EPID:L-2020-LNE-0004, (Open) EPID:L-2020-RNW-0024, License Renewal (Open) EPID:001028, Package: Issuance of Renewed Materials License No. SNM-2507 for the North Anna Power Station Independent Spent Fuel Storage Installation (Cac/Epid Nos. 001028/L-2017-RNW-0010 and 000993/L-2017-LNE-0008) (Approved, Closed) |
|
MONTHYEARML18024A2732018-01-24024 January 2018 Letter to D. G. Stoddard U.S. NRC Approval of Virginia Electric and Power Company Request for Withholding Information from Public Disclosure for North Anna Power Station ISFSI (Cac/Epid Nos. 001028/L-2017-RNW-0010 and 000993/L-2017-LNE-0008 Project stage: Withholding Request Acceptance ML18030A1722018-01-29029 January 2018 Letter to J. P. Zimmerman Request for Additional Information for the Technical Review of the Application for Renewal of the Three Mile Island Unit 2 Independent Spent Fuel Storage Installation License No.: SNM-2508 Project stage: RAI ML18031A2222018-02-0606 February 2018 Letter to D. G. Stoddard Issuance of Renewed Materials License No. SNM-2507 for the North Anna Power Station Independent Spent Fuel Storage Installation (Cac/Epid Nos. 001028/L-2017-RNW-0010 and 000993/L-2017-LNE-0008) Project stage: Approval ML18031A2212018-02-0606 February 2018, 8 February 2018 Package: Issuance of Renewed Materials License No. SNM-2507 for the North Anna Power Station Independent Spent Fuel Storage Installation (Cac/Epid Nos. 001028/L-2017-RNW-0010 and 000993/L-2017-LNE-0008) Project stage: Request ML18040A0502018-02-0606 February 2018 Conversation Record with Dominion Energy Virginia Discuss North Power Station (NAPS) Independent Spent Fuel Storage Installation (ISFSI) Technical Specification Project stage: Other ML18101A0222018-03-15015 March 2018 Tn Americas LLC - Affidavit Project stage: Request ML18101A0202018-03-19019 March 2018 Independent Spent Fuel Storage Installation - Submittal of Application for the License Renewal Project stage: Request ML18221A2812018-03-31031 March 2018 ISFSI - Enclosure 4 to Dpg 18-051 License Renewal Application, Revision 0 Project stage: Other ML18101A0242018-03-31031 March 2018 ISFSI - License Renewal Application, Revision 0 Project stage: Other ML18012A0192018-05-22022 May 2018 SECY-18-0055: Proposed Rule: Regulatory Improvements for Production and Utilization Facilities Transitioning to Decommissioning Project stage: Request ML18201A4552018-07-20020 July 2018 Letter to D. Tallman Application for Renewal of the Rancho Seco Independent Spent Fuel Storage Installation License No. SNM 2510 - Accepted for Review (Cac/Epid Nos. 001028/L-2018-RNW-0005; 000993/L-2018-LNE-0004) Project stage: Other ML18221A2782018-08-0303 August 2018 ISFSI - Affidavit Pursuant to 10CFR2.390 for Enclosure 1 to Dpg 18-138 Project stage: Request ML18221A2922018-08-0303 August 2018 ISFSI - Enclosure 1 to Dpg 18-139, Affidavit Pursuant to 10CFR2.390 Project stage: Request ML18261A0102018-09-14014 September 2018 Letter to D. Tallman U.S. NRC Approval of Sacramento Municipal Utility Request for Withholding Information from Public Disclosure for Rancho Seco ISFSI (Cac/Epid Nos. 001028/L-2018-RNW-0005; 000993/L-2018-LNE-0004) Project stage: Withholding Request Acceptance ML18261A0312018-09-14014 September 2018 Letter to D. Tallman U.S. NRC Approval of Sacramento Municipal Utility Request for Withholding Information from Public Disclosure for Rancho Seco ISFSI (Cac/Epid Nos. 001028/L-2018-RNW-0005; 000993/L-2018-LNE-0004) Project stage: Withholding Request Acceptance ML18261A0222018-09-14014 September 2018 Letter to D. Tallman U.S. NRC Approval of Sacramento Municipal Utility Request for Withholding Information from Public Disclosure for Rancho Seco ISFSI (Cac/Epid Nos. 001028/L-2018-RNW-0005; 000993/L-2018-LNE-0004) Project stage: Withholding Request Acceptance ML18319A2562018-11-14014 