ML24232A18119 August 2024Summer_2024-04_RP Information RequestOffsite Dose Calculation Manual
ML24190A0415 July 2024Notification of Inspection and Request for InformationBoric Acid
Non-Destructive Examination
Nondestructive Examination
Incorporated by reference
Flow Accelerated Corrosion
Liquid penetrant
ML24170A38918 June 2024NRR E-mail Capture - Acceptance Review for VC Summer Containment Tendon Relief Request (L-2024-LLR-0035)
ML24165A19113 June 2024003 Radiation Safety Baseline Inspection Information RequestOffsite Dose Calculation Manual
ML24156A0023 June 2024VC Summer SLRA - Requests for Additional Information - Set 2 - Email from Marieliz Johnson to Eric CarrSubsequent License Renewal
ML24129A0728 May 2024VC Summer SLRA - Requests for Confirmation of Information - Set 1 - Email from Marieliz Johnson to Eric CarrSubsequent License Renewal
ML24075A18715 March 2024NRR E-mail Capture - Draft RAIs for Alternative Request RR-5-V2 (L-2023-LLR-0068)Incorporated by reference
ML24067A0677 March 2024NRR E-mail Capture - Draft RAIs for Inverter CT License Amendment Request TS 3.8.3.1, “Onsite Power Distribution - Operating,” (L-2023-LLA-0157)
ML24061A1891 March 2024NRR E-mail Capture - Request for Additional Information (RAI) for VC Summer Inverter License Amendment Request (LAR) to Revise the Emergency PlanUltimate heat sink
FLEX
ML24052A01016 February 2024NRR E-mail Capture - Draft RAIs for Emergency Plan (EP) Changes License Amendment Request (LAR) (L-2023-LLA-0083)Ultimate heat sink
FLEX
ML24026A28025 January 2024Acceptance Review for Virgil C. Summer Relief Requests RR-5-V1, RR-5-V2, and RR-5-V3 (EPIDs L-2023-LLR-0067, L-2023-LLR-0068, and L-2023-LLR-0069) (Email)
ML23270B87127 September 2023NRR E-mail Capture - Draft RAIs for License Amendment Request (LAR) to Revise the Virgil C. Summer Nuclear Station (VCSNS) Unit 1 Emergency Plan (L-2023-LLA-0083)FLEX
ML23193A95512 July 2023NRR E-mail Capture - Acceptance Review for VC Summer and Surry Relief Request (L-2023-LLR-0029)
ML23186A1395 July 2023NRR E-mail Capture - Acceptance Review for VC Summer Emergency Plan (EP) License Amendment Request (LAR) (L-2023-LLA-0083)
ML23131A14910 May 20232023 V.C. Summer Commercial Grade Dedication Inspection Information RequestCommercial Grade Dedication
ML23044A33913 February 2023NRR E-mail Capture - Acceptance Review for Change to Reactor Vessel Surveillance Capsule Schedule (L-2023-LLL-0002)
ML23027A01226 January 2023002 Radiation Safety Baseline Inspection Information RequestProcess Control Program
Coronavirus
ML23026A01523 January 2023NRR E-mail Capture - Feb 14, 2023 Public Meeting with the Dominion Energy to Discuss a Planned Emergency Preparedness Submittal to Relocate the Emergency Operations Facility for the VC Summer Power Station - Dominion SlidesFLEX
Minimum staff
ML22263A05019 September 2022NRR E-mail Capture - Draft Request for Additional Information for Proposed Alternative Request RR-4-26 Extension of Steam Generator Primary Inlet Nozzle Dissimilar Metal Weld Inspection Interval V.C. Summer Unit 1Stress corrosion cracking
Dissimilar Metal Weld
ML22194A94213 July 2022NRC 50.59 Inspection (IP 71111.17T) Information Request
ML22174A35523 June 2022NRR E-mail Capture - Acceptance Review for Dominion Fleet LAR to Implement TSTF-554 (L-2022-LLA-0078)
ML22173A02917 June 2022NRR E-mail Capture - Acceptance Review for Summer to Defer Weld Examinations (L-2022-LLR-0052)
ML22139A23019 May 2022NRR E-mail Capture - Acceptance Review for Summer TS 4.6.2.1.d LAR (L-2022-LLR-0060)
ML22139A23219 May 2022NRR E-mail Capture - Acceptance Review for Summer TSTF-491 LAR (L-2022-LLR-0059)
ML22084A40525 March 2022NRR E-mail Capture - Acceptance Review for Summer Dissimilar Metal Weld Inspection Interval (L-2022-LLR-0033)Dissimilar Metal Weld
ML22018A02718 January 20222022 All RFI Responses - Exercise and Program Inspections - Revl
ML21333A18929 November 2021NRR E-mail Capture - Draft RAI for Summer LAR Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5b, (TSTF-425)High winds
Internal Flooding
Probabilistic Risk Assessment
Fukushima Dai-Ichi
Large early release frequency
ML21253A1358 September 2021Document Request for VC Summer Nuclear Station - Radiation Protection Inspection - Inspection Report 2021-04
ML21197A04315 July 2021VCS ISI 2021004 RFI - CombinedBoric Acid
Non-Destructive Examination
Nondestructive Examination
Incorporated by reference
Flow Accelerated Corrosion
Liquid penetrant
ML21187A12428 June 202110CFR Part 21 Update - Deviation Identified in the Bolting Utilized to Maintain Seismic Qualification
ML21173A17822 June 2021NRR E-mail Capture - Acceptance Review - Summer LAR Unit Staff Qualification Relocation TS to Quality Assurance Program Description (QAPD)
ML21145A02224 May 2021003 Radiation Safety Baseline Inspection Information RequestOffsite Dose Calculation Manual
Process Control Program
Coronavirus
ML21131A04011 May 2021NRR E-mail Capture - V.C. Summer, Unit 1 - Final RAI for the Spring 2020 RFO Sgtir Review
ML21125A1945 May 2021NRR E-mail Capture - Virgil C. Summer Nuclear Station, Unit 1 - Acceptance Review (L-2021-LLA-0064)
ML21020A05620 January 2021Email Capture Upcoming V.C. Summer POV Inspection (IP71111.21N.02) Information RequestPower-Operated Valves
Pandemic
Power Operated Valves
ML20342A1827 December 2020NRR E-mail Capture - Final RAI for Summer LAR - TS 3.6.4
ML20342A3827 December 2020NRR E-mail Capture - Final RAIs for Summer Fs LOCA LAR
ML20321A21116 November 2020NRR E-mail Capture - Summer, Unit 1 - Final RAIs for the SG Tube Inspection Report Review
ML20316A0124 November 2020NRR E-mail Capture - V.C. Summer Nuclear Station, Unit 1 - Acceptance Review (L-2020-LLR-0141)
ML20302A20328 October 2020NRR E-mail Capture - V.C. Summer Nuclear Station, Unit 1 - Acceptance Review (L-2020-LLR-0141)
ML20260H4263 September 2020NRR E-mail Capture - Acceptance Review for Fleet Relief Request for Code Case N-885
ML20178A58926 June 2020NRR E-mail Capture - Virgil C. Summer Nuclear Station, Unit 1 - Acceptance Review of the Fsloca LAR (L-2020-LLA-0124)
ML20178A59123 June 2020NRR E-mail Capture - VC Summer Unit Alternate Request RR-4-21
ML20178A59323 June 2020NRR E-mail Capture - VC Summer Unit Alternate Request RR-4-19
ML20149K42621 May 2020NRR E-mail Capture - V. C. Summer, Unit 1 - Acceptance of License Amendment Request (LAR-20-142) Related to TS 3.6.4, Containment Isolation Valves (L-2020-LLA-0092)
ML19218A3746 August 2019NRR E-mail Capture - Virgil C. Summer, Unit 1 -Acceptance of Relief Request (RR-4-20), Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography
ML19214A2732 August 2019NRR E-mail Capture - Virgil C. Summer, Unit 1 - Acceptance of License Amendment Request to Change Company Name
ML19211D51030 July 2019NRR E-mail Capture - Virgil C. Summer Nuclear Station, Unit No. 1 - Request for Additional Information LAR-16-01490 NFPA-805 (Supplement to PRA RAI 03)Internal Flooding
Probabilistic Risk Assessment
Fire Protection Program
ML19179A12627 June 2019NRR E-mail Capture - Virgil C. Summer Nuclear Station, Unit No. 1 - Request for Additional Information LAR-16-01490 NFPA-805 Program RevisionsProbabilistic Risk Assessment
Fire Protection Program
ML19155A2754 June 2019VC Summer 2019003 Rad Safety Inspection Document RequestHigh Radiation Area
Offsite Dose Calculation Manual
Locked High Radiation Area
Process Control Program