project stage: Acceptance Review ML20261H4202020-09-0202 September 2020 Submission of Revision 4 of the Safety Analysis Report for the WCS CISF, Docket 72-1050 Cac/Epid 001028/L-2017-NEW-0002 Project stage: Other ML20269A2592020-09-19019 September 2020 Interim Storage Partners, LLC - Revision 5 of the Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan with Updated Cover Sheets, Docket 72-1050 Cac/Epid 001028/L-2017-NEW-0002 Project stage: Other ML20289A4932020-10-0808 October 2020 NRC 699 (10-8-2020 Call on GE Hitachi Nuclear Energy Americas LLC (GEH) GEH-Morris Rsis, Signed) Project stage: Other ML20275A2802020-10-15015 October 2020 GEH-Morris License Renewal Rsi, Request for Supplemental Information for Acceptance Review of the Application for Renewal of the Morris Operation License No. SNM-2500 (Cac/Epid Nos. 001028/L-2020-RNW-0024 and 000993/L-2020-LNE-0004) Project stage: Acceptance Review ML21014A0632021-01-14014 January 2021 Interim Storage Partners, LLC - Submittal of Supplemental Information to Support Nrc'S Continued Review of the Safety Case for the WCS CISF, Docket 72-1050 Cac/Epid 001028/L-2017-NEW-0002 Project stage: Supplement ML21027A1472021-01-27027 January 2021 Supplemental Information Part 2 to Support Nrc'S Continued Review of the Safety Case for the WCS CISF, Docket 72-1050 Cac/Epid 001028/L-2017-NEW-0002 Project stage: Supplement ML21104A0802021-04-20020 April 2021 GEH-Morris Renewal Acceptance Letter Project stage: Acceptance Review ML21111A3342021-04-21021 April 2021 GEH - Response to Request for Additional Information for Acceptance Review of the Morris Operation SNM-2500 Decommissioning Funding Plan (DFP) Project stage: Response to RAI ML21167A3322021-06-15015 June 2021 Request for Additional Information on Morris Operation Decommissioning Funding Plans Project stage: RAI ML21190A1302021-06-17017 June 2021 GE Hitachi Nuclear Energy Americas, LLC, Morris Operation, Independent Spent Fuel Storage Installation, Decommissioning Funding Plan, Revision 5 (Redacted Version of ML21168A260) Project stage: Request ML21168A2582021-06-17017 June 2021 GE-Hitachi Nuclear Energy Americas, LLC, Updated Morris Operation Decommissioning Funding Plan Project stage: Request ML21214A3102021-08-30030 August 2021 Request for Additional Information for the Technical Review of the Application for Renewal of the Morris Operation License No. SNM-2500 (Cac/Epid Nos. 001028/L-2020-RNW-0024) Project stage: RAI ML21334A5082021-12-21021 December 2021 CoC 1015 RAI Transmittal Letter Package Project stage: Request ML21216A2732021-12-21021 December 2021 Memo to File for GEH Morris EA and Fonsi Project stage: Other ML21216A2742021-12-21021 December 2021 Final EA on GEH Morris DFPs Project stage: Other ML21216A2722021-12-21021 December 2021, 29 December 2021, 5 January 2022 GEH Morris Decommissioning Funding Plan Approval Project stage: Request ML21334A5092021-12-21021 December 2021 Request for Additional Information for the Technical Review of the Application for Renewal of the Certificate of Compliance No. 1015 (Cac/Epid Nos. 001028/L-2020-RNE-0031) Project stage: RAI ML22024A1422022-01-24024 January 2022 Request for Amendment to the Part 72 Specific License SNM-2515 for Interim Storage Partners Llc'S WCS CISF, Docket 72-1050 Cac/Epid 001028/L-2017-NEW-0002 Project stage: Request ML22027A5162022-01-27027 January 2022 GEH - Morris Operation (Mo) Response to Request for Additional Information for the Technical Review of the Application for Renewal of the Morris Operation License No. SNM-2500 Project stage: Response to RAI ML22249A0952022-09-0808 September 2022 Proprietary Determination Letter for GEH-Morris License Renewal Application Submittals Project stage: Other ML23159A2362023-07-25025 July 2023 ISFSI Renewal RAI Transmittal Letter Package Project stage: Request ML23159A2382023-07-25025 July 2023 Request for Additional Information for the Technical Review of the Application for Renewal of the Diablo Canyon Independent Spent Fuel Storage Installation (Cac/Epid Nos. 001028/L-2022-RNW-0007) Project stage: RAI L-23-005, Independent Spent Fuel Storage Installation License Renewal Application, Revision 