IR 05000424/2020401
| ML20324A660 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 11/19/2020 |
| From: | James Shehee Division of Reactor Safety II |
| To: | Mcgavin S Southern Nuclear Operating Co |
| References | |
| IR 2020401 | |
| Download: ML20324A660 (8) | |
Text
November 19, 2020
SUBJECT:
VOGTLE ELECTRIC GENERATING PLANT, UNITS 1 AND 2 - SECURITY BASELINE INSPECTION REPORT 05000424/2020401 AND 05000425/2020401
Dear Mr. McGavin:
On November 3, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Vogtle Electric Generating Plant, Units 1 and 2 and discussed the results of this inspection with Mr. M. Horn and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/
James C. Shehee, Chief Plant Support Branch Div of Reactor Safety
Docket Nos. 05000424 and 05000425 License Nos. NPF-68 and NPF-81
Enclosure:
As stated
Inspection Report
Docket Numbers:
05000424 and 05000425
License Numbers:
Report Numbers:
05000424/2020401 and 05000425/2020401
Enterprise Identifier: I-2020-401-0038
Licensee:
Southern Nuclear Operating Company, Inc.
Facility:
Vogtle Electric Generating Plant, Units 1 and 2
Location:
Waynesboro, GA
Inspection Dates:
April 20-24, 2020 (Remote)
July 13-16, 2020 (Remote)
August 31-September 4, 2020 (Onsite)
November 2-3, 2020 (Onsite)
Inspectors:
R. Patterson, Physical Security Inspector
I. Hall, Physical Security Inspector
Approved By:
James C. Shehee, Chief
Plant Support Branch
Div of Reactor Safety
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Vogtle Electric Generating Plant,
Units 1 and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Unless otherwise noted, baseline security inspections were conducted in accordance with the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Publicly available IPs are located at:
http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.
Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the coronavirus (COVID-19), regional inspectors were directed to begin telework. The inspection documented below was completed through a combination of remote and onsite inspections.
SAFEGUARDS
71130.02 - Access Control
The inspectors evaluated the access control program through completion of the following
===inspection elements:
Access Control===
(1)
- Tier I: All Requirements
- Tier II: None
- Tier III: 1 Requirement (02.09)
71130.04 - Equipment Performance, Testing, and Maintenance
Equipment Performance, Testing, and Maintenance (1 Sample)
(1)
- Tier I: All Requirements
- Tier II: None
- Tier III: 1 Requirement (02.14)
71130.07 - Security Training
Security Training (1 Sample)
(1)
- Tier I: All Requirements
- Tier II: None
- Tier III: 7 Requirements (02.10, 02.11, 02 12 a, b, 02.13 a-c)
71130.09 - Security Plan Changes
The inspectors evaluated the security plan changes through completion of the following procedure elements:
Review Security Plan Changes (IP Section 02.01) (1 Sample)
The inspectors evaluated the security plan changes through completion of the the following procedure elements: Security Plan Revision 18 was implemented based on your determination, in accordance with 10 CFR 50.54(p)(2), that the changes resulted in no decrease in safeguards effectiveness of the security plan, and that the revised security plan continues to meet the requirements of 10 CFR 73.55 (b). The inspectors conducted a review of the security plan changes to evaluate the potential decreases in safeguards effectiveness of the security plan. However, this review does not constitute formal NRC approval of the changes. Therefore. These changes remain subject to future NRC inspection in their entirely.
OTHER ACTIVITIES - BASELINE
71151 - Performance Indicator Verification
The inspectors verified licensee performance indicators submittals listed below:
PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17) (1 Sample)
- (1) July 2019-August
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On November 3, 2020, the inspectors presented the security baseline inspection results to Mr. M. Horn and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Corrective Action
Documents
10640406
10647070
10697160
Procedures
NMP-AD-013
Control of Safeguards
NMP-SE-021
Security Search Process
SNC-00008-C
Plant Lock and Key Control
Self-Assessments FLEET-SEC-2020
Nuclear Oversight, Audit of Security
June 6, 2020
Corrective Action
Documents
20-10640406
20-10671807
20-10672488
Procedures
23657-C
Microwave Intrusion Detection System (IDS) Performance
Tests
200-C
Security Seven Day Vital Area Portal Inspections
35.0
202-C
Testing Explosive Detector Units
17.0
203-C
Metal Detector Testing
17.0
204-C
X-Ray Equipment Test Procedure
15.0
205-C
Day Testing of the Security Perimeter and Duress Alarm
Systems
41.0
Corrective Action
Documents
19-10580899
19-10580916
19-10580922
20-50042618
20-50045683
Miscellaneous
Annual Security Written Exam A
01/15/2020
Annual Security Written Exam B
01/15/2020
Procedures
NMP-SE-006
Security Drill and Exercise Program
7.0
NMP-SE-012
Safety/Security Interface
4.0
NMP-SE-020
SNC Security Training Program
6.0
NMP-SE-020-F05
Southern Company Fleet Security Training System Master
Plan
2.0
S-SE-117
Adversary Training Course
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
S-SE-LM-11700-
Adversary Training
Procedures
Vogtle 1&2 Physical Security Plan
71151
Procedures
NMP-AD-029
Preparation of Reporting of Regulatory Assessment
Performance Indicator Data and the Monthly Operating Report
NMP-AD-034
Key Performance Indicator
10