IR 05000424/2020004
| ML21041A217 | |
| Person / Time | |
|---|---|
| Site: | Vogtle, 07201039 |
| Issue date: | 02/10/2021 |
| From: | Alan Blamey NRC/RGN-II/DRP/RPB2 |
| To: | Gayheart C Southern Nuclear Operating Co |
| References | |
| IR 2020002, IR 2020004 | |
| Download: ML21041A217 (29) | |
Text
February 10, 2021
SUBJECT:
VOGTLE ELECTRIC GENERATING PLANT, UNITS 1 & 2 - INTEGRATED INSPECTION REPORT 05000424/2020004 AND 05000425/2020004 AND INDEPENDENT SPENT FUEL STORAGE INSTALLATION REPORT 07201039/2020002
Dear Ms. Gayheart:
On December 31, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Vogtle Electric Generating Plant, Units 1 & 2. On January 25, 2021, the NRC inspectors discussed the results of this inspection with Ms. Cheryl Gayheart and other members of your staff. The results of this inspection are documented in the enclosed report.
Two findings of very low safety significance (Green) are documented in this report. One of these findings involved a violation of NRC requirements. We are treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2 of the Enforcement Policy.
If you contest the violation or the significance or severity of the violation documented in this inspection report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN:
Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region II; the Director, Office of Enforcement; and the NRC Resident Inspector at Vogtle Electric Generating Plant, Units 1 & 2.
If you disagree with a cross-cutting aspect assignment or a finding not associated with a regulatory requirement in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region II; and the NRC Resident Inspector at Vogtle Electric Generating Plant, Units 1 & 2. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/
Alan J. Blamey, Chief Reactor Projects Branch 2 Division of Reactor Projects
Docket Nos. 05000424, 05000425, and 07201039 License Nos. NPF-68 and NPF-81
Enclosure:
As stated
Inspection Report
Docket Numbers:
05000424 and 05000425 and 07201039
License Numbers:
Report Numbers:
05000424/2020004, 05000425/2020004, 07201039/2020002
Enterprise Identifier: I-2020-004-0044 and I-2020-002-0102
Licensee:
Southern Nuclear Operating Co., Inc.
Facility:
Vogtle Electric Generating Plant, Units 1 & 2
Location:
Waynesboro, GA
Inspection Dates:
October 01, 2020 to December 31, 2020
Inspectors:
A. Beasten, Resident Inspector
B. Caballero, Senior Operations Engineer
J. Diaz-Velez, Senior Health Physicist
M. Endress, Senior Resident Inspector
T. Fanelli, Senior Construction Inspector
C. Fontana, Emergency Preparedness Inspector
A. Nielsen, Senior Health Physicist
W. Pursley, Health Physicist
A. Rosebrook, Senior Reactor Analyst
C. Safouri, Resident Inspector
S. Sanchez, Senior Emergency Preparedness Insp
N. Staples, Senior Project Engineer
J. Walker, Emergency Response Inspector
Approved By:
Alan J. Blamey, Chief
Reactor Projects Branch 2
Division of Reactor Projects
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Vogtle Electric Generating Plant, Units 1
& 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
Failure to Initiate Actions to Repair or Replace Degraded Cables associated with the Standby Auxiliary Transformer Cornerstone Significance Cross-Cutting Aspect Report Section Initiating Events Green FIN 05000424,05000425/2020004-01 Open/Closed
[H.13] -
Consistent Process 71111.15 The inspectors identified a Green finding when the licensee failed to initiate actions per procedural requirements in NMP-ES-051-002, Tan Delta Testing, Version 10.2, for degraded cabling associated with the Standby Auxiliary Transformer (SAT). Specifically, following Tan Delta testing on September 2020, the licensee failed to initiate corrective actions per NMP-ES-051-002 for cabling conditions that met the Action Required criteria per the Tan Delta Assessment Criteria, which stated Repair or replacement of the cable SHALL occur at the first preventative maintenance activity or outage.
Inadequate Procedure to Maintain Secured Emergency Diesel Ready for Restart Cornerstone Significance Cross-Cutting Aspect Report Section Mitigating Systems Green NCV 05000424,05000425/2020004-02 Open/Closed
[P.1] -
Identification 71111.21M The team identified a Green finding and associated Non-cited Violation (NCV) of Title 10 of the Code of Federal Regulations (10 CFR) Part 50, Appendix B, Criterion V, Instructions,
Procedures, and Drawings, for the licensees failure to have appropriate procedures to maintain an intentionally secured Emergency Diesel Generator (EDG) ready for restart in response to a single failure in the remaining operating train as described in the Updated Final Safety Analysis Report (UFSAR).
Additional Tracking Items
Type Issue Number Title Report Section Status URI 05000424,05000425/20 19010-02 Corrective Actions for Single Failure Vulnerabilities Identified in Condition Report, CR10606308 71111.21M Closed
PLANT STATUS
Unit 1 began the inspection period at Rated Thermal Power (RTP). On December 4, 2020, the unit was down powered to 92 percent to resolve level control issues associated with the 1A Heater Drain Tank. The unit was returned to RTP on December 8, 2020, and remained at or near RTP for the remainder of the inspection period.
Unit 2 began the inspection period at RTP. On November 12, 2020, the unit automatically tripped due to an unexpected failure of the 'B' Generator Step-up (GSU) Transformer. The licensee placed the spare GSU in-service and the unit was returned to RTP on November 20, 2020, and remained at or near RTP for the remainder of the inspection period.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the Coronavirus Disease 2019 (COVID-19), resident inspectors were directed to begin telework and to remotely access licensee information using available technology. During this time, the resident inspectors performed periodic site visits each week; conducted plant status activities as described in IMC 2515, Appendix D, Plant Status; observed risk-significant activities; and completed on-site portions of IPs. In addition, resident and regional baseline inspections were evaluated to determine if all or portions of the objectives and requirements stated in the IP could be performed remotely. If the inspections could be performed remotely, they were conducted per the applicable IP. In some cases, portions of an IP were completed remotely and on-site. The inspections documented below met the objectives and requirements for completion of the IP.
REACTOR SAFETY
71111.01 - Adverse Weather Protection
Seasonal Extreme Weather Sample (IP Section 03.01) (1 Sample)
- (1) The inspectors evaluated readiness for seasonal extreme weather conditions prior to the onset of seasonal cold temperatures for the following systems:
Chemical and Volume Control System.
Nuclear Service Cooling Water System (NSCW).
71111.04 - Equipment Alignment
Partial Walkdown Sample (IP Section 03.01) (1 Sample)
The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:
- (1) Unit 2 Loops 2, 3, and 4 Main Steam Atmospheric Relief Valves (ARVs), on October 14, 2020.
71111.05 - Fire Protection
Fire Area Walkdown and Inspection Sample (IP Section 03.01) (1 Sample)
The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:
- (1) Fire Zone 39A/45/99/104, Unit 1 North and South Main Steam Valve House, on October 5, 2020.
71111.06 - Flood Protection Measures
Inspection Activities - Internal Flooding (IP Section 03.01) (1 Sample)
The inspectors evaluated internal flooding mitigation protections in the:
- (1) Unit 1 Train A/B NSCW Pumphouse, on November 17, 2020.
71111.11A - Licensed Operator Requalification Program and Licensed Operator Performance
Requalification Examination Results (IP Section 03.03) (1 Sample)
The licensee completed the annual requalification operating test and biennial written examination required to be administered to all licensed operators in accordance with Title 10 of the Code of Federal Regulations 55.59(a)(2), Requalification Requirements, of the NRCs Operators Licenses. During the week of December 14, 2020, the inspector performed an in-office review of the overall pass/fail results of the individual operating examinations, the crew simulator operating examinations, and the biennial written examinations in accordance with Inspection Procedure (IP) 71111.11, Licensed Operator Requalification Program. These results were compared to the thresholds established in Section 3.02, Requalification Examination Results, of IP 71111.11.
- (1) The inspectors reviewed and evaluated the licensed operator examination failure rates for the requalification annual operating exam and biennial written examination completed on December 3, 2020.
71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance
Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)
- (1) The inspectors observed and evaluated licensed operator performance in the Control Room on Unit 2 during reactor startup from Mode 3 to Mode 1 following an unplanned forced outage, on November 17, 2020. The inspectors also observed and evaluated licensed operator performance in the Control Room on Unit 2 during power ascension and main generator synchronization to the grid, on November 19, 2020.
Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)
- (1) The inspectors observed and evaluated a Steam Generator Tube Rupture with multiple malfunctions (i.e. Reactor Trip hand switch inoperable following dropped Control Rods), on October 13, 2020.
71111.12 - Maintenance Effectiveness
Maintenance Effectiveness (IP Section 03.01) (2 Samples)
The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components (SSCs) remain capable of performing their intended function:
- (1) Unit 2 Anticipated Transients Without Scram (ATWS) Mitigation System Actuation Circuitry (AMSAC) Repeat Maintenance Preventable Functional Failure, on January 27, 2020.
- (2) Unit 2 Turbine Driven Auxiliary Feedwater (AFW) pump nearing (a)(1) for unavailability, on May 4, 2020.
Quality Control (IP Section 03.02) (1 Sample)
The inspectors evaluated the effectiveness of maintenance and quality control activities to ensure the following SSC remains capable of performing its intended function:
- (1) Replacement of the Unit 2 Reactor Coolant Pump #1, on November 18, 2020.
71111.15 - Operability Determinations and Functionality Assessments
Operability Determination or Functionality Assessment (IP Section 03.01) (3 Samples)
The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:
- (1) CR 10744552, Unit 1 Loop 3 Main Feedwater Isolation Valve steam leak, on October 8, 2020.
- (2) CR 10752654, Unit 1 Train A Sequencer Trouble Alarm, on November 9, 2020.
- (3) CR 10739386, Standby Auxiliary Transformer (SAT) Tan Delta results requiring safety evaluation, on November 25, 2020.
71111.19 - Post-Maintenance Testing
Post-Maintenance Test Sample (IP Section 03.01) (5 Samples)
The inspectors evaluated the following post-maintenance test activities to verify system operability and functionality:
- (1) SAT maintenance outage, on September 23, 2020.
- (2) Unit 2 Train A Centrifugal Charging Pump (CCP) system outage, on September 23, 2020.
- (3) Unit 2 Loop 1 ARV system outage, on October 14, 2020.
- (4) Unit 2 Train A Emergency Diesel Generator jacket water leak repair, on October 20, 2020.
- (5) Unit 2 Train A Motor Driven AFW Pump system outage, on November 11, 2020.
===71111.21M - Design Bases Assurance Inspection (Teams)
The inspectors evaluated the following components and listed applicable attributes, permanent modifications, and operating experience:
Design Review - Risk-Significant/Low Design Margin Components (IP Section 02.02) (1 Sample)
- (1) Emergency Diesel Generator 2A (Electrical)
- Consistency between station documentation (e.g. procedures) and vendor specifications
71111.22 - Surveillance Testing
The inspectors evaluated the following surveillance tests:
Surveillance Tests (other) (IP Section 03.01)
(1)24991-2, Protection Group II Solid State Protection System Input Relay Test, on October 1, 2020.
(2)14722-2, Emergency Core Cooling System to Reactor Water Storage Tank Back Leakage In-service Test, on October 8, 2020.
FLEX Testing (IP Section 03.02)===
- (1) Steam Generator FLEX Pump Testing, on October 1, 2020.
71114.01 - Exercise Evaluation
Inspection Review (IP Section 02.01-02.11) (1 Sample)
- (1) The inspectors evaluated the biennial emergency plan exercise during the week of December 7, 2020. The simulated scenario began with increased sampling by Chemistry due to a rising trend with dose equivalent iodine in the reactor coolant system. A loose parts alarm and subsequent increased radiation readings on multiple radiation monitors eventually caused the control room simulator crew to manually trip the reactor. Once the letdown radiation monitor reached the threshold for classification, an Unusual Event was declared. Subsequently, a steam generator tube ruptured occurred, and along with fuel clad damage from the loose part, the conditions were met for declaring a Site Area Emergency. When a main steam code safety valve lifted and would not reseat, conditions for a General Emergency were met, and the Offsite Response Organizations were able to demonstrate their ability to implement emergency actions.
71114.04 - Emergency Action Level and Emergency Plan Changes
Inspection Review (IP Section 02.01-02.03) (1 Sample)
- (1) The inspectors evaluated submitted Emergency Action Level, Emergency Plan, and Emergency Plan Implementing Procedure changes during the week of December 7, 2020. This evaluation does not constitute NRC approval.
71114.06 - Drill Evaluation
Drill/Training Evolution Observation (IP Section 03.02) (1 Sample)
The inspectors evaluated:
- (1) Licensed operator annual requalification exam scenario involving a feedwater piping break and Loss of Coolant Accident, on October 19, 2020.
71114.08 - Exercise Evaluation Scenario Review
Inspection Review (IP Section 02.01 - 02.04) (1 Sample)
- (1) The inspectors reviewed and evaluated in-office, the proposed scenario for the biennial emergency plan exercise at least 30 days prior to the day of the exercise.
RADIATION SAFETY
71124.03 - In-Plant Airborne Radioactivity Control and Mitigation
Permanent Ventilation Systems (IP Section 03.01) (1 Sample)
The inspectors evaluated the configuration of the following permanently installed ventilation systems:
- (1) Control Room Emergency Ventilation System (CREVS)
Temporary Ventilation Systems (IP Section 03.02) (1 Sample)
The inspectors evaluated the configuration of the following temporary ventilation systems:
- (1) Portable HEPA systems used during the 2R20 refueling outage.
Use of Respiratory Protection Devices (IP Section 03.03) (1 Sample)
- (1) The inspectors evaluated the licensees use of respiratory protection devices.
Self-Contained Breathing Apparatus for Emergency Use (IP Section 03.04) (1 Sample)
- (1) The inspectors evaluated the licensees use and maintenance of self-contained breathing apparatuses.
71124.04 - Occupational Dose Assessment
Source Term Characterization (IP Section 03.01) (1 Sample)
- (1) The inspectors evaluated licensee performance as it pertains to radioactive source term characterization.
External Dosimetry (IP Section 03.02) (1 Sample)
- (1) The inspectors evaluated licensee performance as it pertains to external dosimetry that is used to assign occupational dose.
Internal Dosimetry (IP Section 03.03) (1 Sample)
The inspectors evaluated the following internal dose assessments for actual internal exposures:
- (1) In accordance with IMC 306, this sample is considered complete based on no internal dosimetry (CEDE) instances that exceeded 10 millirem since October 2018.
Special Dosimetric Situations (IP Section 03.04) (1 Sample)
The inspectors evaluated the following special dosimetric situations:
- (1) Dose assessments for 7 declared pregnant workers.
71124.05 - Radiation Monitoring Instrumentation
Walkdowns and Observations (IP Section 03.01) (10 Samples)
The inspectors evaluated the following radiation detection instrumentation during plant walkdowns:
- (1) Area Radiation Monitors in the Unit 1&2 spent fuel pools.
- (2) Area Radiation Monitors in the main control room.
- (3) Portable Air Samplers in use in the auxiliary building.
- (4) Portal Monitors in use at the protected area exit.
- (5) Personnel Contamination Monitors at the radiologically controlled area exit.
- (6) Portable friskers used at the exit to the U2 radiologically controlled area exit.
- (7) Area Radiation Monitors at the radioactive processing building.
- (8) Telepoles ready for issue at the radiation protection (RP) control point.
- (9) Ludlum Model 3s ready for issue at the RP control point.
- (10) Tool Monitors in service at the RP control point.
Calibration and Testing Program (IP Section 03.02) (11 Samples)
The inspectors evaluated the calibration and testing of the following radiation detection instruments:
- (1) Ludlum Model 300-16, Area Radiation Monitor, SN VEGP-RP 0684.
- (2) Ludlum Model L-30, Neutron Survey Instrument, SN VEGP-RP-1813.
- (3) C-812 Magnehehalic Flow Calibrator, VEGP-RP 0089.
- (4) Mirion Telepole Model BAK-2611, SN VEGP-RP-1731.
- (5) Canberra ARGO 5AB Personnel Contamination Monitor, SN VEGP-HP-1491.
- (6) Thermo Scientific SAM 11, SN VEGP-RP-1152.
- (7) F&J Specialty Products Econoair Plus, Breathing Zone Air Sampler SN VEGP-HP-1688.
- (8) Ludlum Model 3 Survey Meter SN VEGP-HP-1777.
- (9) Canberra GEM 5 SN VEGP-HP-1494.
- (11) Thermo Scientific AMS-4 Continuous Air Monitor SN VEGP-RP1446.
Effluent Monitoring Calibration and Testing Program Sample (IP Sample 03.03) (2 Samples)
The inspectors evaluated the calibration and maintenance of the following radioactive effluent monitoring and measurement instrumentation:
- (1) Unit 2, Isotopic Calibration of 2RE-0018 Waste Liquid Effluent Monitor (dated 02/20/2019).
- (2) Unit 2, Isotopic Calibration of 2RE12444C Plant Vent Post Accident Gas Detector (dated 05/05/2020).
OTHER ACTIVITIES - BASELINE
===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:
EP01: Drill/Exercise Performance (IP Section 02.12)===
- (1) Unit 1 (April 1, 2019, through September 30, 2020).
Unit 2 (April 1, 2019, through September 30, 2020).
EP02: ERO Drill Participation (IP Section 02.13) (1 Sample)
- (1) Unit 1 (April 1, 2019, through September 30, 2020).
Unit 2 (April 1, 2019, through September 30, 2020).
EP03: Alert & Notification System Reliability (IP Section 02.14) (1 Sample)
- (1) Unit 1 (April 1, 2019, through September 30, 2020).
Unit 2 (April 1, 2019, through September 30, 2020).
MS05: Safety System Functional Failures (SSFFs) Sample (IP Section 02.04) (2 Samples)
- (1) Unit 1 (October 1, 2019 - September 30, 2020).
- (2) Unit 2 (October 1, 2019 - September 30, 2020).
MS06: Emergency AC Power Systems (IP Section 02.05) (2 Samples)
- (1) Unit 1 (October 1, 2019 - September 30, 2020).
- (2) Unit 2 (October 1, 2019 - September 30, 2020).
MS10: Cooling Water Support Systems (IP Section 02.09) (2 Samples)
- (1) Unit 1 (October 1, 2019 - September 30, 2020).
- (2) Unit 2 (October 1, 2019 - September 30, 2020).
PR01: Radiological Effluent Technical Specifications/Offsite Dose Calculation Manual Radiological Effluent Occurrences (RETS/ODCM) Radiological Effluent Occurrences Sample (IP Section 02.16) (1 Sample)
(1)
(April 02, 2019 - July 31, 2020).
71152 - Problem Identification and Resolution
Semiannual Trend Review (IP Section 02.02) (1 Sample)
- (1) The inspectors reviewed the licensees corrective action program for potential adverse trends in Unit 2 Train A CCP low oil level that might be indicative of a more significant safety issue.
OTHER ACTIVITIES
- TEMPORARY INSTRUCTIONS (TI), INFREQUENT AND ABNORMAL
2515/194 - Inspection of the Licensees Implementation of Industry Initiative Associated with the Open Phase Condition (OPC) Design Vulnerabilities In Electric Power Systems (NRC Bulletin 2012-01)
Inspection of the Licensees Implementation of Industry Initiative Associated with the Open Phase Condition Design Vulnerabilities In Electric Power Systems (NRC Bulletin 2012-01) (1 Sample)
(1)2515/194 - Inspection of the Licensees Implementation of Industry Initiative Associated with the Open Phase Condition Design Vulnerabilities In Electric Power Systems (NRC Bulletin 2012-01) Revision 0 of this Temporary Instruction (TI) was previously inspected, and closed, in Inspection Report 2019012 (ML19268A063).
However, a subsequent revision to the Nuclear Energy Institute (NEI) Voluntary Initiative (Revision 3), provided licensees the option to leave the open phase protection (OPP) system in monitoring mode only in lieu of activating the automatic trip circuitry, provided it was supported by a risk evaluation. Revision 1 (and later Revision 2) of this TI was issued to provide inspection guidance for the new option.
The inspectors remotely reviewed licensee analyses and procedures that demonstrated operator manual actions would successfully mitigate the impact of an OPC. The inspectors completed Section 03.01c of TI 2515/194, Revision 2.
The inspectors verified that modeling used for the OPC reflected the as-designed and as-built plant, assumptions made by the licensee were reasonable, and licensee procedures were adequate to respond to an OPC. The inspectors also verified that human reliability analysis and recovery evaluations were done in accordance with NEI and voluntary initiative guidance.
60855.1 - Operation of an Independent Spent Fuel Storage Installation (ISFSI) at Operating Plants Operation of an Independent Spent Fuel Storage Installation at Operating Plants
- (1) The inspectors evaluated the licensees activities related to long-term operation and monitoring of their independent spent fuel storage installation on November 3, 2020.
===92702 - Follow-Up on Traditional Enforcement Actions Including Violations, Deviations, Confirmatory Action Letters, and Orders
Follow-Up on Traditional Enforcement Actions Including Violations, Deviations, Confirmatory Action Letters, and Orders===
- (1) On November 20, 2019, as a result of Alternative Dispute Resolution the NRC issued Confirmatory Order (CO) EA-18-130 and EA-18-171 (ML19249B552). The CO was the result of an apparent violation of 10 CFR 53.5, Employee Protection at Vogtle Units 3 & 4, which contained actions for the Farley, Hatch and Vogtle Units 1 & 2 nuclear plants. During the week of November 30, 2020, the inspectors reviewed corrective actions for this CO. Because the CO was fleet wide for the Southern Nuclear Company, the corrective actions reviewed by the inspectors included a review of corrective actions for the Hatch, Farley, and Vogtle Units 1 through 4 nuclear plants. The details can be found in inspection report 0500025/20200012, 0500026/2020012; 11/30/2020 through 12/11/2020; Vogtle Unit 3 Combined License, Vogtle Unit 4 Combined License, CO Follow-Up and Safety Conscious Work Environment inspection report.
INSPECTION RESULTS
Failure to Initiate Actions to Repair or Replace Degraded Cables associated with the Standby Auxiliary Transformer Cornerstone Significance Cross-Cutting Aspect Report Section Initiating Events
Green FIN 05000424,05000425/2020004-01 Open/Closed
[H.13] -
Consistent Process 71111.15 The inspectors identified a Green finding when the licensee failed to initiate actions per procedural requirements in NMP-ES-051-002, Tan Delta Testing, Version 10.2, for degraded cabling associated with the Standby Auxiliary Transformer (SAT). Specifically, following Tan Delta testing on September 2020, the licensee failed to initiate corrective actions per NMP-ES-051-002 for cabling conditions that met the Action Required criteria per the Tan Delta Assessment Criteria, which stated Repair or replacement of the cable SHALL occur at the first preventative maintenance activity or outage.
Description:
The SAT serves as an additional swing preferred offsite power source which is available to supply a safety-related bus for either unit in response to emergency conditions or for use during Reserve Auxiliary Transformer maintenance. The SAT is capable of being placed in service to fulfill Technical Specification 3.8.1, AC Sources - Operating, which requires two qualified circuits between the offsite transmission network and the onsite Class 1E AC Electrical Power Distribution System. The SAT is supplied power through direct buried cables from the Plant Wilson switchyard 13.8 kV system which can be powered from either the Southern Company 230 kV grid or Plant Wilsons onsite combustion turbine electrical generators.
From September 14, 2020, to September 23, 2020, the SAT was taken out of service for planned maintenance and testing evolutions. During the system outage, the licensee performed procedure NMP-ES-051-002, Tan Delta Testing, Version 10.2, in order to assess the global condition of the insulation. Tan Delta testing is performed to ascertain the current health of cables in order to detect degradation and initiate repairs prior to failure. Procedure NMP-ES-051-002, Attachment 4, Evaluation of TD Test Results, Version 10.2, provides Tan Delta assessment criteria for cables, which classifies the condition into Good, Further Study Required, or Action Required. The SAT cable ANAA02 has two parallel sets of shielded cables for all 3 phases and 4 test criteria for the Tan Delta testing. Cables ANAA02AA (A Phase) and ANAA02AF (C Phase) met the criteria for Action Required for exceeding Tan Delta and Delta-Tan Delta assessment criteria. As a result, Procedure NMP-ES-051-002, 4, states the following for Required Actions: Immediate repair or replacement should be performed. IF it is desired to return the cable to service prior to repair or replacement, perform a Withstand Test (see Note). IF the cable passes the Withstand Test, the cable can be returned to service for a limited period. Safety and operational effects of the cable failing during continued operation (I.e., an in-service failure) SHALL be evaluated prior to returning the cable to service. Repair or replacement of the cable SHALL occur at the first preventative maintenance activity or outage.
The licensee deferred the immediate repair or replacement, performed the Withstand Test, and performed a safety and operational effects assessment. The degraded condition and associated evaluation was captured in the Corrective Action Program (CAP) under Condition Report (CR) 10739386. However, the licensee failed to initiate any corrective actions or other formal tracking items to perform a repair or replacement of Cables ANAA02AA (A Phase) and ANAA02AF (C Phase) in accordance with the procedure.
Additionally, the inspectors performed a historical review of the Tan Delta testing results associated with the SAT. The only other Tan Delta data set was the first time performance in September 2013 per work order SNC141477, utilizing Procedure NMP-ES-051-002, Tan Delta Testing, Version 5.1. The inspectors compared the September 2013 Tan Delta results against the effective procedural requirements and assessment criteria at the time and determined Cable ANAA02AA (A Phase) exceeded the acceptable limits and met the criteria for replacement of the cable. However, the licensee did not replace the cable and the inspectors could not locate a condition report documenting the unsatisfactory results, an evaluation of the data, or a basis for deviating from the procedure. The inspectors communicated this concern to the licensee, and the licensee was unable to produce any condition report, technical justification, or assessment conducted at the time that would explain the deviation from the procedural requirement to replace the cable.
Corrective Actions: The licensee captured the inspectors findings in the CAP and created an action to repair or replace Cables ANAA02AA (A Phase) and ANAA02AF (C Phase)during the next preventative maintenance activity or outage, scheduled for September 2022.
Corrective Action References: 10751488, 10762502
Performance Assessment:
Performance Deficiency: Procedure NMP-ES-051-002, Tan Delta Testing, Version 5.1, required the licensee to replace the cable if it exceeds the assessment criteria. Additionally, Procedure NMP-ES-051-002, Tan Delta Testing, Version 10.2, required that if testing determined the cabling condition met the Action Required criteria, Repair or replacement of the cable SHALL occur at the first preventative maintenance activity or outage. Following Tan Delta testing in September 2013 and 2020, the licensee failed to perform or initiate a corrective action to repair or replace the degraded cabling that met the criteria for repair or replacement in accordance with procedural requirements.
Screening: The inspectors determined the performance deficiency was more than minor because if left uncorrected, it would have the potential to lead to a more significant safety concern. Specifically, continuing to operate the SAT without performing the appropriate repairs or replacement of the degraded cabling could lead to an unexpected failure of the SAT and/or a potential partial loss of offsite power if aligned to a safety related bus.
Significance: The inspectors assessed the significance of the finding using Appendix A, The Significance Determination Process (SDP) for Findings At-Power. Utilizing IMC 0609, Appendix A, the performance deficiency was screened as Green because the performance deficiency did not result in a complete or partial loss of a support system.
Cross-Cutting Aspect: H.13 - Consistent Process: Individuals use a consistent, systematic approach to make decisions. Risk insights are incorporated as appropriate.
Enforcement:
Inspectors did not identify a violation of regulatory requirements associated with this finding.
Inadequate Procedure to Maintain Secured Emergency Diesel Ready for Restart Cornerstone Significance Cross-Cutting Aspect Report Section Mitigating Systems
Green NCV 05000424, 05000425/2020004-Open/Closed
[P.1] -
Identification 71111.21M The team identified a Green finding and associated Non-cited Violation (NCV) of Title 10 of the Code of Federal Regulations (10 CFR) Part 50, Appendix B, Criterion V, Instructions, Procedures, and Drawings, for the licensees failure to have appropriate procedures to maintain an intentionally secured Emergency Diesel Generator (EDG) ready for restart in response to a single failure in the remaining operating train as described in the Updated Final Safety Analysis Report (UFSAR).
Description:
The team reviewed unresolved item (URI) 05000424, 425/2019010-02 and additional information provided by the licensee. The team determined that a violation of NRC requirements existed. The URI concerned CR 10606308 that identified the EDGs do not meet a 7-day mission time due to the inability to start a previously secured EDG. When addressing the issue identified in the CR, the licensee asserted that the CR is identifying scenarios that are beyond the current license basis or represent departures from recommended accident response (as stated in the FSAR).
The current licensing basis described in the UFSAR and accepted by the NRC established that a single failure may occur at any time for the entire accident period. Consequently, it was determined that the licensee did not have appropriate procedures to maintain the EDGs in an operationally ready state for the entire accident period after one EDG is secured to preserve Nuclear Service Cooling Water (NSCW) mission time capabilities without offsite power available.
The following procedures were modified to include steps to correct the issue:
- 1910-1, E - 1 Loss of Reactor or Secondary Coolant, version 3
- 1910-2, E - 1 Loss of Reactor or Secondary Coolant, version 3
- 19010-C-BD, E-1 Loss of Reactor or Secondary Coolant, Background Document, version 2
- NMP-OS-019-002-GL03, Vogtle Technical Support Center (TSC) Options Guideline, version 1
Corrective Actions: The licensee modified CR10606308 to document the deficiency in having appropriate procedures and to identify the procedures that need to be updated.
Corrective Action References: CR 10606308
Performance Assessment:
Performance Deficiency: The team determined that the licensees failure to have appropriate procedures to maintain an intentionally secured EDG ready for restart in response to a single failure in the remaining operating train as described in the UFSAR was a performance deficiency and reasonably within the licensees ability to foresee and prevent.
Screening: The inspectors determined the performance deficiency was more than minor because it was associated with the Equipment Performance attribute of the Mitigating Systems cornerstone and adversely affected the cornerstone objective to ensure the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. Specifically, the failure to have appropriate procedures affected the availability of ESF equipment required to mitigate a design basis accident.
Significance: The inspectors assessed the significance of the finding using Appendix A, The Significance Determination Process (SDP) for Findings At-Power. The inspectors assessed the significance of the finding using Inspection Manual Chapter (IMC) 0609, Att. 4, "Initial Characterization of Findings," issued October 7, 2016, for the Mitigating Systems cornerstone, and IMC 0609, App. A, "The Significance Determination Process (SDP) for Findings At-Power," issued June 19, 2012, and determined the finding was of very low safety significance (Green) because the finding was a deficiency affecting the design or qualification of a mitigating SSC that maintained its operability or PRA functionality.
Cross-Cutting Aspect: P.1 - Identification: The organization implements a corrective action program with a low threshold for identifying issues. Individuals identify issues completely, accurately, and in a timely manner in accordance with the program. Specifically, the licensee failed to identify that appropriate procedures were necessary to maintain the design basis of the plant accurately and in a timely manner in accordance with the program (PI.1).
Enforcement:
Violation: Title 10 of the Code of Federal Regulations (10 CFR) Part 50, Appendix B, Criterion V, Instructions, Procedures, and Drawings, required, in part, that Activities affecting quality shall be prescribed by documented instructions, procedures, or drawings, of a type appropriate to the circumstances and shall be accomplished in accordance with these instructions, procedures, or drawings. Instructions, procedures, or drawings shall include appropriate quantitative or qualitative acceptance criteria for determining that important activities have been satisfactorily accomplished.
Contrary to the above, prior to April 30, 2019, the licensee failed to prescribe instructions, procedures, or drawings, of a type appropriate to the circumstances. Specifically, the licensee failed to prescribe procedures to maintain an intentionally secured EDG ready for restart in response to a single failure in the remaining operating train to mitigate a design basis accident.
Enforcement Action: This violation is being treated as a non-cited violation, consistent with Section 2.3.2 of the Enforcement Policy.
URI Corrective Actions for Single Failure Vulnerabilities Identified in Condition Report, CR 10606308 URI 05000424,05000425/2019010-02 71111.21M
Description:
The team identified an unresolved item (URI) for the licensees corrective actions associated with a single-failure vulnerability that is revealed when implementing emergency operating procedures (EOPs).
The EOP 19010-1, E - 1 Loss of Reactor or Secondary Coolant, version 2, Step 17, directs the operators to shut down a train of engineered safety features (ESF) to preserve their long-term Nuclear Service Cooling Water (NSCW) inventory. The licensee identified a single failure hazard when implementing this procedure, and documented it in condition report, CR 10606308. The hazard resulted from previously unidentified design flaws in the EDGs starting system. The procedure stopped one of the operating EDGs during an accident. A short time after this manual stop of the EDG, the EDG becomes incapacitated because the starting air receiver and batteries drain. The EDGs are part of the ESF. The NSCW is the site ultimate heat sink. Neither the procedures nor the UFSAR discussed the ESF train becoming incapacitated from these design flaws during an accident. The licensees immediate determination of operability (IDO) for the condition report stated, This CR is identifying scenarios that are beyond the current license basis or represent departures from recommended accident response (as stated in the FSAR). In summary of the licensees position, the scenarios were judged, beyond the current license basis, because the UFSAR Section 9.2.5, "Ultimate Heat Sink," specified, in part, that the two tower basins of the NSCW meet the combined storage capacity requirements without makeup if operated in conformance with NRC Regulatory Guide 1.27. Section 9.2.5.1, "Design Bases," stated, in part, the design basis meets RG 1.27.
The UFSAR specified several accidents that required the NSCW. The design requirements postulated an accident along with a loss of offsite power, and an electrical or piping system single failure. The requirements for postulating the Single Failure Criterion for electrical and piping system cases were discussed in multiple chapters of the UFSAR. The two cases were postulated differently. For electrical single failures, any single failure within the protection system shall not prevent proper protective action at the system level when required, and there were no differences for active and passive failures. However, for piping systems there were differences between active and passive failures. Only active failures are postulated in the short-term period of an accident, while active or passive failures could be postulated in the long-term period of an accident. The UFSAR acknowledged the Single Failure Criterion in chapters one, two, three, four, five, six, seven, eight, nine, ten, eleven, fifteen, and eighteen and did not specify any exceptions to it. Some of these instances are as stated below.
The UFSAR for electrical systems:
The UFSAR Section 3.1.2, Protection by Multiple Fission Product Barriers, for electrical power systems, stated, in part, a failure of a single component will not prevent the safety-related systems from performing their functionThe diesel generators are arranged so that a failure of a single component will not prevent the safe shutdown of the reactor.
The UFSAR Section 3.1.3, Protection and Reactivity Control Systems, stated, in part, the design basis for all protection systems is in accordance with the guidelines of Institute of Electrical and Electronic Engineers (IEEE) Standards 279-1971 and 379-1972.
- The IEEE 279-1971 standard specified two relevant criteria described by the NRC positions for electrical single failures described in the SECY paper; 4.2, any single failure within the protection system shall not prevent proper protective action at the system level when required, and that 4.16, the protection system shall be so designed that, once initiated, a protective action at the system level shall go to completion. Return to operation shall require subsequent deliberate operator action.
- The relevant criteria from the IEEE 379-1972 standard was, "The system shall be capable of performing the protective actions required to accomplish a protective function in the presence of any single detectable failure within the system (this is the "single failure") concurrent with all identifiable, but non-detectable failures, all failures occurring as a result of the single failure, and all failures which would be caused by the design basis event requiring the protective function."
The UFSAR for fluid systems:
The UFSAR Section 6.3.2.5, System Reliability, for the emergency core cooling system (ECCS), stated, in part,
- 6.3.2.5.1, Active Failure Criteria, an active failure is the failure of a powered component such as a piece of mechanical equipment, a component of the electrical supply system, or instrumentation and control equipment to act on command to perform its design function. Examples include the failure of a motor-operated valve to move to its correct position, the failure of an electrical breaker or relay to respond, the failure of a pump, fan, or diesel generator to start, etc....the ECCS can sustain an active failure in either the short or long term and still meet the required level of performance for core cooling.
- 6.3.2.5.2, Passive Failure Criteria, a passive failure is the structural failure of a static component which limits the component's effectiveness in carrying out its design function. Examples include cracks in pipes, sprung flanges, valve packing leaks, or pump seal failures. the ECCS can sustain a single passive failure during the long-term phase and still retain an intact flow path to the core to supply sufficient flow to keep the core covered and to effect the removal of decay heat.
In 1977, the staff submitted a commission paper (SECY) to describe how the staff used the Single Failure Criterion as a tool in the review of the design of nuclear power plants (SECY 77-439). The SECY discussed the acceptable interpretations of IEEE 279-1972, IEEE 379-1972, and the Single Failure Criterion as applied to piping systems. A summary of the NRC positions from SECY 77-439 were as follows: The General Design Criteria make it clear that for electrical, instrumentation and control systems, application of the Single Failure Criterion to systems evaluation depends not only on the initiating event that invokes safety action of these systems, together with consequential failures, but also on active or passive electrical failures which can occur independent of the event. Thus, evaluation proceeds on the proposition that single failures can occur at any time. In contrast, for various fluid systems, the most limiting single active failure is considered in evaluating systems performance capability within the first 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Twenty-four hours or greater after the event, a single passive failure equal to the leakage that would occur from a valve or pump seal failure, is assumed.
In addition, the UFSAR chapter 8 identified that the standard for the power systems was IEEE 308-1974, IEEE Standard Criteria for Class 1E Power Systems for Nuclear Power Generating Stations. Section 4.8 of the standard stated, in part, an analysis of the failure modes of Class 1E power systems and the effect of these failures on the electric power available to Class 1E loads shall be performed to demonstrate that a single component failure does not prevent satisfactory performance of the minimum Class 1E loads required for safe shutdown and maintenance of post-shutdown or post-accident station security.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On January 25, 2021, the inspectors presented the integrated inspection results to Ms.
Cheryl Gayheart and other members of the licensee staff.
- On October 1, 2020, the inspectors presented the RP Inspection Exit Meeting inspection results to Mr. Drayton Pitts and other members of the licensee staff.
- On November 6, 2020, the inspectors presented the TI 194 Revision 2 inspection results to Mr. Drayton Pitts and other members of the licensee staff.
- On December 11, 2020, the inspectors presented the Emergency Preparedness exercise inspection results to Mr. Drayton Pitts and other members of the licensee staff.
- On December 18, 2020, the inspectors presented the Re-exit for RP inspection results to Mr. Mathew Horn and other members of the licensee staff.
- On December 28, 2020, the inspectors presented the results of the closure of Unresolved Item (URI) 05000424, 425/2019010-02 inspection results to Mr. Jeffrey Deal and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
2515/194
Calculations
PRA-BC-V-19-
003 Revision 2
Vogtle 1&2 Open Phase Condition Evaluation
08/11/2020
60855.1
Miscellaneous
20-53-VC-CASK
Move Sheet - Pre UFLO 6 Cask Shuffle
1.0
Procedures
93711-C
HI-STORM System Site Transport
16.0
Work Orders
SNC1072857
Corrective Action
Documents
10467290
Drawings
2X4DB159-2
P&I Diagram - Main Steam System - System No. 1301
33.0
Work Orders
SNC623970
Corrective Action
Documents
275991,
10596066
Corrective Action
Documents
Resulting from
Inspection
10747955
Procedures
2739A-1
Zone 39A - Auxiliary Building - Level A Fire Fighting Preplan
4.0
2745-1
Zone 45 - Auxiliary Building - Level 1 Fire Fighting Preplan
2.2
2799-1
Zone 99 - Control Building Level A Fire Fighting Preplan
3.2
2804-1
Zone 104 - MSIV Room North Level 1 Fire Fighting Preplan
4.2
Engineering
Evaluations
X6CXC17
Flooding Areas - Outside Areas
X6CXC19
Flooding NSCW Pump House and Outside Areas
11/03/1982
Miscellaneous
DC-1003
Flooding - Interdiscipline
06/20/2020
Procedures
17062-1
Annunciator Response Procedures for ALB 62 on Process
Control Panel
23.0
71111.11Q Procedures
2004-2
Power Operation (Mode 1)
4.1
13830-2
Main Generator Operation
2.4
Corrective Action
Documents
277356, 277358,
1062429,
10309062,
10414037,
10593862,
10665121,
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
10672757,
10681809,
10691420,
10691471,
10734575,
10756069,
10706799
Corrective Action
Documents
Resulting from
Inspection
10763288
Miscellaneous
Maintenance Rule Expert Panel Meeting #2019-09
06/19/2019
EVAL-V-1626-
05107
AMSAC (a)(1) Review, Evaluation, and Action Plan
03/25/2020
MREP Meeting
- 2019-05
Maintenance Rule Expert Panel Meeting #2019-05
05/22/2019
V-RIE-MR-U00
Vogtle 1&2 Maintenance Rule Risk Ranking and
Performance Criteria Assessment
Procedures
27145-C
Reactor Coolant Pump Maintenance
9.2
DC-1626
ATWS Mitigation System Actuation Circuitry (AMSAC)
GAE/GBE-PMS-
P1.25
Vogtle Reactor Coolant Pump Replacement
NMP-ES-027
10.2
NMP-ES-027
10.2
Work Orders
SNC1070414,
SNC1114832,
SNC1086462
Corrective Action
Documents
10566429,
10739386,
10739387
Corrective Action
Documents
Resulting from
Inspection
10751488,
10762502
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Drawings
AX3D-AA-A03A
Vogtle - Wilson Master One Line Diagram
20.0
Miscellaneous
SAT Tan Delta Report Summary - September 2013
SAT Tan Delta Report Summary - September 2020
Procedures
NMP-ES-051-002
Tan Delta Testing
10.2
NMP-ES-051-002
Tan Delta Testing
5.1
Work Orders
SNC141477,
SNC475153,
SNC1118254,
SNC1118573
Corrective Action
Documents
10739386,
10739387,
10739387,
10739982,
10740107,
10740207,
10740467,
10741071,
10746256,
10748479
Corrective Action
Documents
Resulting from
Inspection
10751488
Miscellaneous
Plan of the Day
09/23/2020
Procedures
13006-2
Chemical and Volume Control System
100
13415A-2
Diesel Generator Train A
14.1
13418A-1
Standby Auxiliary Transformer Unit One Train A Operations
5.4
14980A-2
Diesel Generator 2A Operability Test
31.2
NMP-DP-001
Operational Risk Awareness
19.0
NMP-ES-051-002
Tan Delta Testing
10.2
NMP-MA-007
SNC Rigging and Lifting Program
9.0
NMP-MA-014
Post Maintenance Testing/Post Modification Testing
2.2
Work Orders
SNC1101773,
SNC1067180,
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
SNC1119645,
SNC475153,
SNC1118254,
SNC1118573,
SNC929677,
SNC1000621,
SNC1012070
Corrective Action
Documents
1001754,
10745406
Drawings
2X4DB111
P&I Diagram - Reactor Coolant System - System No. 1201
30.0
2X4DB115
P&I Diagram - Chemical & Volume Control System - System
No. 1208
35.0
2X4DB116-1
P&I Diagram - Chemical & Volume Control System - System
No. 1208
49.0
2X4DB116-2
P&I Diagram - Chemical & Volume Control System - System
No. 1208
2.0
2X4DB119
P&I Diagram - Safety Injection System - System No. 1204
28.0
2X4DB121
P&I Diagram - Safety Injection System - System No. 1204
50.0
2X4DB122
P&I Diagram - Residual Heat Removal - System No. 1205
54.0
2X4DB130
P&I Diagram - Spent Fuel Cooling & Purification System -
System No. 1213
2.0
Engineering
Evaluations
SNC918782
RWST Back Leakage Pathway Technical Justification with
Respect to CR/IDO 10448420 and IN 91-56 "Potential
Radioactive Leakage to Tank Vented to Atmosphere"
06/29/2018
SNC949800
Dose Impact of Increased Post-LOCA RWST Backleakage
08/21/2018
Miscellaneous
AX4DT005
Flex Portable System Phase 2 Core Cooling Subsystem
Modes 1-5 with Steam Generators Available
1.0
AX4DT108
Sizing Criteria for the Steam Generator Flex Pump
1.0
Procedures
13011-2
Residual Heat Removal System
14722-2
ECCS to RWST Backleakage In-service Test
1.4
24991-2
Protection Group II SSPS Input Relay Test
13.1
NMP-OS-019-
013-GL03
Vogtle Flex Equipment Unavailability Tracking Guideline
3.0
Work Orders
SNC1017276,
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
SNC1017322,
SNC1017333,
SNC962865
Calibration
Records
Filter Particle Test
Results, HEPA
unit 3360
Filter Particle Test Results, HEPA unit 3360
2/19/2020
Corrective Action
Documents
Resulting from
Inspection
CR 10761657
Engineering
Evaluations
TEDE-ALARA
evaluations for
the 2R20
refueling outage
Selective TEDE-ALARA evaluations for the 2R20 refueling
outage
Various
Miscellaneous
Breathing Air
Reports
Breathing Air Reports
Various
MSA Training
Certificates
MSA Training Certificates
Various
Procedures
43635-C
Operation and Calibration of the AMS-4 Continuous Air
Monitor
Rev. 18.2
43639-C
Operation and Calibration of the F&J Econoair Plus L15P Air
Sampler
Rev. 2.0
43658-C
Air Sampler Calibration
Rev. 18.3
NMP-HP-301
Airborne Radioactivity Sampling and Evaluation
Rev. 4.2
NMP-HP-501-003
Inspection, Repair, and Storage of Non-SCBA Respiratory
Protection Equipment
Rev. 1.1
NMP-HP-501-004
Inspection, Repair and Storage of Self-Contained Breathing
Apparatus
Rev. 1.6
NMP-HP-501-005
Inspection, Repair and Storage of the MSA G1 SCBA
Rev. 2.0
NMP-HP-513
Operation and Use of the Delta Air Supplied Suit
Rev. 3.2
NMP-HP-515
3M Versaflo Powered Air Purifying Respirator (PAPR) Use
and Control
Rev. 1.4
Self-Assessments TE 1060956
NRC Radiation Protection Occupational Routine Baseline
Inspection
06/22/2020
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Corrective Action
Documents
CR 10618674
CR 10618674
CRs: 10541535,
10594779,
10654307,
10696255,
10731405,
10733930,
10733931,
10734293,
10739309, and
10739313
CRs: 10541535, 10594779, 10654307, 10696255,
10731405, 10733930, 10733931, 10734293, 10739309, and
10739313
Various
Miscellaneous
(NMP-HP-408)
2018, 2020 Dry
Active Waste 10 CFR Part 61
Scaling Factors
Determinations
Reports
(NMP-HP-408) 2018, 2020 Dry Active Waste 10 CFR Part
Scaling Factors Determinations Reports
Various
20 OSLD
Update Data
DLR vs. ED Correlations Report
09/15/2020
Alpha
Characterization
(update) Reports
2018 and 2019
Alpha Characterization (update) Reports
Various
NAVLAP
Certificates
NAVLAP Certificates of Accreditation
Various
Site Boundary
Reports
Evaluations of neutron spectra for the ISFSI and
containment at power for yrs. 2018, 2019 and 2020
Various
Procedures
NMP-HP-100
Bioassay Program
Rev. 1.2
NMP-HP-101
In-Vivo Bioassay and Internal Dose Assessment
Rev. 3.1
NMP-HP-102
In-Vitro Bioassay
Rev. 1.2
NMP-HP-103
Skin Dose Assessment
Rev. 3.2
NMP-HP-104
Use and Calibration of Whole Body Counters
Rev. 4.1
NMP-HP-104-008
Resolving Unidentified Peaks and Assignment of Dose
Rev. 1.0
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
NMP-HP-104-009
Whole Body Counter Computer Startup, Logon and
Shutdown With Apex-InVivo
Rev. 3.2
NMP-HP-104-010
Whole Body Counter Daily Quality Control Checks With
Apex-InVivo
Rev. 2.0
NMP-HP-104-011
Performing Whole Body Counts Using Apex-InVivo
Rev. 3.2
NMP-HP-105
Comparison of OSLD and Ed Dosimetry Results
Rev. 1.4
NMP-HP-106
Investigation of Exposures Exceeding Fleet Administrative
Limits
Rev. 2.1
NMP-HP-107
Individual Radiation Exposure Records and Reports
Rev. 3.11
NMP-HP-108
Printed 09/16/2020at 11:52:00SNCUnit SCategory 2NMP-
HP-108Issuance, Use, and Collection of Personnel
Dosimetry
Rev. 2.10
NMP-HP-108-002
Use of EDE (Effective Dose Equivalent) Methodologies
Rev. 3.2
NMP-HP-109
Investigation, Evaluation and Management of Damaged,
Lost, Malfunctioning or Alarming Dosimetry
Rev. 2.6
NMP-HP-201
Personnel Dosimetry Program
Rev. 2.6
NMP-HP-302-004
Control of Discrete Radioactive Particles
Rev. 1.3
NMP-HP-303
Personnel Decontamination
Rev. 4.3
Radiation
Surveys
Area TLD Reports TLD surveys for the spent fuel storage area and general
plant areas
Various
Self-Assessments SNC QA ID: 208
(Log: C NOS-19-
2-01)
GPC Environmental Laboratory Audit Report
05/20/2019
Procedures
43637-C
Calibration of the Eberline MS-2 & MS-3 Mini Scalers with
the HP-210 Probe and the SH-4A Sample Holder
Rev. 11.5
43638-C
Calibration of the Eberline SAC-4 Scintillation Alpha Counter
Rev. 11.2
NMP-HP-700
Radiation Protection Instrumentation Program
Rev. 1.1
NMP-HP-701
Daily Instrumentation Source Checks
Rev. 2.2
NMP-HP-703
Printed at 10:04SNCUnit SNMP-HP-703RO-2, RO-2A and
RO-20 Operation and Calibration
Rev. 2.3
NMP-HP-708
Operation and Calibration of the MGPI Telepole Instrument
Rev. 4.0
NMP-HP-726
Calibration Of Gamma Standards Using the Radcal Accu-
Dose+ Digitizer Module
Rev. 2.0
71151
Miscellaneous
Unit 1/2 Emergency AC Power System MSPI Derivation
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Report Unavailability Index October 2019 - September 2020
Unit 1/2 Emergency AC Power System MSPI Derivation
Report Unreliability Index October 2019 - September 2020
Unit 1/2 Cooling Water System MSPI Derivation Report
Unreliability Index October 2019 - September 2020
Unit 1/2 Cooling Water System MSPI Derivation Report
Unavailability Index October 2019 - September 2020
MSPI-Vogtle
NRC Mitigating System Performance Index (MSPI)
Regulatory Assessment Performance Indicator Guideline
7