1 (Cac/Epid No. 001028/L-2022-RNW-0007)2023-08-10010 August 2023 Independent Spent Fuel Storage Installation License Renewal Application, Revision 1 (Cac/Epid No. 001028/L-2022-RNW-0007) Project stage: Other ML22297A2662023-11-14014 November 2023 Renewal of Initial Certificate and Amendment Nos. 1 Through 8 of Certificate of Compliance No. 1025 for NAC Multi-Purpose Canister System (Cac/Epid Nos. 001028/L-2019-RNW-0029 Project stage: Other ML23328A0052023-12-0505 December 2023 Issuance of Renewed Certificate of Compliance No. 1014, Amendment No. 17 for the Hi-Storm 100 Cask System (Cac/Epid 001028/L-2021-LLA-0140) Project stage: Approval 2021-01-27
[Table View] |
|
---|
Category:Letter
MONTHYEARML24032A1082024-02-0101 February 2024 GEH Notification of GE Company Stock Beneficial Ownership Filing ML24004A1652024-01-0404 January 2024 Morris Operation (Mo) Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23283A3292023-11-30030 November 2023 NRC Issuance of Order Consenting to Indirect Transfer of Control of Ge/Geha/Gnfa Licenses ML23334A2222023-11-30030 November 2023 GE Hitachi Nuclear Energy - NRC Notice Before Actions Necessary to Accomplish the Indirect Transfers of Control Are Completed IR 07200001/20234012023-11-28028 November 2023 GE Hitachi Morris (Gehmo) Independent Spent Fuel Storage Installation NRC Security Inspection Report 07200001/2023401 ML23276B3952023-10-13013 October 2023 the U.S. Nuclear Regulatory Commission Staff Assessment of Ge/Geha/Gnfa Reponses to Acceptance Observations Application for the U.S. Nuclear Regulatory Commission Consent to Indirect Transfer of Licenses ML23229A5122023-08-17017 August 2023 GE-Hitachi Nuclear Energy Americas, LLC, Response to NRC Staff Observations Enclosed with NRC Acceptance Letter (Reference 2) Related to GE, Geha and GNF-A Application (Reference 1) ML23191A8592023-07-27027 July 2023 Acceptance Letter GE GNFA and Geha Application for NRC Consent to Indirect Transfer of Licenses ML23177A0892023-06-26026 June 2023 Geha and GNF-A Application for Indirect Transfer of Control - Revision 2 ML23171A9762023-06-20020 June 2023 Geha and GNF-A Application for Indirect Transfer of Control - Revision 1 ML23152A1162023-05-30030 May 2023 Application for Order Consenting to Indirect Transfer of Control with Respect to Reactor Licenses, Materials Licenses, and Export Licenses, and Notification Regarding Other Approvals ML23104A4172023-03-31031 March 2023 GNF-AGEH Financial Assurance of Decommissioning Funds - Surety Bond Riders Cover Letter and Affidavit ML23054A3332023-02-23023 February 2023 GEH Notification of GE Company Stock Beneficial Ownership Filing ML23044A3282023-02-10010 February 2023 GEH Morris Operation Submittal of Updated Consolidated Safety Analysis Report (CSAR, Rev 15A, Feb 2023) ML22350A4702022-12-12012 December 2022 GEH Morris Operation Submittal of Biennial Report 10CFR72.48; Changes, Tests, and Experiments ML22242A0162022-11-22022 November 2022 Cover Letter for GEH Morris Operation ISFSI Subsequent License Renewal ML22313A1452022-11-0909 November 2022 Usfws Illinois-Iowa Ecological Services Field Office - Species List for Proposed License Renewal for GE-Hitachi Morris Operation Independent Spent Fuel Storage Installation - Project Code: 2022-0044583 ML22249A0952022-09-0808 September 2022 Proprietary Determination Letter for GEH-Morris License Renewal Application Submittals ML22249A3652022-09-0606 September 2022 GEH Notification of GE Company Stock Beneficial Ownership Filing ML22146A3512022-05-19019 May 2022 Usfws Illinois-Iowa Ecological Services Field Office - Species List for Proposed License Renewal for Morris Operation Independent Spent Fuel Storage Installation - Project Code: 2022-0044583 ML22132A0722022-05-12012 May 2022 GEH Morris Operation (Mo) Response to NRC Request for Additional Information for the Technical Review of the Application for Renewal of the Morris Operation License No. SNM-2500 ML22084A5782022-03-23023 March 2022 GNF-A/GEH Financial Assurance of Decommissioning Funds - Surety Bond Riders Cover Letter and Affidavit ML22068A1322022-03-0909 March 2022 GE-Hitachi Nuclear Energy Americas, LLC, Notification