October 14, 2020

SUBJECT:

VOGTLE ELECTRIC GENERATING PLANT - SECURITY BASELINE TARGET SET INSPECTION REPORT 05000424/2020411 AND 05000425/2020411

Dear Ms. Gayheart:

On October 7, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed a security target set inspection at Vogtle Electric Generating Plant, Units 1 & 2, and discussed the results of this inspection with Mr. Jesse Thomas, Plant Manager and other members of your staff. The results of this inspection are documented in the enclosed report.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.

The inspector reviewed selected procedures and records, observed activities, and interviewed site personnel.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Scott M. Shaeffer, Chief Engineering Branch 2 Division of Reactor Safety

Docket Nos. 05000424 and 05000425 License Nos. NPF-68 and NPF-81 cc w/ encl: Distribution via LISTSERV

Gayheart

SUBJECT:

VOGTLE ELECTRIC GENERATING PLANT - SECURITY BASELINE TARGET SET INSPECTION REPORT 05000424/2020411 AND 05000425/2020411 DATED: October 14, 2020

DISTRIBUTION:

M. Franke, RII/DRS A. Blamey, RII/DRP S. Sanchez, RII/DRS M. Kowal, RII/NISC R. Hannah, RII/OPA J. Pelchat, RII/ORA PUBLIC

ADAMS ACCESSION NUMBER: ML20288A596

OFFICE RII/DRS/EB2 RII/DRS/EB2 RII/DRP/B2

NAME W. Monk S. Shaeffer A. Blamey

DATE 10/13/2020 10/13/2020 10/14/2020

Enclosure

U.S. NUCLEAR REGULATORY COMMISSION

Inspection Report

Docket Numbers:

05000424 and 05000425

License Numbers:

NPF-68 and NPF-81

Report Numbers:

05000424/2020411 and 05000425/2020411

Enterprise Identifier: I-2020-411-0017

Licensee:

Southern Nuclear Operating Co., Inc.

Facility:

Vogtle Electric Generating Plant, Units 1 & 2

Location:

Waynesboro, GA

Inspection Dates:

10/06/2020 to 10/07/2020

Inspectors:

William R. Monk, Sr. Reactor Inspector

Approved By:

Scott M. Shaeffer, Chief

Engineering Branch 2

Division of Reactor Safety

(U)

SUMMARY

(U) The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline target set inspection at Vogtle Electric Generating Plant, Units 1 & 2, in accordance with the Reactor Oversight Process (ROP).

The Reactor Oversight Process is the NRCs program for overseeing the safe and secure operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

(U)

List of Findings and Violations

(U) No findings nor violations of more than minor (MTM) significance were identified during the inspection.

(U)

Additional Tracking Items

(U) None.

(U)

INSPECTION SCOPES

(U) Unless otherwise noted, baseline security target set inspections were conducted in accordance with the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and industry standards. Publicly available IPs are located at:

http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.

(U)

OTHER ACTIVITIES

- SECURITY BASELINE (U)

71130.14 - Review of Power Reactor Target Sets

(U) The inspector evaluated the licensee's Security Target Set Program. The following elements were evaluated:

(1)

Power Reactor Target Sets (1 Sample)

Section 02.01 Review of Events and Logs The inspector reviewed any licensee event reports, safeguards log entries, and corrective action program (CAP) entries since the last Target Set inspection that concern the target set identification, development, and maintenance program.

Section 02.02 Target Set Identification and Development Process Review The inspector assessed the licensee's documentation and maintenance of the process used to develop and identify complete and accurate target sets as required by 10 CFR Part 73 by reviewing applicable portions of procedures and samples of records and conducting interviews with responsible personnel and plant employees.

Section 02.03 Verification of Target Sets Changes The inspector reviewed changes to the licensees documented target sets since the last Target Set inspection. The inspector verified that any design modifications and procedure or configuration changes that have occurred were appropriately documented in the site's target sets.

Section 02.04 Verification of Complete and Accurate Target Sets The inspector interviewed licensee personnel and reviewed a sample of target sets for reactor operation and for modes other than operation. Additionally, the inspector reviewed assumptions used in the licensees development of its target sets.

Section 02.05 Physical Protection Program Review The inspector verified that the licensee performed a review of target sets for accuracy, completeness, and applicability at least every 24 months and as otherwise required, documented the results and recommendations, and entered findings in the sites corrective action program (CAP).

(U)

INSPECTION RESULTS

(U) No findings of more than minor significance were identified during the inspection.

(U)

EXIT MEETINGS AND DEBRIEFS

(U) The inspectors verified no proprietary information nor safeguards information was retained or documented in this inspection report.

(U) On October 7, 2020, the inspector presented the security baseline target set inspection results to the plant manager, Mr. Jesse Thomas and other members of the licensee staff.

(U) THIRD PARTY REVIEWS

(U) The NRC inspector did not review any third-party reports or documents during the inspection period.

(U)

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71130.14

Calculations

SNC964580

RER to Support AFW Pumphouse Flooding Calculation

Error PDO

Rev. 1

Corrective Action

Documents

CR 10391293

Limited Target Set Review Completed

7/26/2017

CR 10399044

NRC Target Set Inspection (IP 71130.14)

8/16/2017

CR 10586581

2018 Target Set Analysis Completed

2/28/2019

CR 10586597

Security Operational Needs Analysis - 2018 Target Set

Review

2/28/2019

CR 10641910

Limited Target Set Review Completed

8/27/2019

CR 10672515

Target Set Cabling Not Analyzed for Exploitability

2/18/2019

Corrective Action

Documents

Resulting from

Inspection

CR 10744042

NRC Identified: Unit 1 Turbine Driven Aux Feed Water

House Housekeeping

10/6/2020

CR 10744043

NRC Identified: Unit 2 Turbine Driven Aux Feed Water

House Housekeeping

10/6/2020

CR 10744045

Target Set Worksheet Error

10/6/2020

CR 10744167

Procedure NMP-SE-015 Needs Revision

10/7/2020

CR 10744277

NRC Security Target Set Baseline Inspection

10/7/2020

CR 10744278

NRC Identified: U1 Auxiliary Building Room Bravo 55

10/7/2020

Miscellaneous

Vogtle Target

Sets

VOG Units 1 & 2 Target Set Worksheets

8/27/2019

Procedures

NMP-GM-002-

001

Corrective Action Program Instructions

Rev. 39

NMP-SE-012

Safety/Security Interface

Rev. 4

NMP-SE-015

Target Set Identification, Development, and Maintenance

Rev. 7