Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML24232A181 | 19 August 2024 | Summer_2024-04_RP Information Request | Offsite Dose Calculation Manual |
ML24190A041 | 5 July 2024 | Notification of Inspection and Request for Information | Boric Acid Non-Destructive Examination Nondestructive Examination Incorporated by reference Flow Accelerated Corrosion Liquid penetrant |
ML24170A389 | 18 June 2024 | NRR E-mail Capture - Acceptance Review for VC Summer Containment Tendon Relief Request (L-2024-LLR-0035) | |
ML24165A191 | 13 June 2024 | 003 Radiation Safety Baseline Inspection Information Request | Offsite Dose Calculation Manual |
ML24156A002 | 3 June 2024 | VC Summer SLRA - Requests for Additional Information - Set 2 - Email from Marieliz Johnson to Eric Carr | Subsequent License Renewal |
ML24129A072 | 8 May 2024 | VC Summer SLRA - Requests for Confirmation of Information - Set 1 - Email from Marieliz Johnson to Eric Carr | Subsequent License Renewal |
ML24075A187 | 15 March 2024 | NRR E-mail Capture - Draft RAIs for Alternative Request RR-5-V2 (L-2023-LLR-0068) | Incorporated by reference |
ML24067A067 | 7 March 2024 | NRR E-mail Capture - Draft RAIs for Inverter CT License Amendment Request TS 3.8.3.1, “Onsite Power Distribution - Operating,” (L-2023-LLA-0157) | |
ML24061A189 | 1 March 2024 | NRR E-mail Capture - Request for Additional Information (RAI) for VC Summer Inverter License Amendment Request (LAR) to Revise the Emergency Plan | Ultimate heat sink FLEX |
ML24052A010 | 16 February 2024 | NRR E-mail Capture - Draft RAIs for Emergency Plan (EP) Changes License Amendment Request (LAR) (L-2023-LLA-0083) | Ultimate heat sink FLEX |
ML24026A280 | 25 January 2024 | Acceptance Review for Virgil C. Summer Relief Requests RR-5-V1, RR-5-V2, and RR-5-V3 (EPIDs L-2023-LLR-0067, L-2023-LLR-0068, and L-2023-LLR-0069) (Email) | |
ML23270B871 | 27 September 2023 | NRR E-mail Capture - Draft RAIs for License Amendment Request (LAR) to Revise the Virgil C. Summer Nuclear Station (VCSNS) Unit 1 Emergency Plan (L-2023-LLA-0083) | FLEX |
ML23193A955 | 12 July 2023 | NRR E-mail Capture - Acceptance Review for VC Summer and Surry Relief Request (L-2023-LLR-0029) | |
ML23186A139 | 5 July 2023 | NRR E-mail Capture - Acceptance Review for VC Summer Emergency Plan (EP) License Amendment Request (LAR) (L-2023-LLA-0083) | |
ML23131A149 | 10 May 2023 | 2023 V.C. Summer Commercial Grade Dedication Inspection Information Request | Commercial Grade Dedication |
ML23044A339 | 13 February 2023 | NRR E-mail Capture - Acceptance Review for Change to Reactor Vessel Surveillance Capsule Schedule (L-2023-LLL-0002) | |
ML23027A012 | 26 January 2023 | 002 Radiation Safety Baseline Inspection Information Request | Process Control Program Coronavirus |
ML23026A015 | 23 January 2023 | NRR E-mail Capture - Feb 14, 2023 Public Meeting with the Dominion Energy to Discuss a Planned Emergency Preparedness Submittal to Relocate the Emergency Operations Facility for the VC Summer Power Station - Dominion Slides | FLEX Minimum staff |
ML22263A050 | 19 September 2022 | NRR E-mail Capture - Draft Request for Additional Information for Proposed Alternative Request RR-4-26 Extension of Steam Generator Primary Inlet Nozzle Dissimilar Metal Weld Inspection Interval V.C. Summer Unit 1 | Stress corrosion cracking Dissimilar Metal Weld |
ML22194A942 | 13 July 2022 | NRC 50.59 Inspection (IP 71111.17T) Information Request | |
ML22174A355 | 23 June 2022 | NRR E-mail Capture - Acceptance Review for Dominion Fleet LAR to Implement TSTF-554 (L-2022-LLA-0078) | |
ML22173A029 | 17 June 2022 | NRR E-mail Capture - Acceptance Review for Summer to Defer Weld Examinations (L-2022-LLR-0052) | |
ML22139A230 | 19 May 2022 | NRR E-mail Capture - Acceptance Review for Summer TS 4.6.2.1.d LAR (L-2022-LLR-0060) | |
ML22139A232 | 19 May 2022 | NRR E-mail Capture - Acceptance Review for Summer TSTF-491 LAR (L-2022-LLR-0059) | |