of Stock Beneficial Ownership Filing ML22054A0292022-02-22022 February 2022 GE-Hitachi Nuclear Energy Americas, LLC, 2021 Morris Operation Annual Effluent Report ML22042A4152022-02-11011 February 2022 GE-Hitachi Nuclear Energy Americas, LLC - GEH Notification of GE Company Stock Beneficial Ownership Filings ML22027A5162022-01-27027 January 2022 GEH - Morris Operation (Mo) Response to Request for Additional Information for the Technical Review of the Application for Renewal of the Morris Operation License No. SNM-2500 ML21216A2752022-01-0505 January 2022 GEH Morris DFP Close-out Letter ML21326A2662021-11-22022 November 2021 GEH Notification of GE Company Stock Beneficial Ownership Filing ML21319A2202021-11-17017 November 2021 Letter - Proprietary Determination for GEH Morris DFP Submittals ML21340A2432021-09-28028 September 2021 Illinois Threatened and Endangered Species by County, as of December 2020 IR 07200001/20214012021-09-27027 September 2021 GE-Hitachi Morris (Gehmo) Independent Spent Fuel Storage Installation - NRC Security Inspection Report 07200001/2021401 ML21252A1382021-09-0909 September 2021 GEH - Morris Operation (Mo) Decommissioning Funding Plan (DFP) Redacted Versions ML22063B1752021-08-30030 August 2021 Email and Letter from D. Hunter of Miami Tribe NRC Preliminary Determination Under Section 106 of the NHPA for Proposed GE-Hitachi Morris Operation ISFSI License Renewal ML21214A3102021-08-30030 August 2021 Request for Additional Information for the Technical Review of the Application for Renewal of the Morris Operation License No. SNM-2500 (Cac/Epid Nos. 001028/L-2020-RNW-0024) ML21186A0112021-08-0202 August 2021 Letter to Ho-Chunk Nation Re NRC Preliminary Determination Under Section 106 of the NHPA ML21186A0082021-08-0202 August 2021 Letter to Citizen Potawatomi Nation Re NRC Preliminary Determination Under Section 106 of the NHPA ML21186A0092021-08-0202 August 2021 Letter to Forest County Potawatomi Re NRC Preliminary Determination Under Section 106 of the NHPA ML21138A9052021-08-0202 August 2021 Letter to Hannahville Indian Community Re NRC Preliminary Determination Under Section 106 of the National Historic Preservation Act ML21188A2052021-08-0202 August 2021 Letter to Kickapoo Tribe in Kansas Re NRC Preliminary Determination Under Section 106 of the NHPA ML21189A2312021-08-0202 August 2021 Letter to Little Traverse Bay Bands of Odawa Indians Re NRC Preliminary Determination Under Section 106 of the NHPA ML21189A2522021-08-0202 August 2021 Letter to Match-E-Be-Nash-She-Wish Band of Potawatomi Indians Re NRC Preliminary Determination Under Section 106 of the NHPA ML21189A2602021-08-0202 August 2021 Letter to Menominee Indian Tribe of Wisconsin Re NRC Preliminary Determination Under Section 106 of the NHPA ML21189A3092021-08-0202 August 2021 Letter to Miami Tribe of Oklahoma Re NRC Preliminary Determination Under Section 106 of the NHPA ML21189A3342021-08-0202 August 2021 Letter to Nottawaseppi Huron Band Re NRC Preliminary Determination Under Section 106 of the NHPA ML21193A1312021-08-0202 August 2021 Letter to Peoria Tribe of Indians of Oklahoma Re NRC Preliminary Determination Under Section 106 of the NHPA ML21193A1462021-08-0202 August 2021 Letter to Prairie Band Potawatomi Nation Re NRC Preliminary Determination Under Section 106 of the NHPA ML21193A1522021-08-0202 August 2021 Letter to Winnebago Tribe of Nebraska Re NRC Preliminary Determination Under Section 106 of the NHPA ML21202A1232021-08-0202 August 2021 Letter to Kickapoo Tribe of Oklahoma Re NRC Preliminary Determination Under Section 106 of the NHPA ML21193A1492021-08-0202 August 2021 Letter to Sac and Fox Nation Re NRC Preliminary Determination Under Section 106 of the NHPA ML21216A0762021-08-0202 August 2021 Letter to Kickapoo Traditional Tribe of Texas Re NRC Preliminary Determination Under Section 106 of the NHPA 2024-02-01
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 April 20, 2021 Mr. Scott P. Murray Manager, Facility Licensing GE Hitachi Nuclear Energy 3901 Castle Hayne Road P.O. Box 780, M/C K-84 Wilmington, NC 28402
SUBJECT:
APPLICATION FOR RENEWAL OF THE MORRIS OPERATION LICENSE NO.
SNM-2500 - ACCEPTED FOR REVIEW (CAC/EPID NOS. 001028/L-2020-RNW-0024 AND 000993/L-2020-LNE-0004)
Dear Mr. Murray:
By letter dated June 30, 2020, as supplemented February 26, 2021, March 19, 2021, and March 24, 2021, GE Hitachi Nuclear Energy Americas LLC (GEH) submitted to the U.S. Nuclear Regulatory Commission (NRC) an application for renewal of License No. SNM-2500 for the Morris Operation (Agencywide Documents Access and Management System (ADAMS)
Accession Nos. ML20182A699, ML21057A119, ML21085A859, and ML21083A200). The submittal of the license renewal application was timely per the requirement of Title 10 of the Code of Federal Regulations (10 CFR) 72.42(c) and the exemption dated May 13, 2020 (ADAMS Accession No. ML20134H885). The current license expires on May 31, 2022. In the application, GEH requested to renew the license for an additional 20 years. The NRC staff performed an acceptance review of the application to determine if the application contains sufficient technical information in scope and depth to allow the staff to begin a detailed technical review.
This letter acknowledges acceptance of your application. We have established a schedule for the review. The schedule allows for the staff to complete its review and issue a request for additional information (RAI) in July 2021 (for the environmental review) and August 2021 (for the technical review). If GEH provides a sufficient response to the RAI in September 2021 (for the environmental review) and October 2021 (for the technical review), and a second RAI is not needed, we estimate making a decision on the license renewal in May 2022. We estimate that the staff may need approximately 1300 hours0.015 days <br />0.361 hours <br />0.00215 weeks <br />4.9465e-4 months <br /> and $125,000 contract dollars to complete its review. The review schedule and estimate assumes one RAI. If an additional RAI is needed, the staff will keep you informed of any schedule or estimate changes. In general, no additional changes to the application should be submitted except for changes resulting from your response to a RAI.
S. Murray 2 Please reference Docket No. 72-01 and CAC/EPID Nos. 001028/L-2020-RNW-0024 and 000993/L-2020-LNE-0004 in future correspondence related to this request. If you have any questions regarding this matter, please contact me at 301-415-7116 or Kristina.Banovac@nrc.gov.
Sincerely, Signed by Banovac, Kristina on 04/20/21 Kristina L. Banovac, Project Manager Storage and Transportation Licensing Branch Division of Fuel Management Office of Nuclear Material Safety and Safeguards Docket No. 72-01 License No. SNM-2500 CAC/EPID Nos. 001028/L-2020-RNW-0024 000993/L-2020-LNE-0004 cc:
Morris Operation Service List
S. Murray 3 Morris Operation Service List cc:
Scott P. Murray Manager, Facility Licensing GE Hitachi Nuclear Energy 3901 Castle Hayne Road P.O. Box 780, M/C K-84 Wilmington, NC 28402 Bobbie Lockwood General Manager, Services Operations GE Hitachi Nuclear Energy 3901 Castle Hayne Rd Wilmington, NC 28402 Tony McFadden Site Manager, Morris Operation GE Hitachi Nuclear Energy 7555 East Collins Road Morris, IL 60450 Grundy County Clerk 111 East Washington Street P. O. Box 675 Morris, IL 60450-0675 Adnan Khayyat Division Chief, Division of Nuclear Safety Illinois Emergency Management Agency 1035 Outer Park Dr Springfield, IL 62704 Steven Reynolds Manager, Nuclear Facilities Inspection Illinois Emergency Management Agency 245 W. Roosevelt Rd Bldg. 8, Suite 55 West Chicago, IL 60185 Region III Administrator U.S. Nuclear Regulatory Commission 2443 Warrenville Road, Suite 210 Lisle, IL 60532-4352
Ltr ML21104A080 OFFICE NMSS/DFM/STLB NMSS/DFM/STLB NMSS/DFM/STLB NMSS/DFM/STLB NAME KBanovac KB WWheatley WW JMcKirgan JM KBanovac KB DATE Apr 14, 2021 Apr 14, 2021 Apr 20, 2021 Apr 20, 2021