November 2018 Memo to M. Layton Summary of Nov. 7, 2018, Meeting with GE-Hitachi Nuclear Energy Americas, LLC to Discuss the Upcoming Submittal of the Application for Renewal of the Morris ISFSI License (SNM-2500, Cac/Epid Nos. 001028/L-2018-LRM-0065) Project stage: Meeting ML18325A1422018-11-20020 November 2018 Letter to D. Tallman Request for Additional Information for Review of the Application for Renewal of the Rancho Seco Independent Spent Fuel Storage Installation License No. SNM-2510 (Cac/Epid Nos. 001028/L-2018-RNW-0005; 000993/L-2018-LNE-0 Project stage: RAI ML18360A1862018-12-21021 December 2018 Memorandum to M. Layton Summary of December 6, 2018, Meeting with DOE to Clarify the Responses to the RAI Regarding the Renewal of the Three Mile Island Unit 2 ISFSI (SNM-2508) (CAC /Epid: 001028/L-2017-RNW-0019 and 000993/L-2017-LNE-0007)( Project stage: RAI ML19156A0592019-05-31031 May 2019 Interim Storage Partners (ISP) First Request for Additional Information (RAI) Proposed Submittal Schedule, Docket 72-1050 Cac/Epid 001028/L-2017-NEW-0002 Project stage: Request ML19184A1602019-06-28028 June 2019 Interim Storage Partners Submittal of Responses to Transportation First Rais, Part 3, Docket 72-1050 Cac/Epid 001028/L-2017-NEW-0002 Project stage: Other ML19190A1822019-06-28028 June 2019 Interim Storage Partners Submittal of Additional Partial Response to First RAI, Part 1, Docket 72-1050 Cac/Epid 001028/L-2017-NEW-0002 Project stage: Other ML19211D0252019-07-26026 July 2019 Submission of ISP Draft Responses for Several RAIs and Associated Document Markups from First Request for Additional Information, Part 2, Docket 72-1050 Cac/Epid 001028/L-2017-NEW-0002 Project stage: Draft Request ML19221B6472019-08-0909 August 2019 Letter to B. Nicholson Issuance of Renewed Materials License No. SNM-2509 for the Trojan Independent Spent Fuel Storage Installation (Cac/Epid Nos. 001028/L-2017-RNW-0011 and 000993/L-2017-LNE-0009) Project stage: Approval ML19235A1482019-08-20020 August 2019 Interim Storage Partners, LLC Supplemental Information for RAI Part 1 in Support of RAI NP-2.4-1 and NP-2.4-2, Docket 72-1050 Cac/Epid 001028/L-2017-NEW-0002 Project stage: Supplement ML19305A3062019-10-30030 October 2019 Interim Storage Partners - Submission of ISP Draft Responses for Several RAIs and Associated Document Markups from First Request for Additional Information, Part 2, Docket 72-1050 Cac/Epid 001028/L-2017-NEW-0002 Project stage: Draft Request ML19338E1322019-12-0404 December 2019 Tn Americas, LLC - Response to Request for Supplemental Information for the Technical Review of the Application for Certificate of Compliance No. 1029 (Docket No. 72-1029, Cac/Epid Nos. 001028/L-2019-RNW-0014) Project stage: Supplement ML19345D3492019-12-0909 December 2019 Interim Storage Partners LLC - Submission of ISP Draft Responses for RAIs and Associated Document Markups from Part 2 Chb Cat B Design Draft Docket 72-1050 Cac/Epid 001028/L-2017-NEW-0002 Project stage: Draft Other ML20028E8442020-01-17017 January 2020 Submission of ISP Responses for RAIs and Associated Document Markups from First Request for Additional Information, Part 2, Docket 72-1050 Cac/Epid 001028/L-2017-NEW-0002 Project stage: Request ML20028D8912020-01-22022 January 2020 Interim Storage Partners, LLC, Submittal of ISP Revised Responses for RAI NP-15-7 Cac/Epid 001028/L-2017-NEW-0002 Project stage: Other ML20038A1312020-01-23023 January 2020 Request for Minor Editorial and Clarification Revisions for the Technical Review of the Application for Renewal of the Rancho Seco Independent Spent Fuel Storage Installation License No. SNM-2510(CAC/EPID Nos. 001028/L-2018-RNW-0005;000993/ Project stage: Request ML20031D0562020-01-29029 January 2020 Interim Storage Partners, LLC - Submittal of ISP Updated Draft Responses for Rals NP-8-1, NP-8-2 and Associated SAR Markups from First Request for Additional Information, Part 2, Docket 72-1050 Cac/Epid 001028/L-2017-NEW-0002 Project stage: Draft Request ML20049A0812020-01-31031 January 2020 Holtec International - HI-STORM 100 Storage CoC Renewal Application Project stage: Request ML20049A0822020-01-31031 January 2020 International - HI-STORM 100 Storage CoC Renewal Application Project stage: Other ML20052D9962020-02-14014 February 2020 Interim Storage Partners, LLC - Submission of ISP Responses for RAIs and Associated Document Markups from First Request for Additional Information, Part 2, Docket 72-1050 Cac/Epid 001028/L-2017-NEW-0002 Project stage: Request ML20050D2592020-02-14014 February 2020 Interim Storage Partners (ISP) First Request for Additional Information (RAI) Proposed Updated Submittal Schedule, Docket 72-1050 Cac/Epid 001028/L-2017-NEW-0002 Project stage: Request ML20052E1462020-02-17017 February 2020 Interim Storage Partners, LLC - Submittal of Revision 3 of the Environmental Report for the WCS CISF, Docket 72-1050 Cac/Epid 001028/L-2017-NEW-0002 Project stage: Other ML20066K2702020-03-0606 March 2020 Updated GEH Morris Operation (Mo) Decommissioning Funding Plan (DFP) Project stage: Request ML20099A1802020-04-0606 April 2020 Application for Renewal of the Certificate of Compliance No. 1014 for the Hi-Storm 100 Storage Cask System Accepted for Review (Cac/Epid Nos. 001028/L-2020-RNW-0007) Project stage: Other ML20134H8852020-04-30030 April 2020, 13 May 2020 GEH-Morris Operation Independent Spent Fuel Storage Installation Exemption from 10 CFR 72.42(c) Project stage: Request ML20150A2682020-05-28028 May 2020 Request for Additional Information for the Technical Review of the Application for Renewal of the Certificate of Compliance No. 1029 (Cac/Epid Nos. 001028/L-2019-RNW-0014) Project stage: RAI ML20150A2672020-05-28028 May 2020 CoC 1029 RAI Transmittal Letter Package Project stage: Request ML20182A7002020-06-30030 June 2020 GEH Morris Operation (Mo) Submittal of License Renewal Application Project stage: Other ML20192A1272020-07-10010 July 2020 Response to Request for Additional Information for the Technical Review of the Application for Renewal of the Certificate of Compliance No. 1029 (Docket No. 72-1029, Cac/Epid Nos. 001028/L-2019-RNW-0014) Project stage: Response to RAI ML20213C3252020-07-31031 July 2020 7-31-2020 Email Acknowledgement of NRC Receipt of GEH Morris Operation LRA and Start of Acceptance Review.Pdf Project stage: Acceptance Review ML20261H4202020-09-0202 September 2020 Submission of Revision 4 of the Safety Analysis Report for the WCS CISF, Docket 72-1050 Cac/Epid 001028/L-2017-NEW-0002 Project stage: Other ML20269A2592020-09-19019 September 2020 Interim Storage Partners, LLC - Revision 5 of the Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan with Updated Cover Sheets, Docket 72-1050 Cac/Epid 001028/L-2017-NEW-0002 Project stage: Other ML20289A4932020-10-0808 October 2020 NRC 699 (10-8-2020 Call on GE Hitachi Nuclear Energy Americas LLC (GEH) GEH-Morris Rsis, Signed) Project stage: Other ML20275A2802020-10-15015 October 2020 GEH-Morris License Renewal Rsi, Request for Supplemental Information for Acceptance Review of the Application for Renewal of the Morris Operation License No. SNM-2500 (Cac/Epid Nos. 001028/L-2020-RNW-0024 and 000993/L-2020-LNE-0004) Project stage: Acceptance Review ML21014A0632021-01-14014 January 2021 Interim Storage Partners, LLC - Submittal of Supplemental Information to Support NRCs Continued Review of the Safety Case for the WCS CISF, Docket 72-1050 Cac/Epid 001028/L-2017-NEW-0002 Project stage: Supplement 2019-08-20
[Table View] |
Text
HITACHI M200091 June 30, 2020 Director, Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Attn: Document Control Desk
Subject:
GEH Morris Operation (MO) License Renewal Application
References:
(1) NRG License SNM-2500, Docket 72-1 (2) GEH/NRC Pre-Application Meeting, 11/7/18 (3) GEH/NRC Pre-Application Meeting Telecom, 11/12/19 GE Hitachi Nuclear Energy Scott P. Murray Manager, Facility Licensing 3901 Castle Hayne Road P.O. Box 780 Wilmington, NC 28402 USA T (910) 819-5950 F (910) 362-5950 scott.murray@ge.com (4) Letter S.P. Murray (GEH) to NRG NMSS, Request to Extend Due Date for Submitting GEH MO License Renewal Application, 4/30/20 (5) Letter J. McKirgan (NRG) to S.P. Murray, Issuance of Exemption from 10 CFR 72.42(c) for the Timing of the GEH MO License Renewal Submittal.
GE Hitachi Nuclear Energy Americas LLC (GEH) hereby submits an application to renew Special Nuclear Material License SNM-2500 for the GEH Morris Operation (MO) Independent Spent Fuel Storage Installation (.ISFSI), in Morris, Illinois pursuant to 10 CFR 72.42 and the NRG approved renewal timing exemption (Reference 5).
Included with this application are a revised Consolidated Safety Analysis Report (CSAR),
revised CSAR "A" Appendices and a Supplement to Applicant's Environmental Report. The CSAR "B" Appendices that were submitted during the last license renewal in May 2000 (ML080170476) remain unchanged and are incorporated by reference. As described later in this letter, a revised MO Quality Assurance Plan was previously submitted and approved. The Security Plan and Emergency Plan previously submitted remain unchanged. The license Technical Specifications for Safety approved in Amendment 14 remain unchanged.
As discussed during the pre-application meetings (References 2 and 3), GEH is requesting renewal of the site-specific license, SNM-2500, for the ISFSI. The request is to extend the NRC authorization for operation of the ISFSI and allow GEH to continue to maintain safe storage of the spent fuel until it can be transported offsite. The current license will expire on May 31, 2022.
The renewal request is to extend the license for 20 years beyond the current term through May 2042.
By contract, the US Department of Energy (DOE) has ultimate responsibility for the permanent disposition of the spent fuel stored at the ISFSI. Interim storage for the spent fuel is necessary because there is no operational DOE facility for permanent disposal or storage for irradiated
M200091 US NRC 6/30/20 Page 2 of 4 spent nuclear fuel. Extending operation of the ISFSI is necessary since GEH must be able to store spent fuel in a safe manner pending disposition in a Federal repository.
On December 21, 2004,the NRC renewed the current license and incorporated amendments through Amendment 12, which modified the license to authorize storage of only the spent fuel currently in inventory. There are no plans to receive additional spent fuel or replace any currently in inventory.
In 2007, NRC approved Amendment 13 to transfer the GE license to GEH. The newly formed entity, GEH, acquired ownership of the Morris Operation ISFSI and assumed responsibility for the operation and maintenance of the facility.
In June 2013, GEH submitted a license amendment request to modify the Technical Specifications for Safety regarding submittal of annual environmental reports in accordance with regulatory requirements along with miscellaneous editorial changes (ML15106A008). NRC approved changes to the Technical Specifications and issued Amendment 14 to the license on April 16, 2015 (ML15106A020).
In February 2017, GEH submitted a license amendment request proposing minor clarifying administrative changes to the license. The proposed changes added descriptions of authorized materials and physical forms currently onsite and described in the CSAR. NRC approved the changes and issued Amendment 15 to the license on June 29, 2017 (ML17093A936).
The GEH MO CSAR contains a detailed description of the facility, site characteristics and includes technical information and safety assessments of the principle structures, systems and components of the installation. The CSAR also contains a summary description of the programs and activities relied upon to manage the effects of aging and an evaluation of the time limited aging analysis for the renewal period (CSAR Appendix A.8). The CSAR provides reasonable assurance of protection of the health and safety of the public and operating personnel. A revised CSAR is provided as Attachment 1 to this letter and revised CSAR "A" appendices are provided as Attachment 2 to this letter.
In accordance with 10 CFR 72.24 and 10 CFR Part 72, Subpart G, a GEH MO Quality Assurance Plan (OAP) (NEDE-31559) has been prepared, submitted, and approved by NRC.
NEDE-31559, Revision 4, was submitted on January 23, 2020 (ML20023A840) and was approved for use on April 15, 2020 (ML20094G482). The GEH MO OAP complies with 10 CFR Part 72, 10 CFR Part 21, and 10 CFR Part 71 in support of the SNM-2500 licensed activities (Docket 72-1) and radioactive material packaging and transportation activities (Docket 71-004) respectively.
A GEH MO Physical Security Plan has been prepared and submitted that satisfies the requirements of 10 CFR Part 72, Subpart H. The Physical Security Plan, Revision 9 was submitted on March 9, 2017 with changes that did not decrease the safeguards effectiveness of the plan. The physical security plan describes the design criteria and security measures for the physical protection of the facility and protection against unauthorized access. The requirements of 10 CFR 73, Appendix C for contingency planning are addressed in Section 9.0 of the physical security plan.
M200091 US NRC 6/30/20 Page 3 of 4 In accordance with 10 CFR 72.30, an updated GEH MO Decommissioning Funding Plan (DFP) was revised and submitted on March 6, 2020 (ML20066K270 & ML20066K274). The DFP provides a site-specific decommissioning cost estimate and provides the method of assuring funds to support decommissioning the facility remain available. The DFP includes information on general decommissioning criteria, decommissioning cost estimate assumptions and the technical approach to reduce the level of radioactivity in the facility to residual levels suitable for unrestricted release to allow license termination in accordance with 10 CFR 72.54.
A GEH MO Emergency Plan has been prepared that satisfies the requirements of 10 CFR Part 72.32. An emergency plan document revision summary report for Revision 5 was submitted on May 28, 2019 (ML19148A696 & ML19148A697). The changes were reviewed in accordance with the provisions of 10 CFR 72.48 and determined not to decrease the effectiveness of the plan. The emergency plan describes the emergency response organization, types of postulated accidents and processes for assessments, response, mitigation, training, periodic exercises and notification of offsite agencies.
A GEH MO Supplement to Applicant's Environmental Report was prepared in December 2019 that satisfies the requirements of 1 O CFR Part 72.34. The supplement provides updated local environment information and potential environmental impacts associated with continued operations of the facility. The supplement is provided as Attachment 3 to this letter.
GEH MO maintains an acceptable material control and accountability program pursuant to 1 O CFR 72.72, 72.76, 72.78 and to ensure the SNM currently at the facility is adequately controlled and reported.
GEH recommends retaining the same license conditions as contained in the current license (Amendment 15) as follows:
Conditions 6, 7 and 8 regarding the types of licensed material, chemical or physical forms and maximum amounts that may be possessed.
Conditions 9 and 10 regarding authoriz~d use, possession, storage, transfer and location.
Condition 11 regarding unirradiated and natural uranium.
Condition 12 regarding the Radiological Emergency Plan and implementing procedures.
Condition 13 regarding the Technical Specifications revised through Amendment 14.
Condition 14 should be revised to reference the current Physical Security Plan dated February 16, 2017.
Condition 15 regarding the effective date of the license.
I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge. Executed on June 30, 2020. Please contact me at (910) 819-5950 if you have questions.
/47~{?
Scott P. Murray, Manager Facility Licensing
M200091 USNRC 6/30/20 Page 4 of 4 Cc:
Attachments:
K. Banovac, NRC DFM SPM 20-024
- 1. Updated GEH MO CSAR Chapters 1-11, June 2020
- 2. Updated CSAR "A" appendices 1-17, June 2020
- 3. GEH MO Supplement to Applicant's Environmental Report, December 2019