IR 05000424/2020401

From kanterella
Jump to navigation Jump to search
Security Baseline Inspection Report 05000424/2020401 and 05000425/2020401
ML20324A660
Person / Time
Site: Vogtle  
Issue date: 11/19/2020
From: James Shehee
Division of Reactor Safety II
To: Mcgavin S
Southern Nuclear Operating Co
References
IR 2020401
Download: ML20324A660 (8)


Text

November 19, 2020

SUBJECT:

VOGTLE ELECTRIC GENERATING PLANT, UNITS 1 AND 2 - SECURITY BASELINE INSPECTION REPORT 05000424/2020401 AND 05000425/2020401

Dear Mr. McGavin:

On November 3, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Vogtle Electric Generating Plant, Units 1 and 2 and discussed the results of this inspection with Mr. M. Horn and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

James C. Shehee, Chief Plant Support Branch Div of Reactor Safety

Docket Nos. 05000424 and 05000425 License Nos. NPF-68 and NPF-81

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000424 and 05000425

License Numbers:

NPF-68 and NPF-81

Report Numbers:

05000424/2020401 and 05000425/2020401

Enterprise Identifier: I-2020-401-0038

Licensee:

Southern Nuclear Operating Company, Inc.

Facility:

Vogtle Electric Generating Plant, Units 1 and 2

Location:

Waynesboro, GA

Inspection Dates:

April 20-24, 2020 (Remote)

July 13-16, 2020 (Remote)

August 31-September 4, 2020 (Onsite)

November 2-3, 2020 (Onsite)

Inspectors:

R. Patterson, Physical Security Inspector

I. Hall, Physical Security Inspector

Approved By:

James C. Shehee, Chief

Plant Support Branch

Div of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Vogtle Electric Generating Plant,

Units 1 and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Unless otherwise noted, baseline security inspections were conducted in accordance with the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Publicly available IPs are located at:

http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.

Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the coronavirus (COVID-19), regional inspectors were directed to begin telework. The inspection documented below was completed through a combination of remote and onsite inspections.

SAFEGUARDS

71130.02 - Access Control

The inspectors evaluated the access control program through completion of the following

===inspection elements:

Access Control===

(1)

  • Tier I: All Requirements
  • Tier II: None
  • Tier III: 1 Requirement (02.09)

71130.04 - Equipment Performance, Testing, and Maintenance

Equipment Performance, Testing, and Maintenance (1 Sample)

(1)

  • Tier I: All Requirements
  • Tier II: None
  • Tier III: 1 Requirement (02.14)

71130.07 - Security Training

Security Training (1 Sample)

(1)

  • Tier I: All Requirements
  • Tier II: None
  • Tier III: 7 Requirements (02.10, 02.11, 02 12 a, b, 02.13 a-c)

71130.09 - Security Plan Changes

The inspectors evaluated the security plan changes through completion of the following procedure elements:

Review Security Plan Changes (IP Section 02.01) (1 Sample)

The inspectors evaluated the security plan changes through completion of the the following procedure elements: Security Plan Revision 18 was implemented based on your determination, in accordance with 10 CFR 50.54(p)(2), that the changes resulted in no decrease in safeguards effectiveness of the security plan, and that the revised security plan continues to meet the requirements of 10 CFR 73.55 (b). The inspectors conducted a review of the security plan changes to evaluate the potential decreases in safeguards effectiveness of the security plan. However, this review does not constitute formal NRC approval of the changes. Therefore. These changes remain subject to future NRC inspection in their entirely.

OTHER ACTIVITIES - BASELINE

71151 - Performance Indicator Verification

The inspectors verified licensee performance indicators submittals listed below:

PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17) (1 Sample)

(1) July 2019-August

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On November 3, 2020, the inspectors presented the security baseline inspection results to Mr. M. Horn and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71130.02

Corrective Action

Documents

10640406

10647070

10697160

Procedures

NMP-AD-013

Control of Safeguards

NMP-SE-021

Security Search Process

SNC-00008-C

Plant Lock and Key Control

Self-Assessments FLEET-SEC-2020

Nuclear Oversight, Audit of Security

June 6, 2020

71130.04

Corrective Action

Documents

20-10640406

20-10671807

20-10672488

Procedures

23657-C

Microwave Intrusion Detection System (IDS) Performance

Tests

200-C

Security Seven Day Vital Area Portal Inspections

35.0

202-C

Testing Explosive Detector Units

17.0

203-C

Metal Detector Testing

17.0

204-C

X-Ray Equipment Test Procedure

15.0

205-C

Day Testing of the Security Perimeter and Duress Alarm

Systems

41.0

71130.07

Corrective Action

Documents

19-10580899

19-10580916

19-10580922

20-50042618

20-50045683

Miscellaneous

Annual Security Written Exam A

01/15/2020

Annual Security Written Exam B

01/15/2020

Procedures

NMP-SE-006

Security Drill and Exercise Program

7.0

NMP-SE-012

Safety/Security Interface

4.0

NMP-SE-020

SNC Security Training Program

6.0

NMP-SE-020-F05

Southern Company Fleet Security Training System Master

Plan

2.0

S-SE-117

Adversary Training Course

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

S-SE-LM-11700-

Adversary Training

71130.09

Procedures

Vogtle 1&2 Physical Security Plan

71151

Procedures

NMP-AD-029

Preparation of Reporting of Regulatory Assessment

Performance Indicator Data and the Monthly Operating Report

NMP-AD-034

Key Performance Indicator

10