ML22084A405 | 25 March 2022 | NRR E-mail Capture - Acceptance Review for Summer Dissimilar Metal Weld Inspection Interval (L-2022-LLR-0033) | Dissimilar Metal Weld |
ML22018A027 | 18 January 2022 | 2022 All RFI Responses - Exercise and Program Inspections - Revl | |
ML21333A189 | 29 November 2021 | NRR E-mail Capture - Draft RAI for Summer LAR Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5b, (TSTF-425) | High winds Internal Flooding Probabilistic Risk Assessment Fukushima Dai-Ichi Large early release frequency |
ML21253A135 | 8 September 2021 | Document Request for VC Summer Nuclear Station - Radiation Protection Inspection - Inspection Report 2021-04 | |
ML21197A043 | 15 July 2021 | VCS ISI 2021004 RFI - Combined | Boric Acid Non-Destructive Examination Nondestructive Examination Incorporated by reference Flow Accelerated Corrosion Liquid penetrant |
ML21187A124 | 28 June 2021 | 10CFR Part 21 Update - Deviation Identified in the Bolting Utilized to Maintain Seismic Qualification | |
ML21173A178 | 22 June 2021 | NRR E-mail Capture - Acceptance Review - Summer LAR Unit Staff Qualification Relocation TS to Quality Assurance Program Description (QAPD) | |
ML21145A022 | 24 May 2021 | 003 Radiation Safety Baseline Inspection Information Request | Offsite Dose Calculation Manual Process Control Program Coronavirus |
ML21131A040 | 11 May 2021 | NRR E-mail Capture - V.C. Summer, Unit 1 - Final RAI for the Spring 2020 RFO Sgtir Review | |
ML21125A194 | 5 May 2021 | NRR E-mail Capture - Virgil C. Summer Nuclear Station, Unit 1 - Acceptance Review (L-2021-LLA-0064) | |
ML21020A056 | 20 January 2021 | Email Capture Upcoming V.C. Summer POV Inspection (IP71111.21N.02) Information Request | Power-Operated Valves Pandemic Power Operated Valves |
ML20342A182 | 7 December 2020 | NRR E-mail Capture - Final RAI for Summer LAR - TS 3.6.4 | |
ML20342A382 | 7 December 2020 | NRR E-mail Capture - Final RAIs for Summer Fs LOCA LAR | |
ML20321A211 | 16 November 2020 | NRR E-mail Capture - Summer, Unit 1 - Final RAIs for the SG Tube Inspection Report Review | |
ML20316A012 | 4 November 2020 | NRR E-mail Capture - V.C. Summer Nuclear Station, Unit 1 - Acceptance Review (L-2020-LLR-0141) | |
ML20302A203 | 28 October 2020 | NRR E-mail Capture - V.C. Summer Nuclear Station, Unit 1 - Acceptance Review (L-2020-LLR-0141) | |
ML20260H426 | 3 September 2020 | NRR E-mail Capture - Acceptance Review for Fleet Relief Request for Code Case N-885 | |
ML20178A589 | 26 June 2020 | NRR E-mail Capture - Virgil C. Summer Nuclear Station, Unit 1 - Acceptance Review of the Fsloca LAR (L-2020-LLA-0124) | |
ML20178A591 | 23 June 2020 | NRR E-mail Capture - VC Summer Unit Alternate Request RR-4-21 | |
ML20178A593 | 23 June 2020 | NRR E-mail Capture - VC Summer Unit Alternate Request RR-4-19 | |
ML20149K426 | 21 May 2020 | NRR E-mail Capture - V. C. Summer, Unit 1 - Acceptance of License Amendment Request (LAR-20-142) Related to TS 3.6.4, Containment Isolation Valves (L-2020-LLA-0092) | |
ML19218A374 | 6 August 2019 | NRR E-mail Capture - Virgil C. Summer, Unit 1 -Acceptance of Relief Request (RR-4-20), Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography | |
ML19214A273 | 2 August 2019 | NRR E-mail Capture - Virgil C. Summer, Unit 1 - Acceptance of License Amendment Request to Change Company Name | |
ML19211D510 | 30 July 2019 | NRR E-mail Capture - Virgil C. Summer Nuclear Station, Unit No. 1 - Request for Additional Information LAR-16-01490 NFPA-805 (Supplement to PRA RAI 03) | Internal Flooding Probabilistic Risk Assessment Fire Protection Program |
ML19179A126 | 27 June 2019 | NRR E-mail Capture - Virgil C. Summer Nuclear Station, Unit No. 1 - Request for Additional Information LAR-16-01490 NFPA-805 Program Revisions | Probabilistic Risk Assessment Fire Protection Program |
ML19155A275 | 4 June 2019 | VC Summer 2019003 Rad Safety Inspection Document Request | High Radiation Area Offsite Dose Calculation Manual Locked High Radiation Area Process Control